Bridge Statistics for Tioga, New York (NY) - Condition, Traffic, Stress, Structural Evaluation, Project Costs

Back to: Tioga, NY, New York, New York forum, All US cities.





National Bridge Inventory (NBI) Statistics
Number of bridges: 19
Total length: 57 meters (187ft)
Total costs: $16,673,000
Total average daily traffic: 34,246
Total average daily truck traffic: 2,307
Total future (year 2018) average daily traffic: 40,539
National Bridge Inventory (NBI) Registered Bridges for Tioga

New bridges - Historical Statistics

  • 1930-1939: 2
  • 1940-1949: 1
  • 1950-1959: 2
  • 1960-1969: 3
  • 1970-1979: 1
  • 1980-1989: 5
  • 1990-1999: 4
  • 2000-2009: 1

Average Daily Traffic

Bridge Condition - Deck

Bridge Condition - Superstructure

Bridge Condition - Substructure

Bridge Condition - Channel

Bridge Condition - Culverts

Find on map >>

Structure Number: 10129,  Location: RTE 17C E TIOGA CENTER (Lat: 42.059556,  Lng: -76.345367),  Route carried "on" structure: State highway 17C,  Year Built: 2001,  Status: Open,  Structure Length: 4.63m (15.19ft),  Average Daily Traffic: 4,188 (year 2006),  Truck Traffic: 8%,  Average Future Daily Traffic: 5,036 (year 2026),  Design Load: HS 25,  Features Intersected: PIPE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 24.225,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 18.2m (59.7ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 46.3m (151.9ft),  Curb-To-Curb Width: 11.9m (39.0ft),  Out-to-Out Width: 13.1m (43.0ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Excellent,  Channel: Good,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 58.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Superior to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.63m (15.19ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2007,  Bridge Improvement Cost: $1,289,000,  Roadway Improvement Cost: $767,000,  Total Project Cost: $2,056,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>

Structure Number: 101291,  Location: 3.5 MI WEST OF OWEGO (Lat: 42.085858,  Lng: -76.319483),  Route carried "on" structure: State highway 17C,  Year Built: 1996,  Status: Open,  Structure Length: 5.09m (16.70ft),  Average Daily Traffic: 4,051 (year 2006),  Truck Traffic: 8%,  Average Future Daily Traffic: 4,872 (year 2026),  Design Load: HS 25,  Features Intersected: NORFOLK SOUTHERN
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 25.557,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.1m (39.7ft),  Skew: 4 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 50.2m (164.7ft),  Curb-To-Curb Width: 12.1m (39.7ft),  Out-to-Out Width: 12.9m (42.3ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 42.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.09m (16.70ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2006,  Bridge Improvement Cost: $1,289,000,  Roadway Improvement Cost: $767,000,  Total Project Cost: $2,056,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>

Structure Number: 101292,  Location: 3.0 MI W OF OWEGO (Lat: 42.086606,  Lng: -76.311269),  Route carried "on" structure: State highway 17C,  Year Built: 1995,  Status: Open,  Structure Length: 0.82m (2.69ft),  Average Daily Traffic: 4,051 (year 2006),  Truck Traffic: 8%,  Average Future Daily Traffic: 4,872 (year 2026),  Design Load: HS 25,  Features Intersected: THORNE HOLLOW CRK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 25.580,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.1m (39.7ft),  Skew: 2 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.3m (24.0ft),  Curb-To-Curb Width: 12.1m (39.7ft),  Out-to-Out Width: 13.1m (43.0ft)

Condition: Channel: Satisfactory,  Culverts: Very good,  Operating Rating: 68.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.82m (2.69ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2007,  Bridge Improvement Cost: $232,000,  Roadway Improvement Cost: $138,000,  Total Project Cost: $370,000 ( Estimate for 2007),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 101293,  Location: JCT RTE 17 & CATATONK (Lat: 42.096983,  Lng: -76.277147),  Route carried "on" structure: State highway 17C,  Year Built: 1993,  Status: Open,  Structure Length: 8.16m (26.77ft),  Average Daily Traffic: 7,839 (year 2006),  Truck Traffic: 6%,  Average Future Daily Traffic: 9,784 (year 2026),  Design Load: HS 20,  Features Intersected: OWEGO CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 30.048,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 10.9m (35.8ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 40.5m (132.9ft),  Curb-To-Curb Width: 10.9m (35.8ft),  Out-to-Out Width: 11.5m (37.7ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Very good,  Channel: Satisfactory,  Operating Rating: 72.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 8.16m (26.77ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2007,  Bridge Improvement Cost: $232,000,  Roadway Improvement Cost: $138,000,  Total Project Cost: $370,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>

Structure Number: 109641,  Location: IN SMITHBORO ON S.H.17C (Lat: 42.033822,  Lng: -76.399897),  Route carried "on" structure: State highway 17C,  Year Built: 1938,  Status: Open,  Structure Length: 0.70m (2.30ft),  Average Daily Traffic: 2,627 (year 2007),  Truck Traffic: 8%,  Average Future Daily Traffic: 3,159 (year 2027),  Design Load: H 20,  Features Intersected: TB SUSQUEHANNA RV
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 15.041,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.2m (36.7ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.0m (19.7ft),  Curb or Sidewalk Widths: Left: 0.3m (1.0ft),  Right: 0.3m (1.0ft),  Curb-To-Curb Width: 19.7m (64.6ft),  Out-to-Out Width: 22.2m (72.8ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 78.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 46.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.70m (2.30ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2007,  Bridge Improvement Cost: $207,000,  Roadway Improvement Cost: $123,000,  Total Project Cost: $330,000 ( Estimate for 2007),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 221896,  Location: 0.5 MI N TIOGA CENTER (Lat: 42.062711,  Lng: -76.350794),  Route carried "on" structure: City street ,  Year Built: 1987,  Status: Open,  Structure Length: 2.52m (8.27ft),  Average Daily Traffic: 481 (year 2002),  Truck Traffic: 6%,  Average Future Daily Traffic: 671 (year 2022),  Design Load: HS 20,  Features Intersected: PIPE CREEK,  Facility Carried by Structure: ALLYN ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.4m (21.0ft),  Material/Design: Steel,  Design/Construction: Truss - Thru,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 25.2m (82.7ft),  Curb-To-Curb Width: 7.2m (23.6ft),  Out-to-Out Width: 7.4m (24.3ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Very good,  Channel: Fair,  Operating Rating: 43.5 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 26.3 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.52m (8.27ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: June 2007,  Critical Feature Inspection Date: June 2007,  Bridge Improvement Cost: $102,000,  Roadway Improvement Cost: $61,000,  Total Project Cost: $163,000 ( Estimate for 2007),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 2219,  Location: 3.2 MI NE OF SMITHBORO (Lat: 42.073458,  Lng: -76.375742),  Route carried "on" structure: City street ,  Year Built: 1940,  Status: Posted for load,  Structure Length: 1.00m (3.28ft),  Average Daily Traffic: 296 (year 2002),  Truck Traffic: 6%,  Average Future Daily Traffic: 351 (year 2022),  Features Intersected: NEIGER HOLLOW CRK,  Facility Carried by Structure: DIAMOND VALLEY RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 6.0m (19.7ft),  Skew: 4 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.5m (27.9ft),  Curb-To-Curb Width: 6.6m (21.7ft),  Out-to-Out Width: 7.4m (24.3ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Poor,  Operating Rating: 39.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 22.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 0.1 - 9.9% below),  Length Of Structure Improvement: 1.00m (3.28ft),  Designated Inspection Frequency: Every 12 months,  Inspection Date: May 2007,  Bridge Improvement Cost: $162,000,  Roadway Improvement Cost: $96,000,  Total Project Cost: $258,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 221901,  Location: 1.8 MI NW OF TIOGA CENTER (Lat: 42.074394,  Lng: -76.370825),  Route carried "on" structure: City street ,  Year Built: 1983,  Status: Open,  Structure Length: 1.79m (5.87ft),  Average Daily Traffic: 365 (year 1998),  Truck Traffic: 6%,  Average Future Daily Traffic: 432 (year 2018),  Design Load: HS 20,  Features Intersected: DIAMOND VALLEY CK,  Facility Carried by Structure: DIAMOND VALLEY RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Skew: 4 degrees,  Material/Design: Wood or Timber,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 17.0m (55.8ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Good,  Operating Rating: 29.0 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 17.2 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.79m (5.87ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2007,  Bridge Improvement Cost: $162,000,  Roadway Improvement Cost: $96,000,  Total Project Cost: $258,000 ( Estimate for 2007),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 221903,  Location: 1 MI SW OF STRAITS CORNRS (Lat: 42.141350,  Lng: -76.395619),  Route carried "on" structure: City street ,  Year Built: 1985,  Year Reconstructed: 2004,  Status: Posted for load,  Structure Length: 0.76m (2.49ft),  Average Daily Traffic: 35 (year 2002),  Truck Traffic: 6%,  Average Future Daily Traffic: 49 (year 2022),  Features Intersected: EVELIEN HILL CRK,  Facility Carried by Structure: EVELIEN HILL ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 4.3m (14.1ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.6m (24.9ft),  Curb-To-Curb Width: 5.0m (16.4ft),  Out-to-Out Width: 5.3m (17.4ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Fair,  Channel: Fair,  Operating Rating: 76.2 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 55.3 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Meets minimum limits,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 10.0 - 19.9% below),  Length Of Structure Improvement: 0.76m (2.49ft),  Designated Inspection Frequency: Every 12 months,  Inspection Date: May 2007,  Bridge Improvement Cost: $87,000,  Roadway Improvement Cost: $52,000,  Total Project Cost: $139,000 ( Estimate for 2007),  Deck Structure Type: Open Grating
Find on map >>

Structure Number: 221907,  Location: 3.0 MI N OF SMITHBORO (Lat: 42.074331,  Lng: -76.400783),  Route carried "on" structure: City street ,  Year Built: 1934,  Status: Open,  Structure Length: 0.73m (2.40ft),  Average Daily Traffic: 79 (year 2002),  Truck Traffic: 6%,  Average Future Daily Traffic: 94 (year 2022),  Features Intersected: ALDER SWAMP CREEK,  Facility Carried by Structure: ROSS HILL ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 5.1m (16.7ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.0m (19.7ft),  Curb-To-Curb Width: 6.0m (19.7ft),  Out-to-Out Width: 6.9m (22.6ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 37.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 22.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 0.73m (2.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2007,  Bridge Improvement Cost: $90,000,  Roadway Improvement Cost: $53,000,  Total Project Cost: $143,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 333496,  Location: 2.6 MI NW OF TIOGA CENTER (Lat: 42.089572,  Lng: -76.365069),  Route carried "on" structure: County highway ,  Year Built: 1959,  Status: Open,  Structure Length: 1.06m (3.48ft),  Average Daily Traffic: 985 (year 2002),  Truck Traffic: 8%,  Average Future Daily Traffic: 1,185 (year 2022),  Design Load: H 20,  Features Intersected: PIPE CREEK,  Facility Carried by Structure: HALSEY VALLEY RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.7m (31.8ft),  Curb or Sidewalk Widths: Left: 0.4m (1.3ft),  Right: 0.4m (1.3ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.9m (29.2ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 49.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.06m (3.48ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2007,  Bridge Improvement Cost: $203,000,  Roadway Improvement Cost: $121,000,  Total Project Cost: $324,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 333497,  Location: 2.9 MI NW OF TIOGA CENTER (Lat: 42.091889,  Lng: -76.366731),  Route carried "on" structure: County highway ,  Year Built: 1959,  Status: Open,  Structure Length: 2.80m (9.19ft),  Average Daily Traffic: 953 (year 2003),  Truck Traffic: 8%,  Average Future Daily Traffic: 1,146 (year 2023),  Design Load: H 20,  Features Intersected: PIPE CREEK,  Facility Carried by Structure: HALSEY VALLEY RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.0m (19.7ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 26.8m (87.9ft),  Curb or Sidewalk Widths: Left: 0.4m (1.3ft),  Right: 0.4m (1.3ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.9m (29.2ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 74.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 44.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.80m (9.19ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2007,  Bridge Improvement Cost: $539,000,  Roadway Improvement Cost: $321,000,  Total Project Cost: $860,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 333504,  Location: 5.8 MI NE OF SMITHBORO (Lat: 42.111717,  Lng: -76.382736),  Route carried "on" structure: County highway ,  Year Built: 1963,  Status: Open,  Structure Length: 3.50m (11.48ft),  Average Daily Traffic: 416 (year 2003),  Truck Traffic: 6%,  Average Future Daily Traffic: 493 (year 2023),  Design Load: H 20,  Features Intersected: PIPE CREEK,  Facility Carried by Structure: STRAITS CORNRS RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 16.7m (54.8ft),  Curb or Sidewalk Widths: Left: 0.4m (1.3ft),  Right: 0.4m (1.3ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.8m (28.9ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Poor,  Channel: Satisfactory,  Operating Rating: 71.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 42.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.50m (11.48ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2007,  Bridge Improvement Cost: $817,000,  Roadway Improvement Cost: $488,000,  Total Project Cost: $1,305,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 333505,  Location: 6.7 MI NE OF SMITHBORO (Lat: 42.124272,  Lng: -76.383531),  Route carried "on" structure: County highway ,  Year Built: 1985,  Status: Open,  Structure Length: 2.10m (6.89ft),  Average Daily Traffic: 549 (year 2003),  Truck Traffic: 6%,  Average Future Daily Traffic: 650 (year 2023),  Design Load: HS 20,  Features Intersected: PIPE CREEK,  Facility Carried by Structure: STRAITS CORNRS RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Skew: 4 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 18.8m (61.7ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.1m (29.9ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 97.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 58.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.10m (6.89ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2007,  Bridge Improvement Cost: $817,000,  Roadway Improvement Cost: $488,000,  Total Project Cost: $1,305,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>

Structure Number: 333506,  Location: IN STRAITS CORNERS (Lat: 42.150025,  Lng: -76.380469),  Route carried "on" structure: County highway ,  Year Built: 1996,  Status: Open,  Structure Length: 0.85m (2.79ft),  Average Daily Traffic: 300 (year 2003),  Truck Traffic: 6%,  Average Future Daily Traffic: 355 (year 2023),  Design Load: HS 25,  Features Intersected: CHAMBERS CREEK,  Facility Carried by Structure: STRAITS CORNERS R
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Wood or Timber,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.2m (26.9ft),  Curb-To-Curb Width: 7.8m (25.6ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 78.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 55.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.85m (2.79ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2006,  Bridge Improvement Cost: $817,000,  Roadway Improvement Cost: $488,000,  Total Project Cost: $1,305,000 ( Estimate for 2007),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 333511,  Location: 2.4 MI W OF OWEGO - CR906 (Lat: 42.096572,  Lng: -76.304833),  Route carried "on" structure: County highway ,  Year Built: 1985,  Status: Open,  Structure Length: 1.00m (3.28ft),  Average Daily Traffic: 1,437 (year 2003),  Truck Traffic: 8%,  Average Future Daily Traffic: 1,728 (year 2023),  Design Load: HS 20,  Features Intersected: THORN HLLOW CREEK,  Facility Carried by Structure: GLEN MARY DRIVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.0m (23.0ft),  Skew: 2 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.5m (14.8ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 64.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 38.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.00m (3.28ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2007,  Bridge Improvement Cost: $205,000,  Roadway Improvement Cost: $122,000,  Total Project Cost: $327,000 ( Estimate for 2007),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 333512,  Location: 1.2 MI SE OF CATATONK (Lat: 42.142733,  Lng: -76.294972),  Route carried "on" structure: County highway ,  Year Built: 1967,  Status: Open,  Structure Length: 5.66m (18.57ft),  Average Daily Traffic: 1,106 (year 2007),  Truck Traffic: 4%,  Average Future Daily Traffic: 1,106 (year 2027),  Design Load: H 20,  Features Intersected: CATATONK CREEK,  Facility Carried by Structure: GLEN MARY DRIVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.0m (19.7ft),  Skew: 2 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 21.0m (68.9ft),  Curb or Sidewalk Widths: Left: 0.4m (1.3ft),  Right: 0.4m (1.3ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.8m (28.9ft)

Condition: Deck: Poor,  Superstructure: Fair,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 47.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 28.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 5.66m (18.57ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2007,  Bridge Improvement Cost: $890,000,  Roadway Improvement Cost: $526,000,  Total Project Cost: $1,416,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 333514,  Location: 1 MILE NW OF OWEGO (Lat: 42.111611,  Lng: -76.278675),  Route carried "on" structure: City street ,  Year Built: 1963,  Year Reconstructed: 2004,  Status: Open,  Structure Length: 10.11m (33.17ft),  Average Daily Traffic: 4,118 (year 2003),  Truck Traffic: 4%,  Average Future Daily Traffic: 4,118 (year 2023),  Design Load: HS 20,  Features Intersected: OWEGO CREEK,  Facility Carried by Structure: TALCOTT STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 24.6m (80.7ft),  Curb-To-Curb Width: 9.0m (29.5ft),  Out-to-Out Width: 10.0m (32.8ft)

Condition: Deck: Excellent,  Superstructure: Good,  Substructure: Very good,  Channel: Satisfactory,  Operating Rating: 63.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 38.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 10.11m (33.17ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2007,  Bridge Improvement Cost: $941,000,  Roadway Improvement Cost: $560,000,  Total Project Cost: $1,501,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>

Structure Number: 333554,  Location: 1.5 MI NW OF TIOGA CENTER (Lat: 42.074542,  Lng: -76.359267),  Route carried "on" structure: City street ,  Year Built: 1972,  Status: Open,  Structure Length: 4.54m (14.90ft),  Average Daily Traffic: 370 (year 2003),  Truck Traffic: 6%,  Average Future Daily Traffic: 438 (year 2023),  Design Load: HS 20,  Features Intersected: PIPE CREEK,  Facility Carried by Structure: DIAMOND VALLEY RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.4m (17.7ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 21.9m (71.9ft),  Curb or Sidewalk Widths: Left: 0.4m (1.3ft),  Right: 0.4m (1.3ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 8.2m (26.9ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Channel: Fair,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 53.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 4.54m (14.90ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2007,  Bridge Improvement Cost: $1,316,000,  Roadway Improvement Cost: $871,000,  Total Project Cost: $2,187,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous

Discuss this city on our hugely popular New York forum

Back to: Tioga, NY, New York, All US cities.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2009 Advameg, Inc.