Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Storm Lake, Iowa (IA)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 22Number of bridges
  • 72ft / 21.8mTotal length
  • 22,370Total average daily traffic
  • 2,681Total average daily truck traffic
  • 22,370Total future (year 2038) average daily traffic
  • National Bridge Inventory (NBI) Registered Bridges for Storm Lake
  • No street view available for this location

New bridges in Storm Lake, IA - historical statistics
  • New bridges - historical statistics
  • 11910-1919
  • 41930-1939
  • 31960-1969
  • 71970-1979
  • 11980-1989
  • 31990-1999
  • 12000-2009
  • 12010-2019
  • 12020-2022
Average Bridge Daily Traffic in Storm Lake, IA
Average Bridge Truck Traffic in Storm Lake, IA
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 9.1%Excellent
  • 9.1%Very good
  • 18.2%Good
  • 36.4%Satisfactory
  • 27.3%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 9.1%Excellent
  • 18.2%Very good
  • 9.1%Good
  • 36.4%Satisfactory
  • 27.3%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 9.1%Excellent
  • 9.1%Good
  • 9.1%Satisfactory
  • 18.2%Fair
  • 27.3%Poor
  • 27.3%Serious
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 13.6%Very good
  • 18.2%Good
  • 50.0%Satisfactory
  • 18.2%Fair
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 18.2%Very good
  • 45.5%Satisfactory
  • 27.3%Fair
  • 9.1%Poor
Find on map >>   Show street view

Structure Number: 16271,  Location: 1.5 mi. W of IA 110 (Lat: 42.659856,  Lng: -95.256906),  Route carried "on" structure: State highway 7,  Year Built: 1992,  Status: Open,  Structure Length: 1.22m (4.00ft),  Average Daily Traffic: 4,260 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 4,260 (year 2041),  Design Load: HS 20,  Features Intersected: POWELL CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 20.566,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 52.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 31.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 1628,  Location: 1.2 mi. E of E jct US 71 (Lat: 42.604536,  Lng: -95.127219),  Route carried "on" structure: State highway 7,  Year Built: 1937,  Status: Open,  Structure Length: 0.64m (2.10ft),  Average Daily Traffic: 1,850 (year 2020),  Truck Traffic: 19%,  Average Future Daily Traffic: 1,850 (year 2041),  Design Load: H 15,  Features Intersected: DRAINAGE DITCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 35.599,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 23.2 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 17.0 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021
Find on map >>   Show street view

Structure Number: 1629,  Location: 1.5 mi. E of E jct. US 71 (Lat: 42.604550,  Lng: -95.122342),  Route carried "on" structure: State highway 7,  Year Built: 1937,  Status: Open,  Structure Length: 0.67m (2.20ft),  Average Daily Traffic: 1,850 (year 2020),  Truck Traffic: 19%,  Average Future Daily Traffic: 1,850 (year 2041),  Design Load: HS 20,  Features Intersected: DRAINAGE DITCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 35.999,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Skew: 1 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Fair,  Culverts: Fair,  Operating Rating: 44.1 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021
Find on map >>   Show street view

Structure Number: 163,  Location: 1.9 mi. E of E Jct US 71 (Lat: 42.604594,  Lng: -95.114450),  Route carried "on" structure: State highway 7,  Year Built: 1937,  Status: Open,  Structure Length: 0.76m (2.49ft),  Average Daily Traffic: 1,850 (year 2020),  Truck Traffic: 19%,  Average Future Daily Traffic: 1,850 (year 2041),  Design Load: H 15,  Features Intersected: DRAINAGE DITCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 36.646,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Fair,  Culverts: Fair,  Operating Rating: 23.2 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 17.0 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021
Find on map >>   Show street view

Structure Number: 1631,  Location: 2.6 mi. E of E Jct. US 71 (Lat: 42.604642,  Lng: -95.100056),  Route carried "on" structure: State highway 7,  Year Built: 1937,  Status: Open,  Structure Length: 0.76m (2.49ft),  Average Daily Traffic: 1,850 (year 2020),  Truck Traffic: 19%,  Average Future Daily Traffic: 1,850 (year 2041),  Design Load: H 15,  Features Intersected: DRAINAGE DITCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 37.828,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Satisfactory,  Culverts: Fair,  Operating Rating: 23.2 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 17.0 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021
Find on map >>   Show street view

Structure Number: 8443,  Location: 090360302 (Lat: 42.646408,  Lng: -95.092339),  Route carried "on" structure: County highway ,  Year Built: 1963,  Status: Posted for load,  Structure Length: 0.79m (2.59ft),  Average Daily Traffic: 250 (year 2019),  Truck Traffic: 20%,  Average Future Daily Traffic: 250 (year 2041),  Design Load: H 20,  Features Intersected: BRANCH RACCOON RIVER,  Facility Carried by Structure: FM
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 9.473,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.3m (24.0ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.1m (29.9ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Serious,  Channel: Satisfactory,  Operating Rating: 12.9 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Structural Evaluation: High priority of replacement,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 5.00m (16.40ft),  Designated Inspection Frequency: Every 12 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $108,000,  Roadway Improvement Cost: $11,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 84441,  Location: 090360401 (Lat: 42.647339,  Lng: -95.096622),  Route carried "on" structure: County highway ,  Year Built: 2005,  Status: Open,  Structure Length: 0.82m (2.69ft),  Average Daily Traffic: 60 (year 2019),  Average Future Daily Traffic: 60 (year 2038),  Design Load: HS 20,  Features Intersected: DRAINAGE DITCH,  Facility Carried by Structure: LOCAL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 18.559,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 1 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Very good,  Culverts: Very good,  Operating Rating: 44.1 metric tons,  Method Used To Determine Operating Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Structural Evaluation: Equal to present desirable criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.70m (8.86ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: July 2018,  Bridge Improvement Cost: $15,000,  Roadway Improvement Cost: $2,000
Find on map >>   Show street view

Structure Number: 84481,  Location: 090361602 (Lat: 42.604961,  Lng: -95.111631),  Route carried "on" structure: County highway ,  Year Built: 1996,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 25 (year 2019),  Average Future Daily Traffic: 25 (year 2038),  Design Load: HS 20,  Features Intersected: BOYER RIVER,  Facility Carried by Structure: LOCAL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.865,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.4m (30.8ft),  Curb-To-Curb Width: 8.4m (27.6ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 57.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 3.10m (10.17ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: June 2018,  Bridge Improvement Cost: $15,000,  Roadway Improvement Cost: $2,000,  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 84491,  Location: 090362002 (Lat: 42.602500,  Lng: -95.131281),  Route carried "on" structure: County highway ,  Year Built: 1977,  Status: Open,  Structure Length: 0.67m (2.20ft),  Average Daily Traffic: 35 (year 2019),  Average Future Daily Traffic: 35 (year 2038),  Design Load: H 20,  Features Intersected: BOYER CREEK,  Facility Carried by Structure: LOCAL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.378,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Skew: 1 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 60.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 4.20m (13.78ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: June 2018,  Bridge Improvement Cost: $15,000,  Roadway Improvement Cost: $2,000
Find on map >>   Show street view

Structure Number: 84601,  Location: 090373002 (Lat: 42.584514,  Lng: -95.269717),  Route carried "on" structure: County highway ,  Year Built: 1972,  Status: Posted for load,  Structure Length: 0.79m (2.59ft),  Average Daily Traffic: 15 (year 2019),  Average Future Daily Traffic: 15 (year 2040),  Design Load: H 15,  Features Intersected: CREEK,  Facility Carried by Structure: LOCAL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.622,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.3m (24.0ft),  Curb-To-Curb Width: 7.4m (24.3ft),  Out-to-Out Width: 8.0m (26.2ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Poor,  Channel: Satisfactory,  Operating Rating: 27.4 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 14.1 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 10.0 - 19.9% below),  Length Of Structure Improvement: 4.60m (15.09ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $124,000,  Roadway Improvement Cost: $12,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 8463,  Location: 090373101 (Lat: 42.575428,  Lng: -95.251581),  Route carried "on" structure: County highway ,  Year Built: 1969,  Status: Posted for load,  Structure Length: 0.79m (2.59ft),  Average Daily Traffic: 50 (year 2019),  Average Future Daily Traffic: 50 (year 2041),  Design Load: H 15,  Features Intersected: CREEK,  Facility Carried by Structure: LOCAL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 11.196,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.3m (24.0ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 7.9m (25.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Serious,  Channel: Satisfactory,  Operating Rating: 10.3 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 4.4 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: High priority of replacement,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 4.60m (15.09ft),  Designated Inspection Frequency: Every 12 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $15,000,  Roadway Improvement Cost: $2,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 84641,  Location: 090373102 (Lat: 42.568853,  Lng: -95.269686),  Route carried "on" structure: County highway ,  Year Built: 1975,  Status: Posted for load,  Structure Length: 0.79m (2.59ft),  Average Daily Traffic: 20 (year 2019),  Average Future Daily Traffic: 20 (year 2040),  Design Load: H 15,  Features Intersected: STREAM,  Facility Carried by Structure: LOCAL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.882,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.3m (24.0ft),  Curb-To-Curb Width: 7.4m (24.3ft),  Out-to-Out Width: 8.0m (26.2ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Poor,  Channel: Satisfactory,  Operating Rating: 25.3 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 12.1 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 20.0 - 29.9% below),  Length Of Structure Improvement: 4.60m (15.09ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $124,000,  Roadway Improvement Cost: $12,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 84981,  Location: 091361702 (Lat: 42.691822,  Lng: -95.131917),  Route carried "on" structure: County highway ,  Year Built: 1977,  Status: Posted for load,  Structure Length: 1.01m (3.31ft),  Average Daily Traffic: 15 (year 2019),  Average Future Daily Traffic: 15 (year 2040),  Design Load: H 20,  Features Intersected: BR RACCOON RIVER,  Facility Carried by Structure: LOCAL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 11.298,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.2m (26.9ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.1m (29.9ft),  Curb-To-Curb Width: 7.4m (24.3ft),  Out-to-Out Width: 8.0m (26.2ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 27.9 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 12.5 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 0.1 - 9.9% below),  Length Of Structure Improvement: 5.50m (18.04ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $148,000,  Roadway Improvement Cost: $15,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 85001,  Location: 4.1 mi. S of IA 3 (Lat: 42.689308,  Lng: -95.151533),  Route carried "on" structure: US 71,  Year Built: 1996,  Status: Open,  Structure Length: 0.64m (2.10ft),  Average Daily Traffic: 2,710 (year 2020),  Truck Traffic: 25%,  Average Future Daily Traffic: 2,710 (year 2041),  Design Load: HS 20,  Features Intersected: BRANCH RACCOON RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 269.131,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.7m (44.9ft),  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 42.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 25.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.10m (6.89ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $10,000,  Roadway Improvement Cost: $1,000
Find on map >>   Show street view

Structure Number: 8519,  Location: 091370802 (Lat: 42.708394,  Lng: -95.249522),  Route carried "on" structure: County highway ,  Year Built: 1966,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 510 (year 2019),  Truck Traffic: 15%,  Average Future Daily Traffic: 510 (year 2040),  Design Load: H 20,  Features Intersected: BROOKS CREEK,  Facility Carried by Structure: FM
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 13.181,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.1m (29.9ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.1m (29.9ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Poor,  Channel: Fair,  Operating Rating: 31.0 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 18.9 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.30m (17.39ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $15,000,  Roadway Improvement Cost: $2,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 85221,  Location: 091372402 (Lat: 42.689708,  Lng: -95.171094),  Route carried "on" structure: County highway ,  Year Built: 1971,  Status: Open,  Structure Length: 1.07m (3.51ft),  Average Daily Traffic: 100 (year 2019),  Average Future Daily Traffic: 100 (year 2040),  Design Load: H 20,  Features Intersected: DRAINAGE DITCH,  Facility Carried by Structure: LOCAL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 13.044,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 2.1m (6.9ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 7.9m (25.9ft)

Condition: Channel: Satisfactory,  Culverts: Poor,  Operating Rating: 23.2 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 17.0 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Meets minimum limits,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 5.60m (18.37ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $15,000,  Roadway Improvement Cost: $2,000
Find on map >>   Show street view

Structure Number: 85271,  Location: 091373204 (Lat: 42.651564,  Lng: -95.249919),  Route carried "on" structure: County highway ,  Year Built: 1977,  Status: Open,  Structure Length: 1.16m (3.81ft),  Average Daily Traffic: 50 (year 2019),  Average Future Daily Traffic: 50 (year 2038),  Design Load: H 20,  Features Intersected: POWELL CREEK,  Facility Carried by Structure: LOCAL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.869,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.4m (30.8ft),  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 41.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 25.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.00m (19.69ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: June 2018,  Bridge Improvement Cost: $15,000,  Roadway Improvement Cost: $2,000
Find on map >>   Show street view

Structure Number: 3016,  Location: 089370501 (Lat: 42.560956,  Lng: -95.247003),  Route carried "on" structure: County highway ,  Year Built: 1916,  Status: Posted for load,  Structure Length: 0.73m (2.40ft),  Average Daily Traffic: 10 (year 2019),  Average Future Daily Traffic: 10 (year 2041),  Features Intersected: SMALL STREAM,  Facility Carried by Structure: LOCAL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 8.221,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.7m (22.0ft),  Curb-To-Curb Width: 4.8m (15.7ft),  Out-to-Out Width: 4.9m (16.1ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Serious,  Channel: Fair,  Operating Rating: 19.3 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 12.4 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: High priority of corrective action,  Deck Geometry: Equal to present desirable criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 5.00m (16.40ft),  Designated Inspection Frequency: Every 12 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $132,000,  Roadway Improvement Cost: $13,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Gravel
Find on map >>   Show street view

Structure Number: 301621,  Location: 089370502 (Lat: 42.555453,  Lng: -95.249100),  Route carried "on" structure: County highway ,  Year Built: 1981,  Status: Open,  Structure Length: 2.77m (9.09ft),  Average Daily Traffic: 15 (year 2019),  Average Future Daily Traffic: 15 (year 2040),  Design Load: H 20,  Features Intersected: BOYER RIVER,  Facility Carried by Structure: LOCAL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 37.393,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 52.7 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 31.8 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 9.10m (29.86ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $15,000,  Roadway Improvement Cost: $2,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Gravel
Find on map >>   Show street view

Structure Number: 301631,  Location: 089370502 (Lat: 42.559000,  Lng: -95.249097),  Route carried "on" structure: County highway ,  Year Built: 2021,  Status: Open,  Structure Length: 1.37m (4.49ft),  Average Daily Traffic: 15 (year 2019),  Average Future Daily Traffic: 15 (year 2041),  Design Load: HL 93,  Features Intersected: BOYER CREEK,  Facility Carried by Structure: FOX AVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 37.786,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 13.4m (44.0ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 8.7m (28.5ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Excellent,  Channel: Good,  Operating Rating: 49.9 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 38.6 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Superior to present desirable criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 366385,  Location: 091372704 (Lat: 42.665011,  Lng: -95.200731),  Route carried "on" structure: County highway ,  Year Built: 2017,  Status: Open,  Structure Length: 0.76m (2.49ft),  Average Daily Traffic: 2,420 (year 2019),  Average Future Daily Traffic: 2,420 (year 2041),  Design Load: HL 93,  Features Intersected: POOR FARM CREEK,  Facility Carried by Structure: M44 105TH AVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.341,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Very good,  Culverts: Very good,  Operating Rating: 44.1 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 34.0 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present desirable criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: July 2021
Find on map >>   Show street view

Structure Number: 607214,  Location: 1.3 mi. S of jct. IA 7 (Lat: 42.635972,  Lng: -95.238617),  Route carried "on" structure: State highway 110,  Year Built: 1978,  Status: Open,  Structure Length: 1.65m (5.41ft),  Average Daily Traffic: 4,410 (year 2020),  Truck Traffic: 4%,  Average Future Daily Traffic: 4,410 (year 2041),  Design Load: HS 20,  Features Intersected: STORM LAKE INLET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 21.747,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 15.2m (49.9ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 14.4m (47.2ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Very good,  Operating Rating: 75.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Discuss Storm Lake, Iowa (IA) on our hugely popular Iowa forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.