U.S. Cities - City-Data Homepage  
City-Data Forum
City-Data.com Homepage

Bridge Statistics for Springfield, Tennessee (TN) - Condition, Traffic, Stress, Structural Evaluation, Project Costs

Back to: Springfield, TN, Tennessee, Tennessee forum, All US cities.





National Bridge Inventory (NBI) Statistics
Number of bridges: 13
Total length: 40 meters (131ft)
Total costs: $3,690,000
Total average daily traffic: 123,510
Total average daily truck traffic: 9,274
National Bridge Inventory (NBI) Registered Bridges for Springfield

New bridges - Historical Statistics

  • 1900-1909: 1
  • 1910-1919: 0
  • 1920-1929: 0
  • 1930-1939: 0
  • 1940-1949: 5
  • 1950-1959: 1
  • 1960-1969: 1
  • 1970-1979: 2
  • 1980-1989: 1
  • 1990-1999: 1
  • 2000-2009: 1

Average Daily Traffic

Bridge Condition - Deck

Bridge Condition - Superstructure

Bridge Condition - Substructure

Bridge Condition - Channel

Bridge Condition - Culverts

Find on map >>

Structure Number: 74019470007,  Location: 1.7 MI SE JCT SR11&SR65 (Lat: 36.481750,  Lng: -86.850033),  Route carried "on" structure: City street 1947,  Year Built: 1940,  Status: Open,  Structure Length: 1.31m (4.30ft),  Average Daily Traffic: 3,130 (year 2007),  Truck Traffic: 5%,  Average Future Daily Traffic: 5,008 (year 2028),  Design Load: HS 20,  Features Intersected: WARTRACE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 12.424,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 5.8m (19.0ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.2m (40.0ft),  Curb-To-Curb Width: 6.1m (20.0ft),  Out-to-Out Width: 7.2m (23.6ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 44.1 metric tons,  Inventory Rating: 32.4 metric tons,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.98m (6.50ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2006,  Bridge Improvement Cost: $334,000,  Roadway Improvement Cost: $34,000,  Total Project Cost: $502,000 ( Estimate for 2008),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 74042340001,  Location: IN SPRINGFIELD (Lat: 36.485517,  Lng: -86.859650),  Route carried "on" structure: City street 1947,  Year Built: 1989,  Status: Open,  Structure Length: 4.42m (14.50ft),  Average Daily Traffic: 3,130 (year 2007),  Truck Traffic: 8%,  Average Future Daily Traffic: 5,008 (year 2028),  Design Load: HS 20,  Features Intersected: INDUST ACCESS RD / CSX R
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 13.454,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 14.6m (47.9ft),  Curb-To-Curb Width: 10.4m (34.1ft),  Out-to-Out Width: 11.0m (36.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 64.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2006,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>

Structure Number: 740A3240001,  Location: 2.5 MI SE JCT SR11&SR65 (Lat: 36.473233,  Lng: -86.836617),  Route carried "on" structure: City street 5353,  Year Built: 1975,  Status: Open,  Structure Length: 1.07m (3.51ft),  Average Daily Traffic: 2,410 (year 2007),  Truck Traffic: 2%,  Average Future Daily Traffic: 3,856 (year 2028),  Design Load: H 15,  Features Intersected: WARTRACE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.014,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.0m (23.0ft),  Skew: 3 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.3m (14.1ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Channel: Satisfactory,  Culverts: Fair,  Operating Rating: 36.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 24.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.07m (3.51ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2006,  Bridge Improvement Cost: $77,000,  Roadway Improvement Cost: $8,000,  Total Project Cost: $116,000 ( Estimate for 2008),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 740A3260001,  Location: IN CITY OF SPRINGFIELD (Lat: 36.497483,  Lng: -86.850300),  Route carried "on" structure: City street 4528,  Year Built: 1997,  Status: Open,  Structure Length: 0.80m (2.62ft),  Average Daily Traffic: 2,390 (year 2007),  Truck Traffic: 2%,  Average Future Daily Traffic: 3,824 (year 2028),  Design Load: HS 20,  Features Intersected: WARTRACE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.062,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 11.3m (37.1ft),  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.7m (12.1ft),  Curb-To-Curb Width: 10.3m (33.8ft),  Out-to-Out Width: 12.2m (40.0ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 44.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2006,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>

Structure Number: 740A7740001,  Location: .5 MI W SR11 (Lat: 36.521267,  Lng: -86.886667),  Route carried "on" structure: City street 3297,  Year Built: 1940,  Status: Open,  Structure Length: 5.24m (17.19ft),  Average Daily Traffic: 1,010 (year 2007),  Truck Traffic: 6%,  Average Future Daily Traffic: 1,616 (year 2028),  Design Load: H 15,  Features Intersected: SULPHUR CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.368,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.6m (24.9ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 13.1m (43.0ft),  Curb-To-Curb Width: 6.1m (20.0ft),  Out-to-Out Width: 7.3m (24.0ft)

Condition: Deck: Poor,  Superstructure: Poor,  Substructure: Fair,  Channel: Good,  Operating Rating: 36.0 metric tons,  Inventory Rating: 24.3 metric tons,  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 6.27m (20.57ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2006,  Bridge Improvement Cost: $845,000,  Roadway Improvement Cost: $85,000,  Total Project Cost: $1,268,000 ( Estimate for 2008),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 74M32990001,  Location: .1 M 3RAVE EAST SR11 (Lat: 36.513700,  Lng: -86.882117),  Route carried "on" structure: City street 864,  Year Built: 1965,  Status: Open,  Structure Length: 0.70m (2.30ft),  Average Daily Traffic: 830 (year 2007),  Truck Traffic: 1%,  Average Future Daily Traffic: 1,328 (year 2028),  Design Load: HS 20,  Features Intersected: BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.016,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft)

Condition: Channel: Good,  Culverts: Fair,  Operating Rating: 44.1 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2006
Find on map >>

Structure Number: 74SR0110003,  Location: .4 MI JCT SR49 & SR11 (Lat: 36.514750,  Lng: -86.881717),  Route carried "on" structure: US 41,  Year Built: 1905,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 15,210 (year 2007),  Truck Traffic: 12%,  Average Future Daily Traffic: 26,496 (year 2028),  Design Load: H 15,  Features Intersected: BRANCH,  Facility Carried by Structure: FAP 11
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 17.719,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 27.4m (89.9ft),  Skew: 4 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 28.0m (91.9ft),  Out-to-Out Width: 29.0m (95.1ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 36.0 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 24.3 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.98m (3.22ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2006,  Bridge Improvement Cost: $1,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $2,000 ( Estimate for 2008)
Find on map >>

Structure Number: 74SR0110005,  Location: .6 MI N JCT SR49 (Lat: 36.518167,  Lng: -86.882500),  Route carried "on" structure: US 41,  Year Built: 1949,  Status: Open,  Structure Length: 8.29m (27.20ft),  Average Daily Traffic: 15,210 (year 2007),  Truck Traffic: 12%,  Average Future Daily Traffic: 26,496 (year 2028),  Design Load: HS 20,  Features Intersected: SULPHER FORK CREEK,  Facility Carried by Structure: FAP 11
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 18.121,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.7m (44.9ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 8,  Length of Maximum Span: 13.1m (43.0ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 11.3m (37.1ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Channel: Good,  Operating Rating: 56.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 8.29m (27.20ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2006,  Bridge Improvement Cost: $445,000,  Roadway Improvement Cost: $45,000,  Total Project Cost: $668,000 ( Estimate for 2008),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 74SR0110006,  Location: .6 MI N JCT SR49 (Lat: 36.516667,  Lng: -86.881667),  Route carried "on" structure: US 41,  Year Built: 1949,  Status: Open,  Structure Length: 8.29m (27.20ft),  Average Daily Traffic: 15,210 (year 2007),  Truck Traffic: 12%,  Average Future Daily Traffic: 26,496 (year 2028),  Design Load: HS 20,  Features Intersected: SULPHUR FORK CREEK,  Facility Carried by Structure: FAP 11
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 18.121,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.7m (44.9ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 8,  Length of Maximum Span: 13.1m (43.0ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 0.0m,  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 11.3m (37.1ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 56.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 8.29m (27.20ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2006,  Bridge Improvement Cost: $273,000,  Roadway Improvement Cost: $28,000,  Total Project Cost: $410,000 ( Estimate for 2008),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 74SR0110013,  Location: .4 MI JCT SR49 & SR11 (Lat: 36.505800,  Lng: -86.867117),  Route carried "on" structure: US 41,  Year Built: 2000,  Status: Open,  Structure Length: 2.48m (8.14ft),  Average Daily Traffic: 15,210 (year 2007),  Truck Traffic: 12%,  Average Future Daily Traffic: 26,496 (year 2028),  Design Load: HS 20,  Features Intersected: BRANCH,  Facility Carried by Structure: FAP 11
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 18.443,  Lanes on structure: 5,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 27.4m (89.9ft),  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 44.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.48m (8.14ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2006,  Bridge Improvement Cost: $482,000,  Roadway Improvement Cost: $49,000,  Total Project Cost: $724,000 ( Estimate for 2008)
Find on map >>

Structure Number: 74SR0490009,  Location: 1 MI W JCT SR76 & SR11 (Lat: 36.510817,  Lng: -86.863817),  Route carried "on" structure: State highway 49,  Year Built: 1974,  Status: Open,  Structure Length: 1.19m (3.90ft),  Average Daily Traffic: 10,250 (year 2007),  Truck Traffic: 6%,  Average Future Daily Traffic: 15,728 (year 2028),  Design Load: HS 20,  Features Intersected: WARTRACE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 20.036,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 44.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2006
Find on map >>

Structure Number: 74SR0110001,  Location: NEAR SPRINGFIELD TN (Lat: 36.502483,  Lng: -86.881383),  Route carried "under" structure: US 41,  Year Built: 1954,  Structure Length: 3.75m (12.30ft),  Average Daily Traffic: 30,370 (year 2007),  Truck Traffic: 2%,  Features Intersected: CSX RR / SR 11,  Facility Carried by Structure: CSX RR 348123B
Minimum Vertical Clearance: 5.06m (16.60ft),  Kilometerpoint: 16.335,  Lanes under structure: 4,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 15.8m (51.8ft)

Find on map >>

Structure Number: 74SR0490007,  Location: NEAR SPRINGFIELD TN (Lat: 36.508050,  Lng: -86.895817),  Route carried "under" structure: State highway 49,  Year Built: 1940,  Structure Length: 1.83m (6.00ft),  Average Daily Traffic: 9,150 (year 2007),  Truck Traffic: 2%,  Features Intersected: CSX RR / SR 49,  Facility Carried by Structure: CSX RR 348127D
Minimum Vertical Clearance: 0.46m (1.51ft),  Kilometerpoint: 16.963,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 18.3m (60.0ft)

Discuss this city on our hugely popular Tennessee forum

Back to: Springfield, TN, Tennessee, All US cities.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2009 Advameg, Inc.