![]() |
Bridge Statistics for Umatilla, Oregon (OR) - Condition, Traffic, Stress, Structural Evaluation, Project CostsBack to: Umatilla, OR, Oregon, Oregon forum, All US cities. National Bridge Inventory (NBI) Statistics Number of bridges: 13 Total length: 174 meters (571ft) Total costs: $21,526,000 Total average daily traffic: 72,245 Total average daily truck traffic: 17,531 National Bridge Inventory (NBI) Registered Bridges for Umatilla
Bridge Condition - Deck Bridge Condition - Superstructure Bridge Condition - Substructure Bridge Condition - Channel Find on map >>
Structure Number: P725, Location: 8.53 KM E OF THORN HOLLOW (Lat: 45.701889, Lng: -118.355278), Route carried "on" structure: Federal lands road 600, Year Built: 1955, Status: Open, Structure Length: 3.11m (10.20ft), Average Daily Traffic: 270 (year 2001), Truck Traffic: 15%, Average Future Daily Traffic: 540 (year 2021), Design Load: H 20, Features Intersected: MEACHAM CREEK Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 25.800, Lanes on structure: 2, Owner: Bureau of Indian Affairs, Approaching Roadway Width: 7.0m (23.0ft), Material/Design: Steel, Design/Construction: Truss - Thru, Number Of Spans In Main Unit: 1, Length of Maximum Span: 30.5m (100.1ft), Curb-To-Curb Width: 6.6m (21.7ft), Out-to-Out Width: 6.7m (22.0ft) Condition: Deck: Serious, Superstructure: Poor, Substructure: Poor, Channel: Very good, Operating Rating: 22.2 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 12.2 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Meets minimum limits, Deck Geometry: Meets minimum limits, Waterway Adequacy: Equal to present desirable criteria, Approach Roadway Alignment: Meets minimum limits, Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below), Length Of Structure Improvement: 4.30m (14.11ft), Designated Inspection Frequency: Every 24 months, Critical Feature Inspection Frequency: Every 24 months, Inspection Date: October 2001, Critical Feature Inspection Date: October 2001, Bridge Improvement Cost: $685,000, Roadway Improvement Cost: $180,000, Total Project Cost: $924,000 ( Estimate for 2003), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: P726, Location: 9.8KM E OF THORN HLLW RD (Lat: 45.712111, Lng: -118.343611), Route carried "on" structure: Federal lands road 600, Year Built: 1955, Status: Posted for load, Structure Length: 3.17m (10.40ft), Average Daily Traffic: 270 (year 2001), Truck Traffic: 15%, Average Future Daily Traffic: 540 (year 2021), Design Load: H 20, Features Intersected: UMATILLA RIVER Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 27.300, Lanes on structure: 2, Owner: Bureau of Indian Affairs, Approaching Roadway Width: 6.1m (20.0ft), Material/Design: Steel, Design/Construction: Truss - Thru, Number Of Spans In Main Unit: 1, Length of Maximum Span: 31.1m (102.0ft), Curb-To-Curb Width: 6.6m (21.7ft), Out-to-Out Width: 6.7m (22.0ft) Condition: Deck: Poor, Superstructure: Poor, Substructure: Poor, Channel: Satisfactory, Operating Rating: 22.2 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 12.2 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Meets minimum limits, Deck Geometry: Meets minimum limits, Waterway Adequacy: Equal to present desirable criteria, Approach Roadway Alignment: Somewhat better than minimum adequacy, Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below), Length Of Structure Improvement: 4.30m (14.11ft), Designated Inspection Frequency: Every 24 months, Critical Feature Inspection Frequency: Every 24 months, Inspection Date: October 2001, Critical Feature Inspection Date: October 2001, Bridge Improvement Cost: $856,000, Roadway Improvement Cost: $100,000, Total Project Cost: $1,036,000 ( Estimate for 2004), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: P73, Location: 45.70NORTH 118.35WEST (Lat: 45.700000, Lng: -118.350000), Route carried "on" structure: Federal lands road 900, Year Built: 2006, Status: Open, Structure Length: 4.30m (14.11ft), Average Daily Traffic: 261 (year 2005), Truck Traffic: 29%, Average Future Daily Traffic: 388 (year 2025), Design Load: HS 15, Features Intersected: MEACHAM CREEK Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 8.700, Lanes on structure: 2, Owner: Bureau of Indian Affairs, Approaching Roadway Width: 7.3m (24.0ft), Skew: 2 degrees, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 1, Length of Maximum Span: 42.2m (138.5ft), Curb-To-Curb Width: 10.3m (33.8ft), Out-to-Out Width: 11.2m (36.7ft) Condition: Deck: Very good, Superstructure: Good, Substructure: Very good, Channel: Very good, Operating Rating: 40.5 metric tons, Inventory Rating: 22.5 metric tons, Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Better than present minimum criteria, Waterway Adequacy: Equal to present desirable criteria, Approach Roadway Alignment: Equal to present desirable criteria, Designated Inspection Frequency: Every 24 months, Inspection Date: August 2007, Deck Structure Type: Other, Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 624A002 1826, Location: IN CITY OF UMATILLA (Lat: 45.915689, Lng: -119.352419), Route carried "on" structure: US 730, Year Built: 1925, Year Reconstructed: 1950, Status: Open, Structure Length: 13.38m (43.90ft), Average Daily Traffic: 6,500 (year 2006), Truck Traffic: 23%, Average Future Daily Traffic: 6,700 (year 2026), Design Load: H 15, Features Intersected: UMATILLA RIVER(UMATILLA) Minimum Vertical Clearance: 30.48m (100.00ft), Kilometerpoint: 293.866, Lanes on structure: 2, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 11.0m (36.1ft), Material/Design: Concrete, Design/Construction: Arch - Deck, Number Of Spans In Main Unit: 3, Number Of Approach Spans: 6, Length of Maximum Span: 33.5m (109.9ft), Curb or Sidewalk Widths: Left: 1.1m (3.6ft), Right: 1.1m (3.6ft), Curb-To-Curb Width: 9.2m (30.2ft), Out-to-Out Width: 10.5m (34.4ft) Condition: Deck: Fair, Superstructure: Fair, Substructure: Fair, Channel: Good, Operating Rating: 24.5 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 14.5 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: High priority of corrective action, Deck Geometry: Meets minimum limits, Waterway Adequacy: Equal to present desirable criteria, Approach Roadway Alignment: Better than present minimum criteria, Length Of Structure Improvement: 13.40m (43.96ft), Designated Inspection Frequency: Every 24 months, Underwater Inspection Frequency: Every 48 months, Inspection Date: Febuary 2008, Underwater Inspection Date: September 2005, Bridge Improvement Cost: $1,406,000, Roadway Improvement Cost: $141,000, Total Project Cost: $2,249,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 1628 002 1837, Location: CITY OF UMATILLA (Lat: 45.918219, Lng: -119.330019), Route carried "on" structure: US 730, Year Built: 1933, Year Reconstructed: 1993, Status: Temporarily open, Structure Length: 5.64m (18.50ft), Average Daily Traffic: 7,700 (year 2006), Truck Traffic: 23%, Average Future Daily Traffic: 9,800 (year 2026), Design Load: H 15, Features Intersected: UPRR Minimum Vertical Clearance: 30.48m (100.00ft), Kilometerpoint: 295.636, Lanes on structure: 3, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 18.3m (60.0ft), Material/Design: Concrete continuous, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 4, Length of Maximum Span: 16.8m (55.1ft), Curb or Sidewalk Widths: Left: 0.0m, Right: 1.5m (4.9ft), Curb-To-Curb Width: 18.1m (59.4ft), Out-to-Out Width: 20.3m (66.6ft) Condition: Deck: Satisfactory, Superstructure: Fair, Substructure: Satisfactory, Operating Rating: 41.7 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 24.5 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: Superior to present desirable criteria, Underclear: Meets minimum limits, Approach Roadway Alignment: Equal to present desirable criteria, Designated Inspection Frequency: Every 24 months, Inspection Date: Febuary 2008, Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete, Deck Protection: Epoxy Coated Reinforcing Find on map >>
Structure Number: 2230A070 00039, Location: WASHINGTON STATE LINE (Lat: 45.930556, Lng: -119.331667), Route carried "on" structure: Interstate 82, Year Built: 1955, Year Reconstructed: 1990, Status: Open, Structure Length: 103.02m (337.99ft), Average Daily Traffic: 8,250 (year 2006), Truck Traffic: 33%, Average Future Daily Traffic: 27,500 (year 2026), Design Load: HS 20+Mod, Features Intersected: COLUMBIA RIVER Minimum Vertical Clearance: 4.75m (15.58ft), Kilometerpoint: 0.628, Lanes on structure: 2, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 11.6m (38.1ft), Material/Design: Steel continuous, Design/Construction: Truss - Thru, Number Of Spans In Main Unit: 5, Number Of Approach Spans: 15, Length of Maximum Span: 182.9m (600.1ft), Curb-To-Curb Width: 8.4m (27.6ft), Out-to-Out Width: 9.2m (30.2ft) Condition: Deck: Satisfactory, Superstructure: Fair, Substructure: Good, Channel: Very good, Operating Rating: 51.4 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 31.0 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: High priority of replacement, Waterway Adequacy: Equal to present desirable criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 103.00m (337.93ft), Designated Inspection Frequency: Every 24 months, Underwater Inspection Frequency: Every 60 months, Inspection Date: July 2007, Underwater Inspection Date: September 2003, Bridge Improvement Cost: $10,823,000, Roadway Improvement Cost: $1,082,000, Total Project Cost: $17,317,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Latex Concrete, Deck Protection: Epoxy Coated Reinforcing Find on map >>
Structure Number: 16437 070 00061, Location: 0.6 MI. S. COLUMBIA RIVER (Lat: 45.923700, Lng: -119.324361), Route carried "on" structure: Interstate 82, Year Built: 1985, Status: Open, Structure Length: 6.64m (21.78ft), Average Daily Traffic: 8,541 (year 2006), Truck Traffic: 21%, Average Future Daily Traffic: 13,314 (year 2026), Design Load: HS 25, Features Intersected: THIRD STREET Minimum Vertical Clearance: 30.48m (100.00ft), Kilometerpoint: 0.982, Lanes on structure: 2, Lanes under structure: 2, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 12.2m (40.0ft), Skew: 1 degrees, Material/Design: Prestressed concrete continuous, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 3, Length of Maximum Span: 26.5m (86.9ft), Curb-To-Curb Width: 12.8m (42.0ft), Out-to-Out Width: 13.9m (45.6ft) Condition: Deck: Satisfactory, Superstructure: Good, Substructure: Good, Operating Rating: 68.0 metric tons, Inventory Rating: 40.8 metric tons, Structural Evaluation: Better than present minimum criteria, Deck Geometry: Equal to present desirable criteria, Underclear: Somewhat better than minimum adequacy, Approach Roadway Alignment: Equal to present desirable criteria, Designated Inspection Frequency: Every 24 months, Inspection Date: September 2006, Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete, Deck Protection: Epoxy Coated Reinforcing Find on map >>
Structure Number: 16438 070 00061, Location: 0.6 S. COLUMBIA RIVER (Lat: 45.924111, Lng: -119.324897), Route carried "on" structure: Interstate 82, Year Built: 1985, Status: Open, Structure Length: 6.64m (21.78ft), Average Daily Traffic: 8,250 (year 2006), Truck Traffic: 33%, Average Future Daily Traffic: 27,500 (year 2026), Design Load: HS 25, Features Intersected: THIRD STREET Minimum Vertical Clearance: 30.48m (100.00ft), Kilometerpoint: 0.982, Lanes on structure: 2, Lanes under structure: 2, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 12.2m (40.0ft), Skew: 1 degrees, Material/Design: Prestressed concrete continuous, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 3, Length of Maximum Span: 26.5m (86.9ft), Curb-To-Curb Width: 12.8m (42.0ft), Out-to-Out Width: 13.9m (45.6ft) Condition: Deck: Good, Superstructure: Very good, Substructure: Good, Operating Rating: 68.0 metric tons, Inventory Rating: 40.8 metric tons, Structural Evaluation: Better than present minimum criteria, Deck Geometry: Equal to present desirable criteria, Underclear: Somewhat better than minimum adequacy, Approach Roadway Alignment: Equal to present desirable criteria, Designated Inspection Frequency: Every 24 months, Inspection Date: September 2006, Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete, Deck Protection: Epoxy Coated Reinforcing Find on map >>
Structure Number: 16441 070 001, Location: 1.0 MI. S. WA STATE LINE (Lat: 45.918419, Lng: -119.321100), Route carried "on" structure: Interstate 82, Year Built: 1985, Status: Open, Structure Length: 6.71m (22.01ft), Average Daily Traffic: 5,146 (year 2006), Truck Traffic: 21%, Average Future Daily Traffic: 9,972 (year 2026), Design Load: HS 25, Features Intersected: HWY 2 (UMATILLA) Minimum Vertical Clearance: 30.48m (100.00ft), Kilometerpoint: 1.609, Lanes on structure: 2, Lanes under structure: 4, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 12.8m (42.0ft), Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Number Of Spans In Main Unit: 3, Length of Maximum Span: 34.1m (111.9ft), Curb-To-Curb Width: 13.7m (44.9ft), Out-to-Out Width: 13.9m (45.6ft) Condition: Deck: Satisfactory, Superstructure: Satisfactory, Substructure: Good, Operating Rating: 68.0 metric tons, Inventory Rating: 40.8 metric tons, Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Superior to present desirable criteria, Underclear: Equal to present minimum criteria, Approach Roadway Alignment: Equal to present desirable criteria, Designated Inspection Frequency: Every 24 months, Inspection Date: September 2007, Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete, Deck Protection: Epoxy Coated Reinforcing Find on map >>
Structure Number: 16442 070 001, Location: 1.0 MI. S. WA STATE LINE (Lat: 45.918950, Lng: -119.321450), Route carried "on" structure: Interstate 82, Year Built: 1985, Status: Open, Structure Length: 6.71m (22.01ft), Average Daily Traffic: 4,614 (year 2006), Truck Traffic: 20%, Average Future Daily Traffic: 10,450 (year 2026), Design Load: HS 25, Features Intersected: HWY 2 (UMATILLA) Minimum Vertical Clearance: 30.48m (100.00ft), Kilometerpoint: 1.609, Lanes on structure: 2, Lanes under structure: 4, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 12.8m (42.0ft), Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Number Of Spans In Main Unit: 3, Length of Maximum Span: 34.1m (111.9ft), Curb-To-Curb Width: 12.8m (42.0ft), Out-to-Out Width: 13.9m (45.6ft) Condition: Deck: Satisfactory, Superstructure: Satisfactory, Substructure: Good, Operating Rating: 68.0 metric tons, Inventory Rating: 40.8 metric tons, Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Equal to present desirable criteria, Underclear: Equal to present minimum criteria, Approach Roadway Alignment: Equal to present desirable criteria, Designated Inspection Frequency: Every 24 months, Inspection Date: September 2007, Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete, Deck Protection: Epoxy Coated Reinforcing Find on map >>
Structure Number: 59C270122500064, Location: 0.6 MI SE OF HWY 730 (Lat: 45.908031, Lng: -119.349019), Route carried "on" structure: County highway , Year Built: 1972, Status: Open, Structure Length: 1.43m (4.69ft), Average Daily Traffic: 1,725 (year 2006), Truck Traffic: 25%, Average Future Daily Traffic: 1,092 (year 2026), Design Load: HS 20, Features Intersected: W EXT. IRRIGATION CANAL, Facility Carried by Structure: POWERLINE RD Minimum Vertical Clearance: 30.48m (100.00ft), Kilometerpoint: 1.030, Lanes on structure: 2, Owner: County Highway Agency, Approaching Roadway Width: 9.8m (32.2ft), Skew: 2 degrees, Material/Design: Prestressed concrete, Design/Construction: Slab, Number Of Spans In Main Unit: 1, Length of Maximum Span: 13.7m (44.9ft), Curb or Sidewalk Widths: Left: 0.0m, Right: 2.3m (7.5ft), Curb-To-Curb Width: 10.1m (33.1ft), Out-to-Out Width: 12.3m (40.4ft) Condition: Deck: Very good, Superstructure: Good, Substructure: Very good, Channel: Very good, Operating Rating: 69.9 metric tons, Method Used To Determine Operating Rating: Allowable Stress (AS), Inventory Rating: 41.7 metric tons, Method Used To Determine Inventory Rating: Allowable Stress (AS), Structural Evaluation: Better than present minimum criteria, Deck Geometry: Somewhat better than minimum adequacy, Waterway Adequacy: Equal to present desirable criteria, Approach Roadway Alignment: Meets minimum limits, Designated Inspection Frequency: Every 24 months, Inspection Date: October 2006, Deck Structure Type: Concrete Precast Panels, Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 16441 070 001, Location: 1.0 MI. S. WA STATE LINE (Lat: 45.918419, Lng: -119.321100), Route carried "under" structure: US 730, Year Built: 1985, Structure Length: 6.71m (22.01ft), Average Daily Traffic: 10,818 (year 2006), Truck Traffic: 20%, Features Intersected: HWY 2 (UMATILLA), Facility Carried by Structure: I-82 (HWY 070) WB Minimum Vertical Clearance: 30.48m (100.00ft), Kilometerpoint: 1.545, Lanes on structure: 2, Lanes under structure: 4, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 34.1m (111.9ft) Find on map >>
Structure Number: 16442 070 001, Location: 1.0 MI. S. WA STATE LINE (Lat: 45.918950, Lng: -119.321450), Route carried "under" structure: US 730, Year Built: 1985, Structure Length: 6.71m (22.01ft), Average Daily Traffic: 9,900 (year 2006), Truck Traffic: 23%, Features Intersected: HWY 2 (UMATILLA), Facility Carried by Structure: I-82 (HWY 070) EB Minimum Vertical Clearance: 30.48m (100.00ft), Kilometerpoint: 296.329, Lanes on structure: 2, Lanes under structure: 4, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 34.1m (111.9ft) Discuss this city on our hugely popular Oregon forum Back to: Umatilla, OR, Oregon, All US cities.
|
![]() |