Bridge Statistics for South Park Township, Pennsylvania (PA)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 14Number of bridges
  • 52ft / 15.9mTotal length
  • $752,000Total costs
  • 44,007Total average daily traffic
  • 2,566Total average daily truck traffic
  • 55,515Total future (year 2000) average daily traffic
  • National Bridge Inventory (NBI) Registered Bridges for South Park Township
  • No street view available for this location

New bridges in South Park Township, PA - historical statistics
  • New bridges - historical statistics
  • 11900-1909
  • 21910-1919
  • 21920-1929
  • 21930-1939
  • 11980-1989
  • 11990-1999
  • 32000-2009
  • 22010-2019
Reconstructed bridges in South Park Township, PA - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11970-1979
  • 11980-1989
  • 01990-1999
  • 22000-2009
Average Bridge Daily Traffic in South Park Township, PA
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 16.7%Very good
  • 33.3%Good
  • 50.0%Satisfactory
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 11.1%Very good
  • 22.2%Good
  • 33.3%Satisfactory
  • 22.2%Fair
  • 11.1%Poor
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 11.1%Very good
  • 11.1%Satisfactory
  • 66.7%Fair
  • 11.1%Poor
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 7.1%Very good
  • 28.6%Good
  • 14.3%Satisfactory
  • 28.6%Fair
  • 21.4%Poor
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 40.0%Very good
  • 20.0%Good
  • 40.0%Satisfactory
Find on map >>   Show street view

Structure Number: 1708,  Location: 250' N OF PINEY FORK RD (Lat: 40.289494,  Lng: -80.008528),  Route carried "on" structure: State highway ,  Year Built: 1930,  Status: Open,  Structure Length: 0.79m (2.59ft),  Average Daily Traffic: 1,441 (year 2022),  Truck Traffic: 1%,  Average Future Daily Traffic: 1,944 (year 2032),  Design Load: HS 20,  Features Intersected: PINEY FORK CREEK,  Facility Carried by Structure: STEWART ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.6m (24.9ft),  Material/Design: Masonry,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.9m (25.9ft),  Curb-To-Curb Width: 5.6m (18.4ft),  Out-to-Out Width: 6.8m (22.3ft)

Condition: Superstructure: Satisfactory,  Substructure: Fair,  Channel: Fair,  Operating Rating: 49.0 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.00m (3.28ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $12,000,  Roadway Improvement Cost: $36,000,  Total Project Cost: $165,000
Find on map >>   Show street view

Structure Number: 1719,  Location: @ INTER. WITH SR 3014 (Lat: 40.272417,  Lng: -79.965361),  Route carried "on" structure: State highway ,  Year Built: 1920,  Year Reconstructed: 1978,  Status: Open,  Structure Length: 1.89m (6.20ft),  Average Daily Traffic: 14 (year 2014),  Truck Traffic: 5%,  Average Future Daily Traffic: 46 (year 2038),  Design Load: HS 20,  Features Intersected: PETERS CREEK,  Facility Carried by Structure: SNOWDEN RD.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.518,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 9.1m (29.9ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.8m (32.2ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Poor,  Operating Rating: 55.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.90m (6.23ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $5,000,  Roadway Improvement Cost: $19,000,  Total Project Cost: $62,000,  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 2355,  Location: 219004 200 N INT BRWNVLE (Lat: 40.287108,  Lng: -80.022342),  Route carried "on" structure: Business City street ,  Year Built: 2002,  Status: Open,  Structure Length: 1.74m (5.71ft),  Average Daily Traffic: 400 (year 2018),  Truck Traffic: 5%,  Average Future Daily Traffic: 440 (year 2039),  Design Load: HS 20,  Features Intersected: PINEY FORK CREEK,  Facility Carried by Structure: PLEASANT ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 16.8m (55.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 10.9m (35.8ft),  Out-to-Out Width: 11.8m (38.7ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 71.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 42.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.40m (7.87ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Membrane: Other,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 236,  Location: PF01 PINEY FORK # 1 (Lat: 40.281981,  Lng: -79.983781),  Route carried "on" structure: City street ,  Year Built: 1902,  Year Reconstructed: 2014,  Status: Open,  Structure Length: 0.91m (2.99ft),  Average Daily Traffic: 803 (year 2021),  Truck Traffic: 1%,  Average Future Daily Traffic: 850 (year 2039),  Features Intersected: PINEY FORK,  Facility Carried by Structure: TRIPHAMMER RD T315
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Masonry,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.1m (29.9ft),  Curb-To-Curb Width: 6.1m (20.0ft),  Out-to-Out Width: 6.7m (22.0ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Poor,  Operating Rating: 49.0 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.10m (3.61ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Underwater Inspection Date: September 2021,  Bridge Improvement Cost: $4,000,  Roadway Improvement Cost: $33,000,  Total Project Cost: $52,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 2365,  Location: PF06 PINEY FORK NO. 6 (Lat: 40.288364,  Lng: -80.005075),  Route carried "on" structure: County highway ,  Year Built: 1914,  Year Reconstructed: 1980,  Status: Open,  Structure Length: 1.07m (3.51ft),  Average Daily Traffic: 8,338 (year 2004),  Truck Traffic: 6%,  Average Future Daily Traffic: 10,673 (year 2028),  Features Intersected: PINEY FORK CREEK,  Facility Carried by Structure: BROWNSVILL-LIBR RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.7m (35.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.1m (0.3ft),  Curb-To-Curb Width: 10.1m (33.1ft),  Out-to-Out Width: 11.1m (36.4ft)

Condition: Superstructure: Fair,  Substructure: Fair,  Channel: Poor,  Operating Rating: 43.5 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 26.3 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.10m (3.61ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $6,000,  Roadway Improvement Cost: $28,000,  Total Project Cost: $75,000
Find on map >>   Show street view

Structure Number: 2367,  Location: CT03 CATFISH RUN NO. 3 (Lat: 40.308303,  Lng: -80.000528),  Route carried "on" structure: County highway ,  Year Built: 1920,  Year Reconstructed: 2007,  Status: Open,  Structure Length: 0.76m (2.49ft),  Average Daily Traffic: 6,994 (year 2005),  Truck Traffic: 10%,  Average Future Daily Traffic: 9,000 (year 2025),  Design Load: HS 20,  Features Intersected: CATFISH RUN,  Facility Carried by Structure: CORRIGAN DR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Owner: County Highway Agency,  Approaching Roadway Width: 15.2m (49.9ft),  Skew: 2 degrees,  Material/Design: Concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.4m (21.0ft),  Curb or Sidewalk Widths: Left: 3.2m (10.5ft),  Right: 3.7m (12.1ft),  Curb-To-Curb Width: 14.0m (45.9ft),  Out-to-Out Width: 23.6m (77.4ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Fair,  Channel: Fair,  Inventory Rating: 73.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.80m (2.62ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $8,000,  Roadway Improvement Cost: $28,000,  Total Project Cost: $110,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 237,  Location: CT05 CATFISH RUN NO. 5 (Lat: 40.315506,  Lng: -80.005842),  Route carried "on" structure: County highway ,  Year Built: 1936,  Status: Open,  Structure Length: 0.61m (2.00ft),  Average Daily Traffic: 6,959 (year 2005),  Truck Traffic: 10%,  Average Future Daily Traffic: 7,700 (year 2025),  Features Intersected: CATFISH RUN,  Facility Carried by Structure: MAPLE SPRING DR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Steel,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.1m (20.0ft),  Curb or Sidewalk Widths: Left: 1.6m (5.2ft),  Right: 1.6m (5.2ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 12.3m (40.4ft)

Condition: Superstructure: Fair,  Substructure: Fair,  Channel: Fair,  Operating Rating: 53.5 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 31.8 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.60m (1.97ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $6,000,  Roadway Improvement Cost: $25,000,  Total Project Cost: $83,000
Find on map >>   Show street view

Structure Number: 2609,  Location: LC06 LICK RUN NO. 6 (Lat: 40.320156,  Lng: -79.981650),  Route carried "on" structure: County highway ,  Year Built: 1989,  Status: Open,  Structure Length: 1.13m (3.71ft),  Average Daily Traffic: 4,660 (year 2017),  Truck Traffic: 5%,  Average Future Daily Traffic: 4,660 (year 2037),  Design Load: HS 25 or greater,  Features Intersected: LICK RUN,  Facility Carried by Structure: BROUGHTON-COCHRANS
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Skew: 5 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.3m (37.1ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 15.2m (49.9ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 66.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.10m (3.61ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021
Find on map >>   Show street view

Structure Number: 35346,  Location: 2000' NORTH OF SR 1008 (Lat: 40.265508,  Lng: -79.982364),  Route carried "on" structure: City street T844,  Year Built: 1912,  Status: Posted for load,  Structure Length: 2.07m (6.79ft),  Average Daily Traffic: 5 (year 1993),  Average Future Daily Traffic: 5 (year 2000),  Design Load: H 15,  Features Intersected: PETERS CREEK,  Facility Carried by Structure: ESTEP BRIDGE TR844
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 2.7m (8.9ft),  Material/Design: Steel,  Design/Construction: Truss - Thru,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 19.5m (64.0ft),  Curb-To-Curb Width: 3.7m (12.1ft),  Out-to-Out Width: 4.3m (14.1ft)

Condition: Deck: Satisfactory,  Superstructure: Poor,  Substructure: Poor,  Channel: Fair,  Operating Rating: 10.0 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 7.3 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: High priority of replacement,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 2.70m (8.86ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 12 months,  Other Special Inspection Frequency: Every 6 months,  Inspection Date: June 2021,  Critical Feature Inspection Date: June 2021,  Other Special Inspection Date: September 2021,  Bridge Improvement Cost: $15,000,  Roadway Improvement Cost: $45,000,  Total Project Cost: $205,000,  Deck Structure Type: Wood or Timber
Find on map >>   Show street view

Structure Number: 40597,  Location: 1000 FT NW OF SR 3017 (Lat: 40.277867,  Lng: -79.957000),  Route carried "on" structure: State highway ,  Year Built: 1999,  Status: Open,  Structure Length: 1.25m (4.10ft),  Average Daily Traffic: 595 (year 2022),  Truck Traffic: 3%,  Average Future Daily Traffic: 1,183 (year 2032),  Design Load: HS 20,  Features Intersected: LICK RUN,  Facility Carried by Structure: PETER CK RD EXT
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.015,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 6.1m (20.0ft),  Curb-To-Curb Width: 10.4m (34.1ft),  Out-to-Out Width: 11.3m (37.1ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 86.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 50.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.20m (3.94ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021
Find on map >>   Show street view

Structure Number: 44979,  Location: South Park (Lat: 40.286967,  Lng: -79.996233),  Route carried "on" structure: State highway ,  Year Built: 2008,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 4,462 (year 2020),  Truck Traffic: 2%,  Average Future Daily Traffic: 4,861 (year 2032),  Design Load: HS 25 or greater,  Features Intersected: Piney Fork,  Facility Carried by Structure: Brownsville Rd Ext
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.761,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 11.9m (39.0ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.8m (32.2ft),  Curb or Sidewalk Widths: Left: 0.3m (1.0ft),  Right: 0.3m (1.0ft)

Condition: Channel: Satisfactory,  Culverts: Very good,  Operating Rating: 51.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021
Find on map >>   Show street view

Structure Number: 49137,  Location: BTW T976 & SR3013 (Lat: 40.294967,  Lng: -79.992650),  Route carried "on" structure: City street 7219,  Year Built: 2007,  Status: Open,  Structure Length: 0.70m (2.30ft),  Average Daily Traffic: 5,000 (year 2019),  Truck Traffic: 1%,  Average Future Daily Traffic: 8,750 (year 2039),  Design Load: HS 20,  Features Intersected: Catfish Run,  Facility Carried by Structure: T325, WALLACE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 9.4m (30.8ft),  Skew: 2 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.7m (22.0ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 49.0 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021
Find on map >>   Show street view

Structure Number: 52644,  Location: 3/4 MI NW of SR 3015 (Lat: 40.278361,  Lng: -79.977239),  Route carried "on" structure: State highway ,  Year Built: 2015,  Status: Open,  Structure Length: 1.37m (4.49ft),  Average Daily Traffic: 595 (year 2022),  Truck Traffic: 3%,  Average Future Daily Traffic: 1,183 (year 2034),  Design Load: HL 93,  Features Intersected: Piney Fork Creek,  Facility Carried by Structure: Piney Fork Rd
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.881,  Lanes on structure: 2,  Owner: State Highway Agency,  Maintenance Responsibility: Private,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 13.1m (43.0ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 10.4m (34.1ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Good,  Operating Rating: 70.3 metric tons,  Method Used To Determine Operating Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported by rating factor (RF) using HL93 loadings,  Inventory Rating: 54.4 metric tons,  Method Used To Determine Inventory Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported by rating factor (RF) using HL93 loadings,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 54748,  Location: @ S.PARK SEWAGE PLANT (Lat: 40.287353,  Lng: -79.991028),  Route carried "on" structure: State highway ,  Year Built: 2018,  Status: Open,  Structure Length: 0.64m (2.10ft),  Average Daily Traffic: 3,741 (year 2022),  Truck Traffic: 6%,  Average Future Daily Traffic: 4,220 (year 2037),  Design Load: HL 93,  Features Intersected: CATFISH RUN,  Facility Carried by Structure: PINEY FORK RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: State Highway Agency,  Maintenance Responsibility: Private,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.4m (21.0ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.9m (32.5ft)

Condition: Channel: Very good,  Culverts: Very good,  Operating Rating: 50.5 metric tons,  Method Used To Determine Operating Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported by rating factor (RF) using HL93 loadings,  Inventory Rating: 33.4 metric tons,  Method Used To Determine Inventory Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported by rating factor (RF) using HL93 loadings,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Epoxy Coated Reinforcing
Discuss South Park Township, Pennsylvania (PA) on our hugely popular Pennsylvania forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.