![]() |
Bridge Statistics for Triangle, New York (NY) - Condition, Traffic, Stress, Structural Evaluation, Project CostsBack to: Triangle, NY, New York, New York forum, All US cities. National Bridge Inventory (NBI) Statistics Number of bridges: 13 Total length: 54 meters (177ft) Total costs: $20,936,000 Total average daily traffic: 72,466 Total average daily truck traffic: 12,388 National Bridge Inventory (NBI) Registered Bridges for Triangle
Bridge Condition - Deck Bridge Condition - Superstructure Bridge Condition - Substructure Bridge Condition - Channel Find on map >>
Structure Number: 1008331, Location: 1.3 MI N JCT RTS I-81+26 (Lat: 42.338478, Lng: -75.978517), Route carried "on" structure: Interstate 81, Year Built: 1969, Status: Open, Structure Length: 4.41m (14.47ft), Average Daily Traffic: 10,811 (year 2007), Truck Traffic: 24%, Average Future Daily Traffic: 17,583 (year 2027), Design Load: HS 20+Mod, Features Intersected: RTE 11 Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 29.263, Lanes on structure: 2, Lanes under structure: 2, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 11.5m (37.7ft), Skew: 2 degrees, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 3, Length of Maximum Span: 16.1m (52.8ft), Curb or Sidewalk Widths: Left: 0.4m (1.3ft), Right: 0.4m (1.3ft), Curb-To-Curb Width: 11.1m (36.4ft), Out-to-Out Width: 12.7m (41.7ft) Condition: Deck: Satisfactory, Superstructure: Satisfactory, Substructure: Satisfactory, Operating Rating: 72.6 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 43.5 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Somewhat better than minimum adequacy, Underclear: Meets minimum limits, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 4.41m (14.47ft), Designated Inspection Frequency: Every 24 months, Inspection Date: March 2008, Bridge Improvement Cost: $2,939,000, Roadway Improvement Cost: $1,705,000, Total Project Cost: $4,644,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete Find on map >>
Structure Number: 1008332, Location: 1.3 MI N JCT RTS I-81+26 (Lat: 42.338372, Lng: -75.978286), Route carried "on" structure: Interstate 81, Year Built: 1969, Status: Open, Structure Length: 4.35m (14.27ft), Average Daily Traffic: 10,811 (year 2007), Truck Traffic: 24%, Average Future Daily Traffic: 17,583 (year 2027), Design Load: HS 20+Mod, Features Intersected: RTE 11 Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 29.263, Lanes on structure: 2, Lanes under structure: 2, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 11.5m (37.7ft), Skew: 2 degrees, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 3, Length of Maximum Span: 16.1m (52.8ft), Curb or Sidewalk Widths: Left: 0.4m (1.3ft), Right: 0.4m (1.3ft), Curb-To-Curb Width: 11.1m (36.4ft), Out-to-Out Width: 12.7m (41.7ft) Condition: Deck: Satisfactory, Superstructure: Satisfactory, Substructure: Satisfactory, Operating Rating: 72.6 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 43.5 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Somewhat better than minimum adequacy, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 4.35m (14.27ft), Designated Inspection Frequency: Every 24 months, Inspection Date: November 2007, Bridge Improvement Cost: $2,939,000, Roadway Improvement Cost: $1,705,000, Total Project Cost: $4,644,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete Find on map >>
Structure Number: 101861, Location: 1.7 MI N JCT RTS 26 + 206 (Lat: 42.352147, Lng: -75.967706), Route carried "on" structure: State highway 26, Year Built: 1942, Status: Open, Structure Length: 1.58m (5.18ft), Average Daily Traffic: 3,121 (year 2005), Truck Traffic: 8%, Average Future Daily Traffic: 3,753 (year 2025), Features Intersected: PAGE BROOK Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 48.423, Lanes on structure: 2, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 11.2m (36.7ft), Material/Design: Concrete, Design/Construction: Arch - Deck, Number Of Spans In Main Unit: 1, Length of Maximum Span: 14.0m (45.9ft), Curb-To-Curb Width: 11.5m (37.7ft), Out-to-Out Width: 14.9m (48.9ft) Condition: Superstructure: Satisfactory, Substructure: Fair, Channel: Very good, Operating Rating: 57.7 metric tons, Inventory Rating: 23.8 metric tons, Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: Somewhat better than minimum adequacy, Waterway Adequacy: Equal to present minimum criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 1.58m (5.18ft), Designated Inspection Frequency: Every 24 months, Inspection Date: November 2007, Bridge Improvement Cost: $510,000, Roadway Improvement Cost: $303,000, Total Project Cost: $813,000 ( Estimate for 2007), Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 1031271, Location: JCT I-81 + TIOUGHNIOGA R (Lat: 42.336128, Lng: -75.978692), Route carried "on" structure: Interstate 81, Year Built: 1969, Status: Open, Structure Length: 11.09m (36.38ft), Average Daily Traffic: 8,977 (year 2006), Truck Traffic: 24%, Average Future Daily Traffic: 14,600 (year 2026), Design Load: HS 20+Mod, Features Intersected: TIOUGHNIOGA RIVER Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 27.459, Lanes on structure: 2, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 11.5m (37.7ft), Skew: 4 degrees, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 3, Length of Maximum Span: 35.9m (117.8ft), Curb or Sidewalk Widths: Left: 0.4m (1.3ft), Right: 0.4m (1.3ft), Curb-To-Curb Width: 8.5m (27.9ft), Out-to-Out Width: 10.1m (33.1ft) Condition: Deck: Satisfactory, Superstructure: Very good, Substructure: Good, Channel: Very good, Operating Rating: 54.4 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 32.7 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Better than present minimum criteria, Deck Geometry: High priority of corrective action, Waterway Adequacy: Equal to present minimum criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 11.09m (36.38ft), Designated Inspection Frequency: Every 24 months, Inspection Date: October 2006, Bridge Improvement Cost: $1,285,000, Roadway Improvement Cost: $764,000, Total Project Cost: $2,049,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 1031272, Location: JCT I-81 + TIOUGHNIOGA R (Lat: 42.336061, Lng: -75.978497), Route carried "on" structure: Interstate 81, Year Built: 1969, Status: Open, Structure Length: 11.09m (36.38ft), Average Daily Traffic: 8,977 (year 2006), Truck Traffic: 24%, Average Future Daily Traffic: 14,600 (year 2026), Design Load: HS 20+Mod, Features Intersected: TIOUGHNIOGA RIVER Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 27.459, Lanes on structure: 2, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 11.5m (37.7ft), Skew: 4 degrees, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 3, Length of Maximum Span: 35.9m (117.8ft), Curb or Sidewalk Widths: Left: 0.4m (1.3ft), Right: 0.4m (1.3ft), Curb-To-Curb Width: 8.5m (27.9ft), Out-to-Out Width: 10.1m (33.1ft) Condition: Deck: Good, Superstructure: Good, Substructure: Satisfactory, Channel: Very good, Operating Rating: 54.4 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 32.7 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: High priority of corrective action, Waterway Adequacy: Equal to present minimum criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 11.09m (36.38ft), Designated Inspection Frequency: Every 24 months, Inspection Date: October 2006, Bridge Improvement Cost: $1,285,000, Roadway Improvement Cost: $764,000, Total Project Cost: $2,049,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 104035, Location: 4.4 MI E JCT SH 206 & SH (Lat: 42.338450, Lng: -75.888147), Route carried "on" structure: State highway 206, Year Built: 1996, Status: Open, Structure Length: 2.83m (9.28ft), Average Daily Traffic: 2,396 (year 2007), Truck Traffic: 9%, Average Future Daily Traffic: 3,272 (year 2027), Design Load: HS 25, Features Intersected: TICKNOR BROOK Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 7.548, Lanes on structure: 2, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 10.9m (35.8ft), Skew: 4 degrees, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 1, Length of Maximum Span: 27.4m (89.9ft), Curb-To-Curb Width: 10.9m (35.8ft), Out-to-Out Width: 11.5m (37.7ft) Condition: Deck: Very good, Superstructure: Excellent, Substructure: Very good, Channel: Good, Operating Rating: 74.4 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 44.5 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present desirable criteria, Deck Geometry: Somewhat better than minimum adequacy, Waterway Adequacy: Somewhat better than minimum adequacy, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 2.83m (9.28ft), Designated Inspection Frequency: Every 24 months, Inspection Date: August 2006, Bridge Improvement Cost: $1,285,000, Roadway Improvement Cost: $764,000, Total Project Cost: $2,049,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete, Deck Protection: Epoxy Coated Reinforcing Find on map >>
Structure Number: 104036, Location: 4.7 MI E JCT RTS 206+26 (Lat: 42.339467, Lng: -75.882700), Route carried "on" structure: State highway 206, Year Built: 1936, Status: Open, Structure Length: 1.58m (5.18ft), Average Daily Traffic: 2,396 (year 2007), Truck Traffic: 9%, Average Future Daily Traffic: 3,272 (year 2027), Design Load: H 20, Features Intersected: HALFWAY BROOK Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 7.554, Lanes on structure: 2, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 10.0m (32.8ft), Skew: 2 degrees, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 1, Length of Maximum Span: 13.7m (44.9ft), Curb or Sidewalk Widths: Left: 1.5m (4.9ft), Right: 1.5m (4.9ft), Curb-To-Curb Width: 10.9m (35.8ft), Out-to-Out Width: 11.5m (37.7ft) Condition: Deck: Very good, Superstructure: Very good, Substructure: Good, Channel: Good, Operating Rating: 68.9 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 40.8 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Better than present minimum criteria, Deck Geometry: Somewhat better than minimum adequacy, Waterway Adequacy: Somewhat better than minimum adequacy, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 1.58m (5.18ft), Designated Inspection Frequency: Every 24 months, Inspection Date: May 2007, Bridge Improvement Cost: $1,285,000, Roadway Improvement Cost: $764,000, Total Project Cost: $2,049,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete, Deck Protection: Epoxy Coated Reinforcing Find on map >>
Structure Number: 334968, Location: 0.1 MI WEST OF LISLE (Lat: 42.396689, Lng: -75.959856), Route carried "on" structure: County highway , Year Built: 1902, Year Reconstructed: 1992, Status: Posted for load, Structure Length: 5.54m (18.18ft), Average Daily Traffic: 365 (year 2005), Truck Traffic: 6%, Average Future Daily Traffic: 432 (year 2025), Features Intersected: OTSELIC RIVER, Facility Carried by Structure: UPPER LISLE ROAD Minimum Vertical Clearance: 4.21m (13.81ft), Kilometerpoint: 0.000, Lanes on structure: 1, Owner: County Highway Agency, Approaching Roadway Width: 4.2m (13.8ft), Material/Design: Steel, Design/Construction: Truss - Thru, Number Of Spans In Main Unit: 1, Length of Maximum Span: 55.4m (181.8ft), Curb-To-Curb Width: 4.5m (14.8ft), Out-to-Out Width: 4.8m (15.7ft) Condition: Deck: Satisfactory, Superstructure: Fair, Substructure: Fair, Channel: Fair, Operating Rating: 18.1 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 11.8 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Meets minimum limits, Deck Geometry: High priority of replacement, Waterway Adequacy: Somewhat better than minimum adequacy, Approach Roadway Alignment: High priority of replacement, Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 20.0 - 29.9% below), Length Of Structure Improvement: 5.54m (18.18ft), Designated Inspection Frequency: Every 12 months, Critical Feature Inspection Frequency: Every 12 months, Underwater Inspection Frequency: Every 60 months, Inspection Date: November 2007, Critical Feature Inspection Date: November 2007, Underwater Inspection Date: June 2006, Bridge Improvement Cost: $582,000, Roadway Improvement Cost: $346,000, Total Project Cost: $928,000 ( Estimate for 2007), Deck Structure Type: Open Grating Find on map >>
Structure Number: 334969, Location: 3.0 MI NE WHITNEY POINT (Lat: 42.371014, Lng: -75.935861), Route carried "on" structure: County highway , Year Built: 1943, Status: Open, Structure Length: 1.03m (3.38ft), Average Daily Traffic: 319 (year 2006), Truck Traffic: 6%, Average Future Daily Traffic: 378 (year 2026), Features Intersected: PAGE BROOK, Facility Carried by Structure: PAGEBROOK ROAD Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Owner: County Highway Agency, Approaching Roadway Width: 6.0m (19.7ft), Skew: 3 degrees, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 1, Length of Maximum Span: 9.7m (31.8ft), Curb-To-Curb Width: 7.4m (24.3ft), Out-to-Out Width: 8.3m (27.2ft) Condition: Deck: Excellent, Superstructure: Good, Substructure: Satisfactory, Channel: Fair, Operating Rating: 31.8 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 18.1 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: Somewhat better than minimum adequacy, Waterway Adequacy: Meets minimum limits, Approach Roadway Alignment: Meets minimum limits, Length Of Structure Improvement: 1.03m (3.38ft), Designated Inspection Frequency: Every 24 months, Inspection Date: April 2006, Bridge Improvement Cost: $582,000, Roadway Improvement Cost: $346,000, Total Project Cost: $928,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 33497, Location: 3 MIL. E. OF KILLAWOG (Lat: 42.403375, Lng: -75.974886), Route carried "on" structure: City street , Year Built: 1971, Status: Open, Structure Length: 1.24m (4.07ft), Average Daily Traffic: 70 (year 2005), Truck Traffic: 6%, Average Future Daily Traffic: 98 (year 2025), Design Load: H 20, Features Intersected: MERRILL CREEK, Facility Carried by Structure: BASSETT RD Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Owner: County Highway Agency, Approaching Roadway Width: 5.4m (17.7ft), Skew: 2 degrees, Material/Design: Steel, Design/Construction: Culvert, Number Of Spans In Main Unit: 2, Length of Maximum Span: 5.1m (16.7ft) Condition: Channel: Fair, Culverts: Good, Operating Rating: 73.5 metric tons, Inventory Rating: 32.6 metric tons, Structural Evaluation: Better than present minimum criteria, Waterway Adequacy: Meets minimum limits, Approach Roadway Alignment: Meets minimum limits, Length Of Structure Improvement: 1.24m (4.07ft), Designated Inspection Frequency: Every 24 months, Inspection Date: April 2006, Bridge Improvement Cost: $213,000, Roadway Improvement Cost: $127,000, Total Project Cost: $340,000 ( Estimate for 2007) Find on map >>
Structure Number: 334972, Location: 1.0 MI N OF WHITNEY POINT (Lat: 42.350533, Lng: -75.970656), Route carried "on" structure: Federal lands road , Year Built: 1969, Status: Open, Structure Length: 1.40m (4.59ft), Average Daily Traffic: 317 (year 1999), Truck Traffic: 6%, Average Future Daily Traffic: 442 (year 2019), Features Intersected: PAGE BROOK, Facility Carried by Structure: DORCHESTER PK RD Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.322, Lanes on structure: 2, Owner: County Highway Agency, Approaching Roadway Width: 6.0m (19.7ft), Material/Design: Steel, Design/Construction: Arch - Deck, Number Of Spans In Main Unit: 2, Length of Maximum Span: 6.7m (22.0ft), Curb or Sidewalk Widths: Left: 1.0m (3.3ft), Right: 1.0m (3.3ft), Curb-To-Curb Width: 6.2m (20.3ft), Out-to-Out Width: 9.2m (30.2ft) Condition: Deck: Satisfactory, Superstructure: Satisfactory, Substructure: Satisfactory, Channel: Good, Operating Rating: 77.3 metric tons, Inventory Rating: 32.6 metric tons, Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Meets minimum limits, Waterway Adequacy: Meets minimum limits, Approach Roadway Alignment: Equal to present minimum criteria, Length Of Structure Improvement: 1.40m (4.59ft), Designated Inspection Frequency: Every 24 months, Inspection Date: April 2006, Bridge Improvement Cost: $278,000, Roadway Improvement Cost: $165,000, Total Project Cost: $443,000 ( Estimate for 2007), Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 1008331, Location: 1.3 MI N JCT RTS I-81+26 (Lat: 42.338478, Lng: -75.978517), Route carried "under" structure: US 11, Year Built: 1969, Structure Length: 4.41m (14.47ft), Average Daily Traffic: 11,953 (year 2006), Truck Traffic: 9%, Features Intersected: RTE 11, Facility Carried by Structure: RTE I81 Minimum Vertical Clearance: 4.55m (14.93ft), Kilometerpoint: 27.755, Lanes on structure: 2, Lanes under structure: 2, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 16.1m (52.8ft) Find on map >>
Structure Number: 1008332, Location: 1.3 MI N JCT RTS I-81+26 (Lat: 42.338372, Lng: -75.978286), Route carried "under" structure: US 11, Year Built: 1969, Structure Length: 4.35m (14.27ft), Average Daily Traffic: 11,953 (year 2006), Truck Traffic: 9%, Features Intersected: RTE 11, Facility Carried by Structure: RTE I81 Minimum Vertical Clearance: 0.50m (1.64ft), Kilometerpoint: 27.739, Lanes on structure: 2, Lanes under structure: 2, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 16.1m (52.8ft) Discuss this city on our hugely popular New York forum Back to: Triangle, NY, New York, All US cities.
|
![]() |