![]() |
Bridge Statistics for Shorter-Hardaway, Alabama (AL) - Condition, Traffic, Stress, Structural Evaluation, Project CostsBack to: Shorter-Hardaway, AL, Alabama, Alabama forum, All US cities. National Bridge Inventory (NBI) Statistics Number of bridges: 28 Total length: 1,093 meters (3,586ft) Total costs: $31,644,000 Total average daily traffic: 15,010 Total average daily truck traffic: 1,483 Total future (year 2021) average daily traffic: 15,805 National Bridge Inventory (NBI) Registered Bridges for Shorter-Hardaway
Bridge Condition - Deck Bridge Condition - Superstructure Bridge Condition - Substructure Bridge Condition - Channel Bridge Condition - Culverts Find on map >>
Structure Number: 748, Location: E1/2 S16 T15 R22 (Lat: 32.266667, Lng: -85.850000), Route carried "on" structure: County highway 13, Year Built: 1992, Status: Open, Structure Length: 1.55m (5.09ft), Average Daily Traffic: 95 (year 1992), Truck Traffic: 5%, Average Future Daily Traffic: 125 (year 2030), Design Load: HS 20, Features Intersected: OLD TOWN CREEK Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.010, Lanes on structure: 2, Owner: County Highway Agency, Approaching Roadway Width: 6.1m (20.0ft), Material/Design: Concrete, Design/Construction: Culvert, Number Of Spans In Main Unit: 4, Length of Maximum Span: 3.7m (12.1ft) Condition: Channel: Fair, Culverts: Fair, Operating Rating: 40.8 metric tons, Method Used To Determine Operating Rating: Allowable Stress (AS), Inventory Rating: 40.8 metric tons, Method Used To Determine Inventory Rating: Allowable Stress (AS), Structural Evaluation: Somewhat better than minimum adequacy, Waterway Adequacy: Better than present minimum criteria, Approach Roadway Alignment: Equal to present minimum criteria, Designated Inspection Frequency: Every 24 months, Inspection Date: Febuary 2008 Find on map >>
Structure Number: 4296, Location: SE1/4 S19 T16 R22 (Lat: 32.350000, Lng: -85.883333), Route carried "on" structure: County highway 9, Year Built: 1952, Status: Open, Structure Length: 8.78m (28.81ft), Average Daily Traffic: 268 (year 1990), Truck Traffic: 10%, Average Future Daily Traffic: 300 (year 2030), Design Load: H 15, Features Intersected: CUBAHATCHEE CREEK, Facility Carried by Structure: COUNTY ROUTE Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.010, Lanes on structure: 2, Owner: County Highway Agency, Approaching Roadway Width: 8.5m (27.9ft), Material/Design: Concrete continuous, Design/Construction: Girder and Floorbeam System, Number Of Spans In Main Unit: 9, Length of Maximum Span: 9.8m (32.2ft), Curb-To-Curb Width: 6.6m (21.7ft), Out-to-Out Width: 7.7m (25.3ft) Condition: Deck: Good, Superstructure: Good, Substructure: Good, Channel: Good, Operating Rating: 22.7 metric tons, Inventory Rating: 17.1 metric tons, Structural Evaluation: Somewhat better than minimum adequacy, Waterway Adequacy: Better than present minimum criteria, Approach Roadway Alignment: Equal to present minimum criteria, Length Of Structure Improvement: 9.76m (32.02ft), Designated Inspection Frequency: Every 24 months, Inspection Date: Febuary 2008, Bridge Improvement Cost: $980,000, Roadway Improvement Cost: $98,000, Total Project Cost: $1,470,000 ( Estimate for 2008), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete Find on map >>
Structure Number: 4297, Location: SE1/4 S19 T16 R22 (Lat: 32.350000, Lng: -85.883333), Route carried "on" structure: County highway 9, Year Built: 1952, Status: Open, Structure Length: 6.83m (22.41ft), Average Daily Traffic: 268 (year 1990), Truck Traffic: 10%, Average Future Daily Traffic: 300 (year 2028), Design Load: H 15, Features Intersected: CUBAHATCHEE RELIEF, Facility Carried by Structure: COUNTY ROUTE Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.010, Lanes on structure: 2, Owner: County Highway Agency, Approaching Roadway Width: 8.5m (27.9ft), Material/Design: Concrete continuous, Design/Construction: Girder and Floorbeam System, Number Of Spans In Main Unit: 7, Length of Maximum Span: 9.8m (32.2ft), Curb-To-Curb Width: 6.6m (21.7ft), Out-to-Out Width: 7.7m (25.3ft) Condition: Deck: Satisfactory, Superstructure: Good, Substructure: Good, Channel: Good, Operating Rating: 38.6 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 23.1 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present minimum criteria, Waterway Adequacy: Equal to present desirable criteria, Approach Roadway Alignment: Equal to present minimum criteria, Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 10.0 - 19.9% below), Length Of Structure Improvement: 7.86m (25.79ft), Designated Inspection Frequency: Every 12 months, Inspection Date: January 2008, Bridge Improvement Cost: $790,000, Roadway Improvement Cost: $79,000, Total Project Cost: $1,185,000 ( Estimate for 2008), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete Find on map >>
Structure Number: 4298, Location: E1/2 S19 T16 R22 (Lat: 32.350000, Lng: -85.883333), Route carried "on" structure: County highway 9, Year Built: 1952, Status: Open, Structure Length: 0.76m (2.49ft), Average Daily Traffic: 268 (year 1990), Truck Traffic: 10%, Average Future Daily Traffic: 350 (year 2024), Design Load: H 15, Features Intersected: BRANCH, Facility Carried by Structure: COUNTY ROUTE Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.010, Lanes on structure: 2, Owner: County Highway Agency, Approaching Roadway Width: 8.5m (27.9ft), Material/Design: Concrete, Design/Construction: Culvert, Number Of Spans In Main Unit: 2, Length of Maximum Span: 3.7m (12.1ft), Curb-To-Curb Width: 8.0m (26.2ft), Out-to-Out Width: 8.5m (27.9ft) Condition: Channel: Satisfactory, Culverts: Satisfactory, Operating Rating: 22.7 metric tons, Inventory Rating: 17.1 metric tons, Structural Evaluation: Somewhat better than minimum adequacy, Waterway Adequacy: Equal to present minimum criteria, Approach Roadway Alignment: Equal to present minimum criteria, Designated Inspection Frequency: Every 24 months, Inspection Date: Febuary 2008, Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 4557, Location: E1/2 S2 T15 R21 (Lat: 32.300833, Lng: -85.928056), Route carried "on" structure: County highway 9, Year Built: 1953, Status: Open, Structure Length: 4.57m (14.99ft), Average Daily Traffic: 268 (year 1990), Truck Traffic: 10%, Average Future Daily Traffic: 300 (year 2028), Design Load: H 15, Features Intersected: OLD TOWN CREEK RELIEF, Facility Carried by Structure: FACILITY CARRIED Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.010, Lanes on structure: 2, Owner: County Highway Agency, Approaching Roadway Width: 8.5m (27.9ft), Material/Design: Concrete, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 10, Length of Maximum Span: 4.6m (15.1ft), Curb-To-Curb Width: 6.6m (21.7ft), Out-to-Out Width: 7.7m (25.3ft) Condition: Deck: Fair, Superstructure: Satisfactory, Substructure: Fair, Channel: Good, Operating Rating: 15.8 metric tons, Method Used To Determine Operating Rating: Allowable Stress (AS), Inventory Rating: 8.1 metric tons, Method Used To Determine Inventory Rating: Allowable Stress (AS), Structural Evaluation: High priority of replacement, Waterway Adequacy: Equal to present minimum criteria, Approach Roadway Alignment: Equal to present minimum criteria, Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below), Length Of Structure Improvement: 5.55m (18.21ft), Designated Inspection Frequency: Every 12 months, Inspection Date: January 2008, Bridge Improvement Cost: $558,000, Roadway Improvement Cost: $56,000, Total Project Cost: $837,000 ( Estimate for 2008), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete Find on map >>
Structure Number: 4558, Location: NE1/4 S2 T15 R21 (Lat: 32.315556, Lng: -85.919444), Route carried "on" structure: County highway 9, Year Built: 1953, Status: Open, Structure Length: 4.82m (15.81ft), Average Daily Traffic: 268 (year 1990), Truck Traffic: 10%, Average Future Daily Traffic: 300 (year 2028), Design Load: H 15, Features Intersected: OLD TOWN CREEK Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.010, Lanes on structure: 2, Owner: County Highway Agency, Approaching Roadway Width: 8.5m (27.9ft), Material/Design: Concrete continuous, Design/Construction: Tee Beam, Number Of Spans In Main Unit: 1, Number Of Approach Spans: 7, Length of Maximum Span: 15.2m (49.9ft), Curb-To-Curb Width: 6.6m (21.7ft), Out-to-Out Width: 7.7m (25.3ft) Condition: Deck: Fair, Superstructure: Satisfactory, Substructure: Serious, Channel: Fair, Operating Rating: 5.4 metric tons, Method Used To Determine Operating Rating: Allowable Stress (AS), Inventory Rating: 3.6 metric tons, Method Used To Determine Inventory Rating: Allowable Stress (AS), Structural Evaluation: High priority of replacement, Waterway Adequacy: Meets minimum limits, Approach Roadway Alignment: Equal to present desirable criteria, Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below), Length Of Structure Improvement: 5.82m (19.09ft), Designated Inspection Frequency: Every 3 months, Other Special Inspection Frequency: Every 12 months, Inspection Date: January 2008, Other Special Inspection Date: January 2008, Bridge Improvement Cost: $584,000, Roadway Improvement Cost: $58,000, Total Project Cost: $876,000 ( Estimate for 2008), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete Find on map >>
Structure Number: 4559, Location: NE1/4 S2 T15 R21 (Lat: 32.303611, Lng: -85.940000), Route carried "on" structure: County highway 9, Year Built: 1953, Status: Open, Structure Length: 7.32m (24.02ft), Average Daily Traffic: 268 (year 1990), Truck Traffic: 10%, Average Future Daily Traffic: 300 (year 2028), Design Load: H 15, Features Intersected: OLD TOWN CREEK RELIEF Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.010, Lanes on structure: 2, Owner: County Highway Agency, Approaching Roadway Width: 8.5m (27.9ft), Material/Design: Concrete continuous, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 16, Length of Maximum Span: 4.6m (15.1ft), Curb-To-Curb Width: 6.6m (21.7ft), Out-to-Out Width: 7.7m (25.3ft) Condition: Deck: Very good, Superstructure: Satisfactory, Substructure: Fair, Channel: Satisfactory, Operating Rating: 15.0 metric tons, Method Used To Determine Operating Rating: Allowable Stress (AS), Inventory Rating: 7.3 metric tons, Method Used To Determine Inventory Rating: Allowable Stress (AS), Structural Evaluation: High priority of replacement, Waterway Adequacy: Equal to present desirable criteria, Approach Roadway Alignment: Equal to present minimum criteria, Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below), Length Of Structure Improvement: 8.35m (27.40ft), Designated Inspection Frequency: Every 12 months, Other Special Inspection Frequency: Every 12 months, Inspection Date: January 2008, Other Special Inspection Date: January 2008, Bridge Improvement Cost: $838,000, Roadway Improvement Cost: $84,000, Total Project Cost: $1,257,000 ( Estimate for 2008), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete Find on map >>
Structure Number: 5146, Location: 2.2 MI.E.OF MONTG.CO.LINE (Lat: 32.410278, Lng: -85.979722), Route carried "on" structure: US 80, Year Built: 1955, Status: Open, Structure Length: 10.36m (33.99ft), Average Daily Traffic: 1,880 (year 2007), Truck Traffic: 6%, Average Future Daily Traffic: 1,908 (year 2027), Design Load: HS 20, Features Intersected: CUBAHATCHEE CREEK RELIEF Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 250.184, Lanes on structure: 2, Owner: State Highway Agency, Approaching Roadway Width: 13.4m (44.0ft), Material/Design: Concrete, Design/Construction: Tee Beam, Number Of Spans In Main Unit: 10, Length of Maximum Span: 10.4m (34.1ft), Curb-To-Curb Width: 8.5m (27.9ft), Out-to-Out Width: 9.4m (30.8ft) Condition: Deck: Satisfactory, Superstructure: Satisfactory, Substructure: Satisfactory, Channel: Satisfactory, Operating Rating: 58.0 metric tons, Method Used To Determine Operating Rating: Allowable Stress (AS), Inventory Rating: 36.2 metric tons, Method Used To Determine Inventory Rating: Allowable Stress (AS), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Somewhat better than minimum adequacy, Waterway Adequacy: Superior to present desirable criteria, Approach Roadway Alignment: Better than present minimum criteria, Length Of Structure Improvement: 11.27m (36.98ft), Designated Inspection Frequency: Every 24 months, Inspection Date: Febuary 2008, Bridge Improvement Cost: $1,379,000, Roadway Improvement Cost: $138,000, Total Project Cost: $2,069,000 ( Estimate for 2008), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete Find on map >>
Structure Number: 5147, Location: 2.4 MI.E.OF MONTG.CO LINE (Lat: 32.390000, Lng: -85.980278), Route carried "on" structure: US 80, Year Built: 1955, Status: Open, Structure Length: 8.78m (28.81ft), Average Daily Traffic: 1,880 (year 2007), Truck Traffic: 6%, Average Future Daily Traffic: 1,908 (year 2027), Design Load: HS 20, Features Intersected: CUBAHATCHEE CREEK Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 250.576, Lanes on structure: 2, Owner: State Highway Agency, Approaching Roadway Width: 13.4m (44.0ft), Material/Design: Concrete, Design/Construction: Tee Beam, Number Of Spans In Main Unit: 1, Number Of Approach Spans: 7, Length of Maximum Span: 15.2m (49.9ft), Curb-To-Curb Width: 8.5m (27.9ft), Out-to-Out Width: 9.4m (30.8ft) Condition: Deck: Satisfactory, Superstructure: Satisfactory, Substructure: Satisfactory, Channel: Fair, Operating Rating: 60.8 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 36.2 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Somewhat better than minimum adequacy, Waterway Adequacy: Superior to present desirable criteria, Approach Roadway Alignment: Equal to present minimum criteria, Length Of Structure Improvement: 9.76m (32.02ft), Designated Inspection Frequency: Every 24 months, Underwater Inspection Frequency: Every 24 months, Inspection Date: Febuary 2008, Underwater Inspection Date: Febuary 2008, Bridge Improvement Cost: $1,193,000, Roadway Improvement Cost: $119,000, Total Project Cost: $1,789,000 ( Estimate for 2008), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete Find on map >>
Structure Number: 5148, Location: 11.3 MI.E.MONTG.CO LINE (Lat: 32.385000, Lng: -85.836389), Route carried "on" structure: US 80, Year Built: 1955, Status: Open, Structure Length: 21.95m (72.01ft), Average Daily Traffic: 3,050 (year 2007), Truck Traffic: 10%, Average Future Daily Traffic: 3,062 (year 2027), Design Load: HS 20, Features Intersected: CALEBEE CREEK Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 264.869, Lanes on structure: 2, Owner: State Highway Agency, Approaching Roadway Width: 13.4m (44.0ft), Material/Design: Concrete, Design/Construction: Tee Beam, Number Of Spans In Main Unit: 18, Length of Maximum Span: 12.2m (40.0ft), Curb-To-Curb Width: 8.5m (27.9ft), Out-to-Out Width: 9.4m (30.8ft) Condition: Deck: Satisfactory, Superstructure: Satisfactory, Substructure: Satisfactory, Channel: Fair, Operating Rating: 57.1 metric tons, Method Used To Determine Operating Rating: Allowable Stress (AS), Inventory Rating: 35.3 metric tons, Method Used To Determine Inventory Rating: Allowable Stress (AS), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Meets minimum limits, Waterway Adequacy: Superior to present desirable criteria, Approach Roadway Alignment: Better than present minimum criteria, Length Of Structure Improvement: 21.94m (71.98ft), Designated Inspection Frequency: Every 24 months, Underwater Inspection Frequency: Every 24 months, Inspection Date: Febuary 2008, Underwater Inspection Date: March 2008, Bridge Improvement Cost: $2,683,000, Roadway Improvement Cost: $268,000, Total Project Cost: $4,024,000 ( Estimate for 2008), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete Find on map >>
Structure Number: 5149, Location: 4.5 MI.W.OF TUSKEGEE (Lat: 32.382500, Lng: -85.788889), Route carried "on" structure: US 80, Year Built: 1955, Status: Open, Structure Length: 5.18m (16.99ft), Average Daily Traffic: 3,090 (year 2007), Truck Traffic: 9%, Average Future Daily Traffic: 3,102 (year 2027), Design Load: HS 20, Features Intersected: LITTLE CALEBEE CREEK Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 268.382, Lanes on structure: 2, Owner: State Highway Agency, Approaching Roadway Width: 13.4m (44.0ft), Material/Design: Concrete, Design/Construction: Tee Beam, Number Of Spans In Main Unit: 5, Length of Maximum Span: 10.4m (34.1ft), Curb-To-Curb Width: 8.5m (27.9ft), Out-to-Out Width: 9.4m (30.8ft) Condition: Deck: Satisfactory, Superstructure: Satisfactory, Substructure: Satisfactory, Channel: Fair, Operating Rating: 58.0 metric tons, Method Used To Determine Operating Rating: Allowable Stress (AS), Inventory Rating: 36.2 metric tons, Method Used To Determine Inventory Rating: Allowable Stress (AS), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Meets minimum limits, Waterway Adequacy: Superior to present desirable criteria, Approach Roadway Alignment: Better than present minimum criteria, Length Of Structure Improvement: 6.19m (20.31ft), Designated Inspection Frequency: Every 24 months, Inspection Date: Febuary 2008, Bridge Improvement Cost: $757,000, Roadway Improvement Cost: $76,000, Total Project Cost: $1,136,000 ( Estimate for 2008), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete Find on map >>
Structure Number: 6284, Location: NW1/4 S26 T17N R21E (Lat: 32.416667, Lng: -85.933333), Route carried "on" structure: County highway 40, Year Built: 1958, Status: Open, Structure Length: 15.73m (51.61ft), Average Daily Traffic: 350 (year 1990), Truck Traffic: 40%, Average Future Daily Traffic: 400 (year 2030), Design Load: H 15, Features Intersected: CALEBEE CREEK Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.010, Lanes on structure: 2, Owner: County Highway Agency, Approaching Roadway Width: 9.8m (32.2ft), Material/Design: Concrete, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 15, Length of Maximum Span: 12.2m (40.0ft), Curb-To-Curb Width: 6.6m (21.7ft), Out-to-Out Width: 7.1m (23.3ft) Condition: Deck: Good, Superstructure: Good, Substructure: Good, Channel: Good, Operating Rating: 35.7 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 21.4 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present minimum criteria, Waterway Adequacy: Equal to present desirable criteria, Approach Roadway Alignment: Equal to present minimum criteria, Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 0.1 - 9.9% below), Length Of Structure Improvement: 16.49m (54.10ft), Designated Inspection Frequency: Every 12 months, Other Special Inspection Frequency: Every 12 months, Inspection Date: January 2008, Other Special Inspection Date: January 2008, Bridge Improvement Cost: $1,525,000, Roadway Improvement Cost: $153,000, Total Project Cost: $2,288,000 ( Estimate for 2008), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete Find on map >>
Structure Number: 6559, Location: NE1/4 S5 T16 R22 (Lat: 32.383333, Lng: -85.866667), Route carried "on" structure: County highway 9, Year Built: 1959, Status: Posted for load, Structure Length: 3.47m (11.38ft), Average Daily Traffic: 268 (year 1990), Truck Traffic: 5%, Average Future Daily Traffic: 300 (year 2028), Design Load: H 15, Features Intersected: CALEBEE CREEK Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.010, Lanes on structure: 2, Owner: County Highway Agency, Approaching Roadway Width: 8.5m (27.9ft), Material/Design: Concrete, Design/Construction: Slab, Number Of Spans In Main Unit: 6, Length of Maximum Span: 5.8m (19.0ft), Curb-To-Curb Width: 7.3m (24.0ft), Out-to-Out Width: 7.8m (25.6ft) Condition: Deck: Good, Superstructure: Satisfactory, Substructure: Serious, Channel: Satisfactory, Operating Rating: 51.5 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 30.8 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: High priority of corrective action, Waterway Adequacy: Equal to present desirable criteria, Approach Roadway Alignment: Better than present minimum criteria, Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below), Length Of Structure Improvement: 4.36m (14.30ft), Designated Inspection Frequency: Every 3 months, Other Special Inspection Frequency: Every 12 months, Inspection Date: January 2008, Other Special Inspection Date: January 2008, Bridge Improvement Cost: $443,000, Roadway Improvement Cost: $44,000, Total Project Cost: $664,000 ( Estimate for 2008), Deck Structure Type: Concrete Precast Panels, Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete Find on map >>
Structure Number: 656, Location: NE1/4 S5 T16 R22 (Lat: 32.400000, Lng: -85.866667), Route carried "on" structure: County highway 9, Year Built: 1959, Status: Posted for load, Structure Length: 7.25m (23.79ft), Average Daily Traffic: 268 (year 1990), Truck Traffic: 5%, Average Future Daily Traffic: 300 (year 2028), Design Load: H 15, Features Intersected: CALEBEE Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.010, Lanes on structure: 2, Owner: County Highway Agency, Approaching Roadway Width: 8.5m (27.9ft), Material/Design: Concrete, Design/Construction: Tee Beam, Number Of Spans In Main Unit: 7, Length of Maximum Span: 10.4m (34.1ft), Curb-To-Curb Width: 6.6m (21.7ft), Out-to-Out Width: 7.7m (25.3ft) Condition: Deck: Satisfactory, Superstructure: Good, Substructure: Satisfactory, Channel: Satisfactory, Operating Rating: 41.9 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 25.1 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present minimum criteria, Waterway Adequacy: Equal to present desirable criteria, Approach Roadway Alignment: Equal to present desirable criteria, Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 0.1 - 9.9% below), Length Of Structure Improvement: 8.28m (27.17ft), Designated Inspection Frequency: Every 12 months, Other Special Inspection Frequency: Every 12 months, Inspection Date: January 2008, Other Special Inspection Date: January 2008, Bridge Improvement Cost: $831,000, Roadway Improvement Cost: $83,000, Total Project Cost: $1,246,000 ( Estimate for 2008), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete Find on map >>
Structure Number: 6561, Location: NE1/4 S5 T16 R22 (Lat: 32.400000, Lng: -85.866667), Route carried "on" structure: County highway 9, Year Built: 1959, Status: Posted for load, Structure Length: 5.18m (16.99ft), Average Daily Traffic: 268 (year 1990), Truck Traffic: 5%, Average Future Daily Traffic: 390 (year 2028), Design Load: H 15, Features Intersected: CALEBEE CREEK RELIEF Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.010, Lanes on structure: 2, Owner: County Highway Agency, Approaching Roadway Width: 8.5m (27.9ft), Material/Design: Concrete, Design/Construction: Tee Beam, Number Of Spans In Main Unit: 5, Length of Maximum Span: 10.4m (34.1ft), Curb-To-Curb Width: 6.6m (21.7ft), Out-to-Out Width: 7.7m (25.3ft) Condition: Deck: Good, Superstructure: Good, Substructure: Fair, Channel: Fair, Operating Rating: 35.7 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 21.4 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Somewhat better than minimum adequacy, Waterway Adequacy: Better than present minimum criteria, Approach Roadway Alignment: Better than present minimum criteria, Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 0.1 - 9.9% below), Length Of Structure Improvement: 6.19m (20.31ft), Designated Inspection Frequency: Every 12 months, Underwater Inspection Frequency: Every 12 months, Other Special Inspection Frequency: Every 12 months, Inspection Date: January 2008, Underwater Inspection Date: January 2008, Other Special Inspection Date: January 2008, Bridge Improvement Cost: $622,000, Roadway Improvement Cost: $62,000, Total Project Cost: $933,000 ( Estimate for 2008), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete Find on map >>
Structure Number: 7636, Location: SE1/4 S4 T15 R21 (Lat: 32.300000, Lng: -85.950000), Route carried "on" structure: County highway 4, Year Built: 1962, Status: Open, Structure Length: 5.18m (16.99ft), Average Daily Traffic: 216 (year 1990), Truck Traffic: 10%, Average Future Daily Traffic: 230 (year 2028), Design Load: H 15, Features Intersected: LINE CREEK Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.010, Lanes on structure: 2, Owner: County Highway Agency, Approaching Roadway Width: 8.5m (27.9ft), Material/Design: Concrete, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 5, Length of Maximum Span: 10.4m (34.1ft), Curb-To-Curb Width: 6.6m (21.7ft), Out-to-Out Width: 7.7m (25.3ft) Condition: Deck: Good, Superstructure: Good, Substructure: Good, Channel: Good, Operating Rating: 36.0 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 21.7 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present minimum criteria, Waterway Adequacy: Equal to present desirable criteria, Approach Roadway Alignment: Equal to present desirable criteria, Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 0.1 - 9.9% below), Length Of Structure Improvement: 6.19m (20.31ft), Designated Inspection Frequency: Every 12 months, Inspection Date: January 2007, Bridge Improvement Cost: $622,000, Roadway Improvement Cost: $62,000, Total Project Cost: $933,000 ( Estimate for 2008), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete Find on map >>
Structure Number: 8292, Location: NW1/4 S11 T15 R22 (Lat: 32.300000, Lng: -85.816667), Route carried "on" structure: County highway 19, Year Built: 1964, Status: Open, Structure Length: 11.40m (37.40ft), Average Daily Traffic: 160 (year 1990), Truck Traffic: 10%, Average Future Daily Traffic: 175 (year 2028), Design Load: H 15, Features Intersected: CUBAHATCHEE CREEK Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.010, Lanes on structure: 2, Owner: County Highway Agency, Approaching Roadway Width: 8.5m (27.9ft), Material/Design: Concrete, Design/Construction: Tee Beam, Number Of Spans In Main Unit: 11, Length of Maximum Span: 10.4m (34.1ft), Curb-To-Curb Width: 7.3m (24.0ft), Out-to-Out Width: 8.9m (29.2ft) Condition: Deck: Good, Superstructure: Good, Substructure: Satisfactory, Channel: Good, Operating Rating: 39.0 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 23.6 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present minimum criteria, Waterway Adequacy: Equal to present minimum criteria, Approach Roadway Alignment: Better than present minimum criteria, Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 10.0 - 19.9% below), Length Of Structure Improvement: 12.27m (40.26ft), Designated Inspection Frequency: Every 12 months, Inspection Date: January 2007, Bridge Improvement Cost: $1,422,000, Roadway Improvement Cost: $142,000, Total Project Cost: $2,133,000 ( Estimate for 2008), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete Find on map >>
Structure Number: 8293, Location: NE1/4 S2 T15 R22 (Lat: 32.316667, Lng: -85.816667), Route carried "on" structure: County highway 19, Year Built: 1964, Status: Open, Structure Length: 915.38m (3003.22ft), Average Daily Traffic: 60 (year 1990), Average Future Daily Traffic: 80 (year 2025), Design Load: H 15, Features Intersected: BRANCH Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.010, Lanes on structure: 2, Owner: County Highway Agency, Approaching Roadway Width: 8.5m (27.9ft), Material/Design: Concrete, Design/Construction: Culvert, Number Of Spans In Main Unit: 3, Length of Maximum Span: 3.0m (9.8ft), Curb-To-Curb Width: 13.2m (43.3ft), Out-to-Out Width: 13.7m (44.9ft) Condition: Channel: Good, Culverts: Satisfactory, Operating Rating: 22.7 metric tons, Inventory Rating: 17.1 metric tons, Structural Evaluation: Somewhat better than minimum adequacy, Waterway Adequacy: Better than present minimum criteria, Approach Roadway Alignment: Better than present minimum criteria, Designated Inspection Frequency: Every 24 months, Inspection Date: March 2007, Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 9067, Location: NE1/4 S4 T15 R22 (Lat: 32.316667, Lng: -85.850000), Route carried "on" structure: County highway 13, Year Built: 1966, Status: Open, Structure Length: 8.17m (26.80ft), Average Daily Traffic: 300 (year 1990), Truck Traffic: 30%, Average Future Daily Traffic: 330 (year 2028), Design Load: H 15, Features Intersected: CUBAHATCHEE CREEK Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.010, Lanes on structure: 2, Owner: County Highway Agency, Approaching Roadway Width: 9.1m (29.9ft), Material/Design: Concrete continuous, Design/Construction: Girder and Floorbeam System, Number Of Spans In Main Unit: 1, Number Of Approach Spans: 6, Length of Maximum Span: 15.2m (49.9ft), Curb-To-Curb Width: 7.3m (24.0ft), Out-to-Out Width: 8.9m (29.2ft) Condition: Deck: Good, Superstructure: Satisfactory, Substructure: Satisfactory, Channel: Fair, Operating Rating: 33.8 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 20.2 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Somewhat better than minimum adequacy, Waterway Adequacy: Equal to present minimum criteria, Approach Roadway Alignment: Better than present minimum criteria, Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 10.0 - 19.9% below), Length Of Structure Improvement: 9.16m (30.05ft), Designated Inspection Frequency: Every 12 months, Other Special Inspection Frequency: Every 12 months, Inspection Date: January 2007, Other Special Inspection Date: January 2008, Bridge Improvement Cost: $1,062,000, Roadway Improvement Cost: $106,000, Total Project Cost: $1,593,000 ( Estimate for 2008), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete Find on map >>
Structure Number: 9068, Location: SE1/4 S33 T16 R22 (Lat: 32.316667, Lng: -85.850000), Route carried "on" structure: County highway 13, Year Built: 1966, Status: Open, Structure Length: 7.25m (23.79ft), Average Daily Traffic: 300 (year 1990), Truck Traffic: 30%, Average Future Daily Traffic: 330 (year 2028), Design Load: H 15, Features Intersected: CUBAHATCHEE CREEK, Facility Carried by Structure: COUNTY ROUTE 1 Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.010, Lanes on structure: 2, Owner: County Highway Agency, Approaching Roadway Width: 9.1m (29.9ft), Material/Design: Concrete, Design/Construction: Girder and Floorbeam System, Number Of Spans In Main Unit: 7, Length of Maximum Span: 10.4m (34.1ft), Curb-To-Curb Width: 7.3m (24.0ft), Out-to-Out Width: 8.9m (29.2ft) Condition: Deck: Good, Superstructure: Good, Substructure: Satisfactory, Channel: Fair, Operating Rating: 34.4 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 20.6 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Somewhat better than minimum adequacy, Waterway Adequacy: Equal to present desirable criteria, Approach Roadway Alignment: Better than present minimum criteria, Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 10.0 - 19.9% below), Length Of Structure Improvement: 8.28m (27.17ft), Designated Inspection Frequency: Every 12 months, Other Special Inspection Frequency: Every 12 months, Inspection Date: January 2007, Other Special Inspection Date: January 2008, Bridge Improvement Cost: $959,000, Roadway Improvement Cost: $96,000, Total Project Cost: $1,439,000 ( Estimate for 2008), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete Find on map >>
Structure Number: 9321, Location: NW1/4 S23 T16 R21 (Lat: 32.350000, Lng: -85.916667), Route carried "on" structure: County highway 7, Year Built: 1967, Status: Open, Structure Length: 16.82m (55.18ft), Average Daily Traffic: 185 (year 1990), Truck Traffic: 2%, Average Future Daily Traffic: 200 (year 2030), Design Load: H 15, Features Intersected: CUBAHATCHEE CREEK, Facility Carried by Structure: COUNTY ROUTE Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.010, Lanes on structure: 2, Owner: County Highway Agency, Approaching Roadway Width: 8.5m (27.9ft), Material/Design: Concrete, Design/Construction: Slab, Number Of Spans In Main Unit: 29, Length of Maximum Span: 5.8m (19.0ft), Curb-To-Curb Width: 7.3m (24.0ft), Out-to-Out Width: 7.8m (25.6ft) Condition: Deck: Satisfactory, Superstructure: Satisfactory, Substructure: Poor, Channel: Satisfactory, Operating Rating: 46.0 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 27.6 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Meets minimum limits, Waterway Adequacy: Equal to present desirable criteria, Approach Roadway Alignment: Equal to present minimum criteria, Length Of Structure Improvement: 17.54m (57.55ft), Designated Inspection Frequency: Every 12 months, Inspection Date: Febuary 2008, Bridge Improvement Cost: $1,782,000, Roadway Improvement Cost: $178,000, Total Project Cost: $2,673,000 ( Estimate for 2008), Deck Structure Type: Concrete Precast Panels, Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete Find on map >>
Structure Number: 9322, Location: NW1/4 S23 T16 R21 (Lat: 32.350000, Lng: -85.916667), Route carried "on" structure: County highway 7, Year Built: 1967, Status: Open, Structure Length: 3.47m (11.38ft), Average Daily Traffic: 185 (year 1990), Truck Traffic: 5%, Average Future Daily Traffic: 210 (year 2024), Design Load: H 15, Features Intersected: CUBAHATCHEE CREEK, Facility Carried by Structure: COUNTY ROUTE Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.010, Lanes on structure: 2, Owner: County Highway Agency, Approaching Roadway Width: 8.5m (27.9ft), Material/Design: Concrete, Design/Construction: Slab, Number Of Spans In Main Unit: 6, Length of Maximum Span: 5.8m (19.0ft), Curb-To-Curb Width: 7.3m (24.0ft), Out-to-Out Width: 7.8m (25.6ft) Condition: Deck: Satisfactory, Superstructure: Satisfactory, Substructure: Satisfactory, Channel: Good, Operating Rating: 48.0 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 28.8 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present minimum criteria, Waterway Adequacy: Equal to present desirable criteria, Approach Roadway Alignment: Equal to present minimum criteria, Length Of Structure Improvement: 4.36m (14.30ft), Designated Inspection Frequency: Every 24 months, Inspection Date: Febuary 2008, Bridge Improvement Cost: $443,000, Roadway Improvement Cost: $44,000, Total Project Cost: $664,000 ( Estimate for 2008), Deck Structure Type: Concrete Precast Panels, Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete Find on map >>
Structure Number: 9609, Location: N1/2 S13 T16 R21 (Lat: 32.366667, Lng: -85.900000), Route carried "on" structure: County highway 6, Year Built: 1968, Status: Open, Structure Length: 2.32m (7.61ft), Average Daily Traffic: 108 (year 1990), Truck Traffic: 2%, Average Future Daily Traffic: 125 (year 2024), Design Load: H 15, Features Intersected: BRANCH, Facility Carried by Structure: COUNTY ROUTE Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.010, Lanes on structure: 2, Owner: County Highway Agency, Approaching Roadway Width: 8.5m (27.9ft), Material/Design: Concrete, Design/Construction: Slab, Number Of Spans In Main Unit: 4, Length of Maximum Span: 5.8m (19.0ft), Curb-To-Curb Width: 7.3m (24.0ft), Out-to-Out Width: 7.8m (25.6ft) Condition: Deck: Satisfactory, Superstructure: Good, Substructure: Satisfactory, Channel: Good, Operating Rating: 48.0 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 28.8 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present minimum criteria, Waterway Adequacy: Equal to present desirable criteria, Approach Roadway Alignment: Equal to present minimum criteria, Length Of Structure Improvement: 3.14m (10.30ft), Designated Inspection Frequency: Every 24 months, Inspection Date: Febuary 2007, Bridge Improvement Cost: $319,000, Roadway Improvement Cost: $32,000, Total Project Cost: $479,000 ( Estimate for 2008), Deck Structure Type: Concrete Precast Panels, Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete Find on map >>
Structure Number: 10301, Location: E1/2 S28 T16 R22 (Lat: 32.333333, Lng: -85.833333), Route carried "on" structure: County highway 13, Year Built: 1970, Status: Open, Structure Length: 2.19m (7.19ft), Average Daily Traffic: 300 (year 1990), Truck Traffic: 30%, Average Future Daily Traffic: 330 (year 2028), Design Load: H 15, Features Intersected: BRANCH, Facility Carried by Structure: COUNTY ROUTE 1 Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.010, Lanes on structure: 2, Owner: County Highway Agency, Approaching Roadway Width: 8.5m (27.9ft), Material/Design: Concrete, Design/Construction: Slab, Number Of Spans In Main Unit: 3, Length of Maximum Span: 7.3m (24.0ft), Curb-To-Curb Width: 7.3m (24.0ft), Out-to-Out Width: 7.8m (25.6ft) Condition: Deck: Satisfactory, Superstructure: Satisfactory, Substructure: Satisfactory, Channel: Satisfactory, Operating Rating: 44.8 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 26.8 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present minimum criteria, Waterway Adequacy: Better than present minimum criteria, Approach Roadway Alignment: Better than present minimum criteria, Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 0.1 - 9.9% below), Length Of Structure Improvement: 2.99m (9.81ft), Designated Inspection Frequency: Every 12 months, Other Special Inspection Frequency: Every 12 months, Inspection Date: January 2007, Other Special Inspection Date: January 2008, Bridge Improvement Cost: $304,000, Roadway Improvement Cost: $30,000, Total Project Cost: $456,000 ( Estimate for 2008), Deck Structure Type: Concrete Precast Panels, Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete Find on map >>
Structure Number: 12555, Location: SW1/4 S33 T15 R22 (Lat: 32.233333, Lng: -85.850000), Route carried "on" structure: County highway 13, Year Built: 1981, Status: Closed, Structure Length: 1.83m (6.00ft), Average Daily Traffic: 80 (year 1990), Average Future Daily Traffic: 100 (year 2021), Design Load: H 10, Features Intersected: BUGHALL CREEK Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.010, Lanes on structure: 1, Owner: County Highway Agency, Approaching Roadway Width: 7.3m (24.0ft), Material/Design: Wood or Timber, Design/Construction: Frame, Number Of Spans In Main Unit: 4, Length of Maximum Span: 4.6m (15.1ft), Curb-To-Curb Width: 4.6m (15.1ft), Out-to-Out Width: 4.6m (15.1ft) Condition: Deck: Poor, Superstructure: Fair, Substructure: Fair, Channel: Fair, Deck Geometry: Better than present minimum criteria, Waterway Adequacy: Meets minimum limits, Approach Roadway Alignment: Meets minimum limits, Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below), Length Of Structure Improvement: 2.53m (8.30ft), Designated Inspection Frequency: Every 12 months, Other Special Inspection Frequency: Every 12 months, Inspection Date: Febuary 2003, Other Special Inspection Date: March 2006, Bridge Improvement Cost: $152,000, Roadway Improvement Cost: $15,000, Total Project Cost: $228,000 ( Estimate for 2008), Deck Structure Type: Wood or Timber, Wearing Surface/Protective System: Wearing Surface: Wood or Timber Find on map >>
Structure Number: 13739, Location: E1/2 S16 T15 R22 (Lat: 32.266667, Lng: -85.850000), Route carried "on" structure: County highway 13, Year Built: 1992, Status: Open, Structure Length: 1.19m (3.90ft), Average Daily Traffic: 98 (year 1992), Truck Traffic: 5%, Average Future Daily Traffic: 125 (year 2030), Design Load: HS 20, Features Intersected: OLD TOWN CREEK RELIEF Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.010, Lanes on structure: 2, Owner: County Highway Agency, Approaching Roadway Width: 6.1m (20.0ft), Material/Design: Concrete, Design/Construction: Culvert, Number Of Spans In Main Unit: 3, Length of Maximum Span: 3.7m (12.1ft) Condition: Channel: Good, Culverts: Good, Operating Rating: 40.8 metric tons, Method Used To Determine Operating Rating: Allowable Stress (AS), Inventory Rating: 40.8 metric tons, Method Used To Determine Inventory Rating: Allowable Stress (AS), Structural Evaluation: Better than present minimum criteria, Waterway Adequacy: Equal to present desirable criteria, Approach Roadway Alignment: Equal to present minimum criteria, Designated Inspection Frequency: Every 24 months, Inspection Date: Febuary 2008 Find on map >>
Structure Number: 14316, Location: SW1/4 S6 T15 R23 (Lat: 32.300000, Lng: -85.783333), Route carried "on" structure: County highway , Year Built: 1920, Year Reconstructed: 1988, Status: Posted for load, Structure Length: 1.31m (4.30ft), Average Daily Traffic: 10 (year 1990), Average Future Daily Traffic: 25 (year 2028), Design Load: H 10, Features Intersected: BRANCH, Facility Carried by Structure: COUNTY ROAD Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.010, Lanes on structure: 1, Owner: County Highway Agency, Approaching Roadway Width: 5.5m (18.0ft), Material/Design: Steel, Design/Construction: Truss - Thru, Number Of Spans In Main Unit: 1, Length of Maximum Span: 13.1m (43.0ft), Curb-To-Curb Width: 4.7m (15.4ft), Out-to-Out Width: 5.1m (16.7ft) Condition: Deck: Poor, Superstructure: Fair, Substructure: Poor, Channel: Satisfactory, Operating Rating: 2.7 metric tons, Inventory Rating: 1.8 metric tons, Structural Evaluation: High priority of replacement, Deck Geometry: Better than present minimum criteria, Waterway Adequacy: Equal to present desirable criteria, Approach Roadway Alignment: Equal to present minimum criteria, Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below), Length Of Structure Improvement: 1.98m (6.50ft), Designated Inspection Frequency: Every 12 months, Critical Feature Inspection Frequency: Every 12 months, Inspection Date: January 2008, Critical Feature Inspection Date: January 2008, Bridge Improvement Cost: $131,000, Roadway Improvement Cost: $13,000, Total Project Cost: $196,000 ( Estimate for 2008), Deck Structure Type: Wood or Timber, Wearing Surface/Protective System: Wearing Surface: Wood or Timber Find on map >>
Structure Number: 19409, Location: ????????????????????????? (Lat: 32.300556, Lng: -85.928611), Route carried "on" structure: County highway 9, Year Built: 2005, Status: Open, Structure Length: 4.88m (16.01ft), Average Daily Traffic: 251 (year 2004), Truck Traffic: 5%, Average Future Daily Traffic: 200 (year 2025), Design Load: HS 20, Features Intersected: OLD TOWN CREEK RELIEF Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Owner: County Highway Agency, Approaching Roadway Width: 8.5m (27.9ft), Material/Design: Concrete, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 4, Length of Maximum Span: 12.2m (40.0ft), Curb-To-Curb Width: 8.5m (27.9ft), Out-to-Out Width: 9.4m (30.8ft) Condition: Deck: Excellent, Superstructure: Excellent, Substructure: Excellent, Channel: Very good, Operating Rating: 43.6 metric tons, Inventory Rating: 32.7 metric tons, Structural Evaluation: Superior to present desirable criteria, Deck Geometry: Equal to present minimum criteria, Waterway Adequacy: Equal to present desirable criteria, Approach Roadway Alignment: Equal to present minimum criteria, Length Of Structure Improvement: 5.88m (19.29ft), Designated Inspection Frequency: Every 24 months, Inspection Date: March 2007, Bridge Improvement Cost: $717,000, Roadway Improvement Cost: $72,000, Total Project Cost: $1,076,000 ( Estimate for 2008), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete Discuss this city on our hugely popular Alabama forum Back to: Shorter-Hardaway, AL, Alabama, All US cities.
|
![]() |