Bridge Statistics for Silver City, New Mexico (NM)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 17Number of bridges
  • 77m253ftTotal length
  • $5,272,000Total costs
  • 139,470Total average daily traffic
  • 26,326Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Silver City
  • No street view available for this location


Jump to a detailed profile or search site with Google Custom Search

New bridges - Historical Statistics

  • 61940-1949
  • 21950-1959
  • 41960-1969
  • 41970-1979
  • 11980-1989

Average Daily Traffic

Average Truck Traffic (%)

Bridge Condition - Deck

Bridge Condition - Superstructure

Bridge Condition - Substructure

Bridge Condition - Channel

Bridge Condition - Culverts

Find on map >>   Show street view

Structure Number: 762,  Location: JCT. NM501 and Omega Road (Lat: 35.866667,  Lng: -106.316667),  Route carried "on" structure: State highway 501,  Year Built: 1951,  Year Reconstructed: 1992,  Status: Open,  Structure Length: 24.99m (81.99ft),  Average Daily Traffic: 13,195 (year 2011),  Truck Traffic: 11%,  Average Future Daily Traffic: 14,437 (year 2028),  Design Load: HS 20,  Features Intersected: Omega Road, West Road
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.371,  Lanes on structure: 4,  Lanes under structure: 2,  Approaching Roadway Width: 17.1m (56.1ft),  Material/Design: Steel,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 15,  Number Of Approach Spans: 6,  Length of Maximum Span: 134.9m (442.6ft),  Curb or Sidewalk Widths: Left: 2.4m (7.9ft),  Right: 0.0m,  Curb-To-Curb Width: 13.5m (44.3ft),  Out-to-Out Width: 16.9m (55.4ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 37.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 24.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Underclear: Superior to present desirable criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 12 months,  Critical Feature Inspection Frequency: Every 12 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: June 14,  Critical Feature Inspection Date: June 14,  Other Special Inspection Date: June 14,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 5336,  Location: 4.6 M NW OF NM-356/BAYARD (Lat: 32.781256,  Lng: -108.193931),  Route carried "on" structure: US 180,  Year Built: 1948,  Status: Open,  Structure Length: 0.90m (2.95ft),  Average Daily Traffic: 18,409 (year 2014),  Truck Traffic: 25%,  Average Future Daily Traffic: 24,205 (year 2034),  Design Load: HS 20,  Features Intersected: RIO DE ARENAS
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 190.063,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 19.6m (64.3ft),  Skew: 4 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Good,  Culverts: Fair,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.01m (3.31ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 13,  Bridge Improvement Cost: $166,000,  Roadway Improvement Cost: $16,000,  Total Project Cost: $249,000 ( Estimate for 2008)
Find on map >>   Show street view

Structure Number: 5337,  Location: 4.9 M NW OF NM-356/BAYARD (Lat: 32.782172,  Lng: -108.200083),  Route carried "on" structure: US 180,  Year Built: 1948,  Status: Open,  Structure Length: 2.75m (9.02ft),  Average Daily Traffic: 18,409 (year 2014),  Truck Traffic: 25%,  Average Future Daily Traffic: 24,205 (year 2034),  Design Load: HS 20,  Features Intersected: UNNAMED WATERWAY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 189.741,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 19.6m (64.3ft),  Skew: 4 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Fair,  Operating Rating: 53.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.87m (9.42ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 13,  Bridge Improvement Cost: $617,000,  Roadway Improvement Cost: $61,000,  Total Project Cost: $925,000 ( Estimate for 2008)
Find on map >>   Show street view

Structure Number: 5338,  Location: 5.9 M NW OF NM-356/BAYARD (Lat: 32.784147,  Lng: -108.216525),  Route carried "on" structure: US 180,  Year Built: 1948,  Status: Open,  Structure Length: 0.90m (2.95ft),  Average Daily Traffic: 18,409 (year 2014),  Truck Traffic: 25%,  Average Future Daily Traffic: 24,205 (year 2034),  Design Load: HS 20,  Features Intersected: UNNAMED WATERWAY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 187.971,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 21.5m (70.5ft),  Skew: 24 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 83.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.98m (3.22ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: May 13,  Bridge Improvement Cost: $233,000,  Roadway Improvement Cost: $23,000,  Total Project Cost: $350,000 ( Estimate for 2008)
Find on map >>   Show street view

Structure Number: 5339,  Location: 7.0 M NW OF NM-356/BAYARD (Lat: 32.786028,  Lng: -108.235406),  Route carried "on" structure: US 180,  Year Built: 1948,  Status: Open,  Structure Length: 1.00m (3.28ft),  Average Daily Traffic: 18,409 (year 2014),  Truck Traffic: 25%,  Average Future Daily Traffic: 24,205 (year 2034),  Design Load: HS 20,  Features Intersected: WEST CANYON
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 186.169,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 21.2m (69.6ft),  Skew: 20 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Good,  Culverts: Fair,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.04m (3.41ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 13,  Bridge Improvement Cost: $178,000,  Roadway Improvement Cost: $17,000,  Total Project Cost: $267,000 ( Estimate for 2008)
Find on map >>   Show street view

Structure Number: 534,  Location: 8.9 M NW OF JCT NM-356 (Lat: 32.782956,  Lng: -108.267044),  Route carried "on" structure: US 180,  Year Built: 1948,  Status: Open,  Structure Length: 1.81m (5.94ft),  Average Daily Traffic: 11,097 (year 2014),  Truck Traffic: 7%,  Average Future Daily Traffic: 13,126 (year 2034),  Design Load: HS 20,  Features Intersected: PINOS ALTOS CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 183.143,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 20.1m (65.9ft),  Skew: 24 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.86m (6.10ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: January 13,  Bridge Improvement Cost: $442,000,  Roadway Improvement Cost: $44,000,  Total Project Cost: $663,000 ( Estimate for 2008)
Find on map >>   Show street view

Structure Number: 6328,  Location: 0.3 MI S US-180/SILVERCTY (Lat: 32.775575,  Lng: -108.274183),  Route carried "on" structure: State highway 90,  Year Built: 1961,  Status: Open,  Structure Length: 0.79m (2.59ft),  Average Daily Traffic: 13,695 (year 2014),  Truck Traffic: 13%,  Average Future Daily Traffic: 16,199 (year 2034),  Design Load: HS 20,  Features Intersected: PINOS ALTOS CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 68.043,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 20.7m (67.9ft),  Skew: 3 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft),  Curb or Sidewalk Widths: Left: 1.7m (5.6ft),  Right: 1.7m (5.6ft)

Condition: Channel: Fair,  Culverts: Poor,  Operating Rating: 39.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.88m (2.89ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 14,  Bridge Improvement Cost: $183,000,  Roadway Improvement Cost: $18,000,  Total Project Cost: $274,000 ( Estimate for 2030)
Find on map >>   Show street view

Structure Number: 6431,  Location: 0.7 MI W OF JCT NM-90 (Lat: 32.781653,  Lng: -108.286706),  Route carried "on" structure: US 180,  Year Built: 1963,  Status: Open,  Structure Length: 0.77m (2.53ft),  Average Daily Traffic: 709 (year 2014),  Truck Traffic: 16%,  Average Future Daily Traffic: 839 (year 2034),  Design Load: HS 20,  Features Intersected: MISSISSIPPI STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 181.099,  Lanes on structure: 4,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 19.1m (62.7ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.7m (25.3ft)

Condition: Culverts: Satisfactory,  Operating Rating: 76.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.76m (2.49ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 13,  Bridge Improvement Cost: $20,000,  Roadway Improvement Cost: $2,000,  Total Project Cost: $24,000 ( Estimate for 2009)
Find on map >>   Show street view

Structure Number: 7168,  Location: 0.04 MI W OF JCT NM-90 (Lat: 32.774422,  Lng: -108.274978),  Route carried "on" structure: City street 4843,  Year Built: 1964,  Status: Open,  Structure Length: 2.76m (9.06ft),  Average Daily Traffic: 1,063 (year 2014),  Truck Traffic: 7%,  Average Future Daily Traffic: 1,257 (year 2034),  Design Load: HS 20,  Features Intersected: SAN VICENTE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 26.6m (87.3ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 10.4m (34.1ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 50.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.77m (9.09ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 13,  Bridge Improvement Cost: $139,000,  Roadway Improvement Cost: $13,000,  Total Project Cost: $208,000 ( Estimate for 2030),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 7309,  Location: 42.7 MI E OF US-70/NM-90 (Lat: 32.769711,  Lng: -108.275869),  Route carried "on" structure: City street 4844,  Year Built: 1972,  Status: Open,  Structure Length: 4.03m (13.22ft),  Average Daily Traffic: 1,227 (year 2014),  Truck Traffic: 6%,  Average Future Daily Traffic: 1,451 (year 2034),  Features Intersected: SAN VICENTE ARROYO
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 15.8m (51.8ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 24.7m (81.0ft),  Curb or Sidewalk Widths: Left: 1.6m (5.2ft),  Right: 1.6m (5.2ft),  Curb-To-Curb Width: 15.8m (51.8ft),  Out-to-Out Width: 19.2m (63.0ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 50.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 13,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 731,  Location: 41.4 MI E OF JCT US-70 (Lat: 32.764850,  Lng: -108.275211),  Route carried "on" structure: State highway 90,  Year Built: 1972,  Status: Open,  Structure Length: 14.84m (48.69ft),  Average Daily Traffic: 13,695 (year 2014),  Truck Traffic: 13%,  Average Future Daily Traffic: 16,199 (year 2034),  Design Load: HS 20,  Features Intersected: SAN VICENTE ARROYO/ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 66.627,  Lanes on structure: 4,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 17.6m (57.7ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 25.9m (85.0ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 0.0m,  Curb-To-Curb Width: 17.7m (58.1ft),  Out-to-Out Width: 19.7m (64.6ft)

Condition: Deck: Poor,  Superstructure: Satisfactory,  Substructure: Poor,  Channel: Good,  Operating Rating: 53.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: High priority of corrective action,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 14.84m (48.69ft),  Designated Inspection Frequency: Every 12 months,  Inspection Date: August 14,  Bridge Improvement Cost: $1,541,000,  Roadway Improvement Cost: $154,000,  Total Project Cost: $2,312,000 ( Estimate for 2030),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 7556,  Location: 0.12 MI E OF JCT NM-90 (Lat: 32.777236,  Lng: -108.271694),  Route carried "on" structure: City street 5850,  Year Built: 1953,  Status: Open,  Structure Length: 0.96m (3.15ft),  Average Daily Traffic: 2,637 (year 2014),  Truck Traffic: 7%,  Average Future Daily Traffic: 3,119 (year 2034),  Design Load: H 15,  Features Intersected: PINOS ALTOS CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 12.4m (40.7ft),  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft),  Curb or Sidewalk Widths: Left: 1.4m (4.6ft),  Right: 1.4m (4.6ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 53.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: April 12
Find on map >>   Show street view

Structure Number: 762,  Location: 0.25 MI W OF JCT NM-90 (Lat: 32.777886,  Lng: -108.278344),  Route carried "on" structure: City street 17000,  Year Built: 1948,  Status: Open,  Structure Length: 1.62m (5.31ft),  Average Daily Traffic: 273 (year 2014),  Truck Traffic: 10%,  Average Future Daily Traffic: 323 (year 2034),  Design Load: H 15,  Features Intersected: SILVA CREEK,  Facility Carried by Structure: 17-Z000
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 19.7m (64.6ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 7.6m (24.9ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 71.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 13
Find on map >>   Show street view

Structure Number: 8334,  Location: 0.2 MI S OF US-180 (Lat: 32.779825,  Lng: -108.269831),  Route carried "on" structure: City street 5835,  Year Built: 1977,  Status: Open,  Structure Length: 1.35m (4.43ft),  Average Daily Traffic: 7,598 (year 2014),  Truck Traffic: 21%,  Average Future Daily Traffic: 8,987 (year 2034),  Design Load: H 20,  Features Intersected: PINOS ALTO CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 14.2m (46.6ft),  Skew: 4 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft),  Curb or Sidewalk Widths: Left: 1.3m (4.3ft),  Right: 1.3m (4.3ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 39.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: April 12
Find on map >>   Show street view

Structure Number: 968,  Location: 7.3 miles west jct i-25 (Lat: 32.971944,  Lng: -107.433889),  Route carried "on" structure: US 158,  Year Built: 1988,  Status: Open,  Structure Length: 2.47m (8.10ft),  Average Daily Traffic: 100 (year 2014),  Average Future Daily Traffic: 300 (year 2034),  Design Load: HS 20,  Features Intersected: Unnamed Waterway,  Facility Carried by Structure: NM152
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 93.422,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 7.0m (23.0ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 6,  Length of Maximum Span: 2.8m (9.2ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 53.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: September 14
Find on map >>   Show street view

Structure Number: 6431,  Location: 0.7 MI W OF JCT NM-90 (Lat: 32.781653,  Lng: -108.286706),  Route carried "under" structure: City street 17000,  Year Built: 1963,  Structure Length: 0.77m (2.53ft),  Average Daily Traffic: 273 (year 2014),  Truck Traffic: 10%,  Features Intersected: MISSISSIPPI STREET,  Facility Carried by Structure: US-180
Minimum Vertical Clearance: 4.25m (13.94ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 2,  Material/Design: Concrete,  Design/Construction: Culvert,  Length of Maximum Span: 7.7m (25.3ft)

Find on map >>   Show street view

Structure Number: 731,  Location: 41.4 MI E OF JCT US-70 (Lat: 32.764850,  Lng: -108.275211),  Route carried "under" structure: City street 17000,  Year Built: 1972,  Structure Length: 14.84m (48.69ft),  Average Daily Traffic: 272 (year 2014),  Truck Traffic: 14%,  Features Intersected: SAN VICENTE ARROYO/ROAD,  Facility Carried by Structure: NM-90
Minimum Vertical Clearance: 7.62m (25.00ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 25.9m (85.0ft)

Discuss Silver City, New Mexico (NM) on our hugely popular New Mexico forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2016 Advameg, Inc.