Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Somerset, Massachusetts (MA)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 14Number of bridges
  • 167ft / 50.9mTotal length
  • $49,522,000Total costs
  • 418,565Total average daily traffic
  • 14,257Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Somerset
  • No street view available for this location

New bridges in Somerset, MA - historical statistics
  • New bridges - historical statistics
  • 111960-1969
  • 11970-1979
  • 12000-2009
  • 12010-2019
Average Bridge Daily Traffic in Somerset, MA
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 25.0%Very good
  • 12.5%Good
  • 25.0%Satisfactory
  • 37.5%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 12.5%Very good
  • 12.5%Good
  • 37.5%Satisfactory
  • 37.5%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 25.0%Very good
  • 25.0%Good
  • 37.5%Satisfactory
  • 12.5%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 25.0%Very good
  • 75.0%Satisfactory
Find on map >>   Show street view

Structure Number: S16003AVGDOTNBI,  Location: AT SWANSEA T.L. (Lat: 41.728111,  Lng: -71.191878),  Route carried "on" structure: State highway 103,  Year Built: 2009,  Status: Open,  Structure Length: 3.42m (11.22ft),  Average Daily Traffic: 15,900 (year 2021),  Truck Traffic: 8%,  Average Future Daily Traffic: 25,269 (year 2032),  Design Load: HS 20,  Features Intersected: WATER LEES RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.570,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 9.9m (32.5ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 33.0m (108.3ft),  Curb or Sidewalk Widths: Left: 1.6m (5.2ft),  Right: 0.1m (0.3ft),  Curb-To-Curb Width: 9.9m (32.5ft),  Out-to-Out Width: 12.4m (40.7ft)

Condition: Deck: Very good,  Superstructure: Good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 71.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 43.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.50m (11.48ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $1,155,000,  Roadway Improvement Cost: $116,000,  Total Project Cost: $1,733,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: S160073N4DOTNBI,  Location: AT SWANSEA T.L. (Lat: 41.740444,  Lng: -71.186800),  Route carried "on" structure: US 6,  Year Built: 1970,  Status: Open,  Structure Length: 0.79m (2.59ft),  Average Daily Traffic: 18,265 (year 2019),  Truck Traffic: 6%,  Average Future Daily Traffic: 31,586 (year 2031),  Design Load: H 20,  Features Intersected: WATER LEES RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 14.939,  Lanes on structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 15.8m (51.8ft),  Skew: 6 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.9m (25.9ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.6m (5.2ft),  Curb-To-Curb Width: 15.8m (51.8ft),  Out-to-Out Width: 18.6m (61.0ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 63.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 37.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.80m (2.62ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 36 months,  Inspection Date: March 2020,  Underwater Inspection Date: January 2020,  Bridge Improvement Cost: $585,000,  Roadway Improvement Cost: $59,000,  Total Project Cost: $878,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: S160093Y9DOTNBI,  Location: 1.3MI W OF FALL RIVER C.L (Lat: 41.718853,  Lng: -71.182839),  Route carried "on" structure: City street ,  Year Built: 1960,  Status: Open,  Structure Length: 11.06m (36.29ft),  Average Daily Traffic: 2,600 (year 2021),  Truck Traffic: 12%,  Average Future Daily Traffic: 9,476 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: I 195,  Facility Carried by Structure: HWY BRYTN PNT RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Lanes under structure: 6,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 30.2m (99.1ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 11.1m (36.4ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Inventory Rating: 74.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 11.10m (36.42ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2021,  Bridge Improvement Cost: $9,000,000,  Roadway Improvement Cost: $901,000,  Total Project Cost: $13,501,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: S160103PDDOTNBI,  Location: .4 MI FROM SWANSEA T.L. (Lat: 41.725972,  Lng: -71.185889),  Route carried "on" structure: State highway 103,  Year Built: 1960,  Status: Open,  Structure Length: 13.50m (44.29ft),  Average Daily Traffic: 16,400 (year 2021),  Truck Traffic: 10%,  Average Future Daily Traffic: 56,223 (year 2032),  Design Load: HS 20,  Features Intersected: I 195
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.052,  Lanes on structure: 2,  Lanes under structure: 8,  Owner: State Highway Agency,  Approaching Roadway Width: 14.6m (47.9ft),  Skew: 4 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 37.8m (124.0ft),  Curb or Sidewalk Widths: Left: 0.4m (1.3ft),  Right: 1.3m (4.3ft),  Curb-To-Curb Width: 14.6m (47.9ft),  Out-to-Out Width: 17.2m (56.4ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Fair,  Operating Rating: 53.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 13.60m (44.62ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $9,189,000,  Roadway Improvement Cost: $919,000,  Total Project Cost: $13,784,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: S160113YADOTNBI,  Location: .1 MI N OF ST 103 (Lat: 41.728806,  Lng: -71.188381),  Route carried "on" structure: City street ,  Year Built: 1960,  Status: Open,  Structure Length: 8.63m (28.31ft),  Average Daily Traffic: 7,400 (year 2021),  Truck Traffic: 10%,  Average Future Daily Traffic: 30,638 (year 2032),  Design Load: H 20,  Features Intersected: I 195,  Facility Carried by Structure: HWY LEES RIV AVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 15.498,  Lanes on structure: 2,  Lanes under structure: 6,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 22.8m (74.8ft),  Curb or Sidewalk Widths: Left: 0.4m (1.3ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 14.7m (48.2ft)

Condition: Deck: Good,  Superstructure: Fair,  Substructure: Satisfactory,  Operating Rating: 59.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 8.70m (28.54ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $5,051,000,  Roadway Improvement Cost: $506,000,  Total Project Cost: $7,577,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: S160123U6DOTNBI,  Location: OVER LEES RIVER (Lat: 41.730919,  Lng: -71.191703),  Route carried "on" structure: Interstate 195,  Year Built: 1960,  Status: Open,  Structure Length: 4.15m (13.62ft),  Average Daily Traffic: 29,000 (year 2016),  Truck Traffic: 11%,  Average Future Daily Traffic: 105,971 (year 2031),  Design Load: H 20,  Features Intersected: WATER LEES RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.437,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 15.2m (49.9ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 38.1m (125.0ft),  Curb or Sidewalk Widths: Left: 0.8m (2.6ft),  Right: 0.8m (2.6ft),  Curb-To-Curb Width: 15.2m (49.9ft),  Out-to-Out Width: 18.3m (60.0ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 62.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 37.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 4.20m (13.78ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $2,733,000,  Roadway Improvement Cost: $274,000,  Total Project Cost: $4,100,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: S160123U7DOTNBI,  Location: I195 AT SWANSEA T.L. (Lat: 41.730478,  Lng: -71.191792),  Route carried "on" structure: Interstate 195,  Year Built: 1960,  Status: Open,  Structure Length: 4.15m (13.62ft),  Average Daily Traffic: 40,000 (year 2016),  Truck Traffic: 13%,  Average Future Daily Traffic: 105,971 (year 2031),  Design Load: H 20,  Features Intersected: WATER LEES RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.437,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 15.2m (49.9ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 38.1m (125.0ft),  Curb or Sidewalk Widths: Left: 0.8m (2.6ft),  Right: 0.8m (2.6ft),  Curb-To-Curb Width: 15.2m (49.9ft),  Out-to-Out Width: 18.3m (60.0ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 62.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 37.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.20m (13.78ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $5,148,000,  Roadway Improvement Cost: $515,000,  Total Project Cost: $7,723,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: S16013AG0DOTNBI,  Location: WEST OF TAUNTON RIVER (Lat: 41.727806,  Lng: -71.155994),  Route carried "on" structure: US 6,  Year Built: 2011,  Status: Open,  Structure Length: 5.24m (17.19ft),  Average Daily Traffic: 20,200 (year 2019),  Truck Traffic: 4%,  Average Future Daily Traffic: 56,223 (year 2032),  Design Load: HS 20,  Features Intersected: ST138 RIVERSIDE AVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 5,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 25.5m (83.7ft),  Skew: 31 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 22.4m (73.5ft),  Curb-To-Curb Width: 25.5m (83.7ft),  Out-to-Out Width: 27.6m (90.6ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Operating Rating: 77.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 46.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.30m (17.39ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $150,000,  Roadway Improvement Cost: $16,000,  Total Project Cost: $226,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: S160093Y9DOTNBI,  Location: 1.3MI W OF FALL RIVER C.L (Lat: 41.716667,  Lng: -71.183333),  Route carried "under" structure: Interstate 195,  Year Built: 1960,  Structure Length: 0. m,  Average Daily Traffic: 44,800 (year 0000),  Features Intersected: I 195 EB,  Facility Carried by Structure: HWY BRATN PNT RD
Minimum Vertical Clearance: 4.39m (14.40ft),  Kilometerpoint: 0.000,  Lanes on structure: 3,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 30.2m (99.1ft)

Find on map >>   Show street view

Structure Number: S160093Y9DOTNBI,  Location: 1.3MI W OF FALL RIVER C.L (Lat: 41.716667,  Lng: -71.183333),  Route carried "under" structure: Interstate 195,  Year Built: 1960,  Structure Length: 0. m,  Average Daily Traffic: 44,800 (year 0000),  Features Intersected: I 195 WB,  Facility Carried by Structure: HWY BRTN PNT RD
Minimum Vertical Clearance: 4.39m (14.40ft),  Kilometerpoint: 0.000,  Lanes on structure: 3,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 30.2m (99.1ft)

Find on map >>   Show street view

Structure Number: S160103PDDOTNBI,  Location: .4 MI FROM SWANSEA T.L. (Lat: 41.726403,  Lng: -71.186428),  Route carried "under" structure: Interstate 195,  Year Built: 1960,  Structure Length: 0. m,  Average Daily Traffic: 44,800 (year 0000),  Features Intersected: I 195 EB,  Facility Carried by Structure: ST103
Minimum Vertical Clearance: 4.44m (14.57ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 37.8m (124.0ft)

Find on map >>   Show street view

Structure Number: S160103PDDOTNBI,  Location: .4 MI FROM SWANSEA T.L. (Lat: 41.725719,  Lng: -71.185453),  Route carried "under" structure: Interstate 195,  Year Built: 1960,  Structure Length: 0. m,  Average Daily Traffic: 44,800 (year 0000),  Features Intersected: I 195 WB,  Facility Carried by Structure: ST103
Minimum Vertical Clearance: 4.44m (14.57ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 37.8m (124.0ft)

Find on map >>   Show street view

Structure Number: S160113YADOTNBI,  Location: .1 MI N OF ST 103 (Lat: 41.716667,  Lng: -71.183333),  Route carried "under" structure: Interstate 195,  Year Built: 1960,  Structure Length: 0. m,  Average Daily Traffic: 44,800 (year 0000),  Features Intersected: I 195 EB,  Facility Carried by Structure: HWY LEES RIV AVE
Minimum Vertical Clearance: 4.47m (14.67ft),  Kilometerpoint: 0.000,  Lanes on structure: 3,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 23.2m (76.1ft)

Find on map >>   Show street view

Structure Number: S160113YADOTNBI,  Location: .1 MI N OF ST 103 (Lat: 41.716667,  Lng: -71.183333),  Route carried "under" structure: Interstate 195,  Year Built: 1960,  Structure Length: 0. m,  Average Daily Traffic: 44,800 (year 0000),  Features Intersected: I 195 WB,  Facility Carried by Structure: HWY LEES RIV AVE
Minimum Vertical Clearance: 4.47m (14.67ft),  Kilometerpoint: 0.000,  Lanes on structure: 3,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 23.2m (76.1ft)

Discuss Somerset, Massachusetts (MA) on our hugely popular Massachusetts forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.