U.S. Cities - City-Data Homepage  
City-Data Forum
City-Data.com Homepage

Bridge Statistics for Tyre, New York (NY) - Condition, Traffic, Stress, Structural Evaluation, Project Costs

Back to: Tyre, NY, New York, New York forum, All US cities.


National Bridge Inventory (NBI) Statistics
Number of bridges: 23
Total length: 203 meters (666ft)
Total costs: $50,036,000
Total average daily traffic: 344,501
Total average daily truck traffic: 75,884
National Bridge Inventory (NBI) Registered Bridges for Tyre

New bridges - Historical Statistics

  • 1910-1919: 1
  • 1920-1929: 0
  • 1930-1939: 1
  • 1940-1949: 1
  • 1950-1959: 11
  • 1960-1969: 1
  • 1970-1979: 0
  • 1980-1989: 0
  • 1990-1999: 5
  • 2000-2009: 3

Reconstructed bridges - Historical Statistics

  • 1940-1949: 1
  • 1950-1959: 0
  • 1960-1969: 1
  • 1970-1979: 1
  • 1980-1989: 1

Average Daily Traffic

Average Truck Traffic (%)

Bridge Condition - Deck

Bridge Condition - Superstructure

Bridge Condition - Substructure

Bridge Condition - Channel

Find on map >>

Structure Number: 102179,  Location: .8 MI SE JCT SH31&WYNE CL (Lat: 43.020328,  Lng: -76.728808),  Route carried "on" structure: State highway 31,  Year Built: 1997,  Status: Open,  Structure Length: 0.76m (2.49ft),  Average Daily Traffic: 1,868 (year 2005),  Truck Traffic: 10%,  Average Future Daily Traffic: 2,067 (year 2025),  Design Load: HS 25,  Features Intersected: TRIB SENECA RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.829,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.7m (31.8ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Frame,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.3m (24.0ft)

Condition: Superstructure: Excellent,  Substructure: Excellent,  Channel: Excellent,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 73.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Superior to present desirable criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.76m (2.49ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2007,  Bridge Improvement Cost: $180,000,  Roadway Improvement Cost: $107,000,  Total Project Cost: $287,000 ( Estimate for 2007),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 103432,  Location: JCT OF RTS 89 + I-90 (Lat: 42.985964,  Lng: -76.769900),  Route carried "on" structure: State highway 89,  Year Built: 1953,  Year Reconstructed: 1994,  Status: Open,  Structure Length: 6.58m (21.59ft),  Average Daily Traffic: 1,139 (year 2006),  Truck Traffic: 9%,  Average Future Daily Traffic: 1,406 (year 2026),  Design Load: HS 20+Mod,  Features Intersected: RTE I90
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 54.352,  Lanes on structure: 2,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Toll Authority,  Approaching Roadway Width: 10.4m (34.1ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 19.8m (65.0ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Fair,  Operating Rating: 70.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.58m (21.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2007,  Bridge Improvement Cost: $1,426,000,  Roadway Improvement Cost: $848,000,  Total Project Cost: $2,274,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>

Structure Number: 104815,  Location: JCT SH 414 & I90 (Lat: 42.967853,  Lng: -76.847169),  Route carried "on" structure: State highway 414,  Year Built: 2000,  Status: Open,  Structure Length: 7.01m (23.00ft),  Average Daily Traffic: 2,416 (year 2002),  Truck Traffic: 9%,  Average Future Daily Traffic: 2,983 (year 2022),  Design Load: HS 25,  Features Intersected: RTE I90
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 53.544,  Lanes on structure: 2,  Lanes under structure: 6,  Base Highway Network: Yes,  Owner: State Toll Authority,  Approaching Roadway Width: 11.8m (38.7ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 35.1m (115.2ft),  Curb-To-Curb Width: 12.0m (39.4ft),  Out-to-Out Width: 12.9m (42.3ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Excellent,  Operating Rating: 77.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 46.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Superior to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.01m (23.00ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2006,  Bridge Improvement Cost: $1,000,  Total Project Cost: $1,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Galvanized Reinforcing
Find on map >>

Structure Number: 331399,  Location: 4.6 MI N OF SENECA FALLS (Lat: 42.991814,  Lng: -76.803292),  Route carried "on" structure: County highway ,  Year Built: 1950,  Status: Open,  Structure Length: 1.15m (3.77ft),  Average Daily Traffic: 330 (year 2007),  Truck Traffic: 6%,  Average Future Daily Traffic: 414 (year 2027),  Features Intersected: BLACK BROOK,  Facility Carried by Structure: CR 101
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 4.8m (15.7ft),  Skew: 9 degrees,  Material/Design: Concrete,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.6m (34.8ft),  Curb or Sidewalk Widths: Left: 1.0m (3.3ft),  Right: 0.1m (0.3ft),  Curb-To-Curb Width: 6.0m (19.7ft),  Out-to-Out Width: 7.3m (24.0ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 63.2 metric tons,  Inventory Rating: 26.7 metric tons,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 1.15m (3.77ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2006,  Bridge Improvement Cost: $182,000,  Roadway Improvement Cost: $108,000,  Total Project Cost: $290,000 ( Estimate for 2007),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 336155,  Location: 6.5 MI N OF SENECA FALLS (Lat: 42.996975,  Lng: -76.761569),  Route carried "on" structure: County highway ,  Year Built: 2003,  Status: Open,  Structure Length: 7.83m (25.69ft),  Average Daily Traffic: 150 (year 1999),  Truck Traffic: 6%,  Average Future Daily Traffic: 188 (year 2019),  Design Load: HS 25,  Features Intersected: CLYDE RIVER,  Facility Carried by Structure: MAYS POINT RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.6m (21.7ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 25.0m (82.0ft),  Curb-To-Curb Width: 6.6m (21.7ft),  Out-to-Out Width: 7.6m (24.9ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Excellent,  Channel: Very good,  Operating Rating: 73.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 44.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Superior to present desirable criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 7.83m (25.69ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: October 2007,  Underwater Inspection Date: July 2000,  Bridge Improvement Cost: $1,280,000,  Roadway Improvement Cost: $761,000,  Total Project Cost: $2,041,000 ( Estimate for 2007),  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>

Structure Number: 400197,  Location: JCT US 20 & CAY & SEN CNL (Lat: 42.963047,  Lng: -76.737867),  Route carried "on" structure: State highway 5,  Year Built: 1932,  Year Reconstructed: 1970,  Status: Open,  Structure Length: 9.60m (31.50ft),  Average Daily Traffic: 10,029 (year 1998),  Truck Traffic: 10%,  Average Future Daily Traffic: 13,395 (year 2018),  Design Load: H 20,  Features Intersected: CAY & SEN CANAL
Minimum Vertical Clearance: 4.41m (14.47ft),  Kilometerpoint: 22.960,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.1m (39.7ft),  Navigation Control: Yes ( Vertical Clearance: 4.5m (14.8ft), Horizontal Clearance: 36.5m (119.8ft)),  Material/Design: Steel,  Design/Construction: Truss - Thru,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 38.1m (125.0ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 12.1m (39.7ft),  Out-to-Out Width: 13.2m (43.3ft)

Condition: Deck: Satisfactory,  Superstructure: Poor,  Substructure: Fair,  Channel: Good,  Operating Rating: 59.9 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 9.60m (31.50ft),  Designated Inspection Frequency: Every 12 months,  Critical Feature Inspection Frequency: Every 12 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: October 2007,  Critical Feature Inspection Date: October 2007,  Underwater Inspection Date: June 2007,  Bridge Improvement Cost: $2,741,000,  Roadway Improvement Cost: $1,590,000,  Total Project Cost: $4,331,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>

Structure Number: 40218,  Location: JCT SH 31 & CAY & SEN CNL (Lat: 43.017589,  Lng: -76.712150),  Route carried "on" structure: State highway 31,  Year Built: 1949,  Year Reconstructed: 1968,  Status: Posted for load-capacity,  Structure Length: 15.30m (50.20ft),  Average Daily Traffic: 1,868 (year 2005),  Truck Traffic: 10%,  Average Future Daily Traffic: 2,067 (year 2025),  Design Load: H 20,  Features Intersected: CAY & SEN CANAL
Minimum Vertical Clearance: 4.54m (14.90ft),  Kilometerpoint: 2.756,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 10.3m (33.8ft),  Navigation Control: Yes ( Vertical Clearance: 6.0m (19.7ft), Horizontal Clearance: 45.7m (149.9ft)),  Material/Design: Steel,  Design/Construction: Truss - Thru,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 4,  Length of Maximum Span: 76.2m (250.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 9.6m (31.5ft),  Out-to-Out Width: 11.2m (36.7ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Very good,  Operating Rating: 55.3 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 36.3 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 15.30m (50.20ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: October 2006,  Critical Feature Inspection Date: October 2006,  Underwater Inspection Date: June 2003,  Bridge Improvement Cost: $1,884,000,  Roadway Improvement Cost: $1,093,000,  Total Project Cost: $2,977,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>

Structure Number: 406041,  Location: .8 MI NE JCT SH 89 & I90 (Lat: 42.997789,  Lng: -76.764242),  Route carried "on" structure: State highway 89,  Year Built: 1969,  Status: Open,  Structure Length: 38.86m (127.49ft),  Average Daily Traffic: 1,139 (year 2006),  Truck Traffic: 9%,  Average Future Daily Traffic: 1,406 (year 2026),  Design Load: H 20,  Features Intersected: ERIE CANAL, CLYDE RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 55.800,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 14.3m (46.9ft),  Navigation Control: Yes ( Vertical Clearance: 6.7m (22.0ft), Horizontal Clearance: 39.9m (130.9ft)),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 11,  Length of Maximum Span: 48.1m (157.8ft),  Curb or Sidewalk Widths: Left: 0.1m (0.3ft),  Right: 0.1m (0.3ft),  Curb-To-Curb Width: 10.6m (34.8ft),  Out-to-Out Width: 11.5m (37.7ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Very good,  Operating Rating: 57.2 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 29.9 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 38.86m (127.49ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: October 2006,  Underwater Inspection Date: June 2007,  Bridge Improvement Cost: $9,690,000,  Roadway Improvement Cost: $5,621,000,  Total Project Cost: $15,311,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>

Structure Number: 443501,  Location: 2.3 MI NW JCT SH 89 & CNL (Lat: 43.020811,  Lng: -76.798517),  Route carried "on" structure: County highway ,  Year Built: 1914,  Year Reconstructed: 1951,  Status: Posted for load,  Structure Length: 9.38m (30.77ft),  Average Daily Traffic: 284 (year 1999),  Truck Traffic: 9%,  Average Future Daily Traffic: 351 (year 2019),  Features Intersected: ERIE CNL/CLYDE RV,  Facility Carried by Structure: ARMITAGE ROAD
Minimum Vertical Clearance: 4.52m (14.83ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Owner: State Highway Agency,  Approaching Roadway Width: 5.7m (18.7ft),  Navigation Control: Yes ( Vertical Clearance: 4.8m (15.7ft), Horizontal Clearance: 53.3m (174.9ft)),  Material/Design: Steel,  Design/Construction: Truss - Thru,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 55.1m (180.8ft),  Curb-To-Curb Width: 4.5m (14.8ft),  Out-to-Out Width: 5.3m (17.4ft)

Condition: Deck: Poor,  Superstructure: Poor,  Substructure: Poor,  Channel: Good,  Operating Rating: 42.6 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 29.9 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: High priority of replacement,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 10.0 - 19.9% below),  Length Of Structure Improvement: 9.38m (30.77ft),  Designated Inspection Frequency: Every 12 months,  Critical Feature Inspection Frequency: Every 12 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: October 2007,  Critical Feature Inspection Date: October 2007,  Underwater Inspection Date: December 2006,  Bridge Improvement Cost: $1,078,000,  Roadway Improvement Cost: $641,000,  Total Project Cost: $1,719,000 ( Estimate for 2007),  Deck Structure Type: Open Grating
Find on map >>

Structure Number: 4435021,  Location: JCT I-90 WB+CAYUGA CL + C (Lat: 42.997983,  Lng: -76.730761),  Route carried "on" structure: Interstate 90,  Year Built: 1953,  Status: Open,  Structure Length: 18.89m (61.98ft),  Average Daily Traffic: 33,869 (year 2007),  Truck Traffic: 23%,  Average Future Daily Traffic: 51,701 (year 2027),  Design Load: HS 20+Mod,  Features Intersected: SENECA RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 20.243,  Lanes on structure: 2,  Base Highway Network: Yes,  Toll: On toll road,  Owner: State Toll Authority,  Approaching Roadway Width: 11.2m (36.7ft),  Skew: 2 degrees,  Navigation Control: Yes ( Vertical Clearance: 6.0m (19.7ft), Horizontal Clearance: 82.2m (269.7ft)),  Material/Design: Steel,  Design/Construction: Girder and Floorbeam System,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 82.2m (269.7ft),  Curb-To-Curb Width: 16.0m (52.5ft),  Out-to-Out Width: 17.0m (55.8ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Very good,  Operating Rating: 44.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 27.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 18.89m (61.98ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: May 2006,  Critical Feature Inspection Date: May 2006,  Underwater Inspection Date: November 1995,  Bridge Improvement Cost: $1,078,000,  Roadway Improvement Cost: $641,000,  Total Project Cost: $1,719,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>

Structure Number: 4435022,  Location: JCT I90EB/CAYUGA CL & CNL (Lat: 42.997628,  Lng: -76.730819),  Route carried "on" structure: Interstate 90,  Year Built: 1953,  Status: Open,  Structure Length: 18.89m (61.98ft),  Average Daily Traffic: 24,500 (year 1990),  Truck Traffic: 23%,  Average Future Daily Traffic: 37,399 (year 2010),  Design Load: HS 20+Mod,  Features Intersected: SENECA RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 504.952,  Lanes on structure: 2,  Toll: On toll road,  Owner: State Toll Authority,  Approaching Roadway Width: 11.2m (36.7ft),  Skew: 2 degrees,  Navigation Control: Yes ( Vertical Clearance: 6.0m (19.7ft), Horizontal Clearance: 82.2m (269.7ft)),  Material/Design: Steel,  Design/Construction: Girder and Floorbeam System,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 53.3m (174.9ft),  Curb-To-Curb Width: 16.2m (53.1ft),  Out-to-Out Width: 17.1m (56.1ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Very good,  Operating Rating: 44.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 27.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 18.89m (61.98ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: May 2007,  Critical Feature Inspection Date: May 2007,  Underwater Inspection Date: November 1995,  Bridge Improvement Cost: $3,554,000,  Roadway Improvement Cost: $2,011,000,  Total Project Cost: $5,565,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>

Structure Number: 5510399,  Location: 4.0 MI NW OF FOSTERVILLE (Lat: 43.000303,  Lng: -76.720931),  Route carried "on" structure: Interstate 90,  Year Built: 1954,  Status: Open,  Structure Length: 1.22m (4.00ft),  Average Daily Traffic: 33,335 (year 2000),  Truck Traffic: 23%,  Average Future Daily Traffic: 50,886 (year 2020),  Design Load: HS 20+Mod,  Features Intersected: OLD SENECA RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 180.803,  Lanes on structure: 4,  Toll: On toll road,  Owner: State Toll Authority,  Approaching Roadway Width: 23.8m (78.1ft),  Skew: 20 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 6.1m (20.0ft),  Curb-To-Curb Width: 36.7m (120.4ft),  Out-to-Out Width: 37.5m (123.0ft)

Condition: Channel: Good,  Culverts: Fair,  Operating Rating: 76.4 metric tons,  Inventory Rating: 29.3 metric tons,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.22m (4.00ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2007,  Bridge Improvement Cost: $984,000,  Roadway Improvement Cost: $585,000,  Total Project Cost: $1,569,000 ( Estimate for 2007),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 55104,  Location: 4 MI NOR SENECA FALLS (Lat: 42.980008,  Lng: -76.798008),  Route carried "on" structure: County highway ,  Year Built: 1998,  Status: Open,  Structure Length: 6.22m (20.41ft),  Average Daily Traffic: 400 (year 1987),  Truck Traffic: 6%,  Average Future Daily Traffic: 502 (year 2007),  Design Load: HS 25,  Features Intersected: RTE I90,  Facility Carried by Structure: GRAVEL ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Toll Authority,  Approaching Roadway Width: 9.8m (32.2ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 30.5m (100.1ft),  Curb-To-Curb Width: 9.6m (31.5ft),  Out-to-Out Width: 10.4m (34.1ft)

Condition: Deck: Very good,  Superstructure: Excellent,  Substructure: Very good,  Inventory Rating: 70.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.22m (20.41ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2006,  Bridge Improvement Cost: $984,000,  Roadway Improvement Cost: $585,000,  Total Project Cost: $1,569,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Galvanized Reinforcing
Find on map >>

Structure Number: 551041,  Location: 1.5 MI E OF EXIT 41 (Lat: 42.976797,  Lng: -76.803872),  Route carried "on" structure: Interstate 90,  Year Built: 1953,  Status: Open,  Structure Length: 0.79m (2.59ft),  Average Daily Traffic: 33,869 (year 2007),  Truck Traffic: 23%,  Average Future Daily Traffic: 51,701 (year 2027),  Design Load: HS 20+Mod,  Features Intersected: BLACK BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 14.751,  Lanes on structure: 4,  Base Highway Network: Yes,  Toll: On toll road,  Owner: State Toll Authority,  Approaching Roadway Width: 23.2m (76.1ft),  Skew: 13 degrees,  Material/Design: Concrete,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.0m (23.0ft),  Out-to-Out Width: 81.9m (268.7ft)

Condition: Superstructure: Fair,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 77.5 metric tons,  Inventory Rating: 32.6 metric tons,  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.79m (2.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2007,  Bridge Improvement Cost: $1,397,000,  Roadway Improvement Cost: $831,000,  Total Project Cost: $2,228,000 ( Estimate for 2007),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 551042,  Location: 1.5MI E OF EXIT41 (Lat: 42.972156,  Lng: -76.816867),  Route carried "on" structure: City street ,  Year Built: 1953,  Status: Open,  Structure Length: 7.16m (23.49ft),  Average Daily Traffic: 211 (year 2003),  Truck Traffic: 6%,  Average Future Daily Traffic: 265 (year 2023),  Design Load: HS 20+Mod,  Features Intersected: RTE I90,  Facility Carried by Structure: MID.BLACK BROOK R
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Toll Authority,  Approaching Roadway Width: 6.1m (20.0ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 22.8m (74.8ft),  Curb or Sidewalk Widths: Left: 0.8m (2.6ft),  Right: 0.8m (2.6ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Fair,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 62.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 37.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 7.16m (23.49ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2006,  Bridge Improvement Cost: $1,551,000,  Roadway Improvement Cost: $922,000,  Total Project Cost: $2,473,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 551043,  Location: 1.6 MI E OF EXIT 41 TOLL (Lat: 42.969781,  Lng: -76.828592),  Route carried "on" structure: City street ,  Year Built: 1999,  Status: Open,  Structure Length: 6.16m (20.21ft),  Average Daily Traffic: 96 (year 1999),  Truck Traffic: 6%,  Average Future Daily Traffic: 121 (year 2019),  Design Load: HS 25,  Features Intersected: RTE I90,  Facility Carried by Structure: BLACK BROOK RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Toll Authority,  Approaching Roadway Width: 9.4m (30.8ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 30.5m (100.1ft),  Curb-To-Curb Width: 9.6m (31.5ft),  Out-to-Out Width: 10.4m (34.1ft)

Condition: Deck: Excellent,  Superstructure: Very good,  Substructure: Excellent,  Inventory Rating: 68.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 6.16m (20.21ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2007,  Bridge Improvement Cost: $1,551,000,  Roadway Improvement Cost: $922,000,  Total Project Cost: $2,473,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Galvanized Reinforcing
Find on map >>

Structure Number: 551044,  Location: I90 EXIT 41 RAMP BRIDGE (Lat: 42.967469,  Lng: -76.852222),  Route carried "on" structure: Ramp Other road ,  Year Built: 1953,  Status: Open,  Structure Length: 7.13m (23.39ft),  Average Daily Traffic: 3,818 (year 2003),  Truck Traffic: 6%,  Average Future Daily Traffic: 4,795 (year 2023),  Design Load: HS 20+Mod,  Features Intersected: RTE I90,  Facility Carried by Structure: EXIT 41 RAMP
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 515.540,  Lanes on structure: 2,  Lanes under structure: 5,  Toll: On toll road,  Owner: State Toll Authority,  Approaching Roadway Width: 12.5m (41.0ft),  Skew: 30 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 24.4m (80.1ft),  Curb-To-Curb Width: 11.9m (39.0ft),  Out-to-Out Width: 13.1m (43.0ft)

Condition: Deck: Good,  Superstructure: Fair,  Substructure: Fair,  Operating Rating: 59.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.13m (23.39ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2007,  Bridge Improvement Cost: $2,012,000,  Roadway Improvement Cost: $1,197,000,  Total Project Cost: $3,209,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>

Structure Number: 103432,  Location: JCT OF RTS 89 + I-90 (Lat: 42.985964,  Lng: -76.769900),  Route carried "under" structure: Interstate 90,  Year Built: 1953,  Structure Length: 6.58m (21.59ft),  Average Daily Traffic: 33,869 (year 2007),  Truck Traffic: 23%,  Features Intersected: RTE I90,  Facility Carried by Structure: RTE 89
Minimum Vertical Clearance: 4.37m (14.34ft),  Kilometerpoint: 16.428,  Lanes on structure: 2,  Lanes under structure: 4,  Toll: On toll road,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 19.8m (65.0ft)

Find on map >>

Structure Number: 104815,  Location: JCT SH 414 & I90 (Lat: 42.967853,  Lng: -76.847169),  Route carried "under" structure: Interstate 90,  Year Built: 2000,  Structure Length: 7.01m (23.00ft),  Average Daily Traffic: 31,191 (year 2006),  Truck Traffic: 23%,  Features Intersected: RTE I90,  Facility Carried by Structure: RTE 414
Minimum Vertical Clearance: 4.52m (14.83ft),  Kilometerpoint: 9.702,  Lanes on structure: 2,  Lanes under structure: 6,  Toll: On toll road,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 35.1m (115.2ft)

Find on map >>

Structure Number: 55104,  Location: 4 MI NOR SENECA FALLS (Lat: 42.980008,  Lng: -76.798008),  Route carried "under" structure: Interstate 90,  Year Built: 1998,  Structure Length: 6.22m (20.41ft),  Average Daily Traffic: 31,191 (year 2006),  Truck Traffic: 23%,  Features Intersected: RTE I90,  Facility Carried by Structure: GRAVEL ROAD
Minimum Vertical Clearance: 4.78m (15.68ft),  Kilometerpoint: 14.014,  Lanes on structure: 2,  Lanes under structure: 4,  Toll: On toll road,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 30.5m (100.1ft)

Find on map >>

Structure Number: 551042,  Location: 1.5MI E OF EXIT41 (Lat: 42.972156,  Lng: -76.816867),  Route carried "under" structure: Interstate 90,  Year Built: 1953,  Structure Length: 7.16m (23.49ft),  Average Daily Traffic: 33,869 (year 2007),  Truck Traffic: 23%,  Features Intersected: RTE I90,  Facility Carried by Structure: MID.BLACK BROOK R
Minimum Vertical Clearance: 4.37m (14.34ft),  Kilometerpoint: 12.244,  Lanes on structure: 2,  Lanes under structure: 4,  Toll: On toll road,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 22.8m (74.8ft)

Find on map >>

Structure Number: 551043,  Location: 1.6 MI E OF EXIT 41 TOLL (Lat: 42.969781,  Lng: -76.828592),  Route carried "under" structure: Interstate 90,  Year Built: 1999,  Structure Length: 6.16m (20.21ft),  Average Daily Traffic: 31,191 (year 2006),  Truck Traffic: 23%,  Features Intersected: RTE I90,  Facility Carried by Structure: BLACK BROOK RD
Minimum Vertical Clearance: 4.45m (14.60ft),  Kilometerpoint: 11.247,  Lanes on structure: 2,  Lanes under structure: 4,  Toll: On toll road,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 30.5m (100.1ft)

Find on map >>

Structure Number: 551044,  Location: I90 EXIT 41 RAMP BRIDGE (Lat: 42.967469,  Lng: -76.852222),  Route carried "under" structure: Interstate 90,  Year Built: 1953,  Structure Length: 7.13m (23.39ft),  Average Daily Traffic: 33,869 (year 2007),  Truck Traffic: 23%,  Features Intersected: RTE I90,  Facility Carried by Structure: EXIT 41 RAMP
Minimum Vertical Clearance: 4.42m (14.50ft),  Kilometerpoint: 9.284,  Lanes on structure: 2,  Lanes under structure: 5,  Toll: On toll road,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 24.4m (80.1ft)

Discuss this city on our hugely popular New York forum

Back to: Tyre, NY, New York, All US cities.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2009 Advameg, Inc.