Bridge Statistics for Slocomb, Alabama (AL)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 17Number of bridges
  • 95ft / 29.4mTotal length
  • $8,682,000Total costs
  • 6,372Total average daily traffic
  • 261Total average daily truck traffic
  • 8,918Total future (year 2033) average daily traffic
  • National Bridge Inventory (NBI) Registered Bridges for Slocomb
  • No street view available for this location

New bridges in Slocomb, AL - historical statistics
  • New bridges - historical statistics
  • 21940-1949
  • 21950-1959
  • 21960-1969
  • 11970-1979
  • 11980-1989
  • 71990-1999
  • 12000-2009
  • 12010-2019
Reconstructed bridges in Slocomb, AL - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 21980-1989
  • 11990-1999
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 9.1%Excellent
  • 18.2%Good
  • 72.7%Satisfactory
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 9.1%Excellent
  • 63.6%Good
  • 27.3%Satisfactory
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 9.1%Excellent
  • 18.2%Good
  • 9.1%Satisfactory
  • 63.6%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 5.9%Very good
  • 41.2%Good
  • 47.1%Satisfactory
  • 5.9%Fair
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 16.7%Very good
  • 33.3%Good
  • 16.7%Satisfactory
  • 33.3%Fair
Find on map >>   Show street view

Structure Number: 2994,  Location: 3 MI. SE OF SLOCOMB (Lat: 31.076731,  Lng: -85.555811),  Route carried "on" structure: County highway ,  Year Built: 1947,  Status: Posted for load,  Structure Length: 0.91m (2.99ft),  Average Daily Traffic: 127 (year 2020),  Truck Traffic: 1%,  Average Future Daily Traffic: 178 (year 2040),  Design Load: H 15,  Features Intersected: TINDILL BRANCH,  Facility Carried by Structure: TINDILL CREEK ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Wood or Timber,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.6m (15.1ft),  Curb-To-Curb Width: 4.5m (14.8ft),  Out-to-Out Width: 4.9m (16.1ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 26.9 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 19.9 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 30.0 - 39.9% below),  Length Of Structure Improvement: 1.59m (5.22ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: November 2020,  Other Special Inspection Date: November 2021,  Bridge Improvement Cost: $174,000,  Roadway Improvement Cost: $17,000,  Total Project Cost: $191,000 ( Estimate for 2022),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Wood or Timber
Find on map >>   Show street view

Structure Number: 3386,  Location: 4 MILES S W OF SLOCOMB (Lat: 31.056369,  Lng: -85.624267),  Route carried "on" structure: County highway ,  Year Built: 1990,  Status: Closed,  Structure Length: 1.40m (4.59ft),  Average Daily Traffic: 40 (year 2020),  Average Future Daily Traffic: 76 (year 2040),  Design Load: H 15,  Features Intersected: HURRICANE CREEK,  Facility Carried by Structure: WHITE OAK ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Wood or Timber,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 4.9m (16.1ft),  Curb-To-Curb Width: 4.5m (14.8ft),  Out-to-Out Width: 4.9m (16.1ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Fair,  Channel: Good,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Meets minimum limits,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 2.07m (6.79ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: August 2020,  Other Special Inspection Date: August 2020,  Bridge Improvement Cost: $227,000,  Roadway Improvement Cost: $23,000,  Total Project Cost: $250,000 ( Estimate for 2022),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Wood or Timber
Find on map >>   Show street view

Structure Number: 4295,  Location: 4 MILES SOUTH OF SLOCOMB (Lat: 31.056947,  Lng: -85.616117),  Route carried "on" structure: County highway 9,  Year Built: 1952,  Status: Open,  Structure Length: 0.95m (3.12ft),  Average Daily Traffic: 765 (year 2022),  Truck Traffic: 10%,  Average Future Daily Traffic: 1,075 (year 2042),  Design Load: H 15,  Features Intersected: WOLFPEN BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Fair,  Operating Rating: 67.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.63m (5.35ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2022,  Bridge Improvement Cost: $291,000,  Roadway Improvement Cost: $29,000,  Total Project Cost: $320,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 5742,  Location: 3 MI. SE OF SLOCOMB (Lat: 31.076406,  Lng: -85.559042),  Route carried "on" structure: County highway ,  Year Built: 1995,  Status: Posted for load,  Structure Length: 2.10m (6.89ft),  Average Daily Traffic: 36 (year 2020),  Average Future Daily Traffic: 59 (year 2040),  Design Load: H 15,  Features Intersected: DAVIS MILL CREEK,  Facility Carried by Structure: TINDIL CREEK RD.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Wood or Timber,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 5.2m (17.1ft),  Curb-To-Curb Width: 4.8m (15.7ft),  Out-to-Out Width: 5.0m (16.4ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 32.6 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 24.0 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present desirable criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Meets minimum limits,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 20.0 - 29.9% below),  Length Of Structure Improvement: 2.88m (9.45ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: November 2020,  Other Special Inspection Date: November 2021,  Bridge Improvement Cost: $315,000,  Roadway Improvement Cost: $32,000,  Total Project Cost: $347,000 ( Estimate for 2022),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Wood or Timber
Find on map >>   Show street view

Structure Number: 7878,  Location: 3 MILES E OF HARTFORD (Lat: 31.116589,  Lng: -85.628114),  Route carried "on" structure: County highway ,  Year Built: 1963,  Status: Open,  Structure Length: 1.92m (6.30ft),  Average Daily Traffic: 60 (year 2021),  Average Future Daily Traffic: 88 (year 2041),  Design Load: H 20,  Features Intersected: LITTLE CREEK,  Facility Carried by Structure: LEWIS RD.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 43.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 26.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 2.65m (8.69ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $521,000,  Roadway Improvement Cost: $52,000,  Total Project Cost: $573,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 9018,  Location: 4 MI N OF SLOCOMB (Lat: 31.167722,  Lng: -85.603931),  Route carried "on" structure: County highway ,  Year Built: 1966,  Year Reconstructed: 1991,  Status: Posted for load,  Structure Length: 1.34m (4.40ft),  Average Daily Traffic: 25 (year 2020),  Average Future Daily Traffic: 30 (year 2040),  Features Intersected: PATES CREEK BRANCH,  Facility Carried by Structure: STEWART RD.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Wood or Timber,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 4.6m (15.1ft),  Curb-To-Curb Width: 4.6m (15.1ft),  Out-to-Out Width: 5.0m (16.4ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 26.9 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 19.9 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 30.0 - 39.9% below),  Length Of Structure Improvement: 2.02m (6.63ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: August 2020,  Other Special Inspection Date: August 2021,  Bridge Improvement Cost: $221,000,  Roadway Improvement Cost: $22,000,  Total Project Cost: $243,000 ( Estimate for 2022),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 10352,  Location: 2 MI S OF SLOCOMB (Lat: 31.082136,  Lng: -85.610506),  Route carried "on" structure: County highway 16,  Year Built: 1970,  Status: Open,  Structure Length: 0.95m (3.12ft),  Average Daily Traffic: 450 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 665 (year 2040),  Design Load: HS 20,  Features Intersected: PINE LOG BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 50.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 30.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.63m (5.35ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $376,000,  Roadway Improvement Cost: $38,000,  Total Project Cost: $414,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 12667,  Location: 4 MI SW OF SLOCOMB (Lat: 31.062169,  Lng: -85.632878),  Route carried "on" structure: County highway ,  Year Built: 1982,  Status: Open,  Structure Length: 3.11m (10.20ft),  Average Daily Traffic: 40 (year 2020),  Average Future Daily Traffic: 76 (year 2040),  Design Load: H 15,  Features Intersected: HURRICANE CREEK,  Facility Carried by Structure: MITCHELL RD.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.1m (26.6ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 45.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 27.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 3.96m (12.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $706,000,  Roadway Improvement Cost: $71,000,  Total Project Cost: $777,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 15225,  Location: 5 MI. N. FLA. LINE (Lat: 31.061250,  Lng: -85.556067),  Route carried "on" structure: State highway 103,  Year Built: 1990,  Status: Open,  Structure Length: 5.00m (16.40ft),  Average Daily Traffic: 1,510 (year 2013),  Truck Traffic: 4%,  Average Future Daily Traffic: 1,909 (year 2033),  Design Load: HS 20,  Features Intersected: WRIGHT'S CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 7.986,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 12.5m (41.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.1m (43.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 54.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 30.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.02m (19.75ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $1,774,000,  Roadway Improvement Cost: $177,000,  Total Project Cost: $1,951,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 15281,  Location: 3 MI SW OF SLOCOMB (Lat: 31.071686,  Lng: -85.619633),  Route carried "on" structure: County highway ,  Year Built: 1946,  Year Reconstructed: 1991,  Status: Posted for load,  Structure Length: 0.94m (3.08ft),  Average Daily Traffic: 47 (year 2020),  Average Future Daily Traffic: 61 (year 2040),  Design Load: H 15,  Features Intersected: PINE LOG BR.,  Facility Carried by Structure: UNION HILL RD.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Wood or Timber,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.6m (15.1ft),  Curb-To-Curb Width: 4.5m (14.8ft),  Out-to-Out Width: 4.9m (16.1ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 27.4 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 20.3 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 30.0 - 39.9% below),  Length Of Structure Improvement: 1.61m (5.28ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: July 2020,  Other Special Inspection Date: July 2021,  Bridge Improvement Cost: $176,000,  Roadway Improvement Cost: $18,000,  Total Project Cost: $194,000 ( Estimate for 2018),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Wood or Timber
Find on map >>   Show street view

Structure Number: 16261,  Location: 6 MI NE OF HARTFORD (Lat: 31.165222,  Lng: -85.652744),  Route carried "on" structure: County highway 85,  Year Built: 1994,  Status: Open,  Structure Length: 0.62m (2.03ft),  Average Daily Traffic: 120 (year 2021),  Truck Traffic: 5%,  Average Future Daily Traffic: 275 (year 2041),  Design Load: H 15,  Features Intersected: SANDY BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 10.499,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 88.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.24m (4.07ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Bridge Improvement Cost: $344,000,  Roadway Improvement Cost: $34,000,  Total Project Cost: $378,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 16407,  Location: 1.5MI N GENEVA CORD46 (Lat: 31.173567,  Lng: -85.631150),  Route carried "on" structure: State highway 123,  Year Built: 2001,  Status: Open,  Structure Length: 2.00m (6.56ft),  Average Daily Traffic: 2,400 (year 2013),  Truck Traffic: 4%,  Average Future Daily Traffic: 3,429 (year 2033),  Design Load: HS 20,  Features Intersected: PATES CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 12.691,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 9.9m (32.5ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 4.9m (16.1ft)

Condition: Channel: Very good,  Culverts: Very good,  Operating Rating: 77.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 46.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.75m (9.02ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $954,000,  Roadway Improvement Cost: $95,000,  Total Project Cost: $1,049,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 17358,  Location: 1 MILE SOUTH OF SLOCOMB (Lat: 31.077922,  Lng: -85.612906),  Route carried "on" structure: County highway 85,  Year Built: 1991,  Year Reconstructed: 1997,  Status: Posted for load,  Structure Length: 1.49m (4.89ft),  Average Daily Traffic: 40 (year 2020),  Average Future Daily Traffic: 50 (year 2040),  Design Load: HS 20,  Features Intersected: PINE LOG BR.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Wood or Timber,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 5.5m (18.0ft),  Curb-To-Curb Width: 4.6m (15.1ft),  Out-to-Out Width: 5.0m (16.4ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Fair,  Operating Rating: 31.8 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 23.5 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 20.0 - 29.9% below),  Length Of Structure Improvement: 2.17m (7.12ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: July 2020,  Other Special Inspection Date: July 2021,  Bridge Improvement Cost: $238,000,  Roadway Improvement Cost: $24,000,  Total Project Cost: $262,000 ( Estimate for 2022),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Wood or Timber
Find on map >>   Show street view

Structure Number: 1736,  Location: 4 MILES S. OF SLOCOMB (Lat: 31.038117,  Lng: -85.579228),  Route carried "on" structure: County highway ,  Year Built: 1995,  Status: Posted for load,  Structure Length: 1.07m (3.51ft),  Average Daily Traffic: 50 (year 2020),  Average Future Daily Traffic: 60 (year 2040),  Design Load: HS 20,  Features Intersected: GRANT BRANCH,  Facility Carried by Structure: POST OAK RD.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Wood or Timber,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 5.2m (17.1ft),  Curb-To-Curb Width: 4.6m (15.1ft),  Out-to-Out Width: 5.0m (16.4ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Fair,  Channel: Good,  Operating Rating: 33.0 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 24.4 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 20.0 - 29.9% below),  Length Of Structure Improvement: 1.74m (5.71ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: June 2021,  Other Special Inspection Date: June 2021,  Bridge Improvement Cost: $191,000,  Roadway Improvement Cost: $19,000,  Total Project Cost: $210,000 ( Estimate for 2022),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Wood or Timber
Find on map >>   Show street view

Structure Number: 17361,  Location: 4 MILES S. OF SLOCOMB (Lat: 31.038158,  Lng: -85.578411),  Route carried "on" structure: County highway ,  Year Built: 1995,  Status: Posted for load,  Structure Length: 1.58m (5.18ft),  Average Daily Traffic: 50 (year 2020),  Average Future Daily Traffic: 60 (year 2040),  Design Load: HS 20,  Features Intersected: GRANT BRANCH,  Facility Carried by Structure: POST OAK RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Wood or Timber,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 5.2m (17.1ft),  Curb-To-Curb Width: 4.6m (15.1ft),  Out-to-Out Width: 5.0m (16.4ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Fair,  Channel: Good,  Operating Rating: 32.8 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 24.2 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 20.0 - 29.9% below),  Length Of Structure Improvement: 2.26m (7.41ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: September 2020,  Other Special Inspection Date: September 2021,  Bridge Improvement Cost: $248,000,  Roadway Improvement Cost: $25,000,  Total Project Cost: $273,000 ( Estimate for 2022),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Wood or Timber
Find on map >>   Show street view

Structure Number: 17838,  Location: 2 MILES S.W. OF MALVERN (Lat: 31.090803,  Lng: -85.548686),  Route carried "on" structure: County highway 28,  Year Built: 1951,  Status: Open,  Structure Length: 0.92m (3.02ft),  Average Daily Traffic: 550 (year 2019),  Average Future Daily Traffic: 740 (year 2039),  Design Load: HS 20,  Features Intersected: TINDIL BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 1.5m (4.9ft)

Condition: Channel: Good,  Culverts: Fair,  Operating Rating: 43.5 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.59m (5.22ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $404,000,  Roadway Improvement Cost: $40,000,  Total Project Cost: $444,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 20306,  Location: 2 MILES NW OF SLOCOMB (Lat: 31.132817,  Lng: -85.615617),  Route carried "on" structure: County highway ,  Year Built: 2013,  Status: Open,  Structure Length: 3.11m (10.20ft),  Average Daily Traffic: 62 (year 2021),  Average Future Daily Traffic: 87 (year 2041),  Design Load: HS 20,  Features Intersected: LITTLE CREEK,  Facility Carried by Structure: HARRELL ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 7.5m (24.6ft),  Out-to-Out Width: 8.2m (26.9ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Excellent,  Channel: Satisfactory,  Operating Rating: 75.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 45.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Superior to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 3.96m (12.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $733,000,  Roadway Improvement Cost: $73,000,  Total Project Cost: $806,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels
Discuss Slocomb, Alabama (AL) on our hugely popular Alabama forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.