![]() |
Bridge Statistics for Springfield, Vermont (VT) - Condition, Traffic, Stress, Structural Evaluation, Project CostsBack to: Springfield, VT, Vermont, Vermont forum, All US cities. National Bridge Inventory (NBI) Statistics Number of bridges: 21 Total length: 117 meters (384ft) Total costs: $35,747,000 Total average daily traffic: 81,655 Total average daily truck traffic: 8,841 National Bridge Inventory (NBI) Registered Bridges for Springfield
Bridge Condition - Deck Bridge Condition - Superstructure Bridge Condition - Substructure Bridge Condition - Channel Find on map >>
Structure Number: 101418004414181, Location: 0.4 MI TO JCT W VT11 (Lat: 43.272778, Lng: -72.470000), Route carried "on" structure: Other road C3122, Year Built: 1936, Status: Open, Structure Length: 0.76m (2.49ft), Average Daily Traffic: 300 (year 1999), Truck Traffic: 2%, Average Future Daily Traffic: 450 (year 2019), Features Intersected: SEAVERS BROOK Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Owner: Town or Township Highway Agency, Approaching Roadway Width: 5.5m (18.0ft), Skew: 2 degrees, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 1, Length of Maximum Span: 6.4m (21.0ft), Curb-To-Curb Width: 5.6m (18.4ft), Out-to-Out Width: 6.2m (20.3ft) Condition: Deck: Fair, Superstructure: Fair, Substructure: Satisfactory, Channel: Good, Operating Rating: 32.4 metric tons, Inventory Rating: 32.4 metric tons, Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: High priority of corrective action, Waterway Adequacy: Better than present minimum criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 1.37m (4.49ft), Designated Inspection Frequency: Every 24 months, Inspection Date: September 2007, Bridge Improvement Cost: $269,000, Roadway Improvement Cost: $150,000, Total Project Cost: $419,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 101418004514181, Location: 0.3 MI TO JCT W CL3 TH5 (Lat: 43.321111, Lng: -72.538056), Route carried "on" structure: Other road C2010, Year Built: 1935, Status: Open, Structure Length: 0.82m (2.69ft), Average Daily Traffic: 200 (year 1999), Truck Traffic: 3%, Average Future Daily Traffic: 300 (year 2019), Features Intersected: SPOONERVILLE BROOK Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Owner: Town or Township Highway Agency, Approaching Roadway Width: 5.5m (18.0ft), Skew: 3 degrees, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 1, Length of Maximum Span: 7.6m (24.9ft), Curb-To-Curb Width: 5.5m (18.0ft), Out-to-Out Width: 6.1m (20.0ft) Condition: Deck: Good, Superstructure: Satisfactory, Substructure: Satisfactory, Channel: Good, Operating Rating: 32.4 metric tons, Inventory Rating: 32.4 metric tons, Structural Evaluation: Equal to present minimum criteria, Deck Geometry: High priority of corrective action, Waterway Adequacy: Better than present minimum criteria, Approach Roadway Alignment: Equal to present minimum criteria, Length Of Structure Improvement: 1.49m (4.89ft), Designated Inspection Frequency: Every 24 months, Inspection Date: September 2007, Bridge Improvement Cost: $289,000, Roadway Improvement Cost: $150,000, Total Project Cost: $439,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Gravel Find on map >>
Structure Number: 101418008114181, Location: 0.04 MI TO JCT W VT11 (Lat: 43.271111, Lng: -72.453889), Route carried "on" structure: Other road C3066, Year Built: 1929, Status: Closed, Structure Length: 5.09m (16.70ft), Average Daily Traffic: 300 (year 1999), Truck Traffic: 2%, Average Future Daily Traffic: 450 (year 2019), Design Load: Railroad, Features Intersected: BLACK RIVER Minimum Vertical Clearance: 5.44m (17.85ft), Kilometerpoint: 0.000, Lanes on structure: 2, Owner: Town or Township Highway Agency, Approaching Roadway Width: 7.3m (24.0ft), Skew: 3 degrees, Material/Design: Steel, Design/Construction: Truss - Thru, Number Of Spans In Main Unit: 1, Length of Maximum Span: 48.8m (160.1ft), Curb-To-Curb Width: 7.3m (24.0ft), Out-to-Out Width: 7.5m (24.6ft) Condition: Deck: Poor, Superstructure: Serious, Substructure: Serious, Channel: Satisfactory, Deck Geometry: Somewhat better than minimum adequacy, Approach Roadway Alignment: Equal to present desirable criteria, Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below), Length Of Structure Improvement: 6.10m (20.01ft), Designated Inspection Frequency: Every 24 months, Critical Feature Inspection Frequency: Every 24 months, Other Special Inspection Frequency: Every 12 months, Inspection Date: September 2007, Critical Feature Inspection Date: October 2006, Other Special Inspection Date: September 2007, Bridge Improvement Cost: $1,453,000, Roadway Improvement Cost: $150,000, Total Project Cost: $1,603,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 200016006614182, Location: 0.3 MI WEST JCT U.S.5 S (Lat: 43.266667, Lng: -72.443889), Route carried "on" structure: State highway 11, Year Built: 1966, Status: Open, Structure Length: 10.61m (34.81ft), Average Daily Traffic: 6,200 (year 1998), Truck Traffic: 9%, Average Future Daily Traffic: 9,300 (year 2018), Design Load: HS 20, Features Intersected: BLACK RIVER Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 65.161, Lanes on structure: 4, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 20.7m (67.9ft), Skew: 4 degrees, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 3, Length of Maximum Span: 34.4m (112.9ft), Curb or Sidewalk Widths: Left: 0.5m (1.6ft), Right: 0.5m (1.6ft), Curb-To-Curb Width: 17.7m (58.1ft), Out-to-Out Width: 19.4m (63.6ft) Condition: Deck: Satisfactory, Superstructure: Satisfactory, Substructure: Satisfactory, Channel: Good, Operating Rating: 48.6 metric tons, Method Used To Determine Operating Rating: Allowable Stress (AS), Inventory Rating: 23.4 metric tons, Method Used To Determine Inventory Rating: Allowable Stress (AS), Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: Somewhat better than minimum adequacy, Waterway Adequacy: Better than present minimum criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 11.67m (38.29ft), Designated Inspection Frequency: Every 24 months, Inspection Date: October 2007, Bridge Improvement Cost: $6,423,000, Roadway Improvement Cost: $150,000, Total Project Cost: $6,573,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous, Membrane: Preformed Fabric Find on map >>
Structure Number: 200091025N14182, Location: 0.8 MI S EXIT 7 (Lat: 43.256667, Lng: -72.438889), Route carried "on" structure: Interstate 91, Year Built: 1965, Status: Open, Structure Length: 7.04m (23.10ft), Average Daily Traffic: 5,500 (year 1998), Truck Traffic: 13%, Average Future Daily Traffic: 8,250 (year 2018), Design Load: HS 20, Features Intersected: I 91 OVER US 5 Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 65.840, Lanes on structure: 2, Lanes under structure: 2, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 11.6m (38.1ft), Skew: 14 degrees, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 3, Length of Maximum Span: 27.4m (89.9ft), Curb or Sidewalk Widths: Left: 0.2m (0.7ft), Right: 0.2m (0.7ft), Curb-To-Curb Width: 9.1m (29.9ft), Out-to-Out Width: 10.7m (35.1ft) Condition: Deck: Satisfactory, Superstructure: Satisfactory, Substructure: Good, Operating Rating: 68.4 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 41.4 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Meets minimum limits, Underclear: Superior to present desirable criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 7.74m (25.39ft), Designated Inspection Frequency: Every 24 months, Inspection Date: April 2006, Bridge Improvement Cost: $2,352,000, Roadway Improvement Cost: $150,000, Total Project Cost: $2,502,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous, Membrane: Preformed Fabric Find on map >>
Structure Number: 200091025S14182, Location: 0.8 MI S EXIT 7 (Lat: 43.256944, Lng: -72.439167), Route carried "on" structure: Interstate 91, Year Built: 1965, Status: Open, Structure Length: 6.43m (21.10ft), Average Daily Traffic: 5,500 (year 1998), Truck Traffic: 13%, Average Future Daily Traffic: 8,250 (year 2018), Design Load: HS 20, Features Intersected: I 91 OVER US 5 Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 65.840, Lanes on structure: 2, Lanes under structure: 2, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 11.6m (38.1ft), Skew: 14 degrees, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 3, Length of Maximum Span: 27.4m (89.9ft), Curb or Sidewalk Widths: Left: 0.2m (0.7ft), Right: 0.2m (0.7ft), Curb-To-Curb Width: 9.1m (29.9ft), Out-to-Out Width: 10.7m (35.1ft) Condition: Deck: Satisfactory, Superstructure: Satisfactory, Substructure: Satisfactory, Operating Rating: 67.5 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 40.5 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Meets minimum limits, Underclear: Equal to present minimum criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 7.07m (23.20ft), Designated Inspection Frequency: Every 24 months, Inspection Date: April 2006, Bridge Improvement Cost: $2,149,000, Roadway Improvement Cost: $150,000, Total Project Cost: $2,299,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous, Membrane: Preformed Fabric Find on map >>
Structure Number: 200091026N14182, Location: 0.4 MI S EXIT 7 (Lat: 43.261111, Lng: -72.435833), Route carried "on" structure: Interstate 91, Year Built: 1965, Status: Open, Structure Length: 9.63m (31.59ft), Average Daily Traffic: 5,500 (year 1998), Truck Traffic: 13%, Average Future Daily Traffic: 8,250 (year 2018), Design Load: HS 20, Features Intersected: BLACK RIVER Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 66.387, Lanes on structure: 2, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 11.6m (38.1ft), Skew: 10 degrees, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 3, Length of Maximum Span: 39.6m (129.9ft), Curb or Sidewalk Widths: Left: 0.3m (1.0ft), Right: 0.3m (1.0ft), Curb-To-Curb Width: 9.1m (29.9ft), Out-to-Out Width: 10.7m (35.1ft) Condition: Deck: Fair, Superstructure: Fair, Substructure: Good, Channel: Very good, Operating Rating: 48.6 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 28.8 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: Meets minimum limits, Waterway Adequacy: Equal to present desirable criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 10.61m (34.81ft), Designated Inspection Frequency: Every 24 months, Critical Feature Inspection Frequency: Every 24 months, Underwater Inspection Frequency: Every 48 months, Other Special Inspection Frequency: Every 60 months, Inspection Date: October 2006, Critical Feature Inspection Date: October 2006, Underwater Inspection Date: August 2007, Other Special Inspection Date: October 2006, Bridge Improvement Cost: $3,218,000, Roadway Improvement Cost: $150,000, Total Project Cost: $3,368,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous, Membrane: Preformed Fabric Find on map >>
Structure Number: 200091026S14182, Location: 0.4 MI S EXIT 7 (Lat: 43.261389, Lng: -72.435833), Route carried "on" structure: Interstate 91, Year Built: 1965, Status: Open, Structure Length: 9.63m (31.59ft), Average Daily Traffic: 5,500 (year 1998), Truck Traffic: 13%, Average Future Daily Traffic: 8,250 (year 2018), Design Load: HS 20, Features Intersected: BLACK RIVER Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 66.387, Lanes on structure: 2, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 11.6m (38.1ft), Skew: 10 degrees, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 3, Length of Maximum Span: 39.6m (129.9ft), Curb or Sidewalk Widths: Left: 0.3m (1.0ft), Right: 0.3m (1.0ft), Curb-To-Curb Width: 9.1m (29.9ft), Out-to-Out Width: 10.7m (35.1ft) Condition: Deck: Fair, Superstructure: Fair, Substructure: Good, Channel: Very good, Operating Rating: 48.6 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 28.8 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: Meets minimum limits, Waterway Adequacy: Equal to present desirable criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 10.61m (34.81ft), Designated Inspection Frequency: Every 24 months, Critical Feature Inspection Frequency: Every 24 months, Underwater Inspection Frequency: Every 48 months, Other Special Inspection Frequency: Every 60 months, Inspection Date: October 2006, Critical Feature Inspection Date: October 2006, Underwater Inspection Date: August 2007, Other Special Inspection Date: October 2006, Bridge Improvement Cost: $3,218,000, Roadway Improvement Cost: $150,000, Total Project Cost: $3,368,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous, Membrane: Preformed Fabric Find on map >>
Structure Number: 200091027N14182, Location: 0.1 MI S EXIT 7 (Lat: 43.264722, Lng: -72.433333), Route carried "on" structure: Interstate 91, Year Built: 1965, Status: Open, Structure Length: 2.26m (7.41ft), Average Daily Traffic: 5,500 (year 1998), Truck Traffic: 13%, Average Future Daily Traffic: 8,250 (year 2018), Design Load: HS 20, Features Intersected: BIKE PATH Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 66.854, Lanes on structure: 2, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 11.6m (38.1ft), Skew: 12 degrees, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 1, Length of Maximum Span: 21.9m (71.9ft), Curb or Sidewalk Widths: Left: 0.2m (0.7ft), Right: 0.2m (0.7ft), Curb-To-Curb Width: 11.6m (38.1ft), Out-to-Out Width: 13.2m (43.3ft) Condition: Deck: Good, Superstructure: Good, Substructure: Good, Operating Rating: 88.2 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 52.2 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Better than present minimum criteria, Deck Geometry: Equal to present minimum criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 2.93m (9.61ft), Designated Inspection Frequency: Every 24 months, Inspection Date: April 2006, Bridge Improvement Cost: $1,093,000, Roadway Improvement Cost: $150,000, Total Project Cost: $1,243,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous, Membrane: Preformed Fabric Find on map >>
Structure Number: 200091027S14182, Location: 0.1 MI S EXIT 7 (Lat: 43.264722, Lng: -72.433611), Route carried "on" structure: Interstate 91, Year Built: 1965, Status: Open, Structure Length: 2.26m (7.41ft), Average Daily Traffic: 5,500 (year 1998), Truck Traffic: 13%, Average Future Daily Traffic: 8,250 (year 2018), Design Load: HS 20, Features Intersected: BIKE PATH Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 66.854, Lanes on structure: 3, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 12.5m (41.0ft), Skew: 12 degrees, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 1, Length of Maximum Span: 21.9m (71.9ft), Curb or Sidewalk Widths: Left: 0.2m (0.7ft), Right: 0.2m (0.7ft), Curb-To-Curb Width: 12.8m (42.0ft), Out-to-Out Width: 14.4m (47.2ft) Condition: Deck: Good, Superstructure: Good, Substructure: Good, Operating Rating: 87.3 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 52.2 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Better than present minimum criteria, Deck Geometry: High priority of replacement, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 2.93m (9.61ft), Designated Inspection Frequency: Every 24 months, Inspection Date: April 2006, Bridge Improvement Cost: $1,194,000, Roadway Improvement Cost: $150,000, Total Project Cost: $1,344,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous, Membrane: Preformed Fabric Find on map >>
Structure Number: 200091028N14182, Location: I91 EXIT 7 (Lat: 43.266944, Lng: -72.432500), Route carried "on" structure: Interstate 91, Year Built: 1965, Status: Open, Structure Length: 6.16m (20.21ft), Average Daily Traffic: 5,500 (year 1999), Truck Traffic: 13%, Average Future Daily Traffic: 8,250 (year 2019), Design Load: H 20, Features Intersected: I 91 OVER US 5 Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 67.079, Lanes on structure: 3, Lanes under structure: 4, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 13.7m (44.9ft), Skew: 11 degrees, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 4, Length of Maximum Span: 16.8m (55.1ft), Curb or Sidewalk Widths: Left: 0.2m (0.7ft), Right: 0.2m (0.7ft), Curb-To-Curb Width: 12.8m (42.0ft), Out-to-Out Width: 14.3m (46.9ft) Condition: Deck: Fair, Superstructure: Fair, Substructure: Fair, Operating Rating: 66.6 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 39.6 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: Meets minimum limits, Underclear: Equal to present minimum criteria, Approach Roadway Alignment: Better than present minimum criteria, Length Of Structure Improvement: 6.77m (22.21ft), Designated Inspection Frequency: Every 24 months, Inspection Date: September 2006, Bridge Improvement Cost: $2,747,000, Roadway Improvement Cost: $150,000, Total Project Cost: $2,897,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous, Membrane: Preformed Fabric Find on map >>
Structure Number: 200091028S14182, Location: I91 EXIT 7 (Lat: 43.266667, Lng: -72.433056), Route carried "on" structure: Interstate 91, Year Built: 1965, Status: Open, Structure Length: 6.31m (20.70ft), Average Daily Traffic: 5,375 (year 1998), Truck Traffic: 13%, Average Future Daily Traffic: 8,062 (year 2018), Design Load: HS 20, Features Intersected: I 91 OVER US 5 Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 67.079, Lanes on structure: 2, Lanes under structure: 4, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 11.0m (36.1ft), Skew: 11 degrees, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 4, Length of Maximum Span: 17.1m (56.1ft), Curb or Sidewalk Widths: Left: 0.2m (0.7ft), Right: 0.2m (0.7ft), Curb-To-Curb Width: 9.1m (29.9ft), Out-to-Out Width: 10.7m (35.1ft) Condition: Deck: Satisfactory, Superstructure: Satisfactory, Substructure: Satisfactory, Operating Rating: 66.6 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 39.6 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Meets minimum limits, Underclear: Better than present minimum criteria, Approach Roadway Alignment: Better than present minimum criteria, Length Of Structure Improvement: 6.95m (22.80ft), Designated Inspection Frequency: Every 24 months, Inspection Date: September 2006, Bridge Improvement Cost: $2,096,000, Roadway Improvement Cost: $150,000, Total Project Cost: $2,246,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous, Membrane: Preformed Fabric Find on map >>
Structure Number: 200091029N14182, Location: 3.3 MI N EXIT 7 (Lat: 43.312500, Lng: -72.421389), Route carried "on" structure: Interstate 91, Year Built: 1965, Status: Open, Structure Length: 3.75m (12.30ft), Average Daily Traffic: 5,250 (year 1998), Truck Traffic: 13%, Average Future Daily Traffic: 7,875 (year 2018), Design Load: HS 20, Features Intersected: I 91 OVER TH NO 3 Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 72.389, Lanes on structure: 2, Lanes under structure: 2, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 11.9m (39.0ft), Skew: 14 degrees, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 3, Length of Maximum Span: 18.3m (60.0ft), Curb or Sidewalk Widths: Left: 0.2m (0.7ft), Right: 0.2m (0.7ft), Curb-To-Curb Width: 11.6m (38.1ft), Out-to-Out Width: 13.1m (43.0ft) Condition: Deck: Satisfactory, Superstructure: Good, Substructure: Good, Operating Rating: 58.5 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 34.2 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Better than present minimum criteria, Deck Geometry: Equal to present minimum criteria, Underclear: Somewhat better than minimum adequacy, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 4.51m (14.80ft), Designated Inspection Frequency: Every 24 months, Inspection Date: April 2006, Bridge Improvement Cost: $1,669,000, Roadway Improvement Cost: $150,000, Total Project Cost: $1,819,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous, Membrane: Preformed Fabric Find on map >>
Structure Number: 200091029S14182, Location: 3.3 MI N EXIT 7 (Lat: 43.312222, Lng: -72.421944), Route carried "on" structure: Interstate 91, Year Built: 1965, Status: Open, Structure Length: 3.75m (12.30ft), Average Daily Traffic: 5,250 (year 1998), Truck Traffic: 13%, Average Future Daily Traffic: 7,875 (year 2018), Design Load: HS 20, Features Intersected: I 91 OVER TH NO 3 Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 72.389, Lanes on structure: 2, Lanes under structure: 2, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 11.9m (39.0ft), Skew: 14 degrees, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 3, Length of Maximum Span: 18.3m (60.0ft), Curb or Sidewalk Widths: Left: 0.2m (0.7ft), Right: 0.2m (0.7ft), Curb-To-Curb Width: 11.6m (38.1ft), Out-to-Out Width: 13.1m (43.0ft) Condition: Deck: Good, Superstructure: Good, Substructure: Poor, Operating Rating: 58.5 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 34.2 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Meets minimum limits, Deck Geometry: Equal to present minimum criteria, Underclear: Meets minimum limits, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 4.51m (14.80ft), Designated Inspection Frequency: Every 24 months, Inspection Date: April 2006, Bridge Improvement Cost: $1,669,000, Roadway Improvement Cost: $150,000, Total Project Cost: $1,819,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous, Membrane: Preformed Fabric Find on map >>
Structure Number: 200113004414182, Location: 0.1 MI S JCT. VT.11 W (Lat: 43.263056, Lng: -72.438333), Route carried "on" structure: US 5, Year Built: 1997, Status: Open, Structure Length: 8.84m (29.00ft), Average Daily Traffic: 1,800 (year 1998), Truck Traffic: 5%, Average Future Daily Traffic: 2,700 (year 2018), Design Load: HS 25, Features Intersected: BLACK RIVER Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Owner: State Highway Agency, Approaching Roadway Width: 11.6m (38.1ft), Skew: 1 degrees, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 2, Length of Maximum Span: 43.3m (142.1ft), Curb or Sidewalk Widths: Left: 0.1m (0.3ft), Right: 0.1m (0.3ft), Curb-To-Curb Width: 12.1m (39.7ft), Out-to-Out Width: 13.3m (43.6ft) Condition: Deck: Satisfactory, Superstructure: Very good, Substructure: Good, Channel: Good, Operating Rating: 86.4 metric tons, Method Used To Determine Operating Rating: Allowable Stress (AS), Inventory Rating: 44.1 metric tons, Method Used To Determine Inventory Rating: Allowable Stress (AS), Structural Evaluation: Better than present minimum criteria, Deck Geometry: Equal to present minimum criteria, Waterway Adequacy: Equal to present minimum criteria, Approach Roadway Alignment: Better than present minimum criteria, Length Of Structure Improvement: 9.72m (31.89ft), Designated Inspection Frequency: Every 24 months, Inspection Date: October 2007, Bridge Improvement Cost: $3,658,000, Roadway Improvement Cost: $150,000, Total Project Cost: $3,808,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous, Membrane: Preformed Fabric, Deck Protection: Epoxy Coated Reinforcing Find on map >>
Structure Number: 200091025N14182, Location: 0.6 MI S JCT. VT.11 W (Lat: 43.256667, Lng: -72.438889), Route carried "under" structure: US 5, Year Built: 1965, Structure Length: 7.04m (23.10ft), Average Daily Traffic: 1,800 (year 1998), Truck Traffic: 6%, Features Intersected: I 91 OVER U.S.5, Facility Carried by Structure: I 00091 ML Minimum Vertical Clearance: 5.84m (19.16ft), Kilometerpoint: 0.000, Lanes on structure: 4, Lanes under structure: 2, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 27.4m (89.9ft) Find on map >>
Structure Number: 200091025S14182, Location: 0.6 MI S JCT. VT.11 W (Lat: 43.256944, Lng: -72.439167), Route carried "under" structure: US 5, Year Built: 1965, Structure Length: 7.04m (23.10ft), Average Daily Traffic: 1,800 (year 1998), Truck Traffic: 6%, Features Intersected: I 91 OVER U.S.5, Facility Carried by Structure: I 00091 ML Minimum Vertical Clearance: 0.47m (1.54ft), Kilometerpoint: 0.000, Lanes on structure: 4, Lanes under structure: 2, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 27.4m (89.9ft) Find on map >>
Structure Number: 200091028N14182, Location: 0.3 MI N JCT. VT.11 W (Lat: 43.266944, Lng: -72.432500), Route carried "under" structure: US 5, Year Built: 1965, Structure Length: 6.16m (20.21ft), Average Daily Traffic: 6,800 (year 1998), Truck Traffic: 6%, Features Intersected: I 91 OVER U.S.5, Facility Carried by Structure: I 00091 ML Minimum Vertical Clearance: 6.17m (20.24ft), Kilometerpoint: 69.113, Lanes on structure: 4, Lanes under structure: 4, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 16.8m (55.1ft) Find on map >>
Structure Number: 200091028S14182, Location: 0.3 MI N JCT. VT.11 W (Lat: 43.266667, Lng: -72.433056), Route carried "under" structure: US 5, Year Built: 1965, Structure Length: 6.16m (20.21ft), Average Daily Traffic: 6,800 (year 1996), Truck Traffic: 6%, Features Intersected: I 91 OVER U.S.5, Facility Carried by Structure: I 00091 ML Minimum Vertical Clearance: 6.55m (21.49ft), Kilometerpoint: 69.113, Lanes on structure: 4, Lanes under structure: 4, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 16.8m (55.1ft) Find on map >>
Structure Number: 200091029N14182, Location: 1.4 MI W JCT. U.S.5 (Lat: 43.312500, Lng: -72.421389), Route carried "under" structure: County highway 3, Year Built: 1965, Structure Length: 3.75m (12.30ft), Average Daily Traffic: 640 (year 1995), Truck Traffic: 6%, Features Intersected: I 91 OVER TH NO 3, Facility Carried by Structure: I 00091 ML Minimum Vertical Clearance: 4.83m (15.85ft), Kilometerpoint: 0.000, Lanes on structure: 4, Lanes under structure: 2, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 18.3m (60.0ft) Find on map >>
Structure Number: 200091029S14182, Location: 1.4 MI W JCT. U.S.5 (Lat: 43.312222, Lng: -72.421944), Route carried "under" structure: County highway 3, Year Built: 1965, Structure Length: 3.75m (12.30ft), Average Daily Traffic: 640 (year 1995), Truck Traffic: 6%, Features Intersected: I 91 OVER TH NO 3, Facility Carried by Structure: I 00091 ML Minimum Vertical Clearance: 4.67m (15.32ft), Kilometerpoint: 0.000, Lanes on structure: 4, Lanes under structure: 2, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 18.3m (60.0ft) Discuss this city on our hugely popular Vermont forum Back to: Springfield, VT, Vermont, All US cities.
|
![]() |