Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Sussex, Virginia (VA)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 10Number of bridges
  • 118ft / 35.8mTotal length
  • $2,663,000Total costs
  • 5,007Total average daily traffic
  • 803Total average daily truck traffic
  • 5,749Total future (year 2040) average daily traffic
  • National Bridge Inventory (NBI) Registered Bridges for Sussex
  • No street view available for this location

New bridges in Sussex, VA - historical statistics
  • New bridges - historical statistics
  • 21930-1939
  • 21950-1959
  • 11960-1969
  • 11980-1989
  • 21990-1999
  • 22000-2009
Reconstructed bridges in Sussex, VA - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11980-1989
  • 01990-1999
  • 02000-2009
  • 12010-2019
Average Bridge Truck Traffic in Sussex, VA
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 25.0%Very good
  • 37.5%Good
  • 25.0%Satisfactory
  • 12.5%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 25.0%Very good
  • 12.5%Good
  • 25.0%Satisfactory
  • 37.5%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 25.0%Very good
  • 25.0%Good
  • 25.0%Satisfactory
  • 25.0%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 10.0%Very good
  • 40.0%Good
  • 40.0%Satisfactory
  • 10.0%Fair
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 50.0%Good
  • 50.0%Satisfactory
Find on map >>   Show street view

Structure Number: 18332,  Location: 0.25 fr 640/1.30 to SR35 (Lat: 36.977042,  Lng: -77.268533),  Route carried "on" structure: County highway 626,  Year Built: 1954,  Status: Open,  Structure Length: 6.48m (21.26ft),  Average Daily Traffic: 386 (year 2020),  Truck Traffic: 8%,  Average Future Daily Traffic: 509 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: Nottoway River,  Facility Carried by Structure: Courthouse Road
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.999,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 21.6m (70.9ft),  Curb or Sidewalk Widths: Left: 0.3m (1.0ft),  Right: 0.3m (1.0ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 7.3m (24.0ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 41.5 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 32.0 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.16m (23.49ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: October 2021,  Underwater Inspection Date: June 2020,  Bridge Improvement Cost: $564,000,  Roadway Improvement Cost: $56,000,  Total Project Cost: $621,000 ( Estimate for 2016),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay,  Membrane: Epoxy
Find on map >>   Show street view

Structure Number: 18351,  Location: 0.70 TO 650 / 1.40 TO 622 (Lat: 36.896394,  Lng: -77.201331),  Route carried "on" structure: County highway 634,  Year Built: 1955,  Status: Open,  Structure Length: 8.91m (29.23ft),  Average Daily Traffic: 54 (year 2020),  Average Future Daily Traffic: 59 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: Nottoway River,  Facility Carried by Structure: Old Forty Road
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 9.847,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 22.1m (72.5ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 7.3m (24.0ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 41.7 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 32.2 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 8.99m (29.49ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: November 2021,  Underwater Inspection Date: June 2020,  Bridge Improvement Cost: $260,000,  Roadway Improvement Cost: $50,000,  Total Project Cost: $311,000 ( Estimate for 2016),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay,  Membrane: Epoxy
Find on map >>   Show street view

Structure Number: 1836,  Location: 3.05 fr 40/0.40 to 637 (Lat: 36.967050,  Lng: -77.324583),  Route carried "on" structure: County highway 640,  Year Built: 1989,  Status: Open,  Structure Length: 1.43m (4.69ft),  Average Daily Traffic: 138 (year 2014),  Average Future Daily Traffic: 190 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: Cabin Point Swamp,  Facility Carried by Structure: Cabin Stick Road
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 13.580,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 5.2m (17.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 14.3m (46.9ft),  Curb-To-Curb Width: 7.5m (24.6ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 73.4 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 54.8 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Epoxy,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 18361,  Location: 1.20 from 642/1.30 to 662 (Lat: 36.889542,  Lng: -77.330250),  Route carried "on" structure: County highway 641,  Year Built: 1991,  Status: Open,  Structure Length: 0.88m (2.89ft),  Average Daily Traffic: 18 (year 2014),  Average Future Daily Traffic: 20 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: Hunting Quarter Creek,  Facility Carried by Structure: Emerald Road
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.923,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 5.2m (17.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.3m (24.0ft),  Curb-To-Curb Width: 7.5m (24.6ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Good,  Channel: Good,  Operating Rating: 87.3 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 67.3 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 18364,  Location: 2.5 from 608/.10 to 634 (Lat: 36.903822,  Lng: -77.245189),  Route carried "on" structure: County highway 642,  Year Built: 1932,  Year Reconstructed: 2015,  Status: Open,  Structure Length: 1.43m (4.69ft),  Average Daily Traffic: 292 (year 2014),  Average Future Daily Traffic: 439 (year 2040),  Design Load: HL 93,  Features Intersected: Br Hunting Quarter Creek,  Facility Carried by Structure: Comans Well Road
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 16.637,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 14.3m (46.9ft),  Curb or Sidewalk Widths: Left: 0.3m (1.0ft),  Right: 0.3m (1.0ft),  Curb-To-Curb Width: 6.2m (20.3ft),  Out-to-Out Width: 6.8m (22.3ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Good,  Operating Rating: 70.9 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 54.7 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.52m (4.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $120,000,  Roadway Improvement Cost: $12,000,  Total Project Cost: $133,000 ( Estimate for 2016),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Gravel
Find on map >>   Show street view

Structure Number: 18377,  Location: 0.8 from 709 / 1.9 to 632 (Lat: 36.846586,  Lng: -77.266181),  Route carried "on" structure: County highway 660,  Year Built: 1932,  Year Reconstructed: 1991,  Status: Posted for load,  Structure Length: 0.76m (2.49ft),  Average Daily Traffic: 61 (year 2014),  Average Future Daily Traffic: 69 (year 2040),  Features Intersected: Branch Raccoon Creek,  Facility Carried by Structure: Gilliam Drive
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.103,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 4.3m (14.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.4m (21.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 6.1m (20.0ft),  Out-to-Out Width: 6.4m (21.0ft)

Condition: Deck: Good,  Superstructure: Fair,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 58.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 0.1 - 9.9% below),  Length Of Structure Improvement: 1.07m (3.51ft),  Designated Inspection Frequency: Every 12 months,  Inspection Date: March 2022,  Bridge Improvement Cost: $37,000,  Roadway Improvement Cost: $18,000,  Total Project Cost: $56,000 ( Estimate for 2019),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Gravel
Find on map >>   Show street view

Structure Number: 18388,  Location: 1.80 fr 634/0.60 to 642 (Lat: 36.890203,  Lng: -77.289750),  Route carried "on" structure: County highway 735,  Year Built: 1962,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 783 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 861 (year 2040),  Design Load: HS 20,  Features Intersected: Hunting Quarter Creek,  Facility Carried by Structure: Courthouse Road
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 13.052,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 5.2m (17.1ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 54.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021
Find on map >>   Show street view

Structure Number: 25615,  Location: 2.05 MI 735/0.1 MI 642 (Lat: 36.905242,  Lng: -77.244675),  Route carried "on" structure: County highway 634,  Year Built: 1998,  Status: Open,  Structure Length: 0.70m (2.30ft),  Average Daily Traffic: 231 (year 2020),  Truck Traffic: 2%,  Average Future Daily Traffic: 254 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: Andersons Branch,  Facility Carried by Structure: Old Forty Road
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.261,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.0m (23.0ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 44.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2022
Find on map >>   Show street view

Structure Number: 25651,  Location: 2.09 Mi To Route 35 (Lat: 36.931731,  Lng: -77.202636),  Route carried "on" structure: State highway 40,  Year Built: 2000,  Status: Open,  Structure Length: 8.60m (28.22ft),  Average Daily Traffic: 1,522 (year 2020),  Truck Traffic: 24%,  Average Future Daily Traffic: 1,674 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: Nottoway River,  Facility Carried by Structure: Sussex Drive
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 14.0m (45.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 18.6m (61.0ft),  Curb-To-Curb Width: 14.0m (45.9ft),  Out-to-Out Width: 14.6m (47.9ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 49.9 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 39.0 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 8.60m (28.22ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: September 2020,  Underwater Inspection Date: April 2020,  Bridge Improvement Cost: $1,028,000,  Roadway Improvement Cost: $102,000,  Total Project Cost: $1,542,000,  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Epoxy
Find on map >>   Show street view

Structure Number: 25652,  Location: 2.34 Mi To Route 35 (Lat: 36.931017,  Lng: -77.206264),  Route carried "on" structure: State highway 40,  Year Built: 2000,  Status: Open,  Structure Length: 5.61m (18.41ft),  Average Daily Traffic: 1,522 (year 2020),  Truck Traffic: 24%,  Average Future Daily Traffic: 1,674 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: Nottoway River Overflow,  Facility Carried by Structure: Sussex Drive
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 14.0m (45.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 18.6m (61.0ft),  Curb-To-Curb Width: 14.0m (45.9ft),  Out-to-Out Width: 14.6m (47.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Good,  Operating Rating: 90.7 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 69.9 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: September 2020,  Underwater Inspection Date: June 2020,  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Epoxy
Discuss Sussex, Virginia (VA) on our hugely popular Virginia forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.