National Bridge Inventory (NBI) Statistics
Number of bridges: 23
Total length: 96 meters (315ft)
Total costs: $4,210,000
Total average daily traffic: 109,452
Total average daily truck traffic: 18,977
National Bridge Inventory (NBI) Registered Bridges for Tremonton

New bridges - Historical Statistics

  • 1950-1959: 1
  • 1960-1969: 1
  • 1970-1979: 8
  • 1980-1989: 3
  • 1990-1999: 8
  • 2000-2010: 2

Average Daily Traffic

Average Truck Traffic (%)

Bridge Condition - Deck

Bridge Condition - Superstructure

Bridge Condition - Substructure

Bridge Condition - Channel

Bridge Condition - Culverts

Find on map >>

Structure Number: 3008D,  Location: NW SIDE OF TREMONTON (Lat: 41.725417,  Lng: -112.201417),  Route carried "on" structure: City street ,  Year Built: 1950,  Status: Posted for load,  Structure Length: 0.79m (2.59ft),  Average Daily Traffic: 756 (year 2010),  Truck Traffic: 1%,  Average Future Daily Traffic: 919 (year 2030),  Features Intersected: HIGHLINE CANAL,  Facility Carried by Structure: CITY RD-TREMONTON
Minimum Vertical Clearance: 30.18m (99.02ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.0m (23.0ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 9.8m (32.2ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 27.0 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 22.5 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 10.0 - 19.9% below),  Length Of Structure Improvement: 1.40m (4.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2009,  Bridge Improvement Cost: $97,000,  Roadway Improvement Cost: $10,000,  Total Project Cost: $161,000 ( Estimate for 2003),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 3009V,  Location: NW SIDE OF TREMONTON (Lat: 41.723389,  Lng: -112.200750),  Route carried "on" structure: City street ,  Year Built: 1980,  Status: Open,  Structure Length: 0.67m (2.20ft),  Average Daily Traffic: 164 (year 2010),  Average Future Daily Traffic: 199 (year 2030),  Design Load: HS 20,  Features Intersected: WEST CANAL,  Facility Carried by Structure: CITY RD-TREMONTON
Minimum Vertical Clearance: 30.18m (99.02ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 32.4 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2009
Find on map >>

Structure Number: 3042F,  Location: SOUTH SIDE OF TREMONTON (Lat: 41.697361,  Lng: -112.161833),  Route carried "on" structure: City street ,  Year Built: 1965,  Status: Open,  Structure Length: 1.58m (5.18ft),  Average Daily Traffic: 403 (year 2010),  Truck Traffic: 1%,  Average Future Daily Traffic: 490 (year 2030),  Features Intersected: MALAD RIVER,  Facility Carried by Structure: CITY STREET
Minimum Vertical Clearance: 30.18m (99.02ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 14.9m (48.9ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 8.6m (28.2ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Fair,  Channel: Good,  Operating Rating: 32.4 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2009,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 3045E,  Location: NW.SIDE OF TREMONTON (Lat: 41.725500,  Lng: -112.195556),  Route carried "on" structure: City street ,  Year Built: 1988,  Status: Open,  Structure Length: 1.16m (3.81ft),  Average Daily Traffic: 693 (year 2010),  Truck Traffic: 1%,  Average Future Daily Traffic: 842 (year 2030),  Design Load: HS 20,  Features Intersected: WEST CANAL,  Facility Carried by Structure: TREMONTON CITY RD.
Minimum Vertical Clearance: 30.18m (99.02ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.1m (33.1ft)

Condition: Channel: Very good,  Culverts: Very good,  Operating Rating: 32.4 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present desirable criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2009
Find on map >>

Structure Number: 3054E,  Location: 2000 West 990 North (Lat: 41.725000,  Lng: -112.196111),  Route carried "on" structure: Alternate City street ,  Year Built: 2006,  Status: Open,  Structure Length: 0.67m (2.20ft),  Average Daily Traffic: 756 (year 2010),  Truck Traffic: 1%,  Average Future Daily Traffic: 945 (year 2030),  Design Load: HS 20,  Features Intersected: West Canal,  Facility Carried by Structure: 2000 WEST
Minimum Vertical Clearance: 30.18m (99.02ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Skew: 2 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.1m (20.0ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 24.7m (81.0ft)

Condition: Channel: Excellent,  Culverts: Excellent,  Operating Rating: 32.4 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2009
Find on map >>

Structure Number: E2541,  Location: At Haws Corner (Lat: 41.712222,  Lng: -112.142778),  Route carried "on" structure: State highway 102,  Year Built: 2005,  Status: Open,  Structure Length: 3.38m (11.09ft),  Average Daily Traffic: 7,805 (year 2010),  Truck Traffic: 4%,  Average Future Daily Traffic: 9,483 (year 2030),  Design Load: HS 20+Mod,  Features Intersected: CORRINE CANAL
Minimum Vertical Clearance: 30.18m (99.02ft),  Kilometerpoint: 28.117,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 21.3m (69.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.1m (20.0ft),  Curb-To-Curb Width: 21.3m (69.9ft),  Out-to-Out Width: 21.4m (70.2ft)

Condition: Channel: Very good,  Culverts: Very good,  Operating Rating: 40.5 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 40.5 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2009
Find on map >>

Structure Number: F 545,  Location: EAST SIDE OF TREMONTON (Lat: 41.711861,  Lng: -112.161056),  Route carried "on" structure: State highway 102,  Year Built: 1988,  Status: Open,  Structure Length: 2.04m (6.69ft),  Average Daily Traffic: 8,145 (year 2010),  Truck Traffic: 4%,  Average Future Daily Traffic: 10,362 (year 2030),  Design Load: HS 20,  Features Intersected: MALAD RIVER
Minimum Vertical Clearance: 30.18m (99.02ft),  Kilometerpoint: 26.613,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 18.3m (60.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 18.9m (62.0ft),  Curb or Sidewalk Widths: Left: 1.4m (4.6ft),  Right: 1.4m (4.6ft),  Curb-To-Curb Width: 20.4m (66.9ft),  Out-to-Out Width: 23.3m (76.4ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Good,  Operating Rating: 32.4 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2009,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>

Structure Number: 1F 184,  Location: SOUTH TREMONTON (Lat: 41.699000,  Lng: -112.180611),  Route carried "on" structure: Interstate 15,  Year Built: 1972,  Status: Open,  Structure Length: 3.87m (12.70ft),  Average Daily Traffic: 8,115 (year 2010),  Truck Traffic: 24%,  Average Future Daily Traffic: 18,441 (year 2030),  Design Load: HS 20,  Features Intersected: CO.RD.(IOWA STRING RD)
Minimum Vertical Clearance: 30.18m (99.02ft),  Kilometerpoint: 609.829,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 13 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 18.6m (61.0ft),  Curb-To-Curb Width: 12.3m (40.4ft),  Out-to-Out Width: 13.5m (44.3ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 32.4 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2009,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 1F 316,  Location: SOUTH TREMONTON (Lat: 41.694194,  Lng: -112.170500),  Route carried "on" structure: Interstate 15,  Year Built: 1972,  Status: Open,  Structure Length: 5.18m (16.99ft),  Average Daily Traffic: 8,115 (year 2010),  Truck Traffic: 24%,  Average Future Daily Traffic: 18,441 (year 2030),  Design Load: HS 20,  Features Intersected: COUNTY ROAD & UPRR
Minimum Vertical Clearance: 30.18m (99.02ft),  Kilometerpoint: 608.913,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 12 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 26.2m (86.0ft),  Curb-To-Curb Width: 12.3m (40.4ft),  Out-to-Out Width: 13.5m (44.3ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 32.4 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.20m (20.34ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2009,  Bridge Improvement Cost: $565,000,  Roadway Improvement Cost: $57,000,  Total Project Cost: $933,000 ( Estimate for 2010),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>

Structure Number: 1F 514,  Location: WEST OF TREMONTON (Lat: 41.710861,  Lng: -112.192192),  Route carried "on" structure: Interstate 15,  Year Built: 1990,  Status: Open,  Structure Length: 4.18m (13.71ft),  Average Daily Traffic: 7,920 (year 2010),  Truck Traffic: 24%,  Average Future Daily Traffic: 18,441 (year 2030),  Design Load: HS 20,  Features Intersected: SR-102
Minimum Vertical Clearance: 30.18m (99.02ft),  Kilometerpoint: 611.601,  Lanes on structure: 3,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 15.9m (52.2ft),  Skew: 10 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 40.8m (133.9ft),  Curb-To-Curb Width: 16.1m (52.8ft),  Out-to-Out Width: 17.2m (56.4ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 32.4 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 5.20m (17.06ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2009,  Bridge Improvement Cost: $591,000,  Roadway Improvement Cost: $59,000,  Total Project Cost: $975,000 ( Estimate for 2010),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>

Structure Number: 1F 517,  Location: I-15,I-84 INT.@ TREMONTON (Lat: 41.704625,  Lng: -112.192928),  Route carried "on" structure: Ramp Interstate 15,  Year Built: 1990,  Status: Open,  Structure Length: 8.44m (27.69ft),  Average Daily Traffic: 1,890 (year 2010),  Truck Traffic: 24%,  Average Future Daily Traffic: 2,296 (year 2030),  Design Load: HS 20,  Features Intersected: I-84 (SR-84)
Minimum Vertical Clearance: 30.18m (99.02ft),  Kilometerpoint: 609.872,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 13 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 41.5m (136.2ft),  Curb-To-Curb Width: 8.2m (26.9ft),  Out-to-Out Width: 9.1m (29.9ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Operating Rating: 32.4 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: High priority of corrective action,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 9.40m (30.84ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2009,  Bridge Improvement Cost: $859,000,  Roadway Improvement Cost: $86,000,  Total Project Cost: $1,418,000 ( Estimate for 2010),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>

Structure Number: 2F 184,  Location: SOUTH TREMONTON (Lat: 41.699389,  Lng: -112.180500),  Route carried "on" structure: Interstate 84,  Year Built: 1972,  Status: Open,  Structure Length: 3.87m (12.70ft),  Average Daily Traffic: 4,770 (year 2010),  Truck Traffic: 22%,  Average Future Daily Traffic: 5,796 (year 2030),  Design Load: HS 20,  Features Intersected: CO.RD.(IOWA STRING RD)
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 67.481,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 13 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 18.6m (61.0ft),  Curb-To-Curb Width: 12.3m (40.4ft),  Out-to-Out Width: 13.5m (44.3ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 32.4 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.80m (15.75ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2009,  Bridge Improvement Cost: $438,000,  Roadway Improvement Cost: $44,000,  Total Project Cost: $723,000 ( Estimate for 2020),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 3F 316,  Location: SOUTH TREMONTON (Lat: 41.693936,  Lng: -112.170761),  Route carried "on" structure: Interstate 15,  Year Built: 1972,  Year Reconstructed: 1990,  Status: Open,  Structure Length: 5.18m (16.99ft),  Average Daily Traffic: 8,115 (year 2010),  Truck Traffic: 26%,  Average Future Daily Traffic: 18,441 (year 2030),  Design Load: HS 20,  Features Intersected: COUNTY ROAD & UPRR
Minimum Vertical Clearance: 30.18m (99.02ft),  Kilometerpoint: 608.831,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.8m (42.0ft),  Skew: 12 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 26.2m (86.0ft),  Curb-To-Curb Width: 13.7m (44.9ft),  Out-to-Out Width: 15.9m (52.2ft)

Condition: Deck: Very good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 32.4 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2009,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay
Find on map >>

Structure Number: 3F 514,  Location: WEST OF TREMONTON (Lat: 41.711361,  Lng: -112.192747),  Route carried "on" structure: Interstate 15,  Year Built: 1990,  Status: Open,  Structure Length: 4.18m (13.71ft),  Average Daily Traffic: 7,920 (year 2010),  Truck Traffic: 26%,  Average Future Daily Traffic: 18,441 (year 2030),  Design Load: H 20,  Features Intersected: SR-102
Minimum Vertical Clearance: 30.18m (99.02ft),  Kilometerpoint: 611.657,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 40.8m (133.9ft),  Curb-To-Curb Width: 12.4m (40.7ft),  Out-to-Out Width: 13.5m (44.3ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 32.4 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2009,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>

Structure Number: 3F 517,  Location: I-15, I-84 INT.-TREMONTON (Lat: 41.704392,  Lng: -112.192603),  Route carried "on" structure: Interstate 15,  Year Built: 1990,  Status: Open,  Structure Length: 8.44m (27.69ft),  Average Daily Traffic: 8,115 (year 2010),  Truck Traffic: 26%,  Average Future Daily Traffic: 18,441 (year 2030),  Design Load: HS 20,  Features Intersected: I-84 (SR-84)
Minimum Vertical Clearance: 30.18m (99.02ft),  Kilometerpoint: 609.846,  Lanes on structure: 2,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 13 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 41.5m (136.2ft),  Curb-To-Curb Width: 12.8m (42.0ft),  Out-to-Out Width: 13.5m (44.3ft)

Condition: Deck: Very good,  Superstructure: Good,  Substructure: Very good,  Operating Rating: 32.4 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present desirable criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2009,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>

Structure Number: 1F 184,  Location: SOUTH TREMONTON (Lat: 41.699000,  Lng: -112.180611),  Route carried "under" structure: County highway ,  Year Built: 1972,  Structure Length: 3.87m (12.70ft),  Average Daily Traffic: 1,275 (year 2010),  Truck Traffic: 10%,  Features Intersected: CO.RD.(IOWA STRING RD),  Facility Carried by Structure: I-15 (SR-15) NBL
Minimum Vertical Clearance: 4.88m (16.01ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 18.6m (61.0ft)

Find on map >>

Structure Number: 1F 316,  Location: SOUTH TREMONTON (Lat: 41.694194,  Lng: -112.170500),  Route carried "under" structure: County highway ,  Year Built: 1972,  Structure Length: 5.18m (16.99ft),  Average Daily Traffic: 850 (year 2010),  Truck Traffic: 10%,  Features Intersected: COUNTY ROAD & UPRR,  Facility Carried by Structure: I-15 (SR-15) NBL
Minimum Vertical Clearance: 7.34m (24.08ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 26.2m (86.0ft)

Find on map >>

Structure Number: 1F 514,  Location: WEST OF TREMONTON (Lat: 41.710861,  Lng: -112.192192),  Route carried "under" structure: State highway 102,  Year Built: 1990,  Structure Length: 4.18m (13.71ft),  Average Daily Traffic: 8,140 (year 2010),  Truck Traffic: 5%,  Features Intersected: SR-102,  Facility Carried by Structure: I-15 (SR-15) NBL
Minimum Vertical Clearance: 4.97m (16.31ft),  Kilometerpoint: 24.006,  Lanes on structure: 3,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 40.8m (133.9ft)

Find on map >>

Structure Number: 1F 517,  Location: I-15,I-84 INT.@ TREMONTON (Lat: 41.704625,  Lng: -112.192928),  Route carried "under" structure: Interstate 84,  Year Built: 1990,  Structure Length: 8.44m (27.69ft),  Average Daily Traffic: 4,770 (year 2010),  Truck Traffic: 23%,  Features Intersected: I-84 (SR-84)
Minimum Vertical Clearance: 5.03m (16.50ft),  Kilometerpoint: 67.079,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 41.5m (136.2ft)

Find on map >>

Structure Number: 2F 184,  Location: SOUTH TREMONTON (Lat: 41.699389,  Lng: -112.180500),  Route carried "under" structure: County highway ,  Year Built: 1972,  Structure Length: 3.87m (12.70ft),  Average Daily Traffic: 1,275 (year 2010),  Truck Traffic: 10%,  Features Intersected: CO.RD.(IOWA STRING RD),  Facility Carried by Structure: I-84 (SR-84) EBL
Minimum Vertical Clearance: 4.98m (16.34ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 18.6m (61.0ft)

Find on map >>

Structure Number: 3F 316,  Location: SOUTH TREMONTON (Lat: 41.693936,  Lng: -112.170761),  Route carried "under" structure: County highway ,  Year Built: 1972,  Structure Length: 5.18m (16.99ft),  Average Daily Traffic: 850 (year 2010),  Truck Traffic: 10%,  Features Intersected: COUNTY ROAD & UPRR,  Facility Carried by Structure: I-15 (SR-15) SBL
Minimum Vertical Clearance: 7.53m (24.70ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 26.2m (86.0ft)

Find on map >>

Structure Number: 3F 514,  Location: WEST OF TREMONTON (Lat: 41.711361,  Lng: -112.192747),  Route carried "under" structure: State highway 102,  Year Built: 1990,  Structure Length: 4.18m (13.71ft),  Average Daily Traffic: 8,140 (year 2010),  Truck Traffic: 5%,  Features Intersected: SR-102,  Facility Carried by Structure: I-15 (SR-15) SBL
Minimum Vertical Clearance: 0.50m (1.64ft),  Kilometerpoint: 23.974,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 40.8m (133.9ft)

Find on map >>

Structure Number: 3F 517,  Location: I-15, I-84 INT.-TREMONTON (Lat: 41.704392,  Lng: -112.192603),  Route carried "under" structure: Interstate 84,  Year Built: 1990,  Structure Length: 8.44m (27.69ft),  Average Daily Traffic: 10,470 (year 2010),  Truck Traffic: 23%,  Features Intersected: I-84 (SR-84),  Facility Carried by Structure: I-15 (SR-15) SBL
Minimum Vertical Clearance: 5.08m (16.67ft),  Kilometerpoint: 67.047,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 41.5m (136.2ft)

Jump to a detailed profile or search site with Google Custom Search
Business Search - 14 Million verified businesses
Search for: near: 

Discuss this city on our hugely popular Utah forum

Back to: Tremonton, UT, Utah, All US cities.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2009 Advameg, Inc.