Bridge Statistics for Shrewsbury, Massachusetts (MA) - Condition, Traffic, Stress, Structural Evaluation, Project CostsBack to: Shrewsbury, MA, Massachusetts, Massachusetts forum, All US cities. National Bridge Inventory (NBI) Statistics Number of bridges: 18 Total length: 130 meters (427ft) Total costs: $51,189,000 Total average daily traffic: 633,440 Total average daily truck traffic: 80,907 National Bridge Inventory (NBI) Registered Bridges for Shrewsbury
Bridge Condition - Deck Bridge Condition - Superstructure Bridge Condition - Substructure Bridge Condition - Channel Find on map >>
Structure Number: S140011L0MHDNBI, Location: 100 F.T. E. OF LAKE AVE. (Lat: 42.274294, Lng: -71.755153), Route carried "on" structure: State highway 9, Year Built: 1916, Year Reconstructed: 1983, Status: Open, Structure Length: 24.23m (79.49ft), Average Daily Traffic: 45,200 (year 2007), Truck Traffic: 15%, Average Future Daily Traffic: 71,384 (year 2027), Design Load: H 20, Features Intersected: WATER LAKE QUINSIGAMOND Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 159.723, Lanes on structure: 4, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 13.1m (43.0ft), Skew: 30 degrees, Material/Design: Concrete, Design/Construction: Arch - Deck, Number Of Spans In Main Unit: 6, Length of Maximum Span: 34.1m (111.9ft), Curb or Sidewalk Widths: Left: 2.3m (7.5ft), Right: 2.3m (7.5ft), Curb-To-Curb Width: 13.1m (43.0ft), Out-to-Out Width: 19.2m (63.0ft) Condition: Deck: Serious, Superstructure: Poor, Substructure: Poor, Channel: Good, Operating Rating: 56.8 metric tons, Method Used To Determine Operating Rating: Allowable Stress (AS), Inventory Rating: 33.3 metric tons, Method Used To Determine Inventory Rating: Allowable Stress (AS), Structural Evaluation: Meets minimum limits, Deck Geometry: High priority of replacement, Waterway Adequacy: Equal to present desirable criteria, Approach Roadway Alignment: Better than present minimum criteria, Length Of Structure Improvement: 24.30m (79.72ft), Designated Inspection Frequency: Every 12 months, Underwater Inspection Frequency: Every 36 months, Other Special Inspection Frequency: Every 12 months, Inspection Date: September 2006, Underwater Inspection Date: September 2005, Other Special Inspection Date: September 2007, Bridge Improvement Cost: $8,329,000, Roadway Improvement Cost: $833,000, Total Project Cost: $12,494,000 ( Estimate for 2006), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous, Membrane: Built-up Find on map >>
Structure Number: S140071M0MHDNBI, Location: ST 9/ST 140 (Lat: 42.276594, Lng: -71.711081), Route carried "on" structure: State highway 9, Year Built: 1932, Status: Open, Structure Length: 1.22m (4.00ft), Average Daily Traffic: 34,800 (year 2006), Truck Traffic: 10%, Average Future Daily Traffic: 54,960 (year 2027), Design Load: H 20, Features Intersected: ST140 GRAFTON ST Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 163.634, Lanes on structure: 4, Lanes under structure: 2, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 21.3m (69.9ft), Skew: 20 degrees, Material/Design: Concrete, Design/Construction: Tee Beam, Number Of Spans In Main Unit: 1, Length of Maximum Span: 9.4m (30.8ft), Curb or Sidewalk Widths: Left: 0.2m (0.7ft), Right: 0.2m (0.7ft), Curb-To-Curb Width: 21.3m (69.9ft), Out-to-Out Width: 22.6m (74.1ft) Condition: Deck: Fair, Superstructure: Fair, Substructure: Satisfactory, Operating Rating: 66.0 metric tons, Method Used To Determine Operating Rating: Allowable Stress (AS), Inventory Rating: 36.5 metric tons, Method Used To Determine Inventory Rating: Allowable Stress (AS), Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: Superior to present desirable criteria, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 1.30m (4.27ft), Designated Inspection Frequency: Every 24 months, Inspection Date: July 2006, Bridge Improvement Cost: $525,000, Roadway Improvement Cost: $53,000, Total Project Cost: $788,000 ( Estimate for 2006), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous, Membrane: Built-up Find on map >>
Structure Number: S14008AGMMHDNBI, Location: 1.5 MI. E. OF ST-122 (Lat: 42.246944, Lng: -71.729722), Route carried "on" structure: US 20, Year Built: 2001, Status: Open, Structure Length: 2.97m (9.74ft), Average Daily Traffic: 40,000 (year 2007), Truck Traffic: 15%, Average Future Daily Traffic: 63,172 (year 2028), Design Load: HS 20, Features Intersected: WATER FLINT POND Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 186.647, Lanes on structure: 2, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 13.4m (44.0ft), Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 1, Length of Maximum Span: 28.2m (92.5ft), Curb or Sidewalk Widths: Left: 2.7m (8.9ft), Right: 2.7m (8.9ft), Curb-To-Curb Width: 13.4m (44.0ft), Out-to-Out Width: 19.7m (64.6ft) Condition: Deck: Very good, Superstructure: Very good, Substructure: Very good, Channel: Very good, Operating Rating: 61.3 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 36.7 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present desirable criteria, Deck Geometry: Equal to present minimum criteria, Waterway Adequacy: Equal to present desirable criteria, Approach Roadway Alignment: Equal to present desirable criteria, Designated Inspection Frequency: Every 24 months, Inspection Date: September 2007, Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous, Membrane: Built-up, Deck Protection: Epoxy Coated Reinforcing Find on map >>
Structure Number: S14009B74MUNNBI, Location: .1 MI SOUTH OF U.S. - 20 (Lat: 42.280000, Lng: -71.766111), Route carried "on" structure: City street , Year Built: 2004, Status: Open, Structure Length: 1.15m (3.77ft), Average Daily Traffic: 500 (year 2007), Truck Traffic: 1%, Average Future Daily Traffic: 790 (year 2028), Design Load: HS 20, Features Intersected: WATER PRATTS POND INLET, Facility Carried by Structure: HWY CENTECH BLVD Minimum Vertical Clearance: 99.00m (324.80ft), Kilometerpoint: 0.250, Lanes on structure: 2, Owner: Town or Township Highway Agency, Approaching Roadway Width: 10.9m (35.8ft), Material/Design: Steel, Design/Construction: Arch - Deck, Number Of Spans In Main Unit: 1, Number Of Approach Spans: 1, Length of Maximum Span: 11.5m (37.7ft), Curb or Sidewalk Widths: Left: 1.8m (5.9ft), Right: 0.0m, Curb-To-Curb Width: 10.9m (35.8ft), Out-to-Out Width: 21.9m (71.9ft) Condition: Superstructure: Excellent, Substructure: Excellent, Channel: Very good, Operating Rating: 44.1 metric tons, Inventory Rating: 32.4 metric tons, Structural Evaluation: Equal to present desirable criteria, Deck Geometry: Equal to present minimum criteria, Waterway Adequacy: Superior to present desirable criteria, Approach Roadway Alignment: Equal to present desirable criteria, Designated Inspection Frequency: Every 24 months, Inspection Date: July 2007, Deck Structure Type: Corrugated Steel, Wearing Surface/Protective System: Wearing Surface: Bituminous, Membrane: Built-up Find on map >>
Structure Number: S140121D7MUNNBI, Location: .2 MI NTH.OF I-290 (Lat: 42.297786, Lng: -71.754786), Route carried "on" structure: City street , Year Built: 1939, Year Reconstructed: 1993, Status: Open, Structure Length: 0.73m (2.40ft), Average Daily Traffic: 21,580 (year 2006), Truck Traffic: 6%, Average Future Daily Traffic: 34,081 (year 2027), Design Load: HS 20, Features Intersected: WATER LAKE QUINSIGAMOND, Facility Carried by Structure: HWY W MAIN ST Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.435, Lanes on structure: 2, Owner: Town or Township Highway Agency, Approaching Roadway Width: 15.8m (51.8ft), Skew: 1 degrees, Material/Design: Concrete, Design/Construction: Arch - Deck, Number Of Spans In Main Unit: 1, Length of Maximum Span: 7.3m (24.0ft), Curb or Sidewalk Widths: Left: 1.5m (4.9ft), Right: 1.5m (4.9ft), Curb-To-Curb Width: 15.8m (51.8ft), Out-to-Out Width: 19.8m (65.0ft) Condition: Superstructure: Good, Substructure: Satisfactory, Channel: Good, Inventory Rating: 70.9 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Superior to present desirable criteria, Waterway Adequacy: Equal to present desirable criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 0.80m (2.62ft), Designated Inspection Frequency: Every 24 months, Underwater Inspection Frequency: Every 36 months, Inspection Date: May 2006, Underwater Inspection Date: March 2008, Bridge Improvement Cost: $57,000, Roadway Improvement Cost: $6,000, Total Project Cost: $86,000 ( Estimate for 2006) Find on map >>
Structure Number: S140151YGMHDNBI, Location: 1 MI.STH.OF ST.9 (Lat: 42.249992, Lng: -71.712675), Route carried "on" structure: State highway 140, Year Built: 1966, Status: Open, Structure Length: 3.57m (11.71ft), Average Daily Traffic: 10,000 (year 2007), Truck Traffic: 10%, Average Future Daily Traffic: 15,793 (year 2028), Design Load: H 20, Features Intersected: US 20 HARTFORD TNPK Minimum Vertical Clearance: 6.10m (20.01ft), Kilometerpoint: 114.086, Lanes on structure: 4, Lanes under structure: 2, Owner: State Highway Agency, Approaching Roadway Width: 13.4m (44.0ft), Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 3, Length of Maximum Span: 18.3m (60.0ft), Curb or Sidewalk Widths: Left: 1.7m (5.6ft), Right: 0.0m, Curb-To-Curb Width: 13.4m (44.0ft), Out-to-Out Width: 16.5m (54.1ft) Condition: Deck: Satisfactory, Superstructure: Good, Substructure: Satisfactory, Operating Rating: 44.1 metric tons, Inventory Rating: 32.4 metric tons, Structural Evaluation: Equal to present minimum criteria, Deck Geometry: High priority of replacement, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 3.60m (11.81ft), Designated Inspection Frequency: Every 24 months, Inspection Date: June 2007, Bridge Improvement Cost: $1,342,000, Roadway Improvement Cost: $135,000, Total Project Cost: $2,014,000 ( Estimate for 2006), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous, Membrane: Built-up Find on map >>
Structure Number: S140171RGMHDNBI, Location: M M 11.902 ON I-290 EB (Lat: 42.311614, Lng: -71.731178), Route carried "on" structure: Interstate 290, Year Built: 1967, Status: Open, Structure Length: 2.62m (8.60ft), Average Daily Traffic: 42,000 (year 2008), Truck Traffic: 15%, Average Future Daily Traffic: 66,331 (year 2029), Design Load: HS 20+Mod, Features Intersected: HWY GULF ST Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 19.154, Lanes on structure: 3, Lanes under structure: 2, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 15.2m (49.9ft), Skew: 2 degrees, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 1, Length of Maximum Span: 24.7m (81.0ft), Curb-To-Curb Width: 15.2m (49.9ft), Out-to-Out Width: 17.1m (56.1ft) Condition: Deck: Good, Superstructure: Good, Substructure: Satisfactory, Operating Rating: 63.2 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 37.9 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Meets minimum limits, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 2.70m (8.86ft), Designated Inspection Frequency: Every 24 months, Inspection Date: January 2008, Bridge Improvement Cost: $371,000, Roadway Improvement Cost: $38,000, Total Project Cost: $557,000 ( Estimate for 2006), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous, Membrane: Built-up Find on map >>
Structure Number: S140171RHMHDNBI, Location: M M 11.902 ON I-290 WB (Lat: 42.311800, Lng: -71.731333), Route carried "on" structure: Interstate 290, Year Built: 1967, Status: Open, Structure Length: 2.53m (8.30ft), Average Daily Traffic: 42,000 (year 2008), Truck Traffic: 15%, Average Future Daily Traffic: 66,331 (year 2029), Design Load: HS 20+Mod, Features Intersected: HWY GULF ST Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 19.154, Lanes on structure: 3, Lanes under structure: 2, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 15.2m (49.9ft), Skew: 2 degrees, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 1, Length of Maximum Span: 23.8m (78.1ft), Curb-To-Curb Width: 15.2m (49.9ft), Out-to-Out Width: 17.1m (56.1ft) Condition: Deck: Satisfactory, Superstructure: Fair, Substructure: Satisfactory, Operating Rating: 63.2 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 37.9 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: Meets minimum limits, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 2.60m (8.53ft), Designated Inspection Frequency: Every 24 months, Inspection Date: January 2008, Bridge Improvement Cost: $794,000, Roadway Improvement Cost: $80,000, Total Project Cost: $1,192,000 ( Estimate for 2006), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous, Membrane: Built-up Find on map >>
Structure Number: S140181YHMHDNBI, Location: 1.8 MI. N. OF MAIN ST. (Lat: 42.321358, Lng: -71.719417), Route carried "on" structure: State highway 140, Year Built: 1967, Status: Open, Structure Length: 8.02m (26.31ft), Average Daily Traffic: 19,100 (year 2006), Truck Traffic: 6%, Average Future Daily Traffic: 30,165 (year 2027), Design Load: H 20, Features Intersected: I 290 Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 122.130, Lanes on structure: 4, Lanes under structure: 6, Owner: State Highway Agency, Approaching Roadway Width: 22.6m (74.1ft), Skew: 21 degrees, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 2, Length of Maximum Span: 37.8m (124.0ft), Curb or Sidewalk Widths: Left: 1.5m (4.9ft), Right: 0.2m (0.7ft), Curb-To-Curb Width: 24.1m (79.1ft), Out-to-Out Width: 26.8m (87.9ft) Condition: Deck: Satisfactory, Superstructure: Good, Substructure: Fair, Operating Rating: 44.1 metric tons, Inventory Rating: 32.4 metric tons, Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: Superior to present desirable criteria, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 8.10m (26.57ft), Designated Inspection Frequency: Every 24 months, Inspection Date: November 2006, Bridge Improvement Cost: $3,875,000, Roadway Improvement Cost: $388,000, Total Project Cost: $5,813,000 ( Estimate for 2006), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous, Membrane: Built-up Find on map >>
Structure Number: S140211RAMHDNBI, Location: .1MI.WST.OF W.MAIN ST. (Lat: 42.293550, Lng: -71.757678), Route carried "on" structure: Interstate 290, Year Built: 1969, Status: Open, Structure Length: 25.76m (84.51ft), Average Daily Traffic: 42,000 (year 2006), Truck Traffic: 15%, Average Future Daily Traffic: 66,331 (year 2027), Design Load: HS 20+Mod, Features Intersected: COMB LK QUINSIG&LK AV N Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 15.864, Lanes on structure: 3, Lanes under structure: 2, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 15.5m (50.9ft), Skew: 11 degrees, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 4, Length of Maximum Span: 104.2m (341.9ft), Curb-To-Curb Width: 15.5m (50.9ft), Out-to-Out Width: 17.1m (56.1ft) Condition: Deck: Good, Superstructure: Good, Substructure: Fair, Channel: Good, Operating Rating: 60.5 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 36.3 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: Somewhat better than minimum adequacy, Underclear: Meets minimum limits, Waterway Adequacy: Superior to present desirable criteria, Approach Roadway Alignment: Superior to present desirable criteria, Length Of Structure Improvement: 25.80m (84.65ft), Designated Inspection Frequency: Every 24 months, Underwater Inspection Frequency: Every 36 months, Inspection Date: August 2006, Underwater Inspection Date: September 2005, Bridge Improvement Cost: $7,876,000, Roadway Improvement Cost: $788,000, Total Project Cost: $11,815,000 ( Estimate for 2006), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous, Membrane: Built-up Find on map >>
Structure Number: S140211RBMHDNBI, Location: .1 MI.OF W.MAIN ST. (Lat: 42.293742, Lng: -71.757703), Route carried "on" structure: Interstate 290, Year Built: 1969, Status: Open, Structure Length: 25.76m (84.51ft), Average Daily Traffic: 42,000 (year 2002), Truck Traffic: 15%, Average Future Daily Traffic: 66,331 (year 2027), Design Load: HS 20+Mod, Features Intersected: COMB LK QUINSIG&LK AV N Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 15.864, Lanes on structure: 3, Lanes under structure: 2, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 15.5m (50.9ft), Skew: 11 degrees, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 4, Length of Maximum Span: 104.2m (341.9ft), Curb or Sidewalk Widths: Left: 0.2m (0.7ft), Right: 0.2m (0.7ft), Curb-To-Curb Width: 15.5m (50.9ft), Out-to-Out Width: 17.1m (56.1ft) Condition: Deck: Good, Superstructure: Good, Substructure: Fair, Channel: Good, Operating Rating: 60.5 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 36.3 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: Somewhat better than minimum adequacy, Underclear: Meets minimum limits, Waterway Adequacy: Equal to present desirable criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 25.80m (84.65ft), Designated Inspection Frequency: Every 24 months, Underwater Inspection Frequency: Every 36 months, Inspection Date: August 2006, Underwater Inspection Date: September 2005, Bridge Improvement Cost: $7,876,000, Roadway Improvement Cost: $788,000, Total Project Cost: $11,815,000 ( Estimate for 2006), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous, Membrane: Built-up Find on map >>
Structure Number: S140221RCMHDNBI, Location: 1.5 MI.NTH.OF ST.9 (Lat: 42.294122, Lng: -71.754514), Route carried "on" structure: Interstate 290, Year Built: 1968, Status: Open, Structure Length: 2.71m (8.89ft), Average Daily Traffic: 85,000 (year 2005), Truck Traffic: 15%, Average Future Daily Traffic: 134,240 (year 2028), Design Load: H 20, Features Intersected: HWY N QUINSIGAMOND AVE Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 16.093, Lanes on structure: 3, Lanes under structure: 2, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 15.2m (49.9ft), Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 1, Length of Maximum Span: 25.6m (84.0ft), Curb-To-Curb Width: 15.2m (49.9ft), Out-to-Out Width: 17.1m (56.1ft) Condition: Deck: Good, Superstructure: Good, Substructure: Satisfactory, Operating Rating: 54.7 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 32.8 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Meets minimum limits, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 2.80m (9.19ft), Designated Inspection Frequency: Every 24 months, Inspection Date: October 2007, Bridge Improvement Cost: $384,000, Roadway Improvement Cost: $39,000, Total Project Cost: $577,000 ( Estimate for 2006), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous, Membrane: Built-up Find on map >>
Structure Number: S140221RDMHDNBI, Location: 1.5 MI.NTH.OF ST.9 (Lat: 42.294317, Lng: -71.754539), Route carried "on" structure: Interstate 290, Year Built: 1968, Status: Open, Structure Length: 2.71m (8.89ft), Average Daily Traffic: 85,000 (year 2007), Truck Traffic: 15%, Average Future Daily Traffic: 134,240 (year 2028), Design Load: H 20, Features Intersected: HWY N QUINSIGAMOND AVE Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 3, Lanes under structure: 2, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 15.2m (49.9ft), Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 1, Length of Maximum Span: 25.6m (84.0ft), Curb-To-Curb Width: 15.2m (49.9ft), Out-to-Out Width: 17.1m (56.1ft) Condition: Deck: Good, Superstructure: Good, Substructure: Satisfactory, Operating Rating: 57.2 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 34.3 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Meets minimum limits, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 2.80m (9.19ft), Designated Inspection Frequency: Every 24 months, Inspection Date: October 2007, Bridge Improvement Cost: $384,000, Roadway Improvement Cost: $39,000, Total Project Cost: $577,000 ( Estimate for 2006), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous, Membrane: Built-up Find on map >>
Structure Number: S140231REMHDNBI, Location: 0.4 MI E OF WORC TL (Lat: 42.294689, Lng: -71.751589), Route carried "on" structure: Interstate 290, Year Built: 1968, Status: Open, Structure Length: 4.72m (15.49ft), Average Daily Traffic: 35,000 (year 2008), Truck Traffic: 15%, Average Future Daily Traffic: 108,972 (year 2027), Design Load: H 20, Features Intersected: HWY W MAIN ST Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 3, Lanes under structure: 2, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 15.2m (49.9ft), Skew: 9 degrees, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 2, Length of Maximum Span: 22.9m (75.1ft), Curb-To-Curb Width: 15.2m (49.9ft), Out-to-Out Width: 16.8m (55.1ft) Condition: Deck: Satisfactory, Superstructure: Good, Substructure: Fair, Operating Rating: 57.6 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 34.5 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: Meets minimum limits, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 4.80m (15.75ft), Designated Inspection Frequency: Every 24 months, Inspection Date: March 2008, Bridge Improvement Cost: $1,440,000, Roadway Improvement Cost: $145,000, Total Project Cost: $2,161,000 ( Estimate for 2006), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous, Membrane: Built-up Find on map >>
Structure Number: S140231RFMHDNBI, Location: .4 MI. EAST OF WORC T.L. (Lat: 42.294867, Lng: -71.751689), Route carried "on" structure: Interstate 290, Year Built: 1968, Status: Open, Structure Length: 4.72m (15.49ft), Average Daily Traffic: 35,000 (year 2008), Truck Traffic: 15%, Average Future Daily Traffic: 108,972 (year 2027), Design Load: H 20, Features Intersected: HWY W MAIN ST Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 16.544, Lanes on structure: 3, Lanes under structure: 2, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 15.2m (49.9ft), Skew: 9 degrees, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 2, Length of Maximum Span: 22.9m (75.1ft), Curb-To-Curb Width: 15.2m (49.9ft), Out-to-Out Width: 16.8m (55.1ft) Condition: Deck: Satisfactory, Superstructure: Good, Substructure: Satisfactory, Operating Rating: 55.1 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 33.0 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Meets minimum limits, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 4.80m (15.75ft), Designated Inspection Frequency: Every 24 months, Inspection Date: March 2008, Bridge Improvement Cost: $659,000, Roadway Improvement Cost: $66,000, Total Project Cost: $989,000 ( Estimate for 2006), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous, Membrane: Built-up Find on map >>
Structure Number: S14025AEXMUNNBI, Location: .5 MI EAST OF ST-140 (Lat: 42.321944, Lng: -71.697500), Route carried "on" structure: City street , Year Built: 1990, Status: Open, Structure Length: 1.22m (4.00ft), Average Daily Traffic: 260 (year 2008), Truck Traffic: 1%, Average Future Daily Traffic: 411 (year 2029), Features Intersected: WATER RAWSON HILL BROOK, Facility Carried by Structure: HWY BOWDOIN ST Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.161, Lanes on structure: 2, Owner: Town or Township Highway Agency, Approaching Roadway Width: 7.3m (24.0ft), Material/Design: Concrete, Design/Construction: Arch - Deck, Number Of Spans In Main Unit: 1, Length of Maximum Span: 12.2m (40.0ft), Curb or Sidewalk Widths: Left: 1.4m (4.6ft), Right: 1.4m (4.6ft), Curb-To-Curb Width: 7.3m (24.0ft), Out-to-Out Width: 15.2m (49.9ft) Condition: Superstructure: Very good, Substructure: Very good, Channel: Very good, Operating Rating: 44.1 metric tons, Inventory Rating: 32.4 metric tons, Structural Evaluation: Equal to present desirable criteria, Deck Geometry: Somewhat better than minimum adequacy, Waterway Adequacy: Equal to present desirable criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 1.30m (4.27ft), Designated Inspection Frequency: Every 24 months, Inspection Date: March 2008, Bridge Improvement Cost: $207,000, Roadway Improvement Cost: $21,000, Total Project Cost: $311,000 ( Estimate for 2006) Find on map >>
Structure Number: S140181YHMHDNBI, Location: ST 140/I 290 (Lat: 42.316667, Lng: -71.716667), Route carried "under" structure: Interstate 290, Year Built: 1967, Structure Length: 8.02m (26.31ft), Average Daily Traffic: 27,000 (year 0 ), Features Intersected: I 290 WB, Facility Carried by Structure: ST140 Minimum Vertical Clearance: 5.05m (16.57ft), Kilometerpoint: 0.000, Lanes on structure: 3, Lanes under structure: 4, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 39.0m (128.0ft) Find on map >>
Structure Number: S140181YHMHDNBI, Location: ST 140/I 290 (Lat: 42.316667, Lng: -71.716667), Route carried "under" structure: Interstate 290, Year Built: 1967, Structure Length: 8.02m (26.31ft), Average Daily Traffic: 27,000 (year 0 ), Features Intersected: I 290 EB, Facility Carried by Structure: ST140 Minimum Vertical Clearance: 5.05m (16.57ft), Kilometerpoint: 0.000, Lanes on structure: 3, Lanes under structure: 4, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 39.0m (128.0ft) Discuss this city on our hugely popular Massachusetts forum Back to: Shrewsbury, MA, Massachusetts, All US cities.
|
![]() |