National Bridge Inventory (NBI) Statistics
Number of bridges: 11
Total length: 42 meters (138ft)
Total costs: $22,000
Total average daily traffic: 80,650
Total average daily truck traffic: 3,508
Total future (year 2026) average daily traffic: 40,325
National Bridge Inventory (NBI) Registered Bridges for Simsbury

New bridges - Historical Statistics

  • 1940-1949: 2
  • 1950-1959: 4
  • 1960-1969: 0
  • 1970-1979: 1
  • 1980-1989: 2
  • 1990-1999: 2

Reconstructed bridges - Historical Statistics

  • 1980-1989: 3
  • 1990-1999: 1

Average Daily Traffic

Bridge Condition - Deck

Bridge Condition - Superstructure

Bridge Condition - Substructure

Bridge Condition - Channel

Find on map >>

Structure Number: 653,  Location: 0.1 MI SOUTH OF ROUTE 167 (Lat: 41.880000,  Lng: -72.806667),  Route carried "on" structure: State highway 10,  Year Built: 1957,  Status: Open,  Structure Length: 1.34m (4.40ft),  Average Daily Traffic: 16,200 (year 2006),  Truck Traffic: 4%,  Average Future Daily Traffic: 8,100 (year 2026),  Features Intersected: HOP BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 71.777,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.2m (40.0ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 15.0m (49.2ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 72.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 43.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 0.01m (0.03ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2008,  Bridge Improvement Cost: $1,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $2,000 ( Estimate for 2000),  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>

Structure Number: 15,  Location: 0.18 MILES EAST OF RTE 10 (Lat: 41.840000,  Lng: -72.806667),  Route carried "on" structure: State highway 185,  Year Built: 1954,  Year Reconstructed: 2001,  Status: Open,  Structure Length: 7.04m (23.10ft),  Average Daily Traffic: 18,300 (year 2006),  Truck Traffic: 5%,  Average Future Daily Traffic: 9,150 (year 2026),  Design Load: HS 20,  Features Intersected: FARMINGTON RIVER
Minimum Vertical Clearance: 4.52m (14.83ft),  Kilometerpoint: 0.290,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Material/Design: Steel,  Design/Construction: Truss - Thru,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 68.3m (224.1ft),  Curb or Sidewalk Widths: Left: 1.4m (4.6ft),  Right: 0.0m,  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 10.5m (34.4ft)

Condition: Deck: Good,  Superstructure: Fair,  Substructure: Good,  Channel: Good,  Operating Rating: 51.3 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 30.6 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.01m (0.03ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: November 2007,  Critical Feature Inspection Date: November 2007,  Bridge Improvement Cost: $1,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $2,000 ( Estimate for 2000),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Other Coated Reinforcing
Find on map >>

Structure Number: 151,  Location: .25 MILES NORTH JCT 315 (Lat: 41.911667,  Lng: -72.761667),  Route carried "on" structure: State highway 189,  Year Built: 1956,  Year Reconstructed: 1992,  Status: Open,  Structure Length: 11.98m (39.30ft),  Average Daily Traffic: 10,200 (year 2005),  Truck Traffic: 4%,  Average Future Daily Traffic: 5,100 (year 2026),  Design Load: HS 20,  Features Intersected: FARMINGTON RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 15.350,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 3 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 44.2m (145.0ft),  Curb or Sidewalk Widths: Left: 1.7m (5.6ft),  Right: 0.0m,  Curb-To-Curb Width: 10.5m (34.4ft),  Out-to-Out Width: 12.2m (40.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 89.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 54.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 0.01m (0.03ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2006,  Bridge Improvement Cost: $1,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $2,000 ( Estimate for 2000),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>

Structure Number: 4548,  Location: 150 FT EAST OF ROUTE 167 (Lat: 41.830000,  Lng: -72.856667),  Route carried "on" structure: City street ,  Year Built: 1942,  Year Reconstructed: 1989,  Status: Open,  Structure Length: 1.04m (3.41ft),  Average Daily Traffic: 2,500 (year 2007),  Truck Traffic: 4%,  Average Future Daily Traffic: 1,250 (year 2026),  Features Intersected: NOD BROOK,  Facility Carried by Structure: CLIMAX ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.080,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 4 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.4m (30.8ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 9.2m (30.2ft),  Out-to-Out Width: 10.5m (34.4ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 39.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 23.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 10.0 - 19.9% below),  Length Of Structure Improvement: 0.01m (0.03ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2007,  Bridge Improvement Cost: $1,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $2,000 ( Estimate for 2000),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>

Structure Number: 4549,  Location: 150' NORTH OF NORTHGATE (Lat: 41.925000,  Lng: -72.851667),  Route carried "on" structure: City street ,  Year Built: 1949,  Status: Open,  Structure Length: 0.73m (2.40ft),  Average Daily Traffic: 3,400 (year 2007),  Truck Traffic: 7%,  Average Future Daily Traffic: 1,700 (year 2026),  Design Load: H 20,  Features Intersected: BISSELL BROOK,  Facility Carried by Structure: FIRETOWN ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.467,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 7.6m (24.9ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.4m (21.0ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 8.7m (28.5ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 54.0 metric tons,  Inventory Rating: 36.0 metric tons,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 0.01m (0.03ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2007,  Bridge Improvement Cost: $1,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $2,000 ( Estimate for 2000),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 455,  Location: 1500' NORTH OF HOLCOMB RD (Lat: 41.900000,  Lng: -72.826667),  Route carried "on" structure: City street ,  Year Built: 1956,  Year Reconstructed: 1989,  Status: Open,  Structure Length: 1.22m (4.00ft),  Average Daily Traffic: 450 (year 2007),  Truck Traffic: 2%,  Average Future Daily Traffic: 225 (year 2026),  Design Load: HS 20,  Features Intersected: BISSELL BROOK,  Facility Carried by Structure: BARNDOOR HILLS RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 122.284,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.0m (36.1ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 8.3m (27.2ft)

Condition: Deck: Very good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 52.2 metric tons,  Inventory Rating: 30.6 metric tons,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.01m (0.03ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2007,  Bridge Improvement Cost: $1,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $2,000 ( Estimate for 2000),  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>

Structure Number: 4551,  Location: 350'SOUTH OF CEDAR HLL RD (Lat: 41.881667,  Lng: -72.831667),  Route carried "on" structure: City street ,  Year Built: 1978,  Status: Open,  Structure Length: 0.79m (2.59ft),  Average Daily Traffic: 400 (year 2007),  Truck Traffic: 7%,  Average Future Daily Traffic: 200 (year 2026),  Features Intersected: HOP BROOK,  Facility Carried by Structure: CEDAR GLEN
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.145,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.7m (12.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 15.4m (50.5ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 54.0 metric tons,  Inventory Rating: 38.7 metric tons,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.01m (0.03ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2007,  Bridge Improvement Cost: $1,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $2,000 ( Estimate for 2000)
Find on map >>

Structure Number: 5427,  Location: 0.4 MI WEST OF RTE 10/202 (Lat: 41.878333,  Lng: -72.813333),  Route carried "on" structure: State highway 167,  Year Built: 1986,  Status: Open,  Structure Length: 1.52m (4.99ft),  Average Daily Traffic: 13,800 (year 2006),  Truck Traffic: 4%,  Average Future Daily Traffic: 6,900 (year 2026),  Design Load: HS 20+Mod,  Features Intersected: HOP BROOK POND
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 16.058,  Lanes on structure: 3,  Owner: State Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Skew: 2 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 3.4m (11.2ft),  Curb or Sidewalk Widths: Left: 2.7m (8.9ft),  Right: 0.0m,  Curb-To-Curb Width: 17.2m (56.4ft),  Out-to-Out Width: 26.5m (86.9ft)

Condition: Channel: Very good,  Culverts: Good,  Operating Rating: 63.0 metric tons,  Inventory Rating: 40.5 metric tons,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.01m (0.03ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2007,  Bridge Improvement Cost: $1,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $2,000 ( Estimate for 2000)
Find on map >>

Structure Number: 5637,  Location: 110' WEST OF RIVER RD (Lat: 41.876667,  Lng: -72.798333),  Route carried "on" structure: City street ,  Year Built: 1988,  Status: Open,  Structure Length: 5.82m (19.09ft),  Average Daily Traffic: 3,700 (year 2007),  Truck Traffic: 7%,  Average Future Daily Traffic: 1,850 (year 2026),  Design Load: HS 20,  Features Intersected: FARMINGTON RIVER,  Facility Carried by Structure: DRAKE HILL ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.218,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 35.1m (115.2ft),  Curb-To-Curb Width: 9.7m (31.8ft),  Out-to-Out Width: 10.9m (35.8ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 81.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 48.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 0.01m (0.03ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 48 months,  Inspection Date: October 2007,  Underwater Inspection Date: January 2006,  Bridge Improvement Cost: $1,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $2,000 ( Estimate for 2000),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>

Structure Number: 6191,  Location: .2 MI E OF ROUTE 10 & 202 (Lat: 41.893333,  Lng: -72.783333),  Route carried "on" structure: State highway 315,  Year Built: 1992,  Status: Open,  Structure Length: 9.75m (31.99ft),  Average Daily Traffic: 7,400 (year 2006),  Truck Traffic: 3%,  Average Future Daily Traffic: 3,700 (year 2026),  Design Load: HS 20,  Features Intersected: FARMINGTON RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.322,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Skew: 9 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 33.8m (110.9ft),  Curb or Sidewalk Widths: Left: 2.4m (7.9ft),  Right: 0.0m,  Curb-To-Curb Width: 11.0m (36.1ft),  Out-to-Out Width: 14.3m (46.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 68.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 41.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 0.01m (0.03ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 48 months,  Inspection Date: September 2007,  Underwater Inspection Date: January 2006,  Bridge Improvement Cost: $1,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $2,000 ( Estimate for 2000),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>

Structure Number: 6192,  Location: .32 MI W OF JCT ROUTE 167 (Lat: 41.866667,  Lng: -72.823333),  Route carried "on" structure: State highway 309,  Year Built: 1992,  Status: Open,  Structure Length: 1.04m (3.41ft),  Average Daily Traffic: 4,300 (year 2005),  Truck Traffic: 3%,  Average Future Daily Traffic: 2,150 (year 2026),  Design Load: HS 20,  Features Intersected: STRATTON BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 7.112,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.1m (29.9ft),  Curb-To-Curb Width: 9.3m (30.5ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Very good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 52.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 30.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.01m (0.03ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2006,  Bridge Improvement Cost: $1,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $2,000 ( Estimate for 2000),  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up,  Deck Protection: Epoxy Coated Reinforcing

Discuss this city on our hugely popular Connecticut forum

Back to: Simsbury, CT, Connecticut, All US cities.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2009 Advameg, Inc.