![]() |
Bridge Statistics for Southwest Greensburg, Pennsylvania (PA) - Condition, Traffic, Stress, Structural Evaluation, Project CostsBack to: Southwest Greensburg, PA, Pennsylvania, Pennsylvania forum, All US cities. National Bridge Inventory (NBI) Statistics Number of bridges: 10 Total length: 144 meters (472ft) Total costs: $2,771,000 Total average daily traffic: 137,818 Total average daily truck traffic: 6,004 National Bridge Inventory (NBI) Registered Bridges for Southwest Greensburg
Bridge Condition - Deck Bridge Condition - Superstructure Bridge Condition - Substructure Bridge Condition - Channel Find on map >>
Structure Number: 64003003000454, Location: SOUTHWEST GREENSBURG BORO (Lat: 40.286222, Lng: -79.547850), Route carried "on" structure: US 30, Year Built: 1959, Year Reconstructed: 1988, Status: Open, Structure Length: 28.22m (92.59ft), Average Daily Traffic: 38,193 (year 2008), Truck Traffic: 4%, Average Future Daily Traffic: 56,997 (year 2013), Design Load: H 15, Features Intersected: 0119, R/R, JACKS RN, ST. Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 23.128, Lanes on structure: 4, Lanes under structure: 18, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 21.9m (71.9ft), Skew: 30 degrees, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 2, Number Of Approach Spans: 13, Length of Maximum Span: 32.0m (105.0ft), Curb or Sidewalk Widths: Left: 0.2m (0.7ft), Right: 0.2m (0.7ft), Curb-To-Curb Width: 17.1m (56.1ft), Out-to-Out Width: 19.1m (62.7ft) Condition: Deck: Satisfactory, Superstructure: Satisfactory, Substructure: Fair, Channel: Very good, Operating Rating: 81.6 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 49.0 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: Meets minimum limits, Underclear: High priority of corrective action, Waterway Adequacy: Superior to present desirable criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 28.65m (94.00ft), Designated Inspection Frequency: Every 24 months, Inspection Date: April 2007, Bridge Improvement Cost: $23,000, Roadway Improvement Cost: $69,000, Total Project Cost: $315,000, Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete, Deck Protection: Epoxy Coated Reinforcing Find on map >>
Structure Number: 6401300342202, Location: HEMPFIELD TOWNSHIP (Lat: 40.296667, Lng: -79.521667), Route carried "on" structure: State highway 130, Year Built: 1959, Status: Open, Structure Length: 4.51m (14.80ft), Average Daily Traffic: 8,926 (year 2007), Truck Traffic: 8%, Average Future Daily Traffic: 9,569 (year 2008), Design Load: H 15, Features Intersected: SR 0030 Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 24.510, Lanes on structure: 2, Lanes under structure: 8, Owner: State Highway Agency, Approaching Roadway Width: 11.6m (38.1ft), Skew: 2 degrees, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 3, Length of Maximum Span: 23.8m (78.1ft), Curb or Sidewalk Widths: Left: 1.5m (4.9ft), Right: 0.5m (1.6ft), Curb-To-Curb Width: 11.6m (38.1ft), Out-to-Out Width: 14.2m (46.6ft) Condition: Deck: Fair, Superstructure: Satisfactory, Substructure: Poor, Operating Rating: 60.8 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 36.3 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Meets minimum limits, Deck Geometry: Somewhat better than minimum adequacy, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 4.45m (14.60ft), Designated Inspection Frequency: Every 24 months, Inspection Date: May 2007, Bridge Improvement Cost: $38,000, Roadway Improvement Cost: $200,000, Total Project Cost: $515,000, Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 64310300601985, Location: HEMPFIELD & SW GREENSBURG (Lat: 40.293056, Lng: -79.555922), Route carried "on" structure: State highway , Year Built: 1959, Status: Open, Structure Length: 6.16m (20.21ft), Average Daily Traffic: 3,155 (year 2008), Truck Traffic: 5%, Average Future Daily Traffic: 6,066 (year 2012), Design Load: H 15, Features Intersected: SR 0030 & ZELLERS RUN, Facility Carried by Structure: SR 3103 Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 4.183, Lanes on structure: 2, Lanes under structure: 8, Owner: State Highway Agency, Approaching Roadway Width: 9.1m (29.9ft), Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 3, Length of Maximum Span: 24.1m (79.1ft), Curb or Sidewalk Widths: Left: 1.5m (4.9ft), Right: 1.5m (4.9ft), Curb-To-Curb Width: 9.1m (29.9ft), Out-to-Out Width: 12.8m (42.0ft) Condition: Deck: Fair, Superstructure: Fair, Substructure: Poor, Channel: Satisfactory, Operating Rating: 10.1 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 60.8 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Meets minimum limits, Deck Geometry: Meets minimum limits, Underclear: High priority of corrective action, Waterway Adequacy: Superior to present desirable criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 7.10m (23.29ft), Designated Inspection Frequency: Every 24 months, Inspection Date: December 2007, Bridge Improvement Cost: $144,000, Roadway Improvement Cost: $423,000, Total Project Cost: $1,941,000, Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 64003003000454, Location: SOUTHWEST GREENSBURG BORO (Lat: 40.286222, Lng: -79.547850), Route carried "under" structure: US 119, Year Built: 1959, Structure Length: 28.22m (92.59ft), Average Daily Traffic: 5,422 (year 2008), Truck Traffic: 5%, Features Intersected: 0119, R/R, JACKS RN, ST., Facility Carried by Structure: SR 0030 Minimum Vertical Clearance: 6.86m (22.51ft), Kilometerpoint: 21.021, Lanes on structure: 4, Lanes under structure: 6, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 32.0m (105.0ft) Find on map >>
Structure Number: 64003003000454, Location: SOUTHWEST GREENSBURG BORO (Lat: 40.286222, Lng: -79.547850), Route carried "under" structure: City street , Year Built: 1959, Structure Length: 28.22m (92.59ft), Average Daily Traffic: 100 (year 2005), Truck Traffic: 5%, Features Intersected: 0119, R/R, JACKS RN, ST., Facility Carried by Structure: SR 0030 Minimum Vertical Clearance: 0.61m (2.00ft), Kilometerpoint: 0.000, Lanes on structure: 4, Lanes under structure: 6, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 32.0m (105.0ft) Find on map >>
Structure Number: 64003003000454, Location: SOUTHWEST GREENSBURG BORO (Lat: 40.286222, Lng: -79.547850), Route carried "under" structure: US 119, Year Built: 1959, Structure Length: 28.22m (92.59ft), Average Daily Traffic: 5,422 (year 2008), Truck Traffic: 5%, Features Intersected: 0119, R/R, JACKS RN, ST., Facility Carried by Structure: SR 0030 Minimum Vertical Clearance: 6.86m (22.51ft), Kilometerpoint: 21.005, Lanes on structure: 4, Lanes under structure: 6, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 32.0m (105.0ft) Find on map >>
Structure Number: 6401300342202, Location: HEMPFIELD TOWNSHIP (Lat: 40.296667, Lng: -79.521667), Route carried "under" structure: US 30, Year Built: 1959, Structure Length: 4.51m (14.80ft), Average Daily Traffic: 19,419 (year 2007), Truck Traffic: 3%, Features Intersected: SR 0030 Minimum Vertical Clearance: 4.52m (14.83ft), Kilometerpoint: 26.282, Lanes on structure: 2, Lanes under structure: 4, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 23.8m (78.1ft) Find on map >>
Structure Number: 6401300342202, Location: HEMPFIELD TOWNSHIP (Lat: 40.296667, Lng: -79.521667), Route carried "under" structure: US 30, Year Built: 1959, Structure Length: 4.51m (14.80ft), Average Daily Traffic: 18,988 (year 2007), Truck Traffic: 4%, Features Intersected: SR 0030 Minimum Vertical Clearance: 4.88m (16.01ft), Kilometerpoint: 2.624, Lanes on structure: 2, Lanes under structure: 4, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 23.8m (78.1ft) Find on map >>
Structure Number: 64310300601985, Location: HEMPFIELD & SW GREENSBURG (Lat: 40.293056, Lng: -79.555922), Route carried "under" structure: US 30, Year Built: 1959, Structure Length: 6.16m (20.21ft), Average Daily Traffic: 19,104 (year 2008), Truck Traffic: 5%, Features Intersected: SR 0030 & ZELLERS RUN, Facility Carried by Structure: SR 3103 Minimum Vertical Clearance: 4.37m (14.34ft), Kilometerpoint: 22.244, Lanes on structure: 2, Lanes under structure: 4, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 24.1m (79.1ft) Find on map >>
Structure Number: 64310300601985, Location: HEMPFIELD & SW GREENSBURG (Lat: 40.293056, Lng: -79.555922), Route carried "under" structure: US 30, Year Built: 1959, Structure Length: 6.16m (20.21ft), Average Daily Traffic: 19,089 (year 2008), Truck Traffic: 4%, Features Intersected: SR 0030 & ZELLERS RUN, Facility Carried by Structure: SR 3103 Minimum Vertical Clearance: 0.47m (1.54ft), Kilometerpoint: 22.241, Lanes on structure: 2, Lanes under structure: 4, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 24.1m (79.1ft) Discuss this city on our hugely popular Pennsylvania forum Back to: Southwest Greensburg, PA, Pennsylvania, All US cities.
|
![]() |