U.S. Cities - City-Data Homepage  
City-Data Forum
City-Data.com Homepage

Bridge Statistics for South Fulton, Tennessee (TN) - Condition, Traffic, Stress, Structural Evaluation, Project Costs

Back to: South Fulton, TN, Tennessee, Tennessee forum, All US cities.





National Bridge Inventory (NBI) Statistics
Number of bridges: 11
Total length: 41 meters (135ft)
Total costs: $2,238,000
Total average daily traffic: 37,790
Total average daily truck traffic: 3,344
National Bridge Inventory (NBI) Registered Bridges for South Fulton

New bridges - Historical Statistics

  • 1920-1929: 1
  • 1930-1939: 0
  • 1940-1949: 2
  • 1950-1959: 0
  • 1960-1969: 4
  • 1970-1979: 2
  • 1980-1989: 0
  • 1990-1999: 2

Average Daily Traffic

Average Truck Traffic (%)

Bridge Condition - Deck

Bridge Condition - Superstructure

Bridge Condition - Substructure

Bridge Condition - Channel

Find on map >>

Structure Number: 660A1820001,  Location: IN THE CITY OF SO FULTON (Lat: 36.483250,  Lng: -88.901944),  Route carried "on" structure: City street 182,  Year Built: 1995,  Status: Open,  Structure Length: 0.76m (2.49ft),  Average Daily Traffic: 280 (year 2008),  Truck Traffic: 7%,  Average Future Daily Traffic: 448 (year 2028),  Design Load: HS 20,  Features Intersected: SOUTH FORK HARRIS FK CR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.354,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Skew: 3 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.1m (10.2ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 44.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2008
Find on map >>

Structure Number: 660A2330001,  Location: IN THE CITY OF SO FULTON (Lat: 36.500722,  Lng: -88.875028),  Route carried "on" structure: City street 233,  Year Built: 1965,  Status: Posted for load,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 280 (year 2008),  Truck Traffic: 7%,  Average Future Daily Traffic: 448 (year 2028),  Design Load: H 15,  Features Intersected: SOUTH FORK HARRIS FK CR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.499,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.8m (32.2ft),  Curb-To-Curb Width: 6.0m (19.7ft),  Out-to-Out Width: 6.0m (19.7ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Poor,  Channel: Poor,  Operating Rating: 16.2 metric tons,  Inventory Rating: 16.2 metric tons,  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 0.1 - 9.9% below),  Length Of Structure Improvement: 1.65m (5.41ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2008,  Bridge Improvement Cost: $208,000,  Roadway Improvement Cost: $21,000,  Total Project Cost: $313,000 ( Estimate for 2008),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 660A7310001,  Location: IN THE CITY OF SO FULTON (Lat: 36.499500,  Lng: -88.868278),  Route carried "on" structure: City street 811,  Year Built: 1965,  Status: Posted for load,  Structure Length: 1.01m (3.31ft),  Average Daily Traffic: 1,500 (year 2007),  Truck Traffic: 4%,  Average Future Daily Traffic: 2,400 (year 2028),  Design Load: H 15,  Features Intersected: SOUTH FORK HARRIS FK CR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.016,  Lanes on structure: 1,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.1m (33.1ft),  Curb-To-Curb Width: 4.8m (15.7ft),  Out-to-Out Width: 4.8m (15.7ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 36.0 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 24.3 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.01m (3.31ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2008,  Bridge Improvement Cost: $101,000,  Roadway Improvement Cost: $11,000,  Total Project Cost: $152,000 ( Estimate for 2008),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>

Structure Number: 66FA0051001,  Location: IN SOUTH FULTON (Lat: 36.491139,  Lng: -88.890250),  Route carried "on" structure: US 51,  Year Built: 1997,  Status: Open,  Structure Length: 5.79m (19.00ft),  Average Daily Traffic: 6,000 (year 2007),  Truck Traffic: 20%,  Average Future Daily Traffic: 9,600 (year 2028),  Design Load: HS 20,  Features Intersected: HARRIS FK.DRAINAGE DITCH,  Facility Carried by Structure: FAP 215
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.593,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 25.6m (84.0ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 24.4m (80.1ft),  Curb-To-Curb Width: 25.6m (84.0ft),  Out-to-Out Width: 26.2m (86.0ft)

Condition: Deck: Fair,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 72.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2008,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 66FA0051003,  Location: IN SOUTH FULTON (Lat: 36.491778,  Lng: -88.892472),  Route carried "on" structure: US 51,  Year Built: 1972,  Status: Open,  Structure Length: 7.22m (23.69ft),  Average Daily Traffic: 6,000 (year 2007),  Truck Traffic: 20%,  Average Future Daily Traffic: 9,600 (year 2028),  Design Load: HS 20,  Features Intersected: IC RAILROAD,  Facility Carried by Structure: FAP 215 297329H
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.819,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Skew: 2 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 34.4m (112.9ft),  Curb-To-Curb Width: 14.6m (47.9ft),  Out-to-Out Width: 15.2m (49.9ft)

Condition: Deck: Fair,  Superstructure: Good,  Substructure: Good,  Operating Rating: 45.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 27.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2008,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 66L29430001,  Location: IN SOUTH FULTON,TENNESSEE (Lat: 36.500194,  Lng: -89.879556),  Route carried "on" structure: City street 811,  Year Built: 1970,  Status: Posted for load,  Structure Length: 3.96m (12.99ft),  Average Daily Traffic: 1,500 (year 2007),  Average Future Daily Traffic: 2,400 (year 2028),  Design Load: HS 20,  Features Intersected: HARRIS FORK CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.257,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 15.2m (49.9ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.2m (3.9ft),  Curb-To-Curb Width: 9.0m (29.5ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 44.1 metric tons,  Inventory Rating: 32.4 metric tons,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2008,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 66L29440001,  Location: IN SOUTH FULTON,TENNESSEE (Lat: 36.500083,  Lng: -88.872361),  Route carried "on" structure: City street 812,  Year Built: 1941,  Status: Closed,  Structure Length: 1.31m (4.30ft),  Average Daily Traffic: 920 (year 2007),  Average Future Daily Traffic: 1,472 (year 2028),  Design Load: H 15,  Features Intersected: SOUTH FORK HARRIS CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.271,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 13.1m (43.0ft),  Curb-To-Curb Width: 6.4m (21.0ft),  Out-to-Out Width: 6.8m (22.3ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Poor,  Channel: Satisfactory,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 1.98m (6.50ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2008,  Bridge Improvement Cost: $265,000,  Roadway Improvement Cost: $27,000,  Total Project Cost: $398,000 ( Estimate for 2008),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 66M29480001,  Location: IN SOUTH FULTON,TENNESSEE (Lat: 36.500444,  Lng: -88.878750),  Route carried "on" structure: City street 815,  Year Built: 1940,  Status: Posted for load,  Structure Length: 1.92m (6.30ft),  Average Daily Traffic: 480 (year 2007),  Average Future Daily Traffic: 768 (year 2028),  Design Load: H 15,  Features Intersected: HARRIS FORK CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.402,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Skew: 4 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 10.1m (33.1ft),  Curb-To-Curb Width: 5.6m (18.4ft),  Out-to-Out Width: 5.8m (19.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Fair,  Channel: Fair,  Operating Rating: 4.5 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 4.5 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: High priority of replacement,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 10.0 - 19.9% below),  Length Of Structure Improvement: 2.65m (8.69ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2008,  Bridge Improvement Cost: $335,000,  Roadway Improvement Cost: $34,000,  Total Project Cost: $503,000 ( Estimate for 2008),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 66SR0430007,  Location: IN SOUTH FULTON TN. (Lat: 36.500194,  Lng: -88.875667),  Route carried "on" structure: US 45,  Year Built: 1929,  Status: Open,  Structure Length: 1.89m (6.20ft),  Average Daily Traffic: 3,910 (year 2007),  Truck Traffic: 13%,  Average Future Daily Traffic: 6,256 (year 2028),  Design Load: HS 20,  Features Intersected: HARRIS CREEK,  Facility Carried by Structure: FAP 43
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 10.396,  Lanes on structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 15.8m (51.8ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 9.4m (30.8ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 12.8m (42.0ft),  Out-to-Out Width: 16.6m (54.5ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 68.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 2.62m (8.60ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2008,  Bridge Improvement Cost: $581,000,  Roadway Improvement Cost: $59,000,  Total Project Cost: $872,000 ( Estimate for 2008),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 66SR0030065,  Location: 1 MI S OF FULTON CO KY (Lat: 36.498333,  Lng: -88.899472),  Route carried "under" structure: State highway 215,  Year Built: 1967,  Structure Length: 8.44m (27.69ft),  Average Daily Traffic: 8,460 (year 2007),  Truck Traffic: 2%,  Features Intersected: SR 3 / SR 215,  Facility Carried by Structure: FAP 3
Minimum Vertical Clearance: 5.59m (18.34ft),  Kilometerpoint: 2.945,  Lanes on structure: 2,  Lanes under structure: 5,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 30.8m (101.0ft)

Find on map >>

Structure Number: 66SR0030066,  Location: 1 MI S OF FULTON CO KY (Lat: 36.498528,  Lng: -88.899444),  Route carried "under" structure: State highway 215,  Year Built: 1967,  Structure Length: 8.44m (27.69ft),  Average Daily Traffic: 8,460 (year 2007),  Truck Traffic: 2%,  Features Intersected: SR 3 / SR 215,  Facility Carried by Structure: FAP 3
Minimum Vertical Clearance: 5.05m (16.57ft),  Kilometerpoint: 2.897,  Lanes on structure: 2,  Lanes under structure: 5,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 30.8m (101.0ft)

Discuss this city on our hugely popular Tennessee forum

Back to: South Fulton, TN, Tennessee, All US cities.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2009 Advameg, Inc.