  • National Bridge Inventory (NBI) Statistics
  • 28Number of bridges
  • 712ft / 217mTotal length
  • $5,462,000Total costs
  • 102,706Total average daily traffic
  • 11,690Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Towanda
  • No street view available for this location

New bridges in Towanda, PA - historical statistics
  • New bridges - historical statistics
  • 11920-1929
  • 11940-1949
  • 21950-1959
  • 31960-1969
  • 131970-1979
  • 21980-1989
  • 41990-1999
  • 22000-2009
Reconstructed bridges in Towanda, PA - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11970-1979
  • 11980-1989
  • 11990-1999
  • 42000-2009
  • 12010-2019
Average Bridge Daily Traffic in Towanda, PA
Average Bridge Truck Traffic in Towanda, PA
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 9.1%Very good
  • 54.5%Good
  • 27.3%Satisfactory
  • 4.5%Fair
  • 4.5%Poor
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 18.2%Very good
  • 36.4%Good
  • 27.3%Satisfactory
  • 13.6%Fair
  • 4.5%Poor
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 40.9%Good
  • 50.0%Satisfactory
  • 9.1%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 26.7%Good
  • 20.0%Satisfactory
  • 33.3%Fair
  • 20.0%Poor
Find on map >>   Show street view

Structure Number: 6045,  Location: 1.5 MILE NORTH OF TOWANDA (Lat: 41.794586,  Lng: -76.462675),  Route carried "on" structure: US 6,  Year Built: 1996,  Status: Open,  Structure Length: 8.72m (28.61ft),  Average Daily Traffic: 7,096 (year 2020),  Truck Traffic: 14%,  Average Future Daily Traffic: 10,996 (year 2032),  Design Load: HS 25 or greater,  Features Intersected: SUGAR CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 39.781,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.5m (41.0ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 43.3m (142.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.3m (43.6ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 87.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 48.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 9.70m (31.82ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: December 2019,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 6047,  Location: TOWANDA RIVER BRIDGE (Lat: 41.761778,  Lng: -76.442592),  Route carried "on" structure: US 6,  Year Built: 1986,  Status: Open,  Structure Length: 54.74m (179.59ft),  Average Daily Traffic: 15,619 (year 2020),  Truck Traffic: 9%,  Average Future Daily Traffic: 22,245 (year 2032),  Design Load: HS 25 or greater,  Features Intersected: RAILROADS,SR & SUSQRIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 44.352,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 12,  Number Of Approach Spans: 2,  Length of Maximum Span: 42.1m (138.1ft),  Curb or Sidewalk Widths: Left: 1.6m (5.2ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 11.0m (36.1ft),  Out-to-Out Width: 13.9m (45.6ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 74.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 44.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: High priority of corrective action,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 54.70m (179.46ft),  Designated Inspection Frequency: Every 48 months,  Underwater Inspection Frequency: Every 48 months,  Inspection Date: July 2020,  Underwater Inspection Date: July 2020,  Bridge Improvement Cost: $222,000,  Roadway Improvement Cost: $654,000,  Total Project Cost: $2,999,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 6049,  Location: 1 MILE EAST OF WYSOX (Lat: 41.778400,  Lng: -76.385817),  Route carried "on" structure: US 6,  Year Built: 1993,  Status: Open,  Structure Length: 2.96m (9.71ft),  Average Daily Traffic: 7,377 (year 2022),  Truck Traffic: 14%,  Average Future Daily Traffic: 10,562 (year 2032),  Design Load: HS 25 or greater,  Features Intersected: WYSOX CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 49.539,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 28.3m (92.8ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 14.5m (47.6ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Inventory Rating: 73.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.70m (12.14ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: August 2019,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 6108,  Location: WYSOX PIN/HANGER BRIDGE (Lat: 41.767786,  Lng: -76.395858),  Route carried "on" structure: State highway 187,  Year Built: 1966,  Year Reconstructed: 1993,  Status: Open,  Structure Length: 30.45m (99.90ft),  Average Daily Traffic: 3,069 (year 2022),  Truck Traffic: 14%,  Average Future Daily Traffic: 5,049 (year 2041),  Design Load: HS 20,  Features Intersected: SUSQUEHANNA RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 33.357,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Steel continuous,  Design/Construction: Girder and Floorbeam System,  Number Of Spans In Main Unit: 9,  Length of Maximum Span: 34.7m (113.8ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 10.2m (33.5ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 59.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 38.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 30.90m (101.38ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 48 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: July 2021,  Critical Feature Inspection Date: July 2021,  Underwater Inspection Date: July 2019,  Other Special Inspection Date: July 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay
Find on map >>   Show street view

Structure Number: 6145,  Location: TOWANDA BORO (Lat: 41.762431,  Lng: -76.452692),  Route carried "on" structure: US 220,  Year Built: 1974,  Year Reconstructed: 2009,  Status: Open,  Structure Length: 4.05m (13.29ft),  Average Daily Traffic: 3,339 (year 2021),  Truck Traffic: 9%,  Average Future Daily Traffic: 2,627 (year 2032),  Design Load: HS 20,  Features Intersected: SR 3018-BRIDGE ST.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 26.562,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.8m (42.0ft),  Skew: 4 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 38.7m (127.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 14.6m (47.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Inventory Rating: 72.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.10m (13.45ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: June 2019,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay
Find on map >>   Show street view

Structure Number: 6147,  Location: 1 MI.W.OF TOWANDA BORO (Lat: 41.768728,  Lng: -76.455222),  Route carried "on" structure: US 220,  Year Built: 1974,  Status: Open,  Structure Length: 5.76m (18.90ft),  Average Daily Traffic: 3,339 (year 2021),  Truck Traffic: 9%,  Average Future Daily Traffic: 2,627 (year 2032),  Design Load: HS 20,  Features Intersected: SR 3020
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 27.311,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 19.8m (65.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 13.5m (44.3ft),  Out-to-Out Width: 14.7m (48.2ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Satisfactory,  Inventory Rating: 41.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.70m (21.98ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay
Find on map >>   Show street view

Structure Number: 6148,  Location: .5 MI.N.OF TOWANDA BORO (Lat: 41.781367,  Lng: -76.458122),  Route carried "on" structure: US 220,  Year Built: 1974,  Status: Open,  Structure Length: 4.69m (15.39ft),  Average Daily Traffic: 3,339 (year 2021),  Truck Traffic: 9%,  Average Future Daily Traffic: 2,627 (year 2032),  Design Load: HS 20,  Features Intersected: SR 2036 RAMP
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 28.569,  Lanes on structure: 4,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 17.1m (56.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 26.5m (86.9ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 22.1m (72.5ft),  Out-to-Out Width: 23.5m (77.1ft)

Condition: Deck: Very good,  Superstructure: Good,  Substructure: Good,  Inventory Rating: 26.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.70m (15.42ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $64,000,  Roadway Improvement Cost: $189,000,  Total Project Cost: $866,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 6149,  Location: .5 MI.N.OF TOWANDA BORO (Lat: 41.784325,  Lng: -76.460086),  Route carried "on" structure: US 220,  Year Built: 1974,  Year Reconstructed: 2000,  Status: Open,  Structure Length: 15.91m (52.20ft),  Average Daily Traffic: 3,341 (year 2022),  Truck Traffic: 16%,  Average Future Daily Traffic: 4,948 (year 2032),  Design Load: HS 20,  Features Intersected: SUGAR CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 29.148,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 14.0m (45.9ft),  Skew: 2 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 43.9m (144.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 14.6m (47.9ft),  Out-to-Out Width: 14.7m (48.2ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Poor,  Operating Rating: 69.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 41.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 15.90m (52.17ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: July 2019,  Bridge Improvement Cost: $3,000,  Roadway Improvement Cost: $45,000,  Total Project Cost: $159,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay
Find on map >>   Show street view

Structure Number: 615,  Location: 1 MI.N.OF TOWANDA BORO (Lat: 41.789675,  Lng: -76.463636),  Route carried "on" structure: US 220,  Year Built: 1974,  Year Reconstructed: 2000,  Status: Open,  Structure Length: 8.78m (28.81ft),  Average Daily Traffic: 3,341 (year 2022),  Truck Traffic: 16%,  Average Future Daily Traffic: 4,948 (year 2032),  Design Load: HS 20,  Features Intersected: TURN BACK= T891
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 29.849,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 29.3m (96.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 14.6m (47.9ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 94.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 28.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 8.80m (28.87ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $44,000,  Roadway Improvement Cost: $131,000,  Total Project Cost: $599,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 6151,  Location: 2.5 MI NO OF TOWANDA BORO (Lat: 41.794928,  Lng: -76.481947),  Route carried "on" structure: US 220,  Year Built: 1974,  Year Reconstructed: 2001,  Status: Open,  Structure Length: 7.96m (26.12ft),  Average Daily Traffic: 9,786 (year 2021),  Truck Traffic: 7%,  Average Future Daily Traffic: 12,603 (year 2032),  Design Load: HS 20,  Features Intersected: US 6
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 31.609,  Lanes on structure: 2,  Lanes under structure: 6,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Skew: 4 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 43.3m (142.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 13.8m (45.3ft),  Out-to-Out Width: 14.6m (47.9ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 85.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 50.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 8.00m (26.25ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay
Find on map >>   Show street view

Structure Number: 6263,  Location: 1 MILE SOUTH OF APEX (Lat: 41.806758,  Lng: -76.397086),  Route carried "on" structure: State highway ,  Year Built: 1920,  Year Reconstructed: 1984,  Status: Open,  Structure Length: 0.82m (2.69ft),  Average Daily Traffic: 169 (year 2017),  Truck Traffic: 16%,  Average Future Daily Traffic: 179 (year 2032),  Features Intersected: POND HILL RUN,  Facility Carried by Structure: SR 1029
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.346,  Lanes on structure: 1,  Owner: State Highway Agency,  Approaching Roadway Width: 5.2m (17.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.1m (20.0ft),  Curb or Sidewalk Widths: Left: 0.1m (0.3ft),  Right: 0.1m (0.3ft),  Curb-To-Curb Width: 5.4m (17.7ft),  Out-to-Out Width: 5.4m (17.7ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 51.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 30.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: High priority of corrective action,  Length Of Structure Improvement: 0.80m (2.62ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $10,000,  Roadway Improvement Cost: $50,000,  Total Project Cost: $138,000,  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 6272,  Location: 1.5 MI.NW OF WYSOX (Lat: 41.780481,  Lng: -76.418428),  Route carried "on" structure: State highway ,  Year Built: 1966,  Status: Open,  Structure Length: 1.19m (3.90ft),  Average Daily Traffic: 2,228 (year 2022),  Truck Traffic: 6%,  Average Future Daily Traffic: 1,172 (year 2032),  Design Load: HS 20,  Features Intersected: LANING CREEK,  Facility Carried by Structure: SR 1033
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.075,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.6m (38.1ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 10.8m (35.4ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 66.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 28.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.20m (3.94ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $7,000,  Roadway Improvement Cost: $50,000,  Total Project Cost: $99,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 6274,  Location: 1.5 MI.SE OF BLACK (Lat: 41.808528,  Lng: -76.416831),  Route carried "on" structure: State highway ,  Year Built: 1966,  Year Reconstructed: 2009,  Status: Open,  Structure Length: 1.16m (3.81ft),  Average Daily Traffic: 208 (year 2018),  Truck Traffic: 5%,  Average Future Daily Traffic: 230 (year 2032),  Design Load: HS 20,  Features Intersected: LANING CREEK,  Facility Carried by Structure: SR 1033
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.580,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.0m (36.1ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 10.4m (34.1ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 60.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.20m (3.94ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $9,000,  Roadway Improvement Cost: $50,000,  Total Project Cost: $120,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Galvanized Reinforcing
Find on map >>   Show street view

Structure Number: 6285,  Location: TOWANDA RIVER BR.JAMES ST (Lat: 41.790939,  Lng: -76.444214),  Route carried "on" structure: State highway ,  Year Built: 1977,  Status: Open,  Structure Length: 49.04m (160.89ft),  Average Daily Traffic: 1,874 (year 2020),  Truck Traffic: 8%,  Average Future Daily Traffic: 4,395 (year 2032),  Design Load: HS 20,  Features Intersected: NS/LEHIGH RR/NO BR SUS R,  Facility Carried by Structure: SR 1041
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.523,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 12.8m (42.0ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 13,  Length of Maximum Span: 42.4m (139.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 14.6m (47.9ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Poor,  Operating Rating: 70.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 42.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present desirable criteria,  Underclear: High priority of corrective action,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 49.80m (163.39ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Underwater Inspection Date: July 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 6387,  Location: 2 MI. S.OF TOWANDA BORO (Lat: 41.742050,  Lng: -76.449114),  Route carried "on" structure: State highway ,  Year Built: 1959,  Status: Open,  Structure Length: 0.64m (2.10ft),  Average Daily Traffic: 5,550 (year 2020),  Truck Traffic: 16%,  Average Future Daily Traffic: 7,924 (year 2032),  Features Intersected: TRIBUTARY TOWANDA CREEK,  Facility Carried by Structure: SR 2027
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.1m (20.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 12.3m (40.4ft),  Out-to-Out Width: 13.3m (43.6ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 54.4 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.60m (1.97ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $8,000,  Roadway Improvement Cost: $50,000,  Total Project Cost: $106,000,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: 6389,  Location: LEISURE DR-1M.E OFTOWANDA (Lat: 41.769000,  Lng: -76.415139),  Route carried "on" structure: State highway ,  Year Built: 1991,  Status: Open,  Structure Length: 2.80m (9.19ft),  Average Daily Traffic: 1,194 (year 2022),  Truck Traffic: 12%,  Average Future Daily Traffic: 1,371 (year 2032),  Design Load: HS 25 or greater,  Features Intersected: NORFOLK SOUTHERN,  Facility Carried by Structure: SR 2032
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 4 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 25.0m (82.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 9.2m (30.2ft),  Out-to-Out Width: 10.2m (33.5ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Inventory Rating: 75.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.80m (9.19ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: August 2019,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: 639,  Location: 1 MI.E.OF TOWANDA BORO (Lat: 41.759972,  Lng: -76.433606),  Route carried "on" structure: State highway ,  Year Built: 1958,  Year Reconstructed: 2010,  Status: Open,  Structure Length: 1.01m (3.31ft),  Average Daily Traffic: 1,775 (year 2021),  Truck Traffic: 33%,  Average Future Daily Traffic: 1,199 (year 2032),  Design Load: HL 93,  Features Intersected: LANING CREEK,  Facility Carried by Structure: SR 2032
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.117,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.8m (32.2ft),  Curb or Sidewalk Widths: Left: 0.1m (0.3ft),  Right: 0.1m (0.3ft),  Curb-To-Curb Width: 9.2m (30.2ft),  Out-to-Out Width: 10.4m (34.1ft)

Condition: Deck: Satisfactory,  Superstructure: Very good,  Substructure: Fair,  Channel: Fair,  Operating Rating: 59.9 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 46.3 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.00m (3.28ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $6,000,  Roadway Improvement Cost: $50,000,  Total Project Cost: $80,000,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 6425,  Location: BRIDGE ST, TOWANDA BORO (Lat: 41.765400,  Lng: -76.442256),  Route carried "on" structure: State highway ,  Year Built: 1940,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 1,132 (year 2021),  Truck Traffic: 4%,  Average Future Daily Traffic: 820 (year 2032),  Features Intersected: MONRTNSHIPPERSLIFELINERR,  Facility Carried by Structure: SR 3018
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.756,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Material/Design: Concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.8m (32.2ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 10.4m (34.1ft),  Out-to-Out Width: 14.6m (47.9ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Satisfactory,  Operating Rating: 54.4 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.00m (3.28ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $21,000,  Roadway Improvement Cost: $63,000,  Total Project Cost: $288,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 6643,  Location: 4.4 MI. EAST OF ULSTER (Lat: 41.834131,  Lng: -76.418472),  Route carried "on" structure: City street ,  Year Built: 1977,  Status: Posted for load,  Structure Length: 1.07m (3.51ft),  Average Daily Traffic: 50 (year 2021),  Truck Traffic: 6%,  Average Future Daily Traffic: 77 (year 2043),  Design Load: HS 20,  Features Intersected: LANING CREEK,  Facility Carried by Structure: T-720 (BR # 4)
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 5.8m (19.0ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.1m (33.1ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 7.8m (25.6ft)

Condition: Deck: Poor,  Superstructure: Poor,  Substructure: Good,  Channel: Fair,  Operating Rating: 47.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 27.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.10m (3.61ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: June 2021,  Other Special Inspection Date: June 2021,  Bridge Improvement Cost: $1,000,  Roadway Improvement Cost: $5,000,  Total Project Cost: $8,000 ( Estimate for 2022),  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 40173,  Location: 1 MILE WEST OF WYSOX (Lat: 41.769550,  Lng: -76.422081),  Route carried "on" structure: US 6,  Year Built: 1998,  Status: Open,  Structure Length: 2.50m (8.20ft),  Average Daily Traffic: 13,879 (year 2020),  Truck Traffic: 13%,  Average Future Daily Traffic: 16,545 (year 2032),  Features Intersected: LITTLE WYSOX CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 46.347,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.3m (37.1ft),  Skew: 4 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 24.4m (80.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 14.7m (48.2ft),  Out-to-Out Width: 17.5m (57.4ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Good,  Inventory Rating: 46.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.50m (8.20ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: August 2019,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 42951,  Location: .5 MILE EAST OF AIRPORT (Lat: 41.739428,  Lng: -76.434325),  Route carried "on" structure: State highway ,  Year Built: 2005,  Status: Open,  Structure Length: 7.92m (25.98ft),  Average Daily Traffic: 1,334 (year 2022),  Truck Traffic: 6%,  Average Future Daily Traffic: 1,039 (year 2032),  Design Load: HL 93,  Features Intersected: TOWANDA CREEK,  Facility Carried by Structure: SR 2024
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.271,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 11.3m (37.1ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 38.7m (127.0ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 10.8m (35.4ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Poor,  Operating Rating: 74.4 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 58.1 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 7.90m (25.92ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: June 2019,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 44237,  Location: 2.6 Mi W.OF NORTH TOWANDA (Lat: 41.781100,  Lng: -76.502575),  Route carried "on" structure: County highway ,  Year Built: 2007,  Status: Open,  Structure Length: 3.78m (12.40ft),  Average Daily Traffic: 46 (year 2021),  Average Future Daily Traffic: 71 (year 2043),  Design Load: HL 93,  Features Intersected: SUGAR CREEK,  Facility Carried by Structure: T-544 CTY BR # 32
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 37.5m (123.0ft),  Curb-To-Curb Width: 4.8m (15.7ft),  Out-to-Out Width: 5.8m (19.0ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Good,  Channel: Good,  Operating Rating: 98.9 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 42.6 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 6047,  Location: TOWANDA RIVER BRIDGE (Lat: 41.761778,  Lng: -76.442592),  Route carried "under" structure: ServiceCity street ,  Year Built: 1986,  Structure Length: 0. m,  Average Daily Traffic: 3,413 (year 2007),  Truck Traffic: 5%,  Features Intersected: RAILROADS,SR & SUSQRIVER,  Facility Carried by Structure: US 6
Minimum Vertical Clearance: 6.16m (20.21ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 42.1m (138.1ft)

Find on map >>   Show street view

Structure Number: 6145,  Location: TOWANDA BORO (Lat: 41.762431,  Lng: -76.452692),  Route carried "under" structure: State highway ,  Year Built: 1974,  Structure Length: 0. m,  Average Daily Traffic: 613 (year 2022),  Truck Traffic: 5%,  Features Intersected: SR 3018-BRIDGE ST.,  Facility Carried by Structure: SR 220
Minimum Vertical Clearance: 5.69m (18.67ft),  Kilometerpoint: 5.406,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 38.7m (127.0ft)

Find on map >>   Show street view

Structure Number: 6147,  Location: 1 MI.W.OF TOWANDA BORO (Lat: 41.768728,  Lng: -76.455222),  Route carried "under" structure: State highway ,  Year Built: 1974,  Structure Length: 0. m,  Average Daily Traffic: 487 (year 2020),  Truck Traffic: 4%,  Features Intersected: SR 3020,  Facility Carried by Structure: SR 0220
Minimum Vertical Clearance: 9.04m (29.66ft),  Kilometerpoint: 9.125,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 19.8m (65.0ft)

Find on map >>   Show street view

Structure Number: 6148,  Location: .5 MI.N.OF TOWANDA BORO (Lat: 41.781367,  Lng: -76.458122),  Route carried "under" structure: Spur State highway ,  Year Built: 1974,  Structure Length: 0. m,  Average Daily Traffic: 2,012 (year 2020),  Truck Traffic: 5%,  Features Intersected: SR 2036 RAMP,  Facility Carried by Structure: SR 0220
Minimum Vertical Clearance: 4.49m (14.73ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 26.5m (86.9ft)

Find on map >>   Show street view

Structure Number: 6151,  Location: 2.5 MI NO OF TOWANDA BORO (Lat: 41.794928,  Lng: -76.481947),  Route carried "under" structure: US 6,  Year Built: 1974,  Structure Length: 0. m,  Average Daily Traffic: 3,548 (year 2020),  Truck Traffic: 14%,  Features Intersected: US 6,  Facility Carried by Structure: US 220
Minimum Vertical Clearance: 5.08m (16.67ft),  Kilometerpoint: 38.563,  Lanes on structure: 2,  Lanes under structure: 3,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 43.3m (142.1ft)

Find on map >>   Show street view

Structure Number: 6151,  Location: 2.5 MI NO OF TOWANDA BORO (Lat: 41.794928,  Lng: -76.481947),  Route carried "under" structure: US 6,  Year Built: 1974,  Structure Length: 0. m,  Average Daily Traffic: 3,548 (year 2020),  Truck Traffic: 14%,  Features Intersected: US 6,  Facility Carried by Structure: US 220
Minimum Vertical Clearance: 4.34m (14.24ft),  Kilometerpoint: 38.545,  Lanes on structure: 2,  Lanes under structure: 3,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 43.3m (142.1ft)