Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Tewksbury, Massachusetts (MA)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 15Number of bridges
  • 184ft / 55.8mTotal length
  • $67,235,000Total costs
  • 789,675Total average daily traffic
  • 57,891Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Tewksbury
  • No street view available for this location

New bridges in Tewksbury, MA - historical statistics
  • New bridges - historical statistics
  • 11930-1939
  • 21950-1959
  • 81960-1969
  • 11970-1979
  • 21990-1999
  • 12000-2009
Reconstructed bridges in Tewksbury, MA - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11960-1969
  • 11970-1979
  • 11980-1989
Average Bridge Daily Traffic in Tewksbury, MA
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 10.0%Good
  • 10.0%Satisfactory
  • 80.0%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 20.0%Good
  • 50.0%Satisfactory
  • 30.0%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 10.0%Good
  • 30.0%Satisfactory
  • 20.0%Fair
  • 30.0%Poor
  • 10.0%Serious
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 75.0%Good
  • 25.0%Fair
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 33.3%Good
  • 33.3%Satisfactory
  • 33.3%Fair
Find on map >>   Show street view

Structure Number: T03002AE3DOTNBI,  Location: .24 KM SELY SHAWSHEEN ST. (Lat: 42.587883,  Lng: -71.200600),  Route carried "on" structure: State highway 38,  Year Built: 1997,  Status: Open,  Structure Length: 2.21m (7.25ft),  Average Daily Traffic: 21,500 (year 2019),  Truck Traffic: 10%,  Average Future Daily Traffic: 31,112 (year 2032),  Design Load: HS 20,  Features Intersected: WATER SHAWSHEEN RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 25.353,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 20.7m (67.9ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 0.0m,  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 15.7m (51.5ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 78.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 42.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: T030032D5MUNNBI,  Location: 1 MI. N. OF RT. 38 (Lat: 42.599750,  Lng: -71.192969),  Route carried "on" structure: City street ,  Year Built: 1998,  Status: Open,  Structure Length: 1.49m (4.89ft),  Average Daily Traffic: 170 (year 2018),  Truck Traffic: 6%,  Average Future Daily Traffic: 268 (year 2032),  Features Intersected: WATER SHAWSHEEN RIVER,  Facility Carried by Structure: HWY MILL ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 48.6 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 38.9 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 0.20m (0.66ft),  Designated Inspection Frequency: Every 12 months,  Underwater Inspection Frequency: Every 12 months,  Inspection Date: June 2021,  Underwater Inspection Date: Febuary 2021,  Bridge Improvement Cost: $281,000,  Roadway Improvement Cost: $29,000,  Total Project Cost: $422,000 ( Estimate for 2022),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: T030042C7MUNNBI,  Location: 1 MI NW OF WILMINGTON (Lat: 42.594556,  Lng: -71.195622),  Route carried "on" structure: City street ,  Year Built: 1979,  Status: Open,  Structure Length: 1.37m (4.49ft),  Average Daily Traffic: 3,800 (year 2018),  Truck Traffic: 7%,  Average Future Daily Traffic: 5,054 (year 2033),  Features Intersected: WATER SHAWSHEEN RIVER,  Facility Carried by Structure: HWY BRIDGE ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.129,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 4.3m (14.1ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 10.4m (34.1ft)

Condition: Channel: Fair,  Culverts: Fair,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 0.80m (2.62ft),  Designated Inspection Frequency: Every 12 months,  Underwater Inspection Frequency: Every 12 months,  Inspection Date: March 2020,  Underwater Inspection Date: August 2021,  Bridge Improvement Cost: $431,000,  Roadway Improvement Cost: $44,000,  Total Project Cost: $647,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: T030082NGDOT634,  Location: 0.4 MI SELY RT 495 (Lat: 42.624653,  Lng: -71.266633),  Route carried "on" structure: State highway 38,  Year Built: 1938,  Year Reconstructed: 1991,  Status: Open,  Structure Length: 4.82m (15.81ft),  Average Daily Traffic: 29,095 (year 2018),  Truck Traffic: 11%,  Average Future Daily Traffic: 44,378 (year 2031),  Design Load: H 20,  Features Intersected: RR BMRR
Minimum Vertical Clearance: 5.49m (18.01ft),  Kilometerpoint: 32.349,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 14.0m (45.9ft),  Skew: 4 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 15.5m (50.9ft),  Curb or Sidewalk Widths: Left: 2.0m (6.6ft),  Right: 0.3m (1.0ft),  Curb-To-Curb Width: 14.0m (45.9ft),  Out-to-Out Width: 17.2m (56.4ft)

Condition: Deck: Fair,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 79.6 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 47.7 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 4.90m (16.08ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $1,589,000,  Roadway Improvement Cost: $159,000,  Total Project Cost: $2,384,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: T030102HPDOTNBI,  Location: 0.1 MI SLY ANDOVER T.L. (Lat: 42.617011,  Lng: -71.175397),  Route carried "on" structure: Interstate 93,  Year Built: 1958,  Year Reconstructed: 1975,  Status: Open,  Structure Length: 1.37m (4.49ft),  Average Daily Traffic: 137,300 (year 2016),  Truck Traffic: 10%,  Average Future Daily Traffic: 211,152 (year 2031),  Design Load: HS 20,  Features Intersected: HWY VALE ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 58.434,  Lanes on structure: 3,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 15.2m (49.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.5m (41.0ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 15.2m (49.9ft),  Out-to-Out Width: 16.8m (55.1ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Fair,  Operating Rating: 79.7 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 29.2 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.40m (4.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $924,000,  Roadway Improvement Cost: $93,000,  Total Project Cost: $1,387,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: T030102HQDOTNBI,  Location: 0.1 MI SLY ANDOVER T.L. (Lat: 42.616964,  Lng: -71.175667),  Route carried "on" structure: Interstate 93,  Year Built: 1958,  Year Reconstructed: 1972,  Status: Open,  Structure Length: 1.37m (4.49ft),  Average Daily Traffic: 137,300 (year 2016),  Truck Traffic: 10%,  Average Future Daily Traffic: 211,152 (year 2031),  Design Load: HS 20,  Features Intersected: HWY VALE ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 58.434,  Lanes on structure: 3,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 15.8m (51.8ft),  Skew: 30 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.5m (41.0ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 15.8m (51.8ft),  Out-to-Out Width: 17.4m (57.1ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 79.7 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 29.2 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.40m (4.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $957,000,  Roadway Improvement Cost: $96,000,  Total Project Cost: $1,436,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: T030122M6DOTNBI,  Location: 0.6 MI N RTE 38 (Lat: 42.631325,  Lng: -71.260883),  Route carried "on" structure: City street ,  Year Built: 1962,  Status: Open,  Structure Length: 11.89m (39.01ft),  Average Daily Traffic: 1,990 (year 2018),  Truck Traffic: 4%,  Average Future Daily Traffic: 2,172 (year 2031),  Design Load: H 20,  Features Intersected: I 495,  Facility Carried by Structure: HWY TRULL RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 6,  Owner: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Skew: 4 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Number Of Approach Spans: 2,  Length of Maximum Span: 31.7m (104.0ft),  Curb or Sidewalk Widths: Left: 0.3m (1.0ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 12.3m (40.4ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Operating Rating: 52.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 31.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 11.90m (39.04ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $5,750,000,  Roadway Improvement Cost: $576,000,  Total Project Cost: $8,626,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: T030132L5DOTNBI,  Location: 0.6 MI SWLY RT 133 (Lat: 42.638647,  Lng: -71.240208),  Route carried "on" structure: City street ,  Year Built: 1961,  Status: Posted for load,  Structure Length: 8.47m (27.79ft),  Average Daily Traffic: 11,767 (year 2018),  Truck Traffic: 4%,  Average Future Daily Traffic: 13,266 (year 2031),  Design Load: H 20,  Features Intersected: I 495,  Facility Carried by Structure: HWY NORTH ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 6,  Owner: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 22.1m (72.5ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 12.3m (40.4ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Poor,  Operating Rating: 45.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 27.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 9.50m (31.17ft),  Designated Inspection Frequency: Every 12 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: October 2020,  Other Special Inspection Date: October 2021,  Bridge Improvement Cost: $7,912,000,  Roadway Improvement Cost: $792,000,  Total Project Cost: $11,869,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: T030142JUDOTNBI,  Location: RT 495 AT RT 133 (Lat: 42.642783,  Lng: -71.231256),  Route carried "on" structure: Interstate 495,  Year Built: 1961,  Status: Open,  Structure Length: 6.83m (22.41ft),  Average Daily Traffic: 60,988 (year 2019),  Truck Traffic: 9%,  Average Future Daily Traffic: 189,516 (year 2031),  Design Load: HS 20,  Features Intersected: ST133 ANDOVER ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 152.423,  Lanes on structure: 3,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 15.8m (51.8ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 33.2m (108.9ft),  Curb or Sidewalk Widths: Left: 0.9m (3.0ft),  Right: 0.9m (3.0ft),  Curb-To-Curb Width: 15.8m (51.8ft),  Out-to-Out Width: 18.3m (60.0ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Poor,  Operating Rating: 56.7 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 28.1 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.90m (25.92ft),  Designated Inspection Frequency: Every 12 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: April 2021,  Other Special Inspection Date: April 2021,  Bridge Improvement Cost: $8,649,000,  Roadway Improvement Cost: $865,000,  Total Project Cost: $12,974,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: T030142JVDOTNBI,  Location: RT 495 AT RT 133 (Lat: 42.642781,  Lng: -71.232219),  Route carried "on" structure: Interstate 495,  Year Built: 1961,  Status: Open,  Structure Length: 6.94m (22.77ft),  Average Daily Traffic: 60,884 (year 2019),  Truck Traffic: 9%,  Average Future Daily Traffic: 189,516 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: ST133 ANDOVER ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 152.423,  Lanes on structure: 3,  Lanes under structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 15.8m (51.8ft),  Skew: 5 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 33.2m (108.9ft),  Curb or Sidewalk Widths: Left: 0.9m (3.0ft),  Right: 0.9m (3.0ft),  Curb-To-Curb Width: 15.8m (51.8ft),  Out-to-Out Width: 18.3m (60.0ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Poor,  Operating Rating: 56.7 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 28.1 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 8.00m (26.25ft),  Designated Inspection Frequency: Every 12 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: April 2021,  Other Special Inspection Date: April 2021,  Bridge Improvement Cost: $8,758,000,  Roadway Improvement Cost: $876,000,  Total Project Cost: $13,138,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: T030152JRDOTNBI,  Location: RT 495 AT RT 38 (Lat: 42.627694,  Lng: -71.271825),  Route carried "on" structure: Interstate 495,  Year Built: 1961,  Status: Open,  Structure Length: 4.21m (13.81ft),  Average Daily Traffic: 64,701 (year 2017),  Truck Traffic: 10%,  Average Future Daily Traffic: 184,778 (year 2031),  Design Load: HS 20,  Features Intersected: ST 38 MAIN ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 149.639,  Lanes on structure: 3,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 15.2m (49.9ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 21.0m (68.9ft),  Curb or Sidewalk Widths: Left: 0.8m (2.6ft),  Right: 0.4m (1.3ft),  Curb-To-Curb Width: 15.2m (49.9ft),  Out-to-Out Width: 17.4m (57.1ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 58.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.30m (14.11ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $3,649,000,  Roadway Improvement Cost: $365,000,  Total Project Cost: $5,474,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: T030152JTDOTNBI,  Location: RT 495 AT RT 38 (Lat: 42.627911,  Lng: -71.272347),  Route carried "on" structure: Interstate 495,  Year Built: 1961,  Status: Temporarily open,  Structure Length: 4.21m (13.81ft),  Average Daily Traffic: 63,530 (year 2017),  Truck Traffic: 9%,  Average Future Daily Traffic: 184,778 (year 2031),  Design Load: HS 20,  Features Intersected: ST 38 MAIN ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 149.639,  Lanes on structure: 3,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 15.2m (49.9ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 21.0m (68.9ft),  Curb or Sidewalk Widths: Left: 0.8m (2.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 15.2m (49.9ft),  Out-to-Out Width: 17.4m (57.1ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Serious,  Operating Rating: 52.7 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 29.7 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: High priority of corrective action,  Deck Geometry: Meets minimum limits,  Underclear: High priority of replacement,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.20m (17.06ft),  Designated Inspection Frequency: Every 6 months,  Other Special Inspection Frequency: Every 6 months,  Inspection Date: July 2020,  Other Special Inspection Date: January 2022,  Bridge Improvement Cost: $5,611,000,  Roadway Improvement Cost: $562,000,  Total Project Cost: $8,417,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: T03019BWMMUNNBI,  Location: 0.85MI E OF LIVINGSTON ST (Lat: 42.612283,  Lng: -71.209286),  Route carried "on" structure: City street ,  Year Built: 2008,  Status: Open,  Structure Length: 0.65m (2.13ft),  Average Daily Traffic: 22,050 (year 2019),  Truck Traffic: 5%,  Design Load: HS 20,  Features Intersected: WATER STRONG WATER BROOK,  Facility Carried by Structure: HWY EAST ST
Minimum Vertical Clearance: 99.00m (324.80ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 8.6m (28.2ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Inventory Rating: 86.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 0.50m (1.64ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 36 months,  Inspection Date: April 2021,  Underwater Inspection Date: Febuary 2020,  Bridge Improvement Cost: $307,000,  Roadway Improvement Cost: $31,000,  Total Project Cost: $461,000 ( Estimate for 2022),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: T030132L5DOTNBI,  Location: 0.6 MI SWLY RT 133 (Lat: 42.633333,  Lng: -71.233333),  Route carried "under" structure: Interstate 495,  Year Built: 1961,  Structure Length: 0. m,  Average Daily Traffic: 87,300 (year 0000),  Features Intersected: I 495 NB,  Facility Carried by Structure: HWY NORTH ST
Minimum Vertical Clearance: 5.16m (16.93ft),  Kilometerpoint: 0.000,  Lanes on structure: 3,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 22.6m (74.1ft)

Find on map >>   Show street view

Structure Number: T030132L5DOTNBI,  Location: 0.6 MI SWLY RT 133 (Lat: 42.633333,  Lng: -71.233333),  Route carried "under" structure: Interstate 495,  Year Built: 1961,  Structure Length: 0. m,  Average Daily Traffic: 87,300 (year 0000),  Features Intersected: I 495 SB,  Facility Carried by Structure: HWY NORTH ST
Minimum Vertical Clearance: 5.16m (16.93ft),  Kilometerpoint: 0.000,  Lanes on structure: 3,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 22.6m (74.1ft)

Discuss Tewksbury, Massachusetts (MA) on our hugely popular Massachusetts forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.