U.S. Cities - City-Data Homepage  
City-Data Forum
City-Data.com Homepage

Bridge Statistics for Silver City, New Mexico (NM) - Condition, Traffic, Stress, Structural Evaluation, Project Costs

Back to: Silver City, NM, New Mexico, New Mexico forum, All US cities.





National Bridge Inventory (NBI) Statistics
Number of bridges: 15
Total length: 50 meters (164ft)
Total costs: $10,090,000
Total average daily traffic: 114,963
Total average daily truck traffic: 7,432
National Bridge Inventory (NBI) Registered Bridges for Silver City

New bridges - Historical Statistics

  • 1940-1949: 5
  • 1950-1959: 1
  • 1960-1969: 5
  • 1970-1979: 4

Average Daily Traffic

Bridge Condition - Deck

Bridge Condition - Superstructure

Bridge Condition - Substructure

Bridge Condition - Channel

Bridge Condition - Culverts

Find on map >>

Structure Number: 5336,  Location: 4.6 M NW OF NM-356/BAYARD (Lat: 32.781667,  Lng: -108.193333),  Route carried "on" structure: US 180,  Year Built: 1948,  Status: Open,  Structure Length: 0.88m (2.89ft),  Average Daily Traffic: 16,992 (year 2007),  Truck Traffic: 7%,  Average Future Daily Traffic: 22,461 (year 2027),  Design Load: HS 20,  Features Intersected: RIO DE ARENAS
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 190.064,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 19.5m (64.0ft),  Skew: 4 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Good,  Culverts: Fair,  Operating Rating: 89.1 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.88m (2.89ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2007,  Bridge Improvement Cost: $383,000,  Roadway Improvement Cost: $38,000,  Total Project Cost: $575,000 ( Estimate for 2008)
Find on map >>

Structure Number: 5337,  Location: 4.9 M NW OF NM-356/BAYARD (Lat: 32.783333,  Lng: -108.200000),  Route carried "on" structure: US 180,  Year Built: 1948,  Status: Open,  Structure Length: 2.74m (8.99ft),  Average Daily Traffic: 16,992 (year 2007),  Truck Traffic: 7%,  Average Future Daily Traffic: 22,461 (year 2027),  Design Load: HS 20,  Features Intersected: UNNAMED WATERWAY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 189.742,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 19.5m (64.0ft),  Skew: 4 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Fair,  Operating Rating: 53.5 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.74m (8.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2007,  Bridge Improvement Cost: $1,085,000,  Roadway Improvement Cost: $108,000,  Total Project Cost: $1,628,000 ( Estimate for 2008)
Find on map >>

Structure Number: 5338,  Location: 5.9 M NW OF NM-356/BAYARD (Lat: 32.785000,  Lng: -108.216667),  Route carried "on" structure: US 180,  Year Built: 1948,  Status: Open,  Structure Length: 0.88m (2.89ft),  Average Daily Traffic: 16,992 (year 2007),  Truck Traffic: 7%,  Average Future Daily Traffic: 22,461 (year 2027),  Design Load: HS 20,  Features Intersected: UNNAMED WATERWAY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 188.132,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 21.3m (69.9ft),  Skew: 4 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 82.6 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.88m (2.89ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: April 2005,  Bridge Improvement Cost: $388,000,  Roadway Improvement Cost: $38,000,  Total Project Cost: $583,000 ( Estimate for 2008)
Find on map >>

Structure Number: 534,  Location: 8.9 M NW OF JCT NM-356 (Lat: 32.783333,  Lng: -108.266667),  Route carried "on" structure: US 180,  Year Built: 1948,  Status: Open,  Structure Length: 1.86m (6.10ft),  Average Daily Traffic: 16,774 (year 2007),  Truck Traffic: 7%,  Average Future Daily Traffic: 43,856 (year 2026),  Design Load: HS 20,  Features Intersected: PINOS ALTOS CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 183.143,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 19.5m (64.0ft),  Skew: 14 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 89.1 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.86m (6.10ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: April 2004,  Bridge Improvement Cost: $812,000,  Roadway Improvement Cost: $81,000,  Total Project Cost: $1,218,000 ( Estimate for 2008)
Find on map >>

Structure Number: 6328,  Location: 0.3 MI S US-180/SILVERCTY (Lat: 32.783333,  Lng: -108.266667),  Route carried "on" structure: State highway 90,  Year Built: 1961,  Status: Open,  Structure Length: 0.79m (2.59ft),  Average Daily Traffic: 1,784 (year 2007),  Truck Traffic: 6%,  Average Future Daily Traffic: 2,325 (year 2027),  Design Load: HS 20,  Features Intersected: PINOS ALTOS CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 68.043,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 20.7m (67.9ft),  Skew: 3 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft),  Curb or Sidewalk Widths: Left: 1.7m (5.6ft),  Right: 1.7m (5.6ft)

Condition: Channel: Fair,  Culverts: Poor,  Operating Rating: 38.9 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.79m (2.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2006,  Bridge Improvement Cost: $308,000,  Roadway Improvement Cost: $30,000,  Total Project Cost: $463,000 ( Estimate for 2008)
Find on map >>

Structure Number: 643,  Location: 0.36 MI NW OF JCT NM-90 (Lat: 32.781667,  Lng: -108.278333),  Route carried "on" structure: US 180,  Year Built: 1963,  Status: Open,  Structure Length: 1.86m (6.10ft),  Average Daily Traffic: 17,083 (year 2007),  Truck Traffic: 7%,  Average Future Daily Traffic: 44,662 (year 2026),  Design Load: HS 20,  Features Intersected: SILVER CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 181.808,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 21.3m (69.9ft),  Skew: 23 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 3.7m (12.1ft),  Curb or Sidewalk Widths: Left: 2.0m (6.6ft),  Right: 2.0m (6.6ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 37.3 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.86m (6.10ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: April 2004,  Bridge Improvement Cost: $653,000,  Roadway Improvement Cost: $65,000,  Total Project Cost: $979,000 ( Estimate for 2008)
Find on map >>

Structure Number: 6431,  Location: 0.7 MI W OF JCT NM-90 (Lat: 32.781667,  Lng: -108.286667),  Route carried "on" structure: US 180,  Year Built: 1963,  Status: Open,  Structure Length: 0.76m (2.49ft),  Average Daily Traffic: 5,924 (year 2007),  Truck Traffic: 7%,  Average Future Daily Traffic: 7,722 (year 2027),  Design Load: HS 20,  Features Intersected: MISSISSIPPI STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 181.099,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 18.9m (62.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.6m (24.9ft)

Condition: Culverts: Satisfactory,  Operating Rating: 76.1 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2007
Find on map >>

Structure Number: 7168,  Location: 0.04 MI W OF JCT NM-90 (Lat: 32.775000,  Lng: -108.273333),  Route carried "on" structure: City street ,  Year Built: 1964,  Status: Open,  Structure Length: 2.77m (9.09ft),  Average Daily Traffic: 2,831 (year 2007),  Truck Traffic: 4%,  Average Future Daily Traffic: 3,834 (year 2027),  Design Load: HS 20,  Features Intersected: SAN VICENTE CREEK,  Facility Carried by Structure: COLLEGE AVENUE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.460,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 26.5m (86.9ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 10.4m (34.1ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 50.2 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.77m (9.09ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2007,  Bridge Improvement Cost: $278,000,  Roadway Improvement Cost: $27,000,  Total Project Cost: $417,000 ( Estimate for 2008),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>

Structure Number: 7309,  Location: 42.7 MI E OF US-70/NM-90 (Lat: 32.758333,  Lng: -108.101667),  Route carried "on" structure: City street ,  Year Built: 1972,  Status: Open,  Structure Length: 4.02m (13.19ft),  Average Daily Traffic: 3,801 (year 2007),  Truck Traffic: 6%,  Average Future Daily Traffic: 5,147 (year 2027),  Features Intersected: SAN VICENTE ARROYO,  Facility Carried by Structure: BROADWAY-LOCAL ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.509,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 15.9m (52.2ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 24.7m (81.0ft),  Curb or Sidewalk Widths: Left: 1.6m (5.2ft),  Right: 1.6m (5.2ft),  Curb-To-Curb Width: 15.9m (52.2ft),  Out-to-Out Width: 19.2m (63.0ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 50.2 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2007,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>

Structure Number: 731,  Location: 42.4 MI E OF JCT US-70 (Lat: 32.766667,  Lng: -108.103333),  Route carried "on" structure: State highway 90,  Year Built: 1972,  Status: Open,  Structure Length: 14.84m (48.69ft),  Average Daily Traffic: 1,784 (year 2007),  Truck Traffic: 6%,  Average Future Daily Traffic: 2,325 (year 2027),  Design Load: HS 20,  Features Intersected: SAN VICENTE ARROYO/ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 68.236,  Lanes on structure: 4,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 17.7m (58.1ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 26.2m (86.0ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 0.0m,  Curb-To-Curb Width: 17.7m (58.1ft),  Out-to-Out Width: 19.6m (64.3ft)

Condition: Deck: Poor,  Superstructure: Satisfactory,  Substructure: Poor,  Channel: Good,  Operating Rating: 53.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: High priority of corrective action,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 14.84m (48.69ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2007,  Bridge Improvement Cost: $2,818,000,  Roadway Improvement Cost: $281,000,  Total Project Cost: $4,227,000 ( Estimate for 2008),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>

Structure Number: 7556,  Location: 0.12 MI E OF JCT NM-90 (Lat: 32.776667,  Lng: -108.271667),  Route carried "on" structure: City street ,  Year Built: 1953,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 3,012 (year 2007),  Truck Traffic: 4%,  Average Future Daily Traffic: 4,156 (year 2026),  Design Load: H 15,  Features Intersected: PINOS ALTOS CREEK,  Facility Carried by Structure: 12TH STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.193,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 53.5 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: March 2004
Find on map >>

Structure Number: 762,  Location: 0.25 MI W OF JCT NM-90 (Lat: 32.776667,  Lng: -108.276667),  Route carried "on" structure: City street ,  Year Built: 1948,  Status: Open,  Structure Length: 1.62m (5.31ft),  Average Daily Traffic: 286 (year 2007),  Truck Traffic: 1%,  Average Future Daily Traffic: 387 (year 2027),  Design Load: H 15,  Features Intersected: SILVA CREEK,  Facility Carried by Structure: LOCAL ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 19.5m (64.0ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 7.6m (24.9ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 71.3 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2007
Find on map >>

Structure Number: 8334,  Location: 0.2 MI S OF JCT NM-90 (Lat: 32.781667,  Lng: -108.268333),  Route carried "on" structure: City street ,  Year Built: 1977,  Status: Open,  Structure Length: 1.34m (4.40ft),  Average Daily Traffic: 10,142 (year 2007),  Truck Traffic: 4%,  Average Future Daily Traffic: 10,452 (year 2026),  Design Load: H 20,  Features Intersected: PINOS ALTO CREEK,  Facility Carried by Structure: SWAN STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.322,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 14.3m (46.9ft),  Skew: 4 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 4.3m (14.1ft),  Curb or Sidewalk Widths: Left: 1.2m (3.9ft),  Right: 1.2m (3.9ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 38.9 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: March 2004
Find on map >>

Structure Number: 6431,  Location: 0.7 MI W OF JCT NM-90 (Lat: 32.781667,  Lng: -108.286667),  Route carried "under" structure: City street ,  Year Built: 1963,  Structure Length: 0.76m (2.49ft),  Average Daily Traffic: 286 (year 2007),  Features Intersected: US-180,  Facility Carried by Structure: US-180
Minimum Vertical Clearance: 4.19m (13.75ft),  Kilometerpoint: 0.019,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Concrete,  Design/Construction: Culvert,  Length of Maximum Span: 7.6m (24.9ft)

Find on map >>

Structure Number: 731,  Location: 42.4 MI E OF JCT US-70 (Lat: 32.766667,  Lng: -108.103333),  Route carried "under" structure: City street ,  Year Built: 1972,  Structure Length: 14.84m (48.69ft),  Average Daily Traffic: 280 (year 2007),  Features Intersected: NM-90,  Facility Carried by Structure: NM-90
Minimum Vertical Clearance: 7.62m (25.00ft),  Kilometerpoint: 0.024,  Lanes on structure: 4,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 26.2m (86.0ft)

Discuss this city on our hugely popular New Mexico forum

Back to: Silver City, NM, New Mexico, All US cities.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2009 Advameg, Inc.