U.S. Cities - City-Data Homepage  
City-Data Forum
City-Data.com Homepage

Bridge Statistics for Southbury, Connecticut (CT) - Condition, Traffic, Stress, Structural Evaluation, Project Costs

Back to: Southbury, CT, Connecticut, Connecticut forum, All US cities.





National Bridge Inventory (NBI) Statistics
Number of bridges: 39
Total length: 209 meters (686ft)
Total costs: $52,000
Total average daily traffic: 688,758
Total average daily truck traffic: 71,108
National Bridge Inventory (NBI) Registered Bridges for Southbury
No street view available for this location

New bridges - Historical Statistics

  • 1930-1939: 3
  • 1940-1949: 0
  • 1950-1959: 1
  • 1960-1969: 23
  • 1970-1979: 8
  • 1980-1989: 3
  • 1990-1999: 0
  • 2000-2009: 1

Reconstructed bridges - Historical Statistics

  • 1980-1989: 7
  • 1990-1999: 3

Average Daily Traffic

Average Truck Traffic (%)

Bridge Condition - Deck

Bridge Condition - Superstructure

Bridge Condition - Substructure

Bridge Condition - Channel

Bridge Condition - Culverts

Find on map >>   Show street view

Structure Number: 1047,  Location: .5 WEST OF RT. 6 & 67 (Lat: 41.513333,  Lng: -73.220000),  Route carried "on" structure: State highway 67,  Year Built: 1958,  Year Reconstructed: 1985,  Status: Open,  Structure Length: 3.69m (12.11ft),  Average Daily Traffic: 6,300 (year 2009),  Truck Traffic: 4%,  Average Future Daily Traffic: 3,150 (year 2030),  Design Load: HS 20,  Features Intersected: POMPERAUG RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 24.103,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 35.1m (115.2ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.9m (45.6ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 89.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 53.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.01m (0.03ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 11,  Bridge Improvement Cost: $1,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $2,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: 1149,  Location: BTWN EXITS 13 & 14 1-84 (Lat: 41.458333,  Lng: -73.248333),  Route carried "on" structure: City street ,  Year Built: 1963,  Year Reconstructed: 1993,  Status: Open,  Structure Length: 6.98m (22.90ft),  Average Daily Traffic: 590 (year 2012),  Truck Traffic: 7%,  Average Future Daily Traffic: 295 (year 2030),  Design Load: HS 20,  Features Intersected: INTERSTATE-84,  Facility Carried by Structure: ICHABOD ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 32.502,  Lanes on structure: 2,  Lanes under structure: 5,  Owner: State Highway Agency,  Approaching Roadway Width: 10.7m (35.1ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 34.1m (111.9ft),  Curb-To-Curb Width: 10.9m (35.8ft),  Out-to-Out Width: 12.0m (39.4ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 89.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 63.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 0.01m (0.03ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 12,  Bridge Improvement Cost: $1,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $2,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 115,  Location: AT EXIT 14 (Lat: 41.465000,  Lng: -73.233333),  Route carried "on" structure: Interstate 84,  Year Built: 1963,  Year Reconstructed: 2004,  Status: Open,  Structure Length: 3.96m (12.99ft),  Average Daily Traffic: 33,200 (year 2007),  Truck Traffic: 10%,  Average Future Daily Traffic: 16,600 (year 2030),  Design Load: HS 20,  Features Intersected: ROUTE 172
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 32.486,  Lanes on structure: 3,  Lanes under structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 15.5m (50.9ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 16.5m (54.1ft),  Curb-To-Curb Width: 15.5m (50.9ft),  Out-to-Out Width: 17.7m (58.1ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Inventory Rating: 77.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.01m (0.03ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 10,  Bridge Improvement Cost: $1,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $2,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 1151,  Location: EXIT 14 (Lat: 41.465000,  Lng: -73.235000),  Route carried "on" structure: Interstate 84,  Year Built: 1963,  Status: Open,  Structure Length: 3.99m (13.09ft),  Average Daily Traffic: 33,200 (year 2007),  Truck Traffic: 10%,  Average Future Daily Traffic: 16,600 (year 2030),  Design Load: HS 20,  Features Intersected: ROUTE 172
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 32.502,  Lanes on structure: 2,  Lanes under structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 16.5m (54.1ft),  Curb-To-Curb Width: 12.1m (39.7ft),  Out-to-Out Width: 13.3m (43.6ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 67.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.01m (0.03ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 10,  Bridge Improvement Cost: $1,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $2,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: 1152,  Location: .9 MILE EAST OF ROUTE 172 (Lat: 41.456667,  Lng: -73.221667),  Route carried "on" structure: Interstate 84,  Year Built: 1963,  Year Reconstructed: 2003,  Status: Open,  Structure Length: 4.94m (16.21ft),  Average Daily Traffic: 35,400 (year 2009),  Truck Traffic: 10%,  Average Future Daily Traffic: 17,700 (year 2030),  Design Load: HS 20,  Features Intersected: PETER ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 33.902,  Lanes on structure: 3,  Lanes under structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 15.8m (51.8ft),  Skew: 2 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 17.7m (58.1ft),  Curb-To-Curb Width: 15.8m (51.8ft),  Out-to-Out Width: 17.1m (56.1ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Satisfactory,  Operating Rating: 72.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 43.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.01m (0.03ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 10,  Bridge Improvement Cost: $1,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $2,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 1153,  Location: .9 MI E OF ROUTE 172 (Lat: 41.460000,  Lng: -73.221667),  Route carried "on" structure: Interstate 84,  Year Built: 1963,  Year Reconstructed: 2004,  Status: Open,  Structure Length: 3.96m (12.99ft),  Average Daily Traffic: 35,400 (year 2009),  Truck Traffic: 10%,  Average Future Daily Traffic: 17,700 (year 2030),  Design Load: HS 20,  Features Intersected: PETER ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 33.918,  Lanes on structure: 3,  Lanes under structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 17.7m (58.1ft),  Skew: 3 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 16.8m (55.1ft),  Curb-To-Curb Width: 17.8m (58.4ft),  Out-to-Out Width: 18.9m (62.0ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 77.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 46.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.01m (0.03ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 10,  Bridge Improvement Cost: $1,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $2,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 1154,  Location: .4 MI W OF US RTE 6 & 202 (Lat: 41.476667,  Lng: -73.215000),  Route carried "on" structure: City street ,  Year Built: 1963,  Year Reconstructed: 1986,  Status: Open,  Structure Length: 9.81m (32.19ft),  Average Daily Traffic: 4,726 (year 2011),  Truck Traffic: 2%,  Average Future Daily Traffic: 2,363 (year 2030),  Design Load: HS 20,  Features Intersected: INTERSTATE-84 & RAMP 40,  Facility Carried by Structure: BULLET HILL ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 6,  Owner: State Highway Agency,  Approaching Roadway Width: 9.4m (30.8ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Number Of Approach Spans: 2,  Length of Maximum Span: 35.4m (116.1ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 10.8m (35.4ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Fair,  Operating Rating: 59.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.01m (0.03ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 11,  Bridge Improvement Cost: $1,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $2,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: 1155,  Location: INTERSTATE-84 EXIT 15 (Lat: 41.471667,  Lng: -73.211667),  Route carried "on" structure: Interstate 84,  Year Built: 1963,  Status: Open,  Structure Length: 8.53m (27.99ft),  Average Daily Traffic: 29,250 (year 2009),  Truck Traffic: 10%,  Average Future Daily Traffic: 14,625 (year 2030),  Design Load: HS 20,  Features Intersected: US RTE 6, RTE 67, STREAM
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 35.334,  Lanes on structure: 2,  Lanes under structure: 8,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 32.9m (107.9ft),  Curb-To-Curb Width: 12.1m (39.7ft),  Out-to-Out Width: 13.3m (43.6ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Very good,  Operating Rating: 89.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 54.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.01m (0.03ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 11,  Bridge Improvement Cost: $1,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $2,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: 1156,  Location: EXIT 15 INTERSTATE-84 (Lat: 41.476667,  Lng: -73.211667),  Route carried "on" structure: Interstate 84,  Year Built: 1963,  Status: Open,  Structure Length: 6.92m (22.70ft),  Average Daily Traffic: 29,250 (year 2009),  Truck Traffic: 10%,  Average Future Daily Traffic: 14,625 (year 2030),  Design Load: HS 20,  Features Intersected: US RTE 6, RTE 67, STREAM
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 35.334,  Lanes on structure: 2,  Lanes under structure: 8,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 28.7m (94.2ft),  Curb-To-Curb Width: 12.1m (39.7ft),  Out-to-Out Width: 13.3m (43.6ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Very good,  Operating Rating: 56.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.01m (0.03ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 11,  Bridge Improvement Cost: $1,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $2,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: 1157,  Location: .7 MI WEST OF ROUTE 188 (Lat: 41.493333,  Lng: -73.173333),  Route carried "on" structure: City street ,  Year Built: 1964,  Status: Open,  Structure Length: 7.83m (25.69ft),  Average Daily Traffic: 686 (year 2010),  Truck Traffic: 7%,  Average Future Daily Traffic: 343 (year 2030),  Design Load: HS 20,  Features Intersected: INTERSTATE-84,  Facility Carried by Structure: BUCKS HILL ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 39.887,  Lanes on structure: 2,  Lanes under structure: 5,  Owner: State Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 38.4m (126.0ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 10.4m (34.1ft),  Out-to-Out Width: 12.0m (39.4ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Good,  Operating Rating: 63.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 37.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.01m (0.03ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: March 10,  Other Special Inspection Date: May 11,  Bridge Improvement Cost: $1,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $2,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 1158,  Location: EXIT 16 I-84 E/B (Lat: 41.485000,  Lng: -73.161667),  Route carried "on" structure: Interstate 84,  Year Built: 1964,  Year Reconstructed: 1993,  Status: Open,  Structure Length: 3.38m (11.09ft),  Average Daily Traffic: 33,800 (year 2007),  Truck Traffic: 10%,  Average Future Daily Traffic: 16,900 (year 2030),  Design Load: HS 20,  Features Intersected: ROUTE 188
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 39.887,  Lanes on structure: 2,  Lanes under structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 16.2m (53.1ft),  Curb-To-Curb Width: 12.1m (39.7ft),  Out-to-Out Width: 13.3m (43.6ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 63.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 37.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.01m (0.03ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 10,  Bridge Improvement Cost: $1,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $2,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: 1159,  Location: I-84 WB EXIT 16 (Lat: 41.490000,  Lng: -73.163333),  Route carried "on" structure: Interstate 84,  Year Built: 1964,  Year Reconstructed: 1993,  Status: Open,  Structure Length: 3.63m (11.91ft),  Average Daily Traffic: 33,800 (year 2007),  Truck Traffic: 10%,  Average Future Daily Traffic: 16,900 (year 2030),  Design Load: HS 20,  Features Intersected: ROUTE 188
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 39.887,  Lanes on structure: 3,  Lanes under structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 16.2m (53.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 15.5m (50.9ft),  Curb-To-Curb Width: 16.2m (53.1ft),  Out-to-Out Width: 18.1m (59.4ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 62.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.01m (0.03ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 10,  Bridge Improvement Cost: $1,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $2,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: 1475,  Location: I 84 EXIT 14 & 1 MILE NOR (Lat: 41.478333,  Lng: -73.248333),  Route carried "on" structure: State highway 172,  Year Built: 1939,  Year Reconstructed: 1991,  Status: Open,  Structure Length: 5.03m (16.50ft),  Average Daily Traffic: 9,000 (year 2009),  Truck Traffic: 2%,  Average Future Daily Traffic: 4,500 (year 2030),  Design Load: HS 20,  Features Intersected: POMPERAUG RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.754,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Skew: 4 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 25.6m (84.0ft),  Curb-To-Curb Width: 9.5m (31.2ft),  Out-to-Out Width: 10.6m (34.8ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 89.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 63.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.01m (0.03ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 48 months,  Inspection Date: November 11,  Underwater Inspection Date: November 11,  Bridge Improvement Cost: $1,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $2,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 2751,  Location: 1 MI SOUTH OF JCT RTE 67 (Lat: 41.498333,  Lng: -73.256667),  Route carried "on" structure: State highway 172,  Year Built: 1932,  Status: Open,  Structure Length: 0.67m (2.20ft),  Average Daily Traffic: 5,200 (year 2009),  Truck Traffic: 2%,  Average Future Daily Traffic: 2,600 (year 2030),  Design Load: H 20,  Features Intersected: TRANSYLVANIA BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.680,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.1m (20.0ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 10.8m (35.4ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Fair,  Operating Rating: 60.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.01m (0.03ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 11,  Bridge Improvement Cost: $1,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $2,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 3914,  Location: 100' EAST OF JCT RTE 188 (Lat: 41.473333,  Lng: -73.156667),  Route carried "on" structure: US 486,  Year Built: 1975,  Status: Open,  Structure Length: 1.10m (3.61ft),  Average Daily Traffic: 2,400 (year 2009),  Truck Traffic: 4%,  Average Future Daily Traffic: 1,200 (year 2030),  Features Intersected: EIGHT MILE BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.080,  Lanes on structure: 3,  Owner: State Highway Agency,  Approaching Roadway Width: 15.2m (49.9ft),  Skew: 2 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.4m (11.2ft),  Out-to-Out Width: 36.6m (120.1ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 71.1 metric tons,  Inventory Rating: 45.0 metric tons,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.01m (0.03ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 11,  Bridge Improvement Cost: $1,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $2,000
Find on map >>   Show street view

Structure Number: 4264,  Location: I-84 EXIT 13 (Lat: 41.441667,  Lng: -73.248333),  Route carried "on" structure: City street ,  Year Built: 1978,  Status: Open,  Structure Length: 11.16m (36.61ft),  Average Daily Traffic: 2,990 (year 2011),  Truck Traffic: 7%,  Average Future Daily Traffic: 1,495 (year 2030),  Design Load: HS 20,  Features Intersected: INTERSTATE-84,  Facility Carried by Structure: RIVER ROAD #1
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 119.581,  Lanes on structure: 2,  Lanes under structure: 6,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 3 degrees,  Material/Design: Steel continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 54.3m (178.1ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.7m (5.6ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 14.2m (46.6ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 89.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 69.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 0.01m (0.03ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 11,  Bridge Improvement Cost: $1,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $2,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: 4465,  Location: NEAR I-84 EXIT 13 (Lat: 41.440000,  Lng: -73.251667),  Route carried "on" structure: City street ,  Year Built: 1962,  Status: Open,  Structure Length: 5.67m (18.60ft),  Average Daily Traffic: 4,465 (year 2008),  Truck Traffic: 7%,  Average Future Daily Traffic: 2,233 (year 2030),  Design Load: HS 20,  Features Intersected: POMPERAUG RIVER,  Facility Carried by Structure: RIVER ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.161,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 26.8m (87.9ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.9m (45.6ft)

Condition: Deck: Poor,  Superstructure: Fair,  Substructure: Fair,  Channel: Good,  Operating Rating: 55.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.01m (0.03ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 24 months,  Inspection Date: August 10,  Underwater Inspection Date: October 10,  Bridge Improvement Cost: $1,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $2,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 4466,  Location: 1/4 MI WEST OF SO MAIN ST (Lat: 41.468333,  Lng: -73.230000),  Route carried "on" structure: City street ,  Year Built: 1979,  Status: Open,  Structure Length: 6.25m (20.51ft),  Average Daily Traffic: 387 (year 2010),  Truck Traffic: 7%,  Average Future Daily Traffic: 194 (year 2030),  Design Load: HS 20,  Features Intersected: POMPERAUG RIVER,  Facility Carried by Structure: FLOOD BRIDGE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.708,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 25.6m (84.0ft),  Curb or Sidewalk Widths: Left: 1.4m (4.6ft),  Right: 1.4m (4.6ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 11.3m (37.1ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 63.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.01m (0.03ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 10,  Bridge Improvement Cost: $1,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $2,000,  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: 5029,  Location: .2 MI FROM HERITAGE ROAD (Lat: 41.480000,  Lng: -73.225000),  Route carried "on" structure: City street ,  Year Built: 1967,  Year Reconstructed: 1989,  Status: Open,  Structure Length: 2.35m (7.71ft),  Average Daily Traffic: 4,345 (year 2008),  Truck Traffic: 7%,  Average Future Daily Traffic: 2,173 (year 2030),  Design Load: HS 20,  Features Intersected: POMPERAUG RIVER,  Facility Carried by Structure: POVERTY ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.738,  Lanes on structure: 1,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 21.6m (70.9ft),  Curb or Sidewalk Widths: Left: 0.9m (3.0ft),  Right: 0.0m,  Curb-To-Curb Width: 3.7m (12.1ft),  Out-to-Out Width: 5.9m (19.4ft)

Condition: Deck: Very good,  Superstructure: Fair,  Substructure: Good,  Channel: Good,  Operating Rating: 57.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 0.01m (0.03ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 10,  Bridge Improvement Cost: $1,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $2,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 5031,  Location: .5 MI WEST OF ROUTE 172 (Lat: 41.471667,  Lng: -73.256667),  Route carried "on" structure: City street ,  Year Built: 1975,  Status: Open,  Structure Length: 1.07m (3.51ft),  Average Daily Traffic: 550 (year 2008),  Truck Traffic: 7%,  Average Future Daily Traffic: 275 (year 2030),  Design Load: HS 20,  Features Intersected: TRANSYLVANIA BROOK,  Facility Carried by Structure: EAST FLAT HILL RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.917,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.6m (15.1ft)

Condition: Channel: Poor,  Culverts: Poor,  Operating Rating: 52.2 metric tons,  Inventory Rating: 32.4 metric tons,  Structural Evaluation: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.01m (0.03ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 10,  Bridge Improvement Cost: $1,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $2,000
Find on map >>   Show street view

Structure Number: 5032,  Location: NEAR SOUTH. TRAIN. SCHOOL (Lat: 41.470000,  Lng: -73.258333),  Route carried "on" structure: City street ,  Year Built: 1939,  Status: Open,  Structure Length: 0.88m (2.89ft),  Average Daily Traffic: 970 (year 2010),  Truck Traffic: 7%,  Average Future Daily Traffic: 485 (year 2030),  Features Intersected: TRANSYLVANIA BROOK,  Facility Carried by Structure: SPRUCE BROOK ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.126,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 1.5m (4.9ft)

Condition: Channel: Fair,  Culverts: Serious,  Operating Rating: 38.7 metric tons,  Inventory Rating: 26.1 metric tons,  Structural Evaluation: High priority of corrective action,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.01m (0.03ft),  Designated Inspection Frequency: Every 6 months,  Underwater Inspection Frequency: Every 6 months,  Inspection Date: July 11,  Underwater Inspection Date: January 12,  Bridge Improvement Cost: $1,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $2,000
Find on map >>   Show street view

Structure Number: 5033,  Location: 3 MI S TROOP A BARRACKS (Lat: 41.431667,  Lng: -73.228333),  Route carried "on" structure: City street ,  Year Built: 2001,  Status: Open,  Structure Length: 0.79m (2.59ft),  Average Daily Traffic: 561 (year 2010),  Truck Traffic: 7%,  Average Future Daily Traffic: 281 (year 2030),  Design Load: HS 20,  Features Intersected: LEE FARM BROOK,  Facility Carried by Structure: LAKEMERE DRIVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.204,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.7m (12.1ft),  Out-to-Out Width: 17.1m (56.1ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 52.2 metric tons,  Inventory Rating: 30.6 metric tons,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.01m (0.03ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 10,  Bridge Improvement Cost: $1,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $2,000,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: 5034,  Location: .5 MI WEST OF ROUTE 6 (Lat: 41.483333,  Lng: -73.223333),  Route carried "on" structure: City street ,  Year Built: 1971,  Status: Open,  Structure Length: 6.25m (20.51ft),  Average Daily Traffic: 8,191 (year 2010),  Truck Traffic: 7%,  Average Future Daily Traffic: 4,096 (year 2030),  Design Load: HS 20,  Features Intersected: POMPERAUG RIVER,  Facility Carried by Structure: HERITAGE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.499,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 11.9m (39.0ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 25.6m (84.0ft),  Curb-To-Curb Width: 11.9m (39.0ft),  Out-to-Out Width: 12.8m (42.0ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Good,  Operating Rating: 65.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.01m (0.03ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 10,  Bridge Improvement Cost: $1,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $2,000,  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: 5541,  Location: 500' FROM ROUTE 188 (Lat: 41.478333,  Lng: -73.156667),  Route carried "on" structure: City street ,  Year Built: 1986,  Status: Open,  Structure Length: 1.07m (3.51ft),  Average Daily Traffic: 112 (year 2010),  Truck Traffic: 7%,  Average Future Daily Traffic: 56 (year 2030),  Design Load: HS 20,  Features Intersected: EIGHT MILE BROOK,  Facility Carried by Structure: BRISTOL TOWN ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.223,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 5.8m (19.0ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.1m (33.1ft),  Curb-To-Curb Width: 6.6m (21.7ft),  Out-to-Out Width: 7.9m (25.9ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 83.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 50.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 0.01m (0.03ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 10,  Bridge Improvement Cost: $1,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $2,000,  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 5767,  Location: 1/10 MI N OF ROUTE 172 (Lat: 41.515000,  Lng: -73.248333),  Route carried "on" structure: State highway 67,  Year Built: 1989,  Status: Open,  Structure Length: 1.04m (3.41ft),  Average Daily Traffic: 4,700 (year 2009),  Truck Traffic: 4%,  Average Future Daily Traffic: 2,350 (year 2030),  Design Load: HS 20,  Features Intersected: TRANSYLVANIA BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 20.957,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft),  Curb-To-Curb Width: 10.5m (34.4ft),  Out-to-Out Width: 10.9m (35.8ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 52.2 metric tons,  Inventory Rating: 30.6 metric tons,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.01m (0.03ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 11,  Bridge Improvement Cost: $1,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $2,000
Find on map >>   Show street view

Structure Number: 6259,  Location: NEAR SOUTHBRY TRAIN. SCHL (Lat: 41.488333,  Lng: -73.268333),  Route carried "on" structure: City street ,  Year Built: 1989,  Status: Open,  Structure Length: 0.70m (2.30ft),  Average Daily Traffic: 1,785 (year 2010),  Truck Traffic: 7%,  Average Future Daily Traffic: 893 (year 2030),  Design Load: HS 20,  Features Intersected: SPRUCE BROOK,  Facility Carried by Structure: SPRUCE BROOK ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.126,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 1.5m (4.9ft)

Condition: Channel: Fair,  Culverts: Fair,  Operating Rating: 54.0 metric tons,  Inventory Rating: 32.4 metric tons,  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.01m (0.03ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 10,  Bridge Improvement Cost: $1,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $2,000
Find on map >>   Show street view

Structure Number: 1149,  Location: BTWN EXITS 13 & 14 1-84 (Lat: 41.458333,  Lng: -73.248333),  Route carried "under" structure: Interstate 84,  Year Built: 1963,  Structure Length: 6.98m (22.90ft),  Average Daily Traffic: 68,900 (year 2010),  Truck Traffic: 9%,  Features Intersected: INTERSTATE-84,  Facility Carried by Structure: ICHABOD ROAD
Minimum Vertical Clearance: 5.44m (17.85ft),  Kilometerpoint: 31.022,  Lanes on structure: 2,  Lanes under structure: 5,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 34.1m (111.9ft)

Find on map >>   Show street view

Structure Number: 115,  Location: AT EXIT 14 (Lat: 41.465000,  Lng: -73.233333),  Route carried "under" structure: State highway 172,  Year Built: 1963,  Structure Length: 3.96m (12.99ft),  Average Daily Traffic: 9,600 (year 2007),  Truck Traffic: 1%,  Features Intersected: ROUTE 172,  Facility Carried by Structure: INTERSTATE-84 EB
Minimum Vertical Clearance: 4.88m (16.01ft),  Kilometerpoint: 0.016,  Lanes on structure: 3,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 16.5m (54.1ft)

Find on map >>   Show street view

Structure Number: 1151,  Location: EXIT 14 (Lat: 41.465000,  Lng: -73.235000),  Route carried "under" structure: State highway 172,  Year Built: 1963,  Structure Length: 3.99m (13.09ft),  Average Daily Traffic: 9,600 (year 2007),  Truck Traffic: 2%,  Features Intersected: ROUTE 172,  Facility Carried by Structure: INTERSTATE-84 WB
Minimum Vertical Clearance: 0.49m (1.61ft),  Kilometerpoint: 0.241,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 16.5m (54.1ft)

Find on map >>   Show street view

Structure Number: 1154,  Location: .4 MI W OF US RTE 6 & 202 (Lat: 41.476667,  Lng: -73.215000),  Route carried "under" structure: Ramp Interstate 84,  Year Built: 1963,  Structure Length: 9.81m (32.19ft),  Average Daily Traffic: 2,200 (year 2006),  Truck Traffic: 14%,  Features Intersected: INTERSTATE-84 & RAMP 40,  Facility Carried by Structure: BULLET HILL ROAD
Minimum Vertical Clearance: 4.98m (16.34ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 1,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 35.4m (116.1ft)

Find on map >>   Show street view

Structure Number: 1154,  Location: .4 MI W OF US RTE 6 & 202 (Lat: 41.476667,  Lng: -73.215000),  Route carried "under" structure: Interstate 84,  Year Built: 1963,  Structure Length: 9.81m (32.19ft),  Average Daily Traffic: 70,800 (year 2009),  Truck Traffic: 14%,  Features Intersected: INTERSTATE-84 & RAMP 40,  Facility Carried by Structure: BULLET HILL ROAD
Minimum Vertical Clearance: 7.62m (25.00ft),  Kilometerpoint: 34.787,  Lanes on structure: 2,  Lanes under structure: 5,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 35.4m (116.1ft)

Find on map >>   Show street view

Structure Number: 1155,  Location: INTERSTATE-84 EXIT 15 (Lat: 41.471667,  Lng: -73.211667),  Route carried "under" structure: US 6,  Year Built: 1963,  Structure Length: 8.53m (27.99ft),  Average Daily Traffic: 23,100 (year 2009),  Truck Traffic: 5%,  Features Intersected: US RTE 6, RTE 67, STREAM,  Facility Carried by Structure: INTERSTATE-84 EB
Minimum Vertical Clearance: 8.46m (27.76ft),  Kilometerpoint: 35.784,  Lanes on structure: 2,  Lanes under structure: 8,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 32.9m (107.9ft)

Find on map >>   Show street view

Structure Number: 1156,  Location: EXIT 15 INTERSTATE-84 (Lat: 41.476667,  Lng: -73.211667),  Route carried "under" structure: US 6,  Year Built: 1963,  Structure Length: 6.92m (22.70ft),  Average Daily Traffic: 23,100 (year 2009),  Truck Traffic: 5%,  Features Intersected: US RTE 6, RTE 67, STREAM,  Facility Carried by Structure: INTERSTATE-84 WB
Minimum Vertical Clearance: 5.44m (17.85ft),  Kilometerpoint: 35.832,  Lanes on structure: 2,  Lanes under structure: 8,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 28.7m (94.2ft)

Find on map >>   Show street view

Structure Number: 1157,  Location: .7 MI WEST OF ROUTE 188 (Lat: 41.493333,  Lng: -73.173333),  Route carried "under" structure: Interstate 84,  Year Built: 1964,  Structure Length: 7.83m (25.69ft),  Average Daily Traffic: 67,300 (year 2008),  Truck Traffic: 16%,  Features Intersected: INTERSTATE-84,  Facility Carried by Structure: BUCKS HILL ROAD
Minimum Vertical Clearance: 5.18m (16.99ft),  Kilometerpoint: 38.793,  Lanes on structure: 2,  Lanes under structure: 5,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 38.4m (126.0ft)

Find on map >>   Show street view

Structure Number: 1158,  Location: EXIT 16 I-84 E/B (Lat: 41.485000,  Lng: -73.161667),  Route carried "under" structure: State highway 188,  Year Built: 1964,  Structure Length: 3.38m (11.09ft),  Average Daily Traffic: 9,200 (year 2007),  Truck Traffic: 2%,  Features Intersected: ROUTE 188,  Facility Carried by Structure: INTERSTATE-84 EB
Minimum Vertical Clearance: 4.39m (14.40ft),  Kilometerpoint: 1.646,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 16.2m (53.1ft)

Find on map >>   Show street view

Structure Number: 1159,  Location: I-84 WB EXIT 16 (Lat: 41.490000,  Lng: -73.163333),  Route carried "under" structure: State highway 188,  Year Built: 1964,  Structure Length: 3.63m (11.91ft),  Average Daily Traffic: 9,200 (year 2007),  Truck Traffic: 2%,  Features Intersected: ROUTE 188,  Facility Carried by Structure: INTERSTATE-84 WB
Minimum Vertical Clearance: 0.45m (1.48ft),  Kilometerpoint: 16.492,  Lanes on structure: 3,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 15.5m (50.9ft)

Find on map >>   Show street view

Structure Number: 4264,  Location: I-84 EXIT 13 (Lat: 41.441667,  Lng: -73.248333),  Route carried "under" structure: Ramp Interstate 84,  Year Built: 1978,  Structure Length: 11.16m (36.61ft),  Truck Traffic: 1%,  Features Intersected: INTERSTATE-84,  Facility Carried by Structure: RIVER ROAD #1
Minimum Vertical Clearance: 7.44m (24.41ft),  Kilometerpoint: 30.153,  Lanes on structure: 2,  Lanes under structure: 1,  Material/Design: Steel continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 54.3m (178.1ft)

Find on map >>   Show street view

Structure Number: 4264,  Location: I-84 EXIT 13 (Lat: 41.441667,  Lng: -73.248333),  Route carried "under" structure: Ramp Interstate 84,  Year Built: 1978,  Structure Length: 11.16m (36.61ft),  Truck Traffic: 1%,  Features Intersected: INTERSTATE-84,  Facility Carried by Structure: RIVER ROAD #1
Minimum Vertical Clearance: 4.98m (16.34ft),  Kilometerpoint: 30.153,  Lanes on structure: 2,  Lanes under structure: 1,  Material/Design: Steel continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 54.3m (178.1ft)

Find on map >>   Show street view

Structure Number: 4264,  Location: I-84 EXIT 13 (Lat: 41.441667,  Lng: -73.248333),  Route carried "under" structure: Interstate 84,  Year Built: 1978,  Structure Length: 11.16m (36.61ft),  Average Daily Traffic: 74,500 (year 2009),  Truck Traffic: 16%,  Features Intersected: INTERSTATE-84,  Facility Carried by Structure: RIVER ROAD #1
Minimum Vertical Clearance: 7.34m (24.08ft),  Kilometerpoint: 30.153,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 54.3m (178.1ft)

Jump to a detailed profile or search site with Google Custom Search
Business Search - 14 Million verified businesses
Search for: near: 

Discuss this city on our hugely popular Connecticut forum

Back to: Southbury, CT, Connecticut, All US cities.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2013 Advameg, Inc.