Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Southampton, Massachusetts (MA)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 12Number of bridges
  • 59ft / 18.2mTotal length
  • $16,608,000Total costs
  • 40,405Total average daily traffic
  • 2,541Total average daily truck traffic
  • 44,661Total future (year 21) average daily traffic
  • National Bridge Inventory (NBI) Registered Bridges for Southampton
  • No street view available for this location

New bridges in Southampton, MA - historical statistics
  • New bridges - historical statistics
  • 21930-1939
  • 51950-1959
  • 11960-1969
  • 21980-1989
  • 11990-1999
  • 12000-2009
Average Bridge Daily Traffic in Southampton, MA
Average Bridge Truck Traffic in Southampton, MA
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 11.1%Very good
  • 44.4%Good
  • 33.3%Satisfactory
  • 11.1%Poor
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 55.6%Good
  • 33.3%Satisfactory
  • 11.1%Poor
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 55.6%Good
  • 22.2%Satisfactory
  • 22.2%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 8.3%Very good
  • 50.0%Good
  • 25.0%Satisfactory
  • 16.7%Fair
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 66.7%Good
  • 33.3%Satisfactory
Find on map >>   Show street view

Structure Number: S190025PGMUNNBI,  Location: 2 M W OF CROOKED LEDGE (Lat: 42.239694,  Lng: -72.783194),  Route carried "on" structure: City street ,  Year Built: 1960,  Status: Open,  Structure Length: 0.85m (2.79ft),  Average Daily Traffic: 130 (year 2017),  Design Load: HS 20,  Features Intersected: WATER MANHAN RIVER,  Facility Carried by Structure: HWY FOMER RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 7.4m (24.3ft),  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.4m (11.2ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 0.40m (1.31ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2021,  Bridge Improvement Cost: $321,000,  Roadway Improvement Cost: $33,000,  Total Project Cost: $482,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: S190060RTMUNNBI,  Location: AT JNCT OF MANHAN ROAD (Lat: 42.201667,  Lng: -72.768639),  Route carried "on" structure: City street ,  Year Built: 1956,  Status: Posted for load,  Structure Length: 1.25m (4.10ft),  Average Daily Traffic: 1,810 (year 2019),  Truck Traffic: 22%,  Average Future Daily Traffic: 676 (year 2032),  Design Load: H 15,  Features Intersected: WATER MANHAN RIVER,  Facility Carried by Structure: HWY RUSSLVLLE RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.547,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.2m (40.0ft),  Curb or Sidewalk Widths: Left: 0.3m (1.0ft),  Right: 0.3m (1.0ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 62.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 31.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.30m (4.27ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $435,000,  Roadway Improvement Cost: $44,000,  Total Project Cost: $653,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: S19009AXADOTNBI,  Location: 3.4 M S SOUTHHAMPTON T.L. (Lat: 42.216981,  Lng: -72.730964),  Route carried "on" structure: State highway 10,  Year Built: 2005,  Status: Open,  Structure Length: 2.78m (9.12ft),  Average Daily Traffic: 13,319 (year 2019),  Truck Traffic: 7%,  Average Future Daily Traffic: 15,793 (year 2032),  Design Load: HS 25 or greater,  Features Intersected: WATER MANHAN RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 27.130,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 10.1m (33.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 26.5m (86.9ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 2.0m (6.6ft),  Curb-To-Curb Width: 10.0m (32.8ft),  Out-to-Out Width: 12.9m (42.3ft)

Condition: Deck: Very good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 86.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 51.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.80m (9.19ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $898,000,  Roadway Improvement Cost: $90,000,  Total Project Cost: $1,348,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: S190100RVMUNNBI,  Location: AT INT WITH STRONG RD (Lat: 42.223078,  Lng: -72.721000),  Route carried "on" structure: City street ,  Year Built: 1933,  Status: Posted for load,  Structure Length: 3.43m (11.25ft),  Average Daily Traffic: 2,100 (year 2019),  Truck Traffic: 6%,  Average Future Daily Traffic: 6,633 (year 2032),  Features Intersected: WATER MANHAN RIVER,  Facility Carried by Structure: HWY EAST ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.030,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 2 degrees,  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 5.6m (18.4ft),  Curb or Sidewalk Widths: Left: 0.3m (1.0ft),  Right: 0.3m (1.0ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.4m (27.6ft)

Condition: Deck: Poor,  Superstructure: Poor,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 22.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 13.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Meets minimum limits,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 20.0 - 29.9% below),  Length Of Structure Improvement: 4.40m (14.44ft),  Designated Inspection Frequency: Every 12 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: October 2021,  Other Special Inspection Date: October 2021,  Bridge Improvement Cost: $3,342,000,  Roadway Improvement Cost: $335,000,  Total Project Cost: $5,014,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: S190110RUMUNNBI,  Location: 0.5M S OF RT10 NR EHPTN (Lat: 42.241203,  Lng: -72.705064),  Route carried "on" structure: City street ,  Year Built: 1952,  Status: Posted for load,  Structure Length: 2.32m (7.61ft),  Average Daily Traffic: 388 (year 2002),  Truck Traffic: 6%,  Average Future Daily Traffic: 613 (year 2031),  Design Load: H 15,  Features Intersected: WATER MANHAN RIVER,  Facility Carried by Structure: HWY GUNN RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.867,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Skew: 3 degrees,  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 5.8m (19.0ft),  Curb or Sidewalk Widths: Left: 0.7m (2.3ft),  Right: 0.7m (2.3ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 34.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 20.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 2.40m (7.87ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $887,000,  Roadway Improvement Cost: $89,000,  Total Project Cost: $1,331,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: S190120V5DOTNBI,  Location: .8 M S SOUTHHAMPTON T.L. (Lat: 42.247083,  Lng: -72.706306),  Route carried "on" structure: State highway 10,  Year Built: 1986,  Status: Open,  Structure Length: 2.49m (8.17ft),  Average Daily Traffic: 19,138 (year 2014),  Truck Traffic: 5%,  Average Future Daily Traffic: 18,478 (year 2031),  Design Load: HS 20,  Features Intersected: WATER MANHAN RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 31.478,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 24.4m (80.1ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 0.0m,  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 16.0m (52.5ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Fair,  Channel: Good,  Operating Rating: 70.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 47.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Superior to present desirable criteria,  Length Of Structure Improvement: 2.50m (8.20ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $1,572,000,  Roadway Improvement Cost: $158,000,  Total Project Cost: $2,359,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: S190160RNMUNNBI,  Location: NEAR WSTFLD/MONTGMRY T.L. (Lat: 42.200219,  Lng: -72.768744),  Route carried "on" structure: City street ,  Year Built: 1938,  Year Reconstructed: 1991,  Status: Open,  Structure Length: 1.10m (3.61ft),  Average Daily Traffic: 1,164 (year 2020),  Truck Traffic: 6%,  Average Future Daily Traffic: 407 (year 2033),  Design Load: HS 20,  Features Intersected: WATER SACKET BROOK,  Facility Carried by Structure: HWY RUSSLVLLE RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.370,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 9.2m (30.2ft),  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.1m (33.1ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 9.1m (29.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Fair,  Operating Rating: 62.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 37.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.20m (3.94ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2022,  Bridge Improvement Cost: $621,000,  Roadway Improvement Cost: $63,000,  Total Project Cost: $932,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: S190180RPMUNNBI,  Location: .2 M NORTH POMEROY/MEADOW (Lat: 42.260147,  Lng: -72.711869),  Route carried "on" structure: City street ,  Year Built: 1989,  Status: Open,  Structure Length: 0.68m (2.23ft),  Average Daily Traffic: 259 (year 2019),  Truck Traffic: 6%,  Average Future Daily Traffic: 613 (year 2032),  Design Load: H 20,  Features Intersected: WATER MILLER RED BRK,  Facility Carried by Structure: HWY MILLER AVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.274,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.1m (10.2ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 42.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 26.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 0.80m (2.62ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $208,000,  Roadway Improvement Cost: $21,000,  Total Project Cost: $313,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: S190215PLMUNNBI,  Location: 50 FT E GILBERT RD (Lat: 42.219633,  Lng: -72.746411),  Route carried "on" structure: City street ,  Year Built: 1995,  Status: Open,  Structure Length: 0.61m (2.00ft),  Average Daily Traffic: 685 (year 2018),  Design Load: HS 20,  Features Intersected: WATER RED BROOK,  Facility Carried by Structure: HWY RUSSLVLLE RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 9.7m (31.8ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 2.8m (9.2ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 52.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 31.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.00m (3.28ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2022,  Bridge Improvement Cost: $240,000,  Roadway Improvement Cost: $25,000,  Total Project Cost: $361,000 ( Estimate for 2022),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: S190230RQMUNNBI,  Location: 0.5M E OF RT10 BY CNT CLB (Lat: 42.214561,  Lng: -72.724225),  Route carried "on" structure: City street ,  Year Built: 1956,  Year Reconstructed: 1980,  Status: Open,  Structure Length: 0.69m (2.26ft),  Average Daily Traffic: 259 (year 2019),  Truck Traffic: 6%,  Average Future Daily Traffic: 409 (year 2032),  Design Load: H 15,  Features Intersected: WATER MOOSE BROOK,  Facility Carried by Structure: HWY MOOSEBRK RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.579,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 7.0m (23.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.6m (21.7ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 6.1m (20.0ft),  Out-to-Out Width: 7.3m (24.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Fair,  Operating Rating: 82.2 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 43.0 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 0.70m (2.30ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $324,000,  Roadway Improvement Cost: $33,000,  Total Project Cost: $487,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: S190240RWMUNNBI,  Location: 0.4 M E OF RT10 NR WSTFLD (Lat: 42.198833,  Lng: -72.719333),  Route carried "on" structure: City street ,  Year Built: 1956,  Status: Open,  Structure Length: 0.74m (2.43ft),  Average Daily Traffic: 260 (year 2019),  Truck Traffic: 3%,  Average Future Daily Traffic: 407 (year 2032),  Design Load: H 15,  Features Intersected: WATER MOOSE BROOK,  Facility Carried by Structure: HWY VALLEY RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.156,  Lanes on structure: 1,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.9m (22.6ft),  Curb or Sidewalk Widths: Left: 0.3m (1.0ft),  Right: 0.3m (1.0ft),  Curb-To-Curb Width: 5.5m (18.0ft),  Out-to-Out Width: 6.1m (20.0ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Good,  Operating Rating: 98.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 59.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.40m (4.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $851,000,  Roadway Improvement Cost: $86,000,  Total Project Cost: $1,277,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: S190250RRMUNNBI,  Location: 1MI W OF RT10 NR WSTFLD (Lat: 42.205125,  Lng: -72.747992),  Route carried "on" structure: City street ,  Year Built: 1956,  Year Reconstructed: 1991,  Status: Open,  Structure Length: 1.25m (4.10ft),  Average Daily Traffic: 893 (year 2016),  Average Future Daily Traffic: 632 (year 2031),  Design Load: HS 20,  Features Intersected: WATER MANHAN RIVER,  Facility Carried by Structure: HWY GILBERT RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.435,  Lanes on structure: 1,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 4.9m (16.1ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.1m (39.7ft),  Curb-To-Curb Width: 4.9m (16.1ft),  Out-to-Out Width: 5.7m (18.7ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Good,  Operating Rating: 40.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 24.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 2.00m (6.56ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Underwater Inspection Date: March 2021,  Bridge Improvement Cost: $1,367,000,  Roadway Improvement Cost: $137,000,  Total Project Cost: $2,051,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up,  Deck Protection: Epoxy Coated Reinforcing
Discuss Southampton, Massachusetts (MA) on our hugely popular Massachusetts forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.