National Bridge Inventory (NBI) Statistics
Number of bridges: 21
Total length: 66 meters (217ft)
Total costs: $27,430,000
Total average daily traffic: 887,069
Total average daily truck traffic: 103,031
National Bridge Inventory (NBI) Registered Bridges for Southborough

New bridges - Historical Statistics

  • Before 1900: 1
  • 1900-1909: 2
  • 1910-1919: 0
  • 1920-1929: 0
  • 1930-1939: 4
  • 1940-1949: 0
  • 1950-1959: 6
  • 1960-1969: 7
  • 1970-1979: 0
  • 1980-1989: 0
  • 1990-1999: 1

Reconstructed bridges - Historical Statistics

  • 1980-1989: 8
  • 1990-1999: 1

Average Daily Traffic

Bridge Condition - Deck

Bridge Condition - Superstructure

Bridge Condition - Substructure

Bridge Condition - Channel

Find on map >>

Structure Number: S2000423HMHD634,  Location: .7 MI. NRTH. OF RTE.9 (Lat: 42.301944,  Lng: -71.517319),  Route carried "on" structure: City street ,  Year Built: 1938,  Year Reconstructed: 1995,  Status: Open,  Structure Length: 1.22m (4.00ft),  Average Daily Traffic: 1,300 (year 2007),  Truck Traffic: 2%,  Average Future Daily Traffic: 2,053 (year 2028),  Design Load: HS 20,  Features Intersected: RR CSX,  Facility Carried by Structure: HWY WHITE BGLY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.483,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.0m (36.1ft),  Curb or Sidewalk Widths: Left: 2.0m (6.6ft),  Right: 0.0m,  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 9.8m (32.2ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 66.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.30m (4.27ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2007,  Bridge Improvement Cost: $340,000,  Roadway Improvement Cost: $35,000,  Total Project Cost: $511,000 ( Estimate for 2006),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>

Structure Number: S2000523JMHD634,  Location: 0.9 MI NORTH OF RT 30 (Lat: 42.318981,  Lng: -71.530278),  Route carried "on" structure: State highway 85,  Year Built: 1994,  Status: Open,  Structure Length: 2.62m (8.60ft),  Average Daily Traffic: 7,500 (year 2006),  Truck Traffic: 5%,  Average Future Daily Traffic: 11,845 (year 2027),  Design Load: HS 20,  Features Intersected: RR CSX
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 19.923,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 5 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 13.1m (43.0ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 0.0m,  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 14.6m (47.9ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 53.4 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 34.3 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 2.70m (8.86ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2006,  Bridge Improvement Cost: $139,000,  Roadway Improvement Cost: $14,000,  Total Project Cost: $209,000 ( Estimate for 2006),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>

Structure Number: S2000623KMHD634,  Location: .1MI. E. OF I 290 (Lat: 42.314381,  Lng: -71.564172),  Route carried "on" structure: City street ,  Year Built: 1900,  Status: Posted for load,  Structure Length: 1.16m (3.81ft),  Average Daily Traffic: 6,000 (year 2007),  Truck Traffic: 8%,  Average Future Daily Traffic: 9,476 (year 2028),  Features Intersected: RR CSX,  Facility Carried by Structure: HWY NORTHBORO RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Material/Design: Steel,  Design/Construction: Girder and Floorbeam System,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 10.4m (34.1ft),  Out-to-Out Width: 11.9m (39.0ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 27.9 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 19.5 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Underclear: High priority of corrective action,  Approach Roadway Alignment: High priority of replacement,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 10.0 - 19.9% below),  Length Of Structure Improvement: 1.20m (3.94ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2007,  Bridge Improvement Cost: $255,000,  Roadway Improvement Cost: $26,000,  Total Project Cost: $383,000 ( Estimate for 2006),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Wood or Timber
Find on map >>

Structure Number: S2001423LMHD634,  Location: .6 MI.WST.OF ST-85 (Lat: 42.266078,  Lng: -71.536472),  Route carried "on" structure: City street ,  Year Built: 1900,  Year Reconstructed: 1994,  Status: Open,  Structure Length: 1.89m (6.20ft),  Average Daily Traffic: 700 (year 2007),  Truck Traffic: 2%,  Average Future Daily Traffic: 1,106 (year 2028),  Design Load: HS 20,  Features Intersected: RR CSX,  Facility Carried by Structure: HWY BRIDGE ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Steel,  Design/Construction: Truss - Thru,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 17.1m (56.1ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 5.5m (18.0ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 44.1 metric tons,  Inventory Rating: 32.4 metric tons,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.90m (6.23ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: August 2007,  Critical Feature Inspection Date: August 2007,  Bridge Improvement Cost: $546,000,  Roadway Improvement Cost: $55,000,  Total Project Cost: $820,000 ( Estimate for 2006),  Deck Structure Type: Corrugated Steel,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: S20015207MHDNBI,  Location: 2 MILES EAST OF I-495 (Lat: 42.291556,  Lng: -71.527303),  Route carried "on" structure: State highway 85,  Year Built: 1930,  Year Reconstructed: 1989,  Status: Open,  Structure Length: 4.08m (13.39ft),  Average Daily Traffic: 11,800 (year 2007),  Truck Traffic: 10%,  Average Future Daily Traffic: 18,636 (year 2028),  Design Load: H 20,  Features Intersected: ST 9 TURNPIKE RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 16.817,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 19.5m (64.0ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 12.0m (39.4ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 44.1 metric tons,  Inventory Rating: 32.4 metric tons,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of corrective action,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 4.10m (13.45ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2007,  Bridge Improvement Cost: $756,000,  Roadway Improvement Cost: $76,000,  Total Project Cost: $1,135,000 ( Estimate for 2006),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>

Structure Number: S200164D0MDCNBI,  Location: SUDBURY RESERVOIR (Lat: 42.303856,  Lng: -71.514486),  Route carried "on" structure: State highway 30,  Year Built: 1895,  Status: Open,  Structure Length: 0.73m (2.40ft),  Average Daily Traffic: 7,200 (year 1997),  Truck Traffic: 1%,  Average Future Daily Traffic: 11,371 (year 2028),  Features Intersected: WATER SUDBURY RESERVOIR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 20.708,  Lanes on structure: 2,  Owner: State Agenciy,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Masonry,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.3m (24.0ft),  Curb-To-Curb Width: 18.3m (60.0ft),  Out-to-Out Width: 22.1m (72.5ft)

Condition: Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 89.8 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 24 months,  Inspection Date: September 2007,  Underwater Inspection Date: October 2006
Find on map >>

Structure Number: S200171U7MHDNBI,  Location: 1.25 MILES NO OF STATE 9 (Lat: 42.307286,  Lng: -71.566194),  Route carried "on" structure: Interstate 495,  Year Built: 1962,  Status: Open,  Structure Length: 3.60m (11.81ft),  Average Daily Traffic: 45,000 (year 2007),  Truck Traffic: 15%,  Average Future Daily Traffic: 71,068 (year 2028),  Design Load: H 20,  Features Intersected: ST 30 MAIN ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 97.910,  Lanes on structure: 3,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 15.2m (49.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 16.5m (54.1ft),  Curb-To-Curb Width: 15.2m (49.9ft),  Out-to-Out Width: 17.1m (56.1ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Good,  Operating Rating: 38.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 23.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.70m (12.14ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2007,  Bridge Improvement Cost: $1,130,000,  Roadway Improvement Cost: $114,000,  Total Project Cost: $1,696,000 ( Estimate for 2006),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>

Structure Number: S200171U8MHDNBI,  Location: 1.25 MILES NO. OF STATE 9 (Lat: 42.307242,  Lng: -71.566450),  Route carried "on" structure: Interstate 495,  Year Built: 1962,  Status: Open,  Structure Length: 3.47m (11.38ft),  Average Daily Traffic: 45,000 (year 2007),  Truck Traffic: 15%,  Average Future Daily Traffic: 71,068 (year 2028),  Design Load: H 20,  Features Intersected: ST 30 MAIN ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 97.910,  Lanes on structure: 3,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 15.2m (49.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 15.5m (50.9ft),  Curb-To-Curb Width: 15.2m (49.9ft),  Out-to-Out Width: 17.1m (56.1ft)

Condition: Deck: Good,  Superstructure: Fair,  Substructure: Good,  Operating Rating: 38.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 23.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.50m (11.48ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2007,  Bridge Improvement Cost: $1,069,000,  Roadway Improvement Cost: $107,000,  Total Project Cost: $1,604,000 ( Estimate for 2006),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>

Structure Number: S200181U9MHDNBI,  Location: 1.5 MI. NORTH OF ST-9 (Lat: 42.313692,  Lng: -71.567500),  Route carried "on" structure: Interstate 495,  Year Built: 1962,  Status: Open,  Structure Length: 9.75m (31.99ft),  Average Daily Traffic: 77,500 (year 2006),  Truck Traffic: 15%,  Average Future Daily Traffic: 122,396 (year 2027),  Design Load: H 20,  Features Intersected: COMB MDC AQUEDUCT & CSX
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 98.618,  Lanes on structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 15.2m (49.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 25.6m (84.0ft),  Curb-To-Curb Width: 15.2m (49.9ft),  Out-to-Out Width: 17.1m (56.1ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Fair,  Channel: Very good,  Operating Rating: 66.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Underclear: Meets minimum limits,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 9.80m (32.15ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2006,  Bridge Improvement Cost: $2,992,000,  Roadway Improvement Cost: $300,000,  Total Project Cost: $4,489,000 ( Estimate for 2006),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>

Structure Number: S200181UAMHDNBI,  Location: 1.5 MI. NORTH OF ST-9 (Lat: 42.313661,  Lng: -71.569444),  Route carried "on" structure: Interstate 495,  Year Built: 1962,  Status: Open,  Structure Length: 10.21m (33.50ft),  Average Daily Traffic: 77,500 (year 2006),  Truck Traffic: 15%,  Average Future Daily Traffic: 122,396 (year 2027),  Design Load: H 20,  Features Intersected: COMB MDC AQUEDUCT & CSX
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 98.618,  Lanes on structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 15.2m (49.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 25.3m (83.0ft),  Curb-To-Curb Width: 15.2m (49.9ft),  Out-to-Out Width: 17.1m (56.1ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Fair,  Channel: Very good,  Operating Rating: 69.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 41.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Underclear: Meets minimum limits,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 10.30m (33.79ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2006,  Bridge Improvement Cost: $3,144,000,  Roadway Improvement Cost: $315,000,  Total Project Cost: $4,717,000 ( Estimate for 2006),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>

Structure Number: S200191UBMHDNBI,  Location: .5 MILES NORTH OF MAIN ST (Lat: 42.314989,  Lng: -71.569308),  Route carried "on" structure: Interstate 495,  Year Built: 1963,  Status: Open,  Structure Length: 3.54m (11.61ft),  Average Daily Traffic: 85,000 (year 2007),  Truck Traffic: 15%,  Average Future Daily Traffic: 134,240 (year 2028),  Design Load: H 20,  Features Intersected: HWY NORTHBORO RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 98.843,  Lanes on structure: 3,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 15.2m (49.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 14.0m (45.9ft),  Curb-To-Curb Width: 15.2m (49.9ft),  Out-to-Out Width: 17.1m (56.1ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Poor,  Operating Rating: 55.3 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 38.7 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.60m (11.81ft),  Designated Inspection Frequency: Every 12 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: May 2007,  Other Special Inspection Date: May 2007,  Bridge Improvement Cost: $1,099,000,  Roadway Improvement Cost: $110,000,  Total Project Cost: $1,649,000 ( Estimate for 2006),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>

Structure Number: S200191UCMHDNBI,  Location: .5 MI. NORTH OF MAIN ST (Lat: 42.314894,  Lng: -71.569539),  Route carried "on" structure: Interstate 495,  Year Built: 1963,  Status: Open,  Structure Length: 3.35m (10.99ft),  Average Daily Traffic: 85,000 (year 2007),  Truck Traffic: 15%,  Average Future Daily Traffic: 134,240 (year 2028),  Design Load: H 20,  Features Intersected: HWY NORTHBORO RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 98.843,  Lanes on structure: 3,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 15.2m (49.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 14.0m (45.9ft),  Curb-To-Curb Width: 15.2m (49.9ft),  Out-to-Out Width: 16.2m (53.1ft)

Condition: Deck: Good,  Superstructure: Fair,  Substructure: Fair,  Operating Rating: 55.3 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 38.7 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.40m (11.15ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2007,  Bridge Improvement Cost: $984,000,  Roadway Improvement Cost: $99,000,  Total Project Cost: $1,477,000 ( Estimate for 2006),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>

Structure Number: S200201YTMHDNBI,  Location: .2MI. E. OF I-495 (Lat: 42.307428,  Lng: -71.559258),  Route carried "on" structure: State highway 30,  Year Built: 1962,  Status: Open,  Structure Length: 0.76m (2.49ft),  Average Daily Traffic: 9,000 (year 2005),  Truck Traffic: 2%,  Average Future Daily Traffic: 14,214 (year 2028),  Design Load: H 20,  Features Intersected: WATER WACH AQUEDUCT
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 16.415,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.1m (20.0ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 0.0m,  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 14.0m (45.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 86.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 51.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.80m (2.62ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 48 months,  Inspection Date: April 2007,  Underwater Inspection Date: March 2008,  Bridge Improvement Cost: $42,000,  Roadway Improvement Cost: $5,000,  Total Project Cost: $64,000 ( Estimate for 2006),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>

Structure Number: S200224NRMTANBI,  Location: .6MI.W. ST85 L6 (Lat: 42.275069,  Lng: -71.536486),  Route carried "on" structure: Interstate 90,  Year Built: 1957,  Year Reconstructed: 1986,  Status: Open,  Structure Length: 1.40m (4.59ft),  Average Daily Traffic: 68,385 (year 1997),  Truck Traffic: 10%,  Average Future Daily Traffic: 108,000 (year 2028),  Design Load: HS 20,  Features Intersected: HWY PARKERVILLE RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 173.965,  Lanes on structure: 6,  Lanes under structure: 2,  Base Highway Network: Yes,  Toll: On toll road,  Owner: State Toll Authority,  Approaching Roadway Width: 16.5m (54.1ft),  Skew: 12 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.9m (39.0ft),  Curb-To-Curb Width: 15.2m (49.9ft),  Out-to-Out Width: 17.2m (56.4ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Fair,  Operating Rating: 43.5 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.50m (4.92ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2007,  Bridge Improvement Cost: $1,172,000,  Roadway Improvement Cost: $118,000,  Total Project Cost: $1,759,000 ( Estimate for 2006),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>

Structure Number: S200224NTMTANBI,  Location: .6MI. W. ST85 L6 (Lat: 42.275281,  Lng: -71.536461),  Route carried "on" structure: Interstate 90,  Year Built: 1957,  Year Reconstructed: 1986,  Status: Open,  Structure Length: 1.40m (4.59ft),  Average Daily Traffic: 68,385 (year 1997),  Truck Traffic: 10%,  Average Future Daily Traffic: 108,000 (year 2028),  Design Load: HS 20,  Features Intersected: HWY PARKERVILLE RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 173.965,  Lanes on structure: 3,  Lanes under structure: 2,  Base Highway Network: Yes,  Toll: On toll road,  Owner: State Toll Authority,  Approaching Roadway Width: 15.2m (49.9ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.9m (39.0ft),  Curb or Sidewalk Widths: Left: 0.8m (2.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 15.2m (49.9ft),  Out-to-Out Width: 17.2m (56.4ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Operating Rating: 43.5 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.50m (4.92ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2007,  Bridge Improvement Cost: $90,000,  Roadway Improvement Cost: $10,000,  Total Project Cost: $136,000 ( Estimate for 2006),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>

Structure Number: S200234NPMTANBI,  Location: .5 MI S. ST 9 L7 (Lat: 42.277931,  Lng: -71.525647),  Route carried "on" structure: Interstate 90,  Year Built: 1957,  Year Reconstructed: 1986,  Status: Open,  Structure Length: 3.51m (11.52ft),  Average Daily Traffic: 68,385 (year 1997),  Truck Traffic: 10%,  Average Future Daily Traffic: 108,000 (year 2028),  Design Load: HS 20,  Features Intersected: ST 85 CORDAVILLE RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 174.931,  Lanes on structure: 6,  Lanes under structure: 2,  Base Highway Network: Yes,  Toll: On toll road,  Owner: State Toll Authority,  Approaching Roadway Width: 16.5m (54.1ft),  Skew: 11 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 14.9m (48.9ft),  Curb-To-Curb Width: 16.5m (54.1ft),  Out-to-Out Width: 17.2m (56.4ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 43.5 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.60m (11.81ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2007,  Bridge Improvement Cost: $2,612,000,  Roadway Improvement Cost: $262,000,  Total Project Cost: $3,919,000 ( Estimate for 2006),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>

Structure Number: S200234NQMTANBI,  Location: .5 MI.S.ST 9 L7 (Lat: 42.278111,  Lng: -71.525733),  Route carried "on" structure: Interstate 90,  Year Built: 1957,  Year Reconstructed: 1986,  Status: Open,  Structure Length: 3.34m (10.96ft),  Average Daily Traffic: 42,644 (year 2000),  Truck Traffic: 10%,  Average Future Daily Traffic: 67,348 (year 2027),  Design Load: HS 20,  Features Intersected: ST 85 CORDAVILLE RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 174.931,  Lanes on structure: 3,  Lanes under structure: 2,  Base Highway Network: Yes,  Toll: On toll road,  Owner: State Toll Authority,  Approaching Roadway Width: 16.5m (54.1ft),  Skew: 11 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 14.0m (45.9ft),  Curb-To-Curb Width: 16.5m (54.1ft),  Out-to-Out Width: 17.2m (56.4ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Fair,  Operating Rating: 43.5 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.60m (11.81ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2006,  Bridge Improvement Cost: $1,106,000,  Roadway Improvement Cost: $111,000,  Total Project Cost: $1,660,000 ( Estimate for 2006),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>

Structure Number: S200244NMMTANBI,  Location: .6 MI.E.ST85 L8 (Lat: 42.280467,  Lng: -71.515639),  Route carried "on" structure: Interstate 90,  Year Built: 1957,  Year Reconstructed: 1986,  Status: Open,  Structure Length: 1.28m (4.20ft),  Average Daily Traffic: 68,385 (year 1997),  Truck Traffic: 10%,  Average Future Daily Traffic: 108,000 (year 2028),  Design Load: HS 20,  Features Intersected: HWY WOODLAND RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 175.896,  Lanes on structure: 6,  Lanes under structure: 2,  Base Highway Network: Yes,  Toll: On toll road,  Owner: State Toll Authority,  Approaching Roadway Width: 16.5m (54.1ft),  Skew: 10 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.0m (36.1ft),  Curb-To-Curb Width: 16.5m (54.1ft),  Out-to-Out Width: 17.2m (56.4ft)

Condition: Deck: Fair,  Superstructure: Good,  Substructure: Fair,  Operating Rating: 43.5 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.30m (4.27ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2007,  Bridge Improvement Cost: $400,000,  Roadway Improvement Cost: $41,000,  Total Project Cost: $601,000 ( Estimate for 2006),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>

Structure Number: S200244NNMTANBI,  Location: .6 MI.E.ST85 L8 (Lat: 42.280669,  Lng: -71.515639),  Route carried "on" structure: Interstate 90,  Year Built: 1957,  Year Reconstructed: 1986,  Status: Open,  Structure Length: 1.28m (4.20ft),  Average Daily Traffic: 68,385 (year 1997),  Truck Traffic: 10%,  Average Future Daily Traffic: 108,000 (year 2028),  Design Load: HS 20,  Features Intersected: HWY WOODLAND RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 175.896,  Lanes on structure: 6,  Lanes under structure: 2,  Base Highway Network: Yes,  Toll: On toll road,  Owner: State Toll Authority,  Approaching Roadway Width: 16.5m (54.1ft),  Skew: 10 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.0m (36.1ft),  Curb-To-Curb Width: 16.5m (54.1ft),  Out-to-Out Width: 17.2m (56.4ft)

Condition: Deck: Fair,  Superstructure: Good,  Substructure: Fair,  Operating Rating: 43.5 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.30m (4.27ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2007,  Bridge Improvement Cost: $400,000,  Roadway Improvement Cost: $41,000,  Total Project Cost: $601,000 ( Estimate for 2006),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>

Structure Number: S20015207MHDNBI,  Location: ST 85/ST 9 (Lat: 42.300000,  Lng: -71.533333),  Route carried "under" structure: State highway 9,  Year Built: 1930,  Structure Length: 4.08m (13.39ft),  Average Daily Traffic: 6,000 (year 0 ),  Features Intersected: ST 9 EB,  Facility Carried by Structure: ST 85 CRDVILLE RD
Minimum Vertical Clearance: 4.19m (13.75ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 19.5m (64.0ft)

Find on map >>

Structure Number: S20015207MHDNBI,  Location: ST 85/ST 9 (Lat: 42.300000,  Lng: -71.533333),  Route carried "under" structure: State highway 9,  Year Built: 1930,  Structure Length: 4.08m (13.39ft),  Average Daily Traffic: 38,000 (year 0 ),  Features Intersected: ST 9 WB,  Facility Carried by Structure: ST 85 CRDVILLE RD
Minimum Vertical Clearance: 4.19m (13.75ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 19.5m (64.0ft)

Discuss this city on our hugely popular Massachusetts forum

Back to: Southborough, MA, Massachusetts, All US cities.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2009 Advameg, Inc.