U.S. Cities - City-Data Homepage  
City-Data Forum
City-Data.com Homepage

Bridge Statistics for Spanish Fort, Alabama (AL) - Condition, Traffic, Stress, Structural Evaluation, Project Costs

Back to: Spanish Fort, AL, Alabama, Alabama forum, All US cities.


National Bridge Inventory (NBI) Statistics
Number of bridges: 16
Total length: 126 meters (413ft)
Total costs: $34,375,000
Total average daily traffic: 366,790
Total average daily truck traffic: 54,038
National Bridge Inventory (NBI) Registered Bridges for Spanish Fort

New bridges - Historical Statistics

  • 1960-1969: 11
  • 1970-1979: 1
  • 1980-1989: 0
  • 1990-1999: 0
  • 2000-2009: 4

Average Daily Traffic

Average Truck Traffic (%)

Bridge Condition - Deck

Bridge Condition - Superstructure

Bridge Condition - Substructure

Bridge Condition - Channel

Find on map >>

Structure Number: 7804,  Location: 2.1 M N JCT US 31 & 225 (Lat: 30.693333,  Lng: -87.915000),  Route carried "on" structure: State highway 225,  Year Built: 1962,  Status: Open,  Structure Length: 13.47m (44.19ft),  Average Daily Traffic: 7,720 (year 2007),  Truck Traffic: 7%,  Average Future Daily Traffic: 8,221 (year 2027),  Design Load: HS 20,  Features Intersected: BAY MINETTE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.392,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 8.6m (28.2ft),  Material/Design: Concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 13,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 8.6m (28.2ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 52.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 31.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 14.28m (46.85ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 24 months,  Inspection Date: January 2007,  Underwater Inspection Date: October 2007,  Bridge Improvement Cost: $1,876,000,  Roadway Improvement Cost: $188,000,  Total Project Cost: $2,814,000 ( Estimate for 2008),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>

Structure Number: 9851,  Location: 0.2 MI E US 90 (Lat: 30.658889,  Lng: -87.900000),  Route carried "on" structure: Interstate 10,  Year Built: 1969,  Status: Open,  Structure Length: 0.79m (2.59ft),  Average Daily Traffic: 47,670 (year 2007),  Truck Traffic: 21%,  Average Future Daily Traffic: 49,481 (year 2027),  Design Load: HS 20,  Features Intersected: JOE'S BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 56.836,  Lanes on structure: 8,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 23.7m (77.8ft),  Skew: 20 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 2.4m (7.9ft)

Condition: Channel: Fair,  Culverts: Fair,  Operating Rating: 43.6 metric tons,  Inventory Rating: 32.7 metric tons,  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.44m (4.72ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2006,  Bridge Improvement Cost: $2,486,000,  Roadway Improvement Cost: $249,000,  Total Project Cost: $3,729,000 ( Estimate for 2008)
Find on map >>

Structure Number: 9853,  Location: 1.9 MI E JCT US 90 & I-10 (Lat: 30.651111,  Lng: -87.871667),  Route carried "on" structure: Interstate 10,  Year Built: 1969,  Status: Open,  Structure Length: 1.49m (4.89ft),  Average Daily Traffic: 47,670 (year 2007),  Truck Traffic: 21%,  Average Future Daily Traffic: 49,481 (year 2027),  Design Load: HS 20,  Features Intersected: D'OLIVE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 59.607,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 23.7m (77.8ft),  Skew: 23 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Satisfactory,  Culverts: Fair,  Operating Rating: 43.6 metric tons,  Inventory Rating: 32.7 metric tons,  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.17m (7.12ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2006,  Bridge Improvement Cost: $2,844,000,  Roadway Improvement Cost: $284,000,  Total Project Cost: $4,266,000 ( Estimate for 2008)
Find on map >>

Structure Number: 9854,  Location: 4.2 MI E JCT US 90 (Lat: 30.651667,  Lng: -87.838889),  Route carried "on" structure: Interstate 10,  Year Built: 1969,  Status: Open,  Structure Length: 0.94m (3.08ft),  Average Daily Traffic: 41,010 (year 2007),  Truck Traffic: 22%,  Average Future Daily Traffic: 42,486 (year 2027),  Design Load: HS 20,  Features Intersected: TURKEY BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 63.349,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.9m (39.0ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Fair,  Operating Rating: 43.6 metric tons,  Inventory Rating: 32.7 metric tons,  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.61m (5.28ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2006,  Bridge Improvement Cost: $1,986,000,  Roadway Improvement Cost: $199,000,  Total Project Cost: $2,979,000 ( Estimate for 2008)
Find on map >>

Structure Number: 9855,  Location: 4.6 MI E JCT US 90 (Lat: 30.667222,  Lng: -87.837222),  Route carried "on" structure: Interstate 10,  Year Built: 1969,  Status: Open,  Structure Length: 0.61m (2.00ft),  Average Daily Traffic: 41,010 (year 2007),  Truck Traffic: 22%,  Average Future Daily Traffic: 42,486 (year 2027),  Design Load: HS 20,  Features Intersected: STREAM
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 63.992,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 23.5m (77.1ft),  Skew: 23 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 2.4m (7.9ft)

Condition: Channel: Fair,  Culverts: Fair,  Operating Rating: 43.6 metric tons,  Inventory Rating: 32.7 metric tons,  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.20m (3.94ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2006,  Bridge Improvement Cost: $1,130,000,  Roadway Improvement Cost: $113,000,  Total Project Cost: $1,695,000 ( Estimate for 2008)
Find on map >>

Structure Number: 10002,  Location: US90/I-10(1 MI E SP FT) (Lat: 30.668333,  Lng: -87.901389),  Route carried "on" structure: US 90,  Year Built: 1969,  Status: Open,  Structure Length: 12.31m (40.39ft),  Average Daily Traffic: 15,050 (year 2007),  Truck Traffic: 4%,  Average Future Daily Traffic: 15,441 (year 2027),  Design Load: HS 20,  Features Intersected: I-10
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 71.281,  Lanes on structure: 2,  Lanes under structure: 5,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 11 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 30.5m (100.1ft),  Curb-To-Curb Width: 11.9m (39.0ft),  Out-to-Out Width: 13.1m (43.0ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 43.5 metric tons,  Inventory Rating: 32.7 metric tons,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 13.15m (43.14ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2007,  Bridge Improvement Cost: $2,245,000,  Roadway Improvement Cost: $225,000,  Total Project Cost: $3,368,000 ( Estimate for 2008),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>

Structure Number: 10003,  Location: US90/I-10(1 MI E SP FT) (Lat: 30.660278,  Lng: -87.915556),  Route carried "on" structure: US 90,  Year Built: 1969,  Status: Open,  Structure Length: 12.31m (40.39ft),  Average Daily Traffic: 15,050 (year 2007),  Truck Traffic: 4%,  Average Future Daily Traffic: 15,441 (year 2027),  Design Load: HS 20,  Features Intersected: I-10
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 71.281,  Lanes on structure: 3,  Lanes under structure: 5,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 11 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 30.5m (100.1ft),  Curb-To-Curb Width: 15.6m (51.2ft),  Out-to-Out Width: 16.7m (54.8ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 43.5 metric tons,  Inventory Rating: 32.7 metric tons,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 13.15m (43.14ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2007,  Bridge Improvement Cost: $2,861,000,  Roadway Improvement Cost: $286,000,  Total Project Cost: $4,291,000 ( Estimate for 2008),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>

Structure Number: 10042,  Location: 0.2 MI E JCT I-10 (Lat: 30.653333,  Lng: -87.924722),  Route carried "on" structure: US 98,  Year Built: 1969,  Status: Open,  Structure Length: 6.22m (20.41ft),  Average Daily Traffic: 30,100 (year 2006),  Truck Traffic: 4%,  Average Future Daily Traffic: 66,475 (year 2027),  Design Load: HS 20,  Features Intersected: D'OLIVE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 57.795,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 10 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 11.9m (39.0ft),  Out-to-Out Width: 13.1m (43.0ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 60.0 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 36.3 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 7.25m (23.79ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 24 months,  Inspection Date: January 2007,  Underwater Inspection Date: November 2007,  Bridge Improvement Cost: $1,237,000,  Roadway Improvement Cost: $124,000,  Total Project Cost: $1,856,000 ( Estimate for 2008),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>

Structure Number: 10043,  Location: 0.2 MI E JCT I-10 (Lat: 30.658056,  Lng: -87.908056),  Route carried "on" structure: US 98,  Year Built: 1969,  Status: Open,  Structure Length: 6.22m (20.41ft),  Average Daily Traffic: 30,100 (year 2006),  Truck Traffic: 4%,  Average Future Daily Traffic: 66,475 (year 2027),  Design Load: HS 20,  Features Intersected: D'OLIVE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 57.795,  Lanes on structure: 3,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 10 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 11.9m (39.0ft),  Out-to-Out Width: 13.1m (43.0ft)

Condition: Deck: Good,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 60.0 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 36.3 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 7.25m (23.79ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 24 months,  Inspection Date: January 2007,  Underwater Inspection Date: November 2007,  Bridge Improvement Cost: $1,237,000,  Roadway Improvement Cost: $124,000,  Total Project Cost: $1,856,000 ( Estimate for 2008),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>

Structure Number: 11929,  Location: I10 @ US98-DAPHNE (Lat: 30.661389,  Lng: -87.919167),  Route carried "on" structure: Ramp Interstate 10,  Year Built: 1978,  Status: Open,  Structure Length: 25.57m (83.89ft),  Average Daily Traffic: 6,230 (year 2007),  Truck Traffic: 15%,  Average Future Daily Traffic: 6,379 (year 2027),  Design Load: HS 20,  Features Intersected: US 98
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 56.198,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.6m (24.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 13,  Length of Maximum Span: 19.8m (65.0ft),  Curb-To-Curb Width: 7.6m (24.9ft),  Out-to-Out Width: 8.4m (27.6ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 44.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 26.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 25.57m (83.89ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2007,  Underwater Inspection Date: January 2007,  Bridge Improvement Cost: $2,802,000,  Roadway Improvement Cost: $280,000,  Total Project Cost: $4,203,000 ( Estimate for 2008),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>

Structure Number: 18007,  Location: 0.3MI W SPANISH FORT HILL (Lat: 30.659167,  Lng: -87.927778),  Route carried "on" structure: State highway 90,  Year Built: 2002,  Status: Open,  Structure Length: 5.61m (18.41ft),  Average Daily Traffic: 7,880 (year 2007),  Truck Traffic: 8%,  Average Future Daily Traffic: 8,179 (year 2027),  Design Load: HS 20,  Features Intersected: US 90/98 WB
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 69.334,  Lanes on structure: 2,  Lanes under structure: 1,  Owner: State Highway Agency,  Approaching Roadway Width: 9.4m (30.8ft),  Skew: 14 degrees,  Material/Design: Concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 23.5m (77.1ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 12.8m (42.0ft)

Condition: Deck: Very good,  Superstructure: Good,  Substructure: Very good,  Operating Rating: 83.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 50.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 6.63m (21.75ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2006,  Bridge Improvement Cost: $1,106,000,  Roadway Improvement Cost: $111,000,  Total Project Cost: $1,659,000 ( Estimate for 2008),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>

Structure Number: 18008,  Location: 0.3MI W SPANISH FORT HILL (Lat: 30.682500,  Lng: -87.930278),  Route carried "on" structure: State highway 90,  Year Built: 2002,  Status: Open,  Structure Length: 5.61m (18.41ft),  Average Daily Traffic: 7,880 (year 2007),  Truck Traffic: 8%,  Average Future Daily Traffic: 8,179 (year 2027),  Design Load: HS 20,  Features Intersected: US 90/98 WB
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 69.334,  Lanes on structure: 2,  Lanes under structure: 1,  Owner: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Skew: 14 degrees,  Material/Design: Concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 23.5m (77.1ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 12.8m (42.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Very good,  Operating Rating: 64.8 metric tons,  Inventory Rating: 42.5 metric tons,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 6.63m (21.75ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2006,  Bridge Improvement Cost: $1,106,000,  Roadway Improvement Cost: $111,000,  Total Project Cost: $1,659,000 ( Estimate for 2008),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>

Structure Number: 10002,  Location: US90 I10 JCT 1 MI E SP FT (Lat: 30.668333,  Lng: -87.901389),  Route carried "under" structure: Interstate 10,  Year Built: 1969,  Structure Length: 12.31m (40.39ft),  Average Daily Traffic: 31,150 (year 2007),  Truck Traffic: 15%,  Features Intersected: US 90,  Facility Carried by Structure: US 90 WB
Minimum Vertical Clearance: 5.27m (17.29ft),  Kilometerpoint: 56.514,  Lanes on structure: 2,  Lanes under structure: 5,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 30.5m (100.1ft)

Find on map >>

Structure Number: 10003,  Location: US90 I10 JCT 1 MI E SP FT (Lat: 30.660278,  Lng: -87.915556),  Route carried "under" structure: Interstate 10,  Year Built: 1969,  Structure Length: 12.31m (40.39ft),  Average Daily Traffic: 31,150 (year 2007),  Truck Traffic: 15%,  Features Intersected: US 90,  Facility Carried by Structure: US 90 EB
Minimum Vertical Clearance: 5.05m (16.57ft),  Kilometerpoint: 56.514,  Lanes on structure: 2,  Lanes under structure: 5,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 30.5m (100.1ft)

Find on map >>

Structure Number: 18007,  Location: 0.3 MI W. SPANISH FORT (Lat: 30.659167,  Lng: -87.927778),  Route carried "under" structure: Alternate US 90,  Year Built: 2002,  Structure Length: 5.61m (18.41ft),  Average Daily Traffic: 3,560 (year 2006),  Truck Traffic: 4%,  Features Intersected: US 90/98
Minimum Vertical Clearance: 5.82m (19.09ft),  Kilometerpoint: 69.334,  Lanes on structure: 2,  Lanes under structure: 1,  Material/Design: Concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 23.5m (77.1ft)

Find on map >>

Structure Number: 18008,  Location: 0.3 MI W SPANISH FORT (Lat: 30.682500,  Lng: -87.930278),  Route carried "under" structure: Alternate US 90,  Year Built: 2002,  Structure Length: 5.61m (18.41ft),  Average Daily Traffic: 3,560 (year 2006),  Truck Traffic: 4%,  Features Intersected: US 90/98
Minimum Vertical Clearance: 5.29m (17.36ft),  Kilometerpoint: 69.334,  Lanes on structure: 2,  Lanes under structure: 1,  Material/Design: Concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 23.5m (77.1ft)

Discuss this city on our hugely popular Alabama forum

Back to: Spanish Fort, AL, Alabama, All US cities.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2009 Advameg, Inc.