![]() |
Bridge Statistics for Sloatsburg, New York (NY) - Condition, Traffic, Stress, Structural Evaluation, Project CostsBack to: Sloatsburg, NY, New York, New York forum, All US cities. National Bridge Inventory (NBI) Statistics Number of bridges: 14 Total length: 58 meters (190ft) Total costs: $18,811,000 Total average daily traffic: 234,061 Total average daily truck traffic: 38,549 National Bridge Inventory (NBI) Registered Bridges for Sloatsburg
Bridge Condition - Deck Bridge Condition - Superstructure Bridge Condition - Substructure Bridge Condition - Channel Find on map >>
Structure Number: 101406, Location: 2.2 MI N JCT RTS 17+59 (Lat: 41.153942, Lng: -74.193436), Route carried "on" structure: State highway 17, Year Built: 1939, Year Reconstructed: 1950, Status: Open, Structure Length: 1.34m (4.40ft), Average Daily Traffic: 19,606 (year 2007), Truck Traffic: 6%, Average Future Daily Traffic: 27,448 (year 2027), Design Load: H 20, Features Intersected: NAKAMA CREEK Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 3.276, Lanes on structure: 5, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 16.4m (53.8ft), Material/Design: Concrete continuous, Design/Construction: Culvert, Number Of Spans In Main Unit: 3, Length of Maximum Span: 4.8m (15.7ft), Curb or Sidewalk Widths: Left: 1.6m (5.2ft), Right: 1.6m (5.2ft), Curb-To-Curb Width: 16.4m (53.8ft), Out-to-Out Width: 20.3m (66.6ft) Condition: Channel: Fair, Culverts: Good, Operating Rating: 72.9 metric tons, Inventory Rating: 32.6 metric tons, Structural Evaluation: Better than present minimum criteria, Deck Geometry: High priority of replacement, Waterway Adequacy: Somewhat better than minimum adequacy, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 1.34m (4.40ft), Designated Inspection Frequency: Every 24 months, Inspection Date: May 2006, Bridge Improvement Cost: $602,000, Roadway Improvement Cost: $358,000, Total Project Cost: $960,000 ( Estimate for 2007), Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 105041, Location: IN SLOATSBURG (Lat: 41.161044, Lng: -74.191344), Route carried "on" structure: Other road , Year Built: 1950, Year Reconstructed: 1955, Status: Open, Structure Length: 2.59m (8.50ft), Average Daily Traffic: 1,500 (year 1979), Truck Traffic: 6%, Average Future Daily Traffic: 1,954 (year 1999), Design Load: H 20, Features Intersected: MNRR PJ LINE, Facility Carried by Structure: SEVEN LAKES PKWY Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 160.932, Lanes on structure: 2, Owner: State Highway Agency, Approaching Roadway Width: 8.5m (27.9ft), Material/Design: Concrete, Design/Construction: Frame, Number Of Spans In Main Unit: 2, Length of Maximum Span: 11.8m (38.7ft), Curb or Sidewalk Widths: Left: 1.5m (4.9ft), Right: 1.5m (4.9ft), Curb-To-Curb Width: 8.5m (27.9ft), Out-to-Out Width: 12.2m (40.0ft) Condition: Deck: Satisfactory, Superstructure: Satisfactory, Substructure: Satisfactory, Operating Rating: 60.5 metric tons, Inventory Rating: 25.3 metric tons, Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Somewhat better than minimum adequacy, Underclear: Meets minimum limits, Approach Roadway Alignment: Meets minimum limits, Length Of Structure Improvement: 2.59m (8.50ft), Designated Inspection Frequency: Every 24 months, Inspection Date: September 2006, Bridge Improvement Cost: $699,000, Roadway Improvement Cost: $416,000, Total Project Cost: $1,115,000 ( Estimate for 2007), Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 105042, Location: 0.1MI E JCT RTE17+PARK RD (Lat: 41.161706, Lng: -74.189442), Route carried "on" structure: State highway 974, Year Built: 1929, Status: Open, Structure Length: 1.82m (5.97ft), Average Daily Traffic: 1,500 (year 1979), Truck Traffic: 6%, Average Future Daily Traffic: 1,954 (year 1999), Features Intersected: RAMAPO RIVER Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 161.109, Lanes on structure: 2, Owner: State Highway Agency, Approaching Roadway Width: 11.5m (37.7ft), Material/Design: Concrete continuous, Design/Construction: Arch - Deck, Number Of Spans In Main Unit: 2, Length of Maximum Span: 7.6m (24.9ft), Curb or Sidewalk Widths: Left: 1.2m (3.9ft), Right: 0.0m, Curb-To-Curb Width: 7.5m (24.6ft), Out-to-Out Width: 9.1m (29.9ft) Condition: Deck: Satisfactory, Superstructure: Satisfactory, Substructure: Satisfactory, Channel: Fair, Operating Rating: 51.1 metric tons, Inventory Rating: 23.6 metric tons, Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Meets minimum limits, Waterway Adequacy: Meets minimum limits, Approach Roadway Alignment: Meets minimum limits, Length Of Structure Improvement: 1.82m (5.97ft), Designated Inspection Frequency: Every 24 months, Inspection Date: December 2006, Bridge Improvement Cost: $369,000, Roadway Improvement Cost: $220,000, Total Project Cost: $589,000 ( Estimate for 2007), Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 105043, Location: 0.2MI E JCT RTE17+PARK RD (Lat: 41.161892, Lng: -74.188833), Route carried "on" structure: State highway 974, Year Built: 1929, Year Reconstructed: 1963, Status: Open, Structure Length: 1.49m (4.89ft), Average Daily Traffic: 1,500 (year 1979), Truck Traffic: 6%, Average Future Daily Traffic: 1,954 (year 1999), Features Intersected: RAMAPO RIVER Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 161.174, Lanes on structure: 2, Owner: State Highway Agency, Approaching Roadway Width: 11.5m (37.7ft), Material/Design: Concrete, Design/Construction: Arch - Deck, Number Of Spans In Main Unit: 1, Length of Maximum Span: 14.3m (46.9ft), Curb or Sidewalk Widths: Left: 0.1m (0.3ft), Right: 1.2m (3.9ft), Curb-To-Curb Width: 7.3m (24.0ft), Out-to-Out Width: 8.9m (29.2ft) Condition: Deck: Satisfactory, Superstructure: Satisfactory, Substructure: Satisfactory, Channel: Fair, Operating Rating: 42.0 metric tons, Inventory Rating: 17.7 metric tons, Structural Evaluation: Meets minimum limits, Deck Geometry: Meets minimum limits, Waterway Adequacy: Somewhat better than minimum adequacy, Approach Roadway Alignment: Meets minimum limits, Length Of Structure Improvement: 1.49m (4.89ft), Designated Inspection Frequency: Every 24 months, Inspection Date: December 2006, Bridge Improvement Cost: $296,000, Roadway Improvement Cost: $176,000, Total Project Cost: $472,000 ( Estimate for 2007), Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 334617, Location: .6 MILE N OF SLOATSBURG (Lat: 41.168131, Lng: -74.190794), Route carried "on" structure: City street , Year Built: 1992, Status: Open, Structure Length: 4.99m (16.37ft), Average Daily Traffic: 500 (year 2007), Truck Traffic: 8%, Average Future Daily Traffic: 700 , Design Load: HS 20, Features Intersected: RAMAPO RIVER, Facility Carried by Structure: WASHINGTON AVENUE Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Owner: County Highway Agency, Approaching Roadway Width: 9.1m (29.9ft), Skew: 1 degrees, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 3, Length of Maximum Span: 24.3m (79.7ft), Curb or Sidewalk Widths: Left: 0.0m, Right: 1.5m (4.9ft), Curb-To-Curb Width: 9.4m (30.8ft), Out-to-Out Width: 10.2m (33.5ft) Condition: Deck: Satisfactory, Superstructure: Good, Substructure: Very good, Channel: Very good, Operating Rating: 61.7 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 31.8 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Better than present minimum criteria, Deck Geometry: Equal to present minimum criteria, Waterway Adequacy: Equal to present minimum criteria, Approach Roadway Alignment: Equal to present minimum criteria, Length Of Structure Improvement: 4.99m (16.37ft), Designated Inspection Frequency: Every 24 months, Inspection Date: April 2007, Bridge Improvement Cost: $1,126,000, Roadway Improvement Cost: $670,000, Total Project Cost: $1,796,000 ( Estimate for 2007), Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 336471, Location: AT SLOATSBURG (Lat: 41.166478, Lng: -74.180133), Route carried "on" structure: Other road , Year Built: 1953, Status: Open, Structure Length: 1.88m (6.17ft), Average Daily Traffic: 800 (year 2007), Truck Traffic: 6%, Average Future Daily Traffic: 1,042 , Design Load: HS 20, Features Intersected: STONY BROOK, Facility Carried by Structure: SEVEN LAKES DRIVE Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Owner: State Park, Forest, or Reservation Agency, Approaching Roadway Width: 6.7m (22.0ft), Skew: 2 degrees, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 1, Length of Maximum Span: 17.3m (56.8ft), Curb or Sidewalk Widths: Left: 0.7m (2.3ft), Right: 0.7m (2.3ft), Curb-To-Curb Width: 10.5m (34.4ft), Out-to-Out Width: 12.6m (41.3ft) Condition: Deck: Fair, Superstructure: Satisfactory, Substructure: Satisfactory, Channel: Satisfactory, Operating Rating: 62.6 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 37.2 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Equal to present minimum criteria, Waterway Adequacy: Somewhat better than minimum adequacy, Approach Roadway Alignment: Somewhat better than minimum adequacy, Length Of Structure Improvement: 1.88m (6.17ft), Designated Inspection Frequency: Every 24 months, Inspection Date: June 2007, Bridge Improvement Cost: $865,000, Roadway Improvement Cost: $515,000, Total Project Cost: $1,380,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete Find on map >>
Structure Number: 336472, Location: AT SLOATSBURG (Lat: 41.162508, Lng: -74.185750), Route carried "on" structure: City street , Year Built: 1910, Year Reconstructed: 1971, Status: Open, Structure Length: 1.31m (4.30ft), Average Daily Traffic: 100 (year 2007), Truck Traffic: 8%, Average Future Daily Traffic: 140 , Features Intersected: STONY BROOK, Facility Carried by Structure: WALDRON TERRACE Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Owner: County Highway Agency, Approaching Roadway Width: 4.8m (15.7ft), Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 1, Length of Maximum Span: 12.4m (40.7ft), Curb or Sidewalk Widths: Left: 1.2m (3.9ft), Right: 0.0m, Curb-To-Curb Width: 4.6m (15.1ft), Out-to-Out Width: 6.4m (21.0ft) Condition: Deck: Good, Superstructure: Satisfactory, Substructure: Poor, Channel: Poor, Operating Rating: 53.5 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 31.8 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Meets minimum limits, Deck Geometry: High priority of replacement, Waterway Adequacy: Meets minimum limits, Approach Roadway Alignment: Meets minimum limits, Length Of Structure Improvement: 1.31m (4.30ft), Designated Inspection Frequency: Every 24 months, Inspection Date: March 2007, Bridge Improvement Cost: $185,000, Roadway Improvement Cost: $110,000, Total Project Cost: $295,000 ( Estimate for 2007), Deck Structure Type: Open Grating Find on map >>
Structure Number: 336479, Location: AT SLOATSBURG (Lat: 41.164125, Lng: -74.183536), Route carried "on" structure: Other road , Year Built: 1953, Status: Open, Structure Length: 2.22m (7.28ft), Average Daily Traffic: 877 (year 1989), Truck Traffic: 6%, Average Future Daily Traffic: 1,143 (year 2009), Design Load: HS 20, Features Intersected: STONY BROOK, Facility Carried by Structure: SEVEN LAKES DRIVE Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Owner: State Park, Forest, or Reservation Agency, Approaching Roadway Width: 6.7m (22.0ft), Skew: 4 degrees, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 1, Length of Maximum Span: 20.4m (66.9ft), Curb or Sidewalk Widths: Left: 1.4m (4.6ft), Right: 0.8m (2.6ft), Curb-To-Curb Width: 12.1m (39.7ft), Out-to-Out Width: 15.0m (49.2ft) Condition: Deck: Satisfactory, Superstructure: Satisfactory, Substructure: Poor, Channel: Satisfactory, Operating Rating: 60.8 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 36.3 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Meets minimum limits, Deck Geometry: Better than present minimum criteria, Waterway Adequacy: Meets minimum limits, Approach Roadway Alignment: Somewhat better than minimum adequacy, Length Of Structure Improvement: 2.22m (7.28ft), Designated Inspection Frequency: Every 24 months, Inspection Date: June 2007, Bridge Improvement Cost: $739,000, Roadway Improvement Cost: $440,000, Total Project Cost: $1,179,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete Find on map >>
Structure Number: 5514181, Location: 4.3 MI N JCT RTS I87+202 (Lat: 41.163669, Lng: -74.184233), Route carried "on" structure: Interstate 87, Year Built: 1953, Status: Open, Structure Length: 8.16m (26.77ft), Average Daily Traffic: 42,609 (year 2000), Truck Traffic: 18%, Average Future Daily Traffic: 67,092 (year 2020), Design Load: HS 20+Mod, Features Intersected: SEVEN LAKES DRIVE, STONY Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 193.209, Lanes on structure: 3, Lanes under structure: 2, Toll: On toll road, Owner: State Toll Authority, Approaching Roadway Width: 15.8m (51.8ft), Skew: 3 degrees, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 4, Length of Maximum Span: 23.1m (75.8ft), Curb or Sidewalk Widths: Left: 0.2m (0.7ft), Right: 0.2m (0.7ft), Curb-To-Curb Width: 15.8m (51.8ft), Out-to-Out Width: 17.1m (56.1ft) Condition: Deck: Good, Superstructure: Satisfactory, Substructure: Fair, Channel: Good, Operating Rating: 59.9 metric tons, Method Used To Determine Operating Rating: Allowable Stress (AS), Inventory Rating: 33.6 metric tons, Method Used To Determine Inventory Rating: Allowable Stress (AS), Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: Somewhat better than minimum adequacy, Underclear: Meets minimum limits, Waterway Adequacy: Somewhat better than minimum adequacy, Approach Roadway Alignment: Better than present minimum criteria, Length Of Structure Improvement: 8.16m (26.77ft), Designated Inspection Frequency: Every 24 months, Inspection Date: May 2006, Bridge Improvement Cost: $3,088,000, Roadway Improvement Cost: $1,792,000, Total Project Cost: $4,880,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 5514182, Location: 4.3 MI N JCT RTS I87+202 (Lat: 41.163633, Lng: -74.184233), Route carried "on" structure: Interstate 87, Year Built: 1953, Status: Open, Structure Length: 8.93m (29.30ft), Average Daily Traffic: 42,609 (year 2000), Truck Traffic: 18%, Average Future Daily Traffic: 67,092 (year 2020), Design Load: HS 20+Mod, Features Intersected: SEVEN LAKES DRIVE, STONY Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 193.209, Lanes on structure: 3, Lanes under structure: 2, Toll: On toll road, Owner: State Toll Authority, Approaching Roadway Width: 14.9m (48.9ft), Skew: 3 degrees, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 4, Length of Maximum Span: 27.7m (90.9ft), Curb or Sidewalk Widths: Left: 0.7m (2.3ft), Right: 0.7m (2.3ft), Curb-To-Curb Width: 14.9m (48.9ft), Out-to-Out Width: 17.0m (55.8ft) Condition: Deck: Poor, Superstructure: Fair, Substructure: Fair, Channel: Satisfactory, Operating Rating: 58.1 metric tons, Method Used To Determine Operating Rating: Allowable Stress (AS), Inventory Rating: 28.1 metric tons, Method Used To Determine Inventory Rating: Allowable Stress (AS), Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: Meets minimum limits, Underclear: Meets minimum limits, Waterway Adequacy: Meets minimum limits, Approach Roadway Alignment: Better than present minimum criteria, Length Of Structure Improvement: 8.93m (29.30ft), Designated Inspection Frequency: Every 24 months, Inspection Date: May 2006, Bridge Improvement Cost: $3,364,000, Roadway Improvement Cost: $1,953,000, Total Project Cost: $5,317,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous, Membrane: Preformed Fabric Find on map >>
Structure Number: 552138, Location: 0.9 MI NE OF SLOATSBURG (Lat: 41.169403, Lng: -74.176150), Route carried "on" structure: Other road , Year Built: 1961, Status: Open, Structure Length: 2.07m (6.79ft), Average Daily Traffic: 1,540 (year 2002), Truck Traffic: 6%, Average Future Daily Traffic: 2,006 (year 2022), Features Intersected: STONY BROOK, Facility Carried by Structure: 987E987E85011002 Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 162.927, Lanes on structure: 2, Owner: State Park, Forest, or Reservation Agency, Approaching Roadway Width: 8.2m (26.9ft), Skew: 3 degrees, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 1, Length of Maximum Span: 19.2m (63.0ft), Curb or Sidewalk Widths: Left: 0.5m (1.6ft), Right: 0.5m (1.6ft), Curb-To-Curb Width: 9.7m (31.8ft), Out-to-Out Width: 11.3m (37.1ft) Condition: Deck: Satisfactory, Superstructure: Fair, Substructure: Satisfactory, Channel: Good, Operating Rating: 66.2 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 39.0 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: Somewhat better than minimum adequacy, Waterway Adequacy: Somewhat better than minimum adequacy, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 2.07m (6.79ft), Designated Inspection Frequency: Every 24 months, Inspection Date: June 2007, Bridge Improvement Cost: $519,000, Roadway Improvement Cost: $309,000, Total Project Cost: $828,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 551417, Location: 3.6 MI N JCT I87 & US 202 (Lat: 41.151697, Lng: -74.189100), Route carried "under" structure: Interstate 87, Year Built: 1953, Structure Length: 4.48m (14.70ft), Average Daily Traffic: 118,920 (year 2005), Truck Traffic: 18%, Features Intersected: RTE I87, Facility Carried by Structure: SLOATSBURG PEDES Minimum Vertical Clearance: 5.74m (18.83ft), Kilometerpoint: 29.767, Lanes under structure: 6, Material/Design: Steel continuous, Design/Construction: Girder and Floorbeam System, Length of Maximum Span: 21.9m (71.9ft) Find on map >>
Structure Number: 5514181, Location: 4.3 MI N JCT RTS I87+202 (Lat: 41.163669, Lng: -74.184233), Route carried "under" structure: Other road , Year Built: 1953, Structure Length: 8.16m (26.77ft), Average Daily Traffic: 1,000 (year 2007), Truck Traffic: 6%, Features Intersected: SEVEN LAKES DRIVE, STONY, Facility Carried by Structure: RTE I87 Minimum Vertical Clearance: 4.87m (15.98ft), Kilometerpoint: 0.000, Lanes on structure: 3, Lanes under structure: 2, Toll: On toll road, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 23.1m (75.8ft) Find on map >>
Structure Number: 5514182, Location: 4.3 MI N JCT RTS I87+202 (Lat: 41.163633, Lng: -74.184233), Route carried "under" structure: Other road , Year Built: 1953, Structure Length: 8.93m (29.30ft), Average Daily Traffic: 1,000 (year 2007), Truck Traffic: 6%, Features Intersected: SEVEN LAKES DRIVE, STONY, Facility Carried by Structure: RTE I87 Minimum Vertical Clearance: 6.73m (22.08ft), Kilometerpoint: 0.000, Lanes on structure: 3, Lanes under structure: 2, Toll: On toll road, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 27.7m (90.9ft) Discuss this city on our hugely popular New York forum Back to: Sloatsburg, NY, New York, All US cities.
|
![]() |