National Bridge Inventory (NBI) Statistics
Number of bridges: 38
Total length: 514 meters (1,686ft)
Total costs: $36,409,000
Total average daily traffic: 1,256,604
Total average daily truck traffic: 178,779
National Bridge Inventory (NBI) Registered Bridges for Summit

New bridges - Historical Statistics

  • 1900-1909: 1
  • 1910-1919: 0
  • 1920-1929: 0
  • 1930-1939: 2
  • 1940-1949: 0
  • 1950-1959: 0
  • 1960-1969: 30
  • 1970-1979: 0
  • 1980-1989: 2
  • 1990-1999: 3

Reconstructed bridges - Historical Statistics

  • 1980-1989: 2
  • 1990-1999: 3
  • 2000-2009: 4

Average Daily Traffic

Average Truck Traffic (%)

Bridge Condition - Deck

Bridge Condition - Superstructure

Bridge Condition - Substructure

Bridge Condition - Channel

Find on map >>

Structure Number: 16001203688,  Location: 2.2 M SW ILL 43 (Lat: 41.783828,  Lng: -87.830436),  Route carried "on" structure: Interstate 55,  Year Built: 1963,  Year Reconstructed: 2000,  Status: Open,  Structure Length: 6.83m (22.41ft),  Average Daily Traffic: 77,350 (year 2006),  Truck Traffic: 17%,  Average Future Daily Traffic: 84,980 (year 2021),  Features Intersected: RR - CSXT
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 453.223,  Lanes on structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 18.3m (60.0ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 18.3m (60.0ft),  Curb-To-Curb Width: 20.4m (66.9ft),  Out-to-Out Width: 21.3m (69.9ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 89.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 55.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2006,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>

Structure Number: 16001303689,  Location: 2.2 M SW ILL 43 (Lat: 41.783936,  Lng: -87.830300),  Route carried "on" structure: Interstate 55,  Year Built: 1963,  Year Reconstructed: 2000,  Status: Open,  Structure Length: 6.83m (22.41ft),  Average Daily Traffic: 77,350 (year 2006),  Truck Traffic: 17%,  Average Future Daily Traffic: 84,980 (year 2021),  Features Intersected: RR - CSXT
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 453.239,  Lanes on structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 18.3m (60.0ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 18.3m (60.0ft),  Curb-To-Curb Width: 20.3m (66.6ft),  Out-to-Out Width: 21.3m (69.9ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 89.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 55.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2006,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>

Structure Number: 1600140369,  Location: 0.9 M SW ILL 43 (Lat: 41.796433,  Lng: -87.813300),  Route carried "on" structure: Interstate 55,  Year Built: 1964,  Year Reconstructed: 2000,  Status: Open,  Structure Length: 21.31m (69.91ft),  Average Daily Traffic: 78,350 (year 2006),  Truck Traffic: 16%,  Average Future Daily Traffic: 87,010 (year 2021),  Features Intersected: SAN & SHIP CANAL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 455.170,  Lanes on structure: 4,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 21.3m (69.9ft),  Skew: 4 degrees,  Navigation Control: Yes ( Vertical Clearance: 11.2m (36.7ft), Horizontal Clearance: 48.7m (159.8ft)),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 73.3m (240.5ft),  Curb-To-Curb Width: 21.9m (71.9ft),  Out-to-Out Width: 22.9m (75.1ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Very good,  Operating Rating: 66.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Meets minimum limits,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 21.40m (70.21ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: May 2007,  Underwater Inspection Date: May 2007,  Bridge Improvement Cost: $3,256,000,  Roadway Improvement Cost: $326,000,  Total Project Cost: $5,373,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>

Structure Number: 16001503691,  Location: 0.9 M SW ILL 43 (Lat: 41.796425,  Lng: -87.812944),  Route carried "on" structure: Interstate 55,  Year Built: 1964,  Year Reconstructed: 2000,  Status: Open,  Structure Length: 21.31m (69.91ft),  Average Daily Traffic: 78,350 (year 2006),  Truck Traffic: 16%,  Average Future Daily Traffic: 87,010 (year 2021),  Features Intersected: SAN & SHIP CANAL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 455.202,  Lanes on structure: 4,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 21.9m (71.9ft),  Skew: 4 degrees,  Navigation Control: Yes ( Vertical Clearance: 11.5m (37.7ft), Horizontal Clearance: 49.0m (160.8ft)),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 73.3m (240.5ft),  Curb-To-Curb Width: 21.9m (71.9ft),  Out-to-Out Width: 22.9m (75.1ft)

Condition: Deck: Good,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Very good,  Operating Rating: 66.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Better than present minimum criteria,  Underclear: Somewhat better than minimum adequacy,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 21.40m (70.21ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: May 2007,  Underwater Inspection Date: May 2007,  Bridge Improvement Cost: $3,256,000,  Roadway Improvement Cost: $326,000,  Total Project Cost: $5,373,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>

Structure Number: 16004622202,  Location: 1.4 M SW ILL 43 (Lat: 41.792308,  Lng: -87.821983),  Route carried "on" structure: Ramp Interstate 55,  Year Built: 1963,  Status: Open,  Structure Length: 9.32m (30.58ft),  Average Daily Traffic: 9,309 (year 2000),  Average Future Daily Traffic: 13,020 (year 2021),  Design Load: HS 20,  Features Intersected: I- 55 STEVENSON
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.191,  Lanes on structure: 1,  Lanes under structure: 9,  Owner: State Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 26.2m (86.0ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 58.5 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 36.9 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2007,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>

Structure Number: 16031704059,  Location: 0.1 M S I-55 (Lat: 41.798122,  Lng: -87.801703),  Route carried "on" structure: State highway 43,  Year Built: 1966,  Year Reconstructed: 1990,  Status: Open,  Structure Length: 21.77m (71.42ft),  Average Daily Traffic: 23,750 (year 2007),  Truck Traffic: 15%,  Average Future Daily Traffic: 30,983 (year 2021),  Design Load: HS 20,  Features Intersected: RR - CN
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 32.808,  Lanes on structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Skew: 2 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 11,  Length of Maximum Span: 22.4m (73.5ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 13.0m (42.7ft),  Out-to-Out Width: 15.3m (50.2ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 71.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 42.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2006,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>

Structure Number: 1603180406,  Location: 0.1 M S I-55 (Lat: 41.798264,  Lng: -87.801700),  Route carried "on" structure: State highway 43,  Year Built: 1931,  Year Reconstructed: 1990,  Status: Open,  Structure Length: 6.64m (21.78ft),  Average Daily Traffic: 23,750 (year 2007),  Truck Traffic: 15%,  Average Future Daily Traffic: 30,983 (year 2021),  Design Load: HS 20,  Features Intersected: RR - CN
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 32.824,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 22.6m (74.1ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 14.8m (48.6ft),  Out-to-Out Width: 16.9m (55.4ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 88.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 53.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.99m (26.21ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2008,  Bridge Improvement Cost: $1,857,000,  Roadway Improvement Cost: $186,000,  Total Project Cost: $2,786,000 ( Estimate for 2000),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>

Structure Number: 16048304169,  Location: 0.2 M W I-55 (Lat: 41.794900,  Lng: -87.824317),  Route carried "on" structure: State highway 171,  Year Built: 1964,  Status: Open,  Structure Length: 16.09m (52.79ft),  Average Daily Traffic: 24,600 (year 2003),  Truck Traffic: 10%,  Average Future Daily Traffic: 24,908 (year 2021),  Design Load: HS 20,  Features Intersected: DES PLAINES RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 40.354,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.4m (30.8ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 44.5m (146.0ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 11.0m (36.1ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 60.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 24 months,  Inspection Date: September 2007,  Underwater Inspection Date: September 2007,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>

Structure Number: 1604840417,  Location: 1.4 M SW IL 43 (Lat: 41.793472,  Lng: -87.820864),  Route carried "on" structure: State highway 171,  Year Built: 1964,  Status: Open,  Structure Length: 8.65m (28.38ft),  Average Daily Traffic: 21,350 (year 2007),  Truck Traffic: 11%,  Average Future Daily Traffic: 29,295 (year 2021),  Design Load: HS 20,  Features Intersected: I- 55 STEVENSON
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 40.032,  Lanes on structure: 3,  Lanes under structure: 8,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 10.1m (33.1ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 22.6m (74.1ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 15.3m (50.2ft)

Condition: Deck: Poor,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 53.1 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2006,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>

Structure Number: 16048504171,  Location: 1.4 M SW IL 43 (Lat: 41.793758,  Lng: -87.820592),  Route carried "on" structure: State highway 171,  Year Built: 1964,  Status: Open,  Structure Length: 8.95m (29.36ft),  Average Daily Traffic: 21,350 (year 2007),  Truck Traffic: 11%,  Average Future Daily Traffic: 29,295 (year 2021),  Design Load: HS 20,  Features Intersected: I- 55 STEVENSON
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 40.016,  Lanes on structure: 3,  Lanes under structure: 8,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 10.1m (33.1ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 22.6m (74.1ft),  Curb-To-Curb Width: 13.5m (44.3ft),  Out-to-Out Width: 15.3m (50.2ft)

Condition: Deck: Poor,  Superstructure: Poor,  Substructure: Satisfactory,  Operating Rating: 70.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 42.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 8.90m (29.20ft),  Designated Inspection Frequency: Every 12 months,  Inspection Date: October 2007,  Bridge Improvement Cost: $1,169,000,  Roadway Improvement Cost: $117,000,  Total Project Cost: $1,754,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>

Structure Number: 16048604172,  Location: 0.2 M SE I-55 (Lat: 41.792844,  Lng: -87.818839),  Route carried "on" structure: State highway 171,  Year Built: 1963,  Status: Open,  Structure Length: 25.40m (83.33ft),  Average Daily Traffic: 21,350 (year 2007),  Truck Traffic: 11%,  Average Future Daily Traffic: 29,295 (year 2021),  Design Load: HS 20,  Features Intersected: S&S CANAL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 39.919,  Lanes on structure: 3,  Lanes under structure: 1,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Skew: 1 degrees,  Navigation Control: Yes ( Vertical Clearance: 12.1m (39.7ft), Horizontal Clearance: 48.7m (159.8ft)),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 14,  Length of Maximum Span: 52.9m (173.6ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 11.0m (36.1ft)

Condition: Deck: Poor,  Superstructure: Fair,  Substructure: Fair,  Channel: Very good,  Operating Rating: 47.7 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Underclear: High priority of corrective action,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 25.12m (82.41ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: September 2007,  Underwater Inspection Date: September 2007,  Bridge Improvement Cost: $2,855,000,  Roadway Improvement Cost: $286,000,  Total Project Cost: $4,283,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>

Structure Number: 16048704173,  Location: 0.2 M SE I-55 (Lat: 41.793058,  Lng: -87.818431),  Route carried "on" structure: State highway 171,  Year Built: 1963,  Status: Open,  Structure Length: 24.22m (79.46ft),  Average Daily Traffic: 21,350 (year 2007),  Truck Traffic: 11%,  Average Future Daily Traffic: 29,295 (year 2021),  Design Load: HS 20,  Features Intersected: S&S CANAL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 39.903,  Lanes on structure: 2,  Lanes under structure: 1,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 2 degrees,  Navigation Control: Yes ( Vertical Clearance: 11.5m (37.7ft), Horizontal Clearance: 48.7m (159.8ft)),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 12,  Length of Maximum Span: 52.9m (173.6ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 11.0m (36.1ft)

Condition: Deck: Poor,  Superstructure: Fair,  Substructure: Fair,  Channel: Very good,  Operating Rating: 48.6 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Underclear: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 25.63m (84.09ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: September 2007,  Underwater Inspection Date: September 2007,  Bridge Improvement Cost: $3,436,000,  Roadway Improvement Cost: $344,000,  Total Project Cost: $5,154,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>

Structure Number: 16048804174,  Location: 0.3 M SE I-55 (Lat: 41.791703,  Lng: -87.815683),  Route carried "on" structure: State highway 171,  Year Built: 1963,  Status: Open,  Structure Length: 5.07m (16.63ft),  Average Daily Traffic: 21,350 (year 2007),  Truck Traffic: 11%,  Average Future Daily Traffic: 29,295 (year 2021),  Design Load: HS 20,  Features Intersected: RR - CN
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 39.533,  Lanes on structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 14.6m (47.9ft),  Skew: 1 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 19.2m (63.0ft),  Curb-To-Curb Width: 12.8m (42.0ft),  Out-to-Out Width: 14.6m (47.9ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 49.5 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 34.2 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2007,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>

Structure Number: 16048904175,  Location: 0.3 M SE I-55 (Lat: 41.791658,  Lng: -87.815564),  Route carried "on" structure: State highway 171,  Year Built: 1963,  Status: Open,  Structure Length: 5.07m (16.63ft),  Average Daily Traffic: 21,350 (year 2007),  Truck Traffic: 11%,  Average Future Daily Traffic: 29,295 (year 2021),  Design Load: HS 20,  Features Intersected: RR - CN
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 39.517,  Lanes on structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 14.6m (47.9ft),  Skew: 1 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 19.2m (63.0ft),  Curb-To-Curb Width: 12.8m (42.0ft),  Out-to-Out Width: 14.6m (47.9ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 49.5 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 34.2 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2007,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>

Structure Number: 16098526586,  Location: 0.2 M NW I-55 (Lat: 41.794975,  Lng: -87.824519),  Route carried "on" structure: State highway 171,  Year Built: 1964,  Status: Open,  Structure Length: 15.99m (52.46ft),  Average Daily Traffic: 24,600 (year 2003),  Truck Traffic: 10%,  Average Future Daily Traffic: 24,908 (year 2021),  Design Load: HS 20,  Features Intersected: DES PLAINES RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 40.370,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 17.7m (58.1ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Number Of Approach Spans: 7,  Length of Maximum Span: 44.5m (146.0ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 11.0m (36.1ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 60.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 24 months,  Inspection Date: September 2007,  Underwater Inspection Date: September 2007,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>

Structure Number: 16098726432,  Location: 1.3 M SW IL 43 (Lat: 41.795653,  Lng: -87.822594),  Route carried "on" structure: Ramp Interstate 55R,  Year Built: 1963,  Status: Open,  Structure Length: 27.22m (89.30ft),  Average Daily Traffic: 11,200 (year 2002),  Average Future Daily Traffic: 10,780 (year 2021),  Design Load: HS 20,  Features Intersected: DES PLAINES RIVER,  Facility Carried by Structure: I- 55 WB RMP IL171
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.402,  Lanes on structure: 1,  Owner: State Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Skew: 6 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 8,  Length of Maximum Span: 33.8m (110.9ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 7.9m (25.9ft)

Condition: Deck: Good,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 54.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 27.19m (89.21ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 24 months,  Inspection Date: September 2007,  Underwater Inspection Date: September 2007,  Bridge Improvement Cost: $1,734,000,  Roadway Improvement Cost: $173,000,  Total Project Cost: $2,601,000 ( Estimate for 2000),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>

Structure Number: 16102626438,  Location: 1.5 M SW IL 43 (Lat: 41.793833,  Lng: -87.824792),  Route carried "on" structure: Ramp Interstate 55,  Year Built: 1964,  Year Reconstructed: 1994,  Status: Open,  Structure Length: 21.24m (69.69ft),  Average Daily Traffic: 13,300 (year 2002),  Average Future Daily Traffic: 18,620 (year 2021),  Design Load: HS 20,  Features Intersected: DES PLAINES RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.370,  Lanes on structure: 1,  Owner: State Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Skew: 3 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 7,  Number Of Approach Spans: 4,  Length of Maximum Span: 23.2m (76.1ft),  Curb-To-Curb Width: 8.1m (26.6ft),  Out-to-Out Width: 9.8m (32.2ft)

Condition: Deck: Good,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 40.5 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 23.4 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 21.24m (69.69ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: September 2006,  Underwater Inspection Date: October 2004,  Bridge Improvement Cost: $1,611,000,  Roadway Improvement Cost: $161,000,  Total Project Cost: $2,417,000 ( Estimate for 2000),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>

Structure Number: 16240807468,  Location: 1 M N ARCHER AVE (Lat: 41.791867,  Lng: -87.815772),  Route carried "on" structure: Ramp Interstate 55R,  Year Built: 1981,  Year Reconstructed: 2001,  Status: Open,  Structure Length: 19.36m (63.52ft),  Average Daily Traffic: 2,209 (year 2000),  Average Future Daily Traffic: 3,080 (year 2023),  Design Load: HS 20,  Features Intersected: SAN & SHIP CANAL,  Facility Carried by Structure: IL 171 NB TO I-55
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.097,  Lanes on structure: 1,  Owner: State Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Skew: 2 degrees,  Navigation Control: Yes ( Vertical Clearance: 12.1m (39.7ft), Horizontal Clearance: 48.7m (159.8ft)),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 57.4m (188.3ft),  Curb-To-Curb Width: 7.6m (24.9ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Very good,  Operating Rating: 63.0 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 37.8 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: September 2007,  Underwater Inspection Date: September 2007,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete,  Membrane: Built-up
Find on map >>

Structure Number: 16245422279,  Location: 1.0 M W OF I-55 (Lat: 41.796361,  Lng: -87.828228),  Route carried "on" structure: State highway 171,  Year Built: 1964,  Status: Open,  Structure Length: 11.03m (36.19ft),  Average Daily Traffic: 24,600 (year 2003),  Truck Traffic: 10%,  Average Future Daily Traffic: 24,908 (year 2021),  Design Load: HS 20,  Features Intersected: RR - BNSF
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 40.740,  Lanes on structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 16.5m (54.1ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 33.2m (108.9ft),  Curb-To-Curb Width: 13.6m (44.6ft),  Out-to-Out Width: 15.4m (50.5ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 54.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2007,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>

Structure Number: 16245522281,  Location: 1.0 M W OF I-55 (Lat: 41.796447,  Lng: -87.828478),  Route carried "on" structure: State highway 171,  Year Built: 1964,  Status: Open,  Structure Length: 11.52m (37.80ft),  Average Daily Traffic: 24,600 (year 2003),  Truck Traffic: 10%,  Average Future Daily Traffic: 24,908 (year 2021),  Design Load: HS 20,  Features Intersected: RR - BNSF
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 40.756,  Lanes on structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 16.5m (54.1ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 36.6m (120.1ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 15.2m (49.9ft)

Condition: Deck: Poor,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 55.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2007,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>

Structure Number: 16245622282,  Location: 0.5 M SE JOLIET RD (Lat: 41.795742,  Lng: -87.826600),  Route carried "on" structure: State highway 171,  Year Built: 1964,  Year Reconstructed: 1994,  Status: Open,  Structure Length: 29.42m (96.52ft),  Average Daily Traffic: 24,600 (year 2003),  Truck Traffic: 10%,  Average Future Daily Traffic: 24,908 (year 2021),  Design Load: HS 20,  Features Intersected: STA 53&15 TO 63&18
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 40.531,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 12,  Length of Maximum Span: 32.3m (106.0ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 11.0m (36.1ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 52.2 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 35.1 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 31.73m (104.10ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2006,  Bridge Improvement Cost: $4,445,000,  Roadway Improvement Cost: $445,000,  Total Project Cost: $6,668,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>

Structure Number: 16245722283,  Location: 0.5 M SE JOLIET RD (Lat: 41.796100,  Lng: -87.827481),  Route carried "on" structure: State highway 171,  Year Built: 1964,  Status: Open,  Structure Length: 29.67m (97.34ft),  Average Daily Traffic: 24,600 (year 2003),  Truck Traffic: 10%,  Average Future Daily Traffic: 24,908 (year 2021),  Design Load: HS 20,  Features Intersected: STA 53&15 TO 63&18
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 40.692,  Lanes on structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 16.5m (54.1ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 12,  Length of Maximum Span: 32.4m (106.3ft),  Curb-To-Curb Width: 16.4m (53.8ft),  Out-to-Out Width: 18.1m (59.4ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 51.3 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 35.1 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2007,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>

Structure Number: 16254229854,  Location: 0.1 M S OF 63RD ST (Lat: 41.776539,  Lng: -87.814319),  Route carried "on" structure: Other road 3565,  Year Built: 1991,  Status: Open,  Structure Length: 2.30m (7.55ft),  Average Daily Traffic: 1,050 (year 2006),  Truck Traffic: 16%,  Average Future Daily Traffic: 611 (year 2020),  Design Load: HS 20,  Features Intersected: IL 171 (ARCHER AVE),  Facility Carried by Structure: SERVICE RD NE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.048,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 22.1m (72.5ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 0.0m,  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 11.5m (37.7ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Operating Rating: 89.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 60.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 36 months,  Inspection Date: October 2006,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>

Structure Number: 16260731696,  Location: AT 60TH PL (Lat: 41.783789,  Lng: -87.811731),  Route carried "on" structure: State highway 171,  Year Built: 1995,  Status: Open,  Structure Length: 4.07m (13.35ft),  Average Daily Traffic: 28,900 (year 2007),  Truck Traffic: 7%,  Average Future Daily Traffic: 28,755 (year 2020),  Design Load: HS 20,  Features Intersected: RR - IHB
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 38.198,  Lanes on structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 14.3m (46.9ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 14.6m (47.9ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 15.5m (50.9ft),  Out-to-Out Width: 19.2m (63.0ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Operating Rating: 76.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 45.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Meets minimum limits,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2006,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>

Structure Number: 1600140369,  Location: 0.9 M SW ILL 43 (Lat: 41.796433,  Lng: -87.813300),  Route carried "under" structure: City street 3000,  Year Built: 1964,  Structure Length: 21.31m (69.91ft),  Average Daily Traffic: 209 (year 1998),  Features Intersected: SAN & SHIP CANAL,  Facility Carried by Structure: I- 55 EB STEVENSON
Minimum Vertical Clearance: 6.93m (22.74ft),  Kilometerpoint: 0.037,  Lanes on structure: 4,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 73.3m (240.5ft)

Find on map >>

Structure Number: 16001503691,  Location: 0.9 M SW ILL 43 (Lat: 41.796425,  Lng: -87.812944),  Route carried "under" structure: City street 3000,  Year Built: 1964,  Structure Length: 21.31m (69.91ft),  Average Daily Traffic: 209 (year 1998),  Features Intersected: SAN & SHIP CANAL,  Facility Carried by Structure: I- 55 WB STEVENSON
Minimum Vertical Clearance: 6.91m (22.67ft),  Kilometerpoint: 0.386,  Lanes on structure: 4,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 73.3m (240.5ft)

Find on map >>

Structure Number: 16004622202,  Location: 1.4 M SW ILL 43 (Lat: 41.792308,  Lng: -87.821983),  Route carried "under" structure: Interstate 55,  Year Built: 1963,  Structure Length: 9.32m (30.58ft),  Average Daily Traffic: 144,400 (year 2006),  Truck Traffic: 18%,  Features Intersected: I- 55 STEVENSON
Minimum Vertical Clearance: 4.44m (14.57ft),  Kilometerpoint: 454.237,  Lanes on structure: 1,  Lanes under structure: 7,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 26.2m (86.0ft)

Find on map >>

Structure Number: 16004622202,  Location: 1.4 M SW ILL 43 (Lat: 41.792308,  Lng: -87.821983),  Route carried "under" structure: Interstate 55,  Year Built: 1963,  Structure Length: 9.32m (30.58ft),  Average Daily Traffic: 5,700 (year 2006),  Truck Traffic: 18%,  Features Intersected: I- 55 STEVENSON
Minimum Vertical Clearance: 4.37m (14.34ft),  Kilometerpoint: 0.901,  Lanes on structure: 1,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 26.2m (86.0ft)

Find on map >>

Structure Number: 16021422953,  Location: S OF 63RD ST P10 (Lat: 41.776442,  Lng: -87.814375),  Route carried "under" structure: State highway 171,  Year Built: 1939,  Structure Length: 2.13m (6.99ft),  Average Daily Traffic: 28,500 (year 2007),  Truck Traffic: 11%,  Features Intersected: ILL 171(ARCHER AV),  Facility Carried by Structure: B&OCT RR
Minimum Vertical Clearance: 4.32m (14.17ft),  Kilometerpoint: 37.377,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Length of Maximum Span: 15.5m (50.9ft)

Find on map >>

Structure Number: 1604840417,  Location: 1.4 M SW IL 43 (Lat: 41.793472,  Lng: -87.820864),  Route carried "under" structure: Interstate 55,  Year Built: 1964,  Structure Length: 8.65m (28.38ft),  Average Daily Traffic: 144,400 (year 2006),  Truck Traffic: 18%,  Features Intersected: I- 55 STEVENSON,  Facility Carried by Structure: IL 171 SB FIRST AV
Minimum Vertical Clearance: 0.47m (1.54ft),  Kilometerpoint: 454.382,  Lanes on structure: 3,  Lanes under structure: 6,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 22.6m (74.1ft)

Find on map >>

Structure Number: 1604840417,  Location: 1.4 M SW IL 43 (Lat: 41.793472,  Lng: -87.820864),  Route carried "under" structure: Interstate 55,  Year Built: 1964,  Structure Length: 8.65m (28.38ft),  Average Daily Traffic: 5,700 (year 2006),  Truck Traffic: 18%,  Features Intersected: I- 55 STEVENSON,  Facility Carried by Structure: IL 171 SB FIRST AV
Minimum Vertical Clearance: 4.57m (14.99ft),  Kilometerpoint: 0.074,  Lanes on structure: 3,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 22.6m (74.1ft)

Find on map >>

Structure Number: 16048504171,  Location: 1.4 M SW IL 43 (Lat: 41.793758,  Lng: -87.820592),  Route carried "under" structure: Interstate 55,  Year Built: 1964,  Structure Length: 8.95m (29.36ft),  Average Daily Traffic: 144,400 (year 2006),  Truck Traffic: 17%,  Features Intersected: I- 55 STEVENSON,  Facility Carried by Structure: IL 171 NB FIRST AV
Minimum Vertical Clearance: 4.42m (14.50ft),  Kilometerpoint: 454.414,  Lanes on structure: 3,  Lanes under structure: 6,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 22.6m (74.1ft)

Find on map >>

Structure Number: 16048504171,  Location: 1.4 M SW IL 43 (Lat: 41.793758,  Lng: -87.820592),  Route carried "under" structure: Interstate 55,  Year Built: 1964,  Structure Length: 8.95m (29.36ft),  Average Daily Traffic: 5,700 (year 2006),  Truck Traffic: 17%,  Features Intersected: I- 55 STEVENSON,  Facility Carried by Structure: IL 171 NB FIRST AV
Minimum Vertical Clearance: 4.39m (14.40ft),  Kilometerpoint: 0.724,  Lanes on structure: 3,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 22.6m (74.1ft)

Find on map >>

Structure Number: 16048604172,  Location: 0.2 M SE I-55 (Lat: 41.792844,  Lng: -87.818839),  Route carried "under" structure: Ramp Interstate 55,  Year Built: 1963,  Structure Length: 25.40m (83.33ft),  Average Daily Traffic: 9,309 (year 2000),  Features Intersected: S&S CANAL,  Facility Carried by Structure: IL 171 SB FIRST AV
Minimum Vertical Clearance: 4.39m (14.40ft),  Kilometerpoint: 1.352,  Lanes on structure: 3,  Lanes under structure: 1,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 52.9m (173.6ft)

Find on map >>

Structure Number: 16048704173,  Location: 0.2 M SE I-55 (Lat: 41.793058,  Lng: -87.818431),  Route carried "under" structure: Ramp Interstate 55,  Year Built: 1963,  Structure Length: 24.22m (79.46ft),  Average Daily Traffic: 9,309 (year 2000),  Features Intersected: S&S CANAL,  Facility Carried by Structure: IL 171 NB FIRST AV
Minimum Vertical Clearance: 4.57m (14.99ft),  Kilometerpoint: 1.368,  Lanes on structure: 2,  Lanes under structure: 1,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 52.9m (173.6ft)

Find on map >>

Structure Number: 16088123525,  Location: 0.26 M N 55TH P10 (Lat: 41.793367,  Lng: -87.812964),  Route carried "under" structure: Other road 305,  Year Built: 1900,  Structure Length: 2.59m (8.50ft),  Average Daily Traffic: 1,200 (year 2006),  Truck Traffic: 24%,  Features Intersected: LAWNDALE AVE,  Facility Carried by Structure: GM&O RR
Minimum Vertical Clearance: 4.19m (13.75ft),  Kilometerpoint: 0.145,  Lanes under structure: 2,  Material/Design: Steel,  Length of Maximum Span: 9.4m (30.8ft)

Find on map >>

Structure Number: 16254229854,  Location: 0.1 M S OF 63RD ST (Lat: 41.776539,  Lng: -87.814319),  Route carried "under" structure: State highway 171,  Year Built: 1991,  Structure Length: 2.30m (7.55ft),  Average Daily Traffic: 28,500 (year 2007),  Truck Traffic: 11%,  Features Intersected: IL 171 (ARCHER AVE),  Facility Carried by Structure: SERVICE RD NE
Minimum Vertical Clearance: 4.72m (15.49ft),  Kilometerpoint: 37.393,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 22.1m (72.5ft)

Find on map >>

Structure Number: 16254306178,  Location: 0.05 M S OF 63RD ST (Lat: 41.776247,  Lng: -87.814497),  Route carried "under" structure: State highway 171,  Year Built: 1987,  Structure Length: 2.26m (7.41ft),  Average Daily Traffic: 28,500 (year 2007),  Truck Traffic: 11%,  Features Intersected: IL 171 (ARCHER AVE),  Facility Carried by Structure: SERVICE RD SW
Minimum Vertical Clearance: 4.44m (14.57ft),  Kilometerpoint: 37.345,  Lanes under structure: 4,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 21.3m (69.9ft)

Discuss this city on our hugely popular Illinois forum

Back to: Summit, IL, Illinois, All US cities.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2009 Advameg, Inc.