U.S. Cities - City-Data Homepage  
City-Data Forum
City-Data.com Homepage

Bridge Statistics for Stockbridge, Massachusetts (MA) - Condition, Traffic, Stress, Structural Evaluation, Project Costs

Back to: Stockbridge, MA, Massachusetts, Massachusetts forum, All US cities.





National Bridge Inventory (NBI) Statistics
Number of bridges: 18
Total length: 80 meters (262ft)
Total costs: $9,946,000
Total average daily traffic: 174,446
Total average daily truck traffic: 13,281
National Bridge Inventory (NBI) Registered Bridges for Stockbridge

New bridges - Historical Statistics

  • 1900-1909: 1
  • 1910-1919: 0
  • 1920-1929: 1
  • 1930-1939: 0
  • 1940-1949: 0
  • 1950-1959: 15
  • 1960-1969: 0
  • 1970-1979: 1

Reconstructed bridges - Historical Statistics

  • 1950-1959: 1
  • 1960-1969: 0
  • 1970-1979: 0
  • 1980-1989: 5
  • 1990-1999: 2

Average Daily Traffic

Bridge Condition - Deck

Bridge Condition - Superstructure

Bridge Condition - Substructure

Bridge Condition - Channel

Bridge Condition - Culverts

Find on map >>

Structure Number: S2600109UMHDNBI,  Location: 1.7 MI N OF GT BAR TL (Lat: 42.278889,  Lng: -73.314167),  Route carried "on" structure: US 7,  Year Built: 1956,  Status: Open,  Structure Length: 3.24m (10.63ft),  Average Daily Traffic: 12,600 (year 2005),  Truck Traffic: 10%,  Average Future Daily Traffic: 19,899 (year 2028),  Design Load: H 20,  Features Intersected: WATER HOUSATONIC RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 28.628,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.5m (44.3ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 30.5m (100.1ft),  Curb or Sidewalk Widths: Left: 1.7m (5.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 13.5m (44.3ft),  Out-to-Out Width: 16.5m (54.1ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 47.2 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 20.3 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.30m (10.83ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 36 months,  Inspection Date: June 2007,  Underwater Inspection Date: July 2006,  Bridge Improvement Cost: $972,000,  Roadway Improvement Cost: $98,000,  Total Project Cost: $1,459,000 ( Estimate for 2006),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>

Structure Number: S2600202LMUNNBI,  Location: .7 MI W OF RTE 7 (Lat: 42.283333,  Lng: -73.326111),  Route carried "on" structure: City street ,  Year Built: 1928,  Year Reconstructed: 1985,  Status: Posted for load,  Structure Length: 3.26m (10.70ft),  Average Daily Traffic: 1,100 (year 1997),  Truck Traffic: 6%,  Average Future Daily Traffic: 1,737 (year 2027),  Features Intersected: WATER HOUSATONIC RIVER,  Facility Carried by Structure: HWY GLENDALE MDL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.625,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Material/Design: Steel,  Design/Construction: Truss - Thru,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 29.2m (95.8ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 8.4m (27.6ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 26.0 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 10.6 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: High priority of corrective action,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Meets minimum limits,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 10.0 - 19.9% below),  Length Of Structure Improvement: 3.30m (10.83ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: June 2006,  Critical Feature Inspection Date: June 2006,  Bridge Improvement Cost: $495,000,  Roadway Improvement Cost: $50,000,  Total Project Cost: $743,000 ( Estimate for 2006),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>

Structure Number: S2600402MMUNNBI,  Location: 1.5 M W OF RTE 7 (Lat: 42.283056,  Lng: -73.342500),  Route carried "on" structure: City street ,  Year Built: 1978,  Status: Open,  Structure Length: 3.78m (12.40ft),  Average Daily Traffic: 1,100 (year 1997),  Truck Traffic: 6%,  Average Future Daily Traffic: 1,737 (year 2027),  Design Load: H 20,  Features Intersected: WATER HOUSATONIC RIVER,  Facility Carried by Structure: HWY GLENDALE MDL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.414,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 17.5m (57.4ft),  Curb or Sidewalk Widths: Left: 2.5m (8.2ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 12.9m (42.3ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 49.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 3.80m (12.47ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 36 months,  Inspection Date: June 2006,  Underwater Inspection Date: September 2006,  Bridge Improvement Cost: $876,000,  Roadway Improvement Cost: $88,000,  Total Project Cost: $1,315,000 ( Estimate for 2006),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>

Structure Number: S260050E9MHD634,  Location: 0.5 MI E OF RT 183 (Lat: 42.283889,  Lng: -73.334167),  Route carried "on" structure: State highway ,  Year Built: 1957,  Status: Open,  Structure Length: 2.32m (7.61ft),  Average Daily Traffic: 600 (year 2008),  Truck Traffic: 5%,  Average Future Daily Traffic: 948 (year 2029),  Design Load: H 20,  Features Intersected: RR HRR,  Facility Carried by Structure: HWY GLENDALE MDL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 7.9m (25.9ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 0.3m (1.0ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 11.0m (36.1ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 61.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 42.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 2.40m (7.87ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2008,  Bridge Improvement Cost: $443,000,  Roadway Improvement Cost: $45,000,  Total Project Cost: $665,000 ( Estimate for 2006),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>

Structure Number: S260060E8MHD634,  Location: 1.5 MI N OF GT BAR TL (Lat: 42.277778,  Lng: -73.316111),  Route carried "on" structure: US 7,  Year Built: 1909,  Year Reconstructed: 1956,  Status: Posted for load,  Structure Length: 3.35m (10.99ft),  Average Daily Traffic: 10,500 (year 2006),  Truck Traffic: 10%,  Average Future Daily Traffic: 16,583 (year 2029),  Design Load: H 20,  Features Intersected: RR HRR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 28.404,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 14.6m (47.9ft),  Curb or Sidewalk Widths: Left: 0.3m (1.0ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 16.2m (53.1ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 28.3 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 11.8 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: High priority of corrective action,  Deck Geometry: Equal to present minimum criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 10.0 - 19.9% below),  Length Of Structure Improvement: 3.40m (11.15ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2008,  Bridge Improvement Cost: $984,000,  Roadway Improvement Cost: $99,000,  Total Project Cost: $1,477,000 ( Estimate for 2006),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>

Structure Number: S260124H4MTANBI,  Location: 2 MI S. LAKE MAHKEENAC (Lat: 42.304172,  Lng: -73.335192),  Route carried "on" structure: Interstate 95,  Year Built: 1957,  Status: Open,  Structure Length: 1.01m (3.31ft),  Average Daily Traffic: 17,241 (year 1997),  Truck Traffic: 12%,  Average Future Daily Traffic: 27,229 (year 2028),  Design Load: HS 20,  Features Intersected: WATER LARRYWAUG BROOK,  Facility Carried by Structure: I 90 EB
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 8.513,  Lanes on structure: 4,  Base Highway Network: Yes,  Toll: On toll road,  Owner: State Toll Authority,  Approaching Roadway Width: 11.6m (38.1ft),  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.6m (15.1ft)

Condition: Channel: Very good,  Culverts: Good,  Operating Rating: 43.5 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.90m (2.95ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2007,  Bridge Improvement Cost: $390,000,  Roadway Improvement Cost: $40,000,  Total Project Cost: $586,000 ( Estimate for 2006)
Find on map >>

Structure Number: S260134H6MTANBI,  Location: 1 MI W. DWTN STOCKBRG A7 (Lat: 42.304133,  Lng: -73.334258),  Route carried "on" structure: Interstate 90,  Year Built: 1957,  Year Reconstructed: 1993,  Status: Open,  Structure Length: 3.29m (10.79ft),  Average Daily Traffic: 17,241 (year 1997),  Truck Traffic: 7%,  Average Future Daily Traffic: 27,229 (year 2027),  Design Load: HS 20,  Features Intersected: ST183 INTERLAKEN RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 8.835,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Toll Authority,  Approaching Roadway Width: 12.8m (42.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 13.4m (44.0ft),  Curb-To-Curb Width: 12.8m (42.0ft),  Out-to-Out Width: 13.7m (44.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 43.5 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present desirable criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.30m (10.83ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2006,  Bridge Improvement Cost: $81,000,  Roadway Improvement Cost: $9,000,  Total Project Cost: $122,000 ( Estimate for 2006),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>

Structure Number: S260134H7MTANBI,  Location: 1 MI W. DWTN STOCKBRG A7 (Lat: 42.305258,  Lng: -73.334167),  Route carried "on" structure: Interstate 90,  Year Built: 1957,  Year Reconstructed: 1993,  Status: Open,  Structure Length: 3.26m (10.70ft),  Average Daily Traffic: 17,241 (year 1997),  Truck Traffic: 7%,  Average Future Daily Traffic: 27,229 (year 2027),  Design Load: HS 20,  Features Intersected: ST183 INTERLAKEN RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 8.835,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Toll: On toll road,  Owner: State Toll Authority,  Approaching Roadway Width: 12.8m (42.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 13.4m (44.0ft),  Curb-To-Curb Width: 12.8m (42.0ft),  Out-to-Out Width: 13.7m (44.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 43.5 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present desirable criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 3.30m (10.83ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2006,  Bridge Improvement Cost: $81,000,  Roadway Improvement Cost: $9,000,  Total Project Cost: $122,000 ( Estimate for 2006),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>

Structure Number: S260144H3MTANBI,  Location: 1 MI N.DWTN STOCKBRG A8 (Lat: 42.300775,  Lng: -73.316878),  Route carried "on" structure: Interstate 90,  Year Built: 1957,  Year Reconstructed: 1995,  Status: Open,  Structure Length: 4.88m (16.01ft),  Average Daily Traffic: 300 (year 1997),  Truck Traffic: 5%,  Average Future Daily Traffic: 474 (year 2027),  Design Load: HS 20,  Features Intersected: I 90,  Facility Carried by Structure: HWY PRSPCT HL RD
Minimum Vertical Clearance: 0.00m,  Kilometerpoint: 10.203,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Toll Authority,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 15.5m (50.9ft),  Curb or Sidewalk Widths: Left: 1.2m (3.9ft),  Right: 0.8m (2.6ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 12.1m (39.7ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Very good,  Operating Rating: 43.5 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.90m (16.08ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2006,  Bridge Improvement Cost: $399,000,  Roadway Improvement Cost: $40,000,  Total Project Cost: $599,000 ( Estimate for 2006),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: S260154H1MTANBI,  Location: 1 MI N. DWTN STOCKBRG A9 (Lat: 42.297339,  Lng: -73.294694),  Route carried "on" structure: Interstate 90,  Year Built: 1957,  Year Reconstructed: 1993,  Status: Open,  Structure Length: 4.88m (16.01ft),  Average Daily Traffic: 17,241 (year 1997),  Truck Traffic: 10%,  Average Future Daily Traffic: 27,229 (year 2027),  Design Load: HS 20,  Features Intersected: US 7 EAST ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 12.070,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Toll: On toll road,  Owner: State Toll Authority,  Approaching Roadway Width: 12.8m (42.0ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 20.1m (65.9ft),  Curb-To-Curb Width: 12.8m (42.0ft),  Out-to-Out Width: 13.7m (44.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 43.5 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present desirable criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.90m (16.08ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2006,  Bridge Improvement Cost: $120,000,  Roadway Improvement Cost: $13,000,  Total Project Cost: $181,000 ( Estimate for 2006),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>

Structure Number: S260154H2MTANBI,  Location: 1 MI N.DWTN STOCKBRG A9 (Lat: 42.297531,  Lng: -73.294675),  Route carried "on" structure: Interstate 90,  Year Built: 1957,  Year Reconstructed: 1993,  Status: Open,  Structure Length: 4.82m (15.81ft),  Average Daily Traffic: 17,241 (year 1997),  Truck Traffic: 10%,  Average Future Daily Traffic: 27,229 (year 2027),  Design Load: HS 20,  Features Intersected: US 7 EAST ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 12.070,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Toll: On toll road,  Owner: State Toll Authority,  Approaching Roadway Width: 12.8m (42.0ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 19.8m (65.0ft),  Curb-To-Curb Width: 12.8m (42.0ft),  Out-to-Out Width: 13.7m (44.9ft)

Condition: Deck: Very good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 43.5 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present desirable criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.90m (16.08ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2006,  Bridge Improvement Cost: $120,000,  Roadway Improvement Cost: $13,000,  Total Project Cost: $181,000 ( Estimate for 2006),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>

Structure Number: S260164H5MTANBI,  Location: 2 MI S. LAKE MAHKEENAC (Lat: 42.305342,  Lng: -73.334936),  Route carried "on" structure: Interstate 95,  Year Built: 1957,  Status: Open,  Structure Length: 1.01m (3.31ft),  Average Daily Traffic: 17,241 (year 1997),  Truck Traffic: 12%,  Average Future Daily Traffic: 27,229 (year 2028),  Design Load: H 20,  Features Intersected: WATER LARRYWAUG BROOK,  Facility Carried by Structure: I 90 WB
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 8.513,  Lanes on structure: 4,  Base Highway Network: Yes,  Toll: On toll road,  Owner: State Toll Authority,  Approaching Roadway Width: 11.6m (38.1ft),  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.6m (15.1ft)

Condition: Channel: Good,  Culverts: Very good,  Operating Rating: 43.5 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.90m (2.95ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2007,  Bridge Improvement Cost: $390,000,  Roadway Improvement Cost: $40,000,  Total Project Cost: $586,000 ( Estimate for 2006)
Find on map >>

Structure Number: S2602009TMHDNBI,  Location: 1.3 MI N OF GT BAR TL (Lat: 42.275556,  Lng: -73.319167),  Route carried "on" structure: US 7,  Year Built: 1955,  Status: Open,  Structure Length: 0.73m (2.40ft),  Average Daily Traffic: 10,500 (year 2006),  Truck Traffic: 5%,  Average Future Daily Traffic: 16,583 (year 2029),  Design Load: H 20,  Features Intersected: WATER KONKAPOT BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 28.131,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.4m (21.0ft),  Curb or Sidewalk Widths: Left: 0.3m (1.0ft),  Right: 0.3m (1.0ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 14.8m (48.6ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Good,  Operating Rating: 44.6 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 30.1 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 0.80m (2.62ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2008,  Bridge Improvement Cost: $212,000,  Roadway Improvement Cost: $22,000,  Total Project Cost: $319,000 ( Estimate for 2006),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: S260214H8MTANBI,  Location: 2 MI W.DWTN STOCKBRG A20A (Lat: 42.307014,  Lng: -73.351669),  Route carried "on" structure: Interstate 90,  Year Built: 1957,  Year Reconstructed: 1995,  Status: Open,  Structure Length: 10.27m (33.69ft),  Average Daily Traffic: 3,900 (year 1997),  Truck Traffic: 7%,  Average Future Daily Traffic: 6,159 (year 2027),  Design Load: H 20,  Features Intersected: I 90,  Facility Carried by Structure: ST102 W STCKBRG RD
Minimum Vertical Clearance: 4.74m (15.55ft),  Kilometerpoint: 7.242,  Lanes on structure: 2,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Toll Authority,  Approaching Roadway Width: 9.8m (32.2ft),  Skew: 4 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 28.7m (94.2ft),  Curb or Sidewalk Widths: Left: 0.6m (2.0ft),  Right: 0.6m (2.0ft),  Curb-To-Curb Width: 11.0m (36.1ft),  Out-to-Out Width: 13.1m (43.0ft)

Condition: Deck: Very good,  Superstructure: Satisfactory,  Substructure: Very good,  Operating Rating: 44.1 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 10.30m (33.79ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2006,  Bridge Improvement Cost: $1,060,000,  Roadway Improvement Cost: $107,000,  Total Project Cost: $1,591,000 ( Estimate for 2006),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Epoxy
Find on map >>

Structure Number: S260144H3MTANBI,  Location: AT MILE 6.34 (Lat: 42.300000,  Lng: -73.316667),  Route carried "under" structure: Interstate 90,  Year Built: 1957,  Structure Length: 4.88m (16.01ft),  Average Daily Traffic: 7,600 (year 0 ),  Features Intersected: I 90 WB,  Facility Carried by Structure: HWY PRSPCT HL RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 10.203,  Lanes on structure: 2,  Lanes under structure: 2,  Toll: On toll road,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 15.5m (50.9ft)

Find on map >>

Structure Number: S260144H3MTANBI,  Location: AT MILE 6.34 (Lat: 42.300000,  Lng: -73.316667),  Route carried "under" structure: Interstate 90,  Year Built: 1957,  Structure Length: 4.88m (16.01ft),  Average Daily Traffic: 7,600 (year 0 ),  Features Intersected: I 90 EB,  Facility Carried by Structure: HWY PRSPCT HL RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 10.203,  Lanes on structure: 2,  Lanes under structure: 2,  Toll: On toll road,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 15.5m (50.9ft)

Find on map >>

Structure Number: S260214H8MTANBI,  Location: AT MILE 4.5 (Lat: 42.300000,  Lng: -73.350000),  Route carried "under" structure: Interstate 90,  Year Built: 1957,  Structure Length: 10.18m (33.40ft),  Average Daily Traffic: 7,600 (year 0 ),  Features Intersected: I 90 WB,  Facility Carried by Structure: ST102 W STKBRG RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 7.242,  Lanes on structure: 2,  Lanes under structure: 2,  Toll: On toll road,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 28.7m (94.2ft)

Find on map >>

Structure Number: S260214H8MTANBI,  Location: AT MILE 4.5 (Lat: 42.300000,  Lng: -73.350000),  Route carried "under" structure: Interstate 90,  Year Built: 1957,  Structure Length: 10.18m (33.40ft),  Average Daily Traffic: 7,600 (year 0 ),  Features Intersected: I 90 EB,  Facility Carried by Structure: ST102 W STKBRG RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 7.242,  Lanes on structure: 2,  Lanes under structure: 2,  Toll: On toll road,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 28.7m (94.2ft)

Discuss this city on our hugely popular Massachusetts forum

Back to: Stockbridge, MA, Massachusetts, All US cities.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2009 Advameg, Inc.