Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Union Springs, Alabama (AL)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 19Number of bridges
  • 161ft / 48.6mTotal length
  • $18,723,000Total costs
  • 39,050Total average daily traffic
  • 4,781Total average daily truck traffic
  • 52,209Total future (year 2033) average daily traffic
  • National Bridge Inventory (NBI) Registered Bridges for Union Springs
  • No street view available for this location

New bridges in Union Springs, AL - historical statistics
  • New bridges - historical statistics
  • 41920-1929
  • 51950-1959
  • 11960-1969
  • 61980-1989
  • 32000-2009
Average Bridge Daily Traffic in Union Springs, AL
Average Bridge Truck Traffic in Union Springs, AL
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 40.0%Good
  • 50.0%Satisfactory
  • 10.0%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 30.0%Very good
  • 30.0%Good
  • 30.0%Satisfactory
  • 10.0%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 30.0%Very good
  • 20.0%Good
  • 40.0%Satisfactory
  • 10.0%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 5.9%Very good
  • 23.5%Good
  • 52.9%Satisfactory
  • 17.6%Fair
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 77.8%Satisfactory
  • 22.2%Fair
Find on map >>   Show street view

Structure Number: 499,  Location: 1.5 MI.N.OF AL.239 JCT (Lat: 32.094167,  Lng: -85.691950),  Route carried "on" structure: US 29,  Year Built: 1928,  Status: Open,  Structure Length: 1.01m (3.31ft),  Average Daily Traffic: 2,520 (year 2013),  Truck Traffic: 15%,  Average Future Daily Traffic: 3,503 (year 2033),  Design Load: H 15,  Features Intersected: BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 224.513,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 82.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 49.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.68m (5.51ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $320,000,  Roadway Improvement Cost: $32,000,  Total Project Cost: $352,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 5,  Location: 2.1 MI. N. OF AL. 239 JCT (Lat: 32.102517,  Lng: -85.694817),  Route carried "on" structure: US 29,  Year Built: 1928,  Status: Open,  Structure Length: 1.01m (3.31ft),  Average Daily Traffic: 2,520 (year 2013),  Truck Traffic: 15%,  Average Future Daily Traffic: 3,503 (year 2033),  Design Load: H 15,  Features Intersected: BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 225.508,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 10.7m (35.1ft),  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 82.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 49.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.68m (5.51ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $311,000,  Roadway Improvement Cost: $31,000,  Total Project Cost: $342,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 4577,  Location: UNION SPRINGS (Lat: 32.139861,  Lng: -85.716111),  Route carried "on" structure: Bypass US 29,  Year Built: 1953,  Status: Open,  Structure Length: 3.84m (12.60ft),  Average Daily Traffic: 3,860 (year 2013),  Truck Traffic: 9%,  Average Future Daily Traffic: 5,365 (year 2033),  Design Load: H 20,  Features Intersected: C. OF GA. RR(ABAND.)
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 230.323,  Lanes on structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 20.7m (67.9ft),  Skew: 24 degrees,  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 12.8m (42.0ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 14.6m (47.9ft),  Out-to-Out Width: 17.7m (58.1ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 39.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 23.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 4.78m (15.68ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $1,901,000,  Roadway Improvement Cost: $190,000,  Total Project Cost: $2,091,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 4776,  Location: 2.7 MI E OF JCT AL 110 (Lat: 32.141800,  Lng: -85.720000),  Route carried "on" structure: US 82,  Year Built: 1954,  Status: Open,  Structure Length: 3.29m (10.79ft),  Average Daily Traffic: 8,040 (year 2013),  Truck Traffic: 11%,  Average Future Daily Traffic: 10,410 (year 2033),  Design Load: H 20,  Features Intersected: C. OF GA. RR(ABAND.)
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 319.072,  Lanes on structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 19.8m (65.0ft),  Skew: 20 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 11.0m (36.1ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 14.6m (47.9ft),  Out-to-Out Width: 17.7m (58.1ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Satisfactory,  Operating Rating: 63.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 37.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 4.17m (13.68ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $1,657,000,  Roadway Improvement Cost: $166,000,  Total Project Cost: $1,823,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 5519,  Location: SEC 10 T14 R23 (Lat: 32.203722,  Lng: -85.742686),  Route carried "on" structure: County highway 23,  Year Built: 1956,  Status: Open,  Structure Length: 1.35m (4.43ft),  Average Daily Traffic: 290 (year 2013),  Truck Traffic: 9%,  Average Future Daily Traffic: 430 (year 2033),  Design Load: H 20,  Features Intersected: TOWN CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Good,  Culverts: Fair,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 60.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 2.02m (6.63ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2022,  Bridge Improvement Cost: $443,000,  Roadway Improvement Cost: $44,000,  Total Project Cost: $487,000 ( Estimate for 2022),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 5537,  Location: SEC 33 T14 R24 (Lat: 32.149983,  Lng: -85.644189),  Route carried "on" structure: County highway 30,  Year Built: 1956,  Status: Open,  Structure Length: 1.31m (4.30ft),  Average Daily Traffic: 400 (year 2015),  Truck Traffic: 5%,  Average Future Daily Traffic: 500 (year 2035),  Design Load: H 20,  Features Intersected: CONECUH RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Fair,  Culverts: Satisfactory,  Operating Rating: 57.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.98m (6.50ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $458,000,  Roadway Improvement Cost: $46,000,  Total Project Cost: $504,000 ( Estimate for 2022),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 5926,  Location: SEC 16 T14 R24 (Lat: 32.193836,  Lng: -85.654439),  Route carried "on" structure: County highway 49,  Year Built: 1957,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 100 (year 2015),  Average Future Daily Traffic: 150 (year 2035),  Design Load: H 20,  Features Intersected: MOSLEY CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 56.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 1.64m (5.38ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $313,000,  Roadway Improvement Cost: $31,000,  Total Project Cost: $344,000 ( Estimate for 2022),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 7123,  Location: SEC 7 T14 R24 (Lat: 32.209439,  Lng: -85.683331),  Route carried "on" structure: County highway 115,  Year Built: 1967,  Status: Posted for load,  Structure Length: 3.47m (11.38ft),  Average Daily Traffic: 200 (year 2015),  Truck Traffic: 5%,  Average Future Daily Traffic: 300 (year 2035),  Design Load: H 15,  Features Intersected: MOORES CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 5.8m (19.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 7.4m (24.3ft),  Out-to-Out Width: 7.8m (25.6ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Fair,  Channel: Fair,  Operating Rating: 34.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 21.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 10.0 - 19.9% below),  Length Of Structure Improvement: 4.38m (14.37ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: Febuary 2022,  Other Special Inspection Date: Febuary 2022,  Bridge Improvement Cost: $750,000,  Roadway Improvement Cost: $75,000,  Total Project Cost: $825,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 12251,  Location: 3.6 MI.E.OF U.S.29 (Lat: 32.146300,  Lng: -85.652700),  Route carried "on" structure: US 82,  Year Built: 1928,  Year Reconstructed: 1980,  Status: Open,  Structure Length: 0.67m (2.20ft),  Average Daily Traffic: 3,580 (year 2013),  Truck Traffic: 16%,  Average Future Daily Traffic: 4,635 (year 2033),  Design Load: H 15,  Features Intersected: BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 325.836,  Lanes on structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 23.2m (76.1ft),  Skew: 10 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Fair,  Culverts: Satisfactory,  Operating Rating: 78.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 47.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.30m (4.27ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $1,149,000,  Roadway Improvement Cost: $115,000,  Total Project Cost: $1,264,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 12352,  Location: UNION SPRINGS (Lat: 32.146169,  Lng: -85.703258),  Route carried "on" structure: US 82,  Year Built: 1980,  Status: Open,  Structure Length: 2.44m (8.01ft),  Average Daily Traffic: 7,360 (year 2013),  Truck Traffic: 10%,  Average Future Daily Traffic: 9,529 (year 2033),  Design Load: HS 20,  Features Intersected: CONECUH RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 321.048,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 18.9m (62.0ft),  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 82.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 49.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 3.31m (10.86ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $1,357,000,  Roadway Improvement Cost: $136,000,  Total Project Cost: $1,493,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 12484,  Location: SEC 27 T13 R23 (Lat: 32.081611,  Lng: -85.735408),  Route carried "on" structure: County highway 22,  Year Built: 1981,  Status: Open,  Structure Length: 5.18m (16.99ft),  Average Daily Traffic: 300 (year 2014),  Truck Traffic: 5%,  Average Future Daily Traffic: 350 (year 2034),  Design Load: HS 20,  Features Intersected: CONECUH RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 10.4m (34.1ft),  Curb or Sidewalk Widths: Left: 0.4m (1.3ft),  Right: 0.4m (1.3ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.1m (26.6ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 43.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 24.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 6.21m (20.37ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $1,106,000,  Roadway Improvement Cost: $111,000,  Total Project Cost: $1,217,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 13237,  Location: 1.9 MI.E.OF CO.RD 22 (Lat: 32.115000,  Lng: -85.783333),  Route carried "on" structure: US 82,  Year Built: 1984,  Status: Open,  Structure Length: 2.07m (6.79ft),  Average Daily Traffic: 1,070 (year 2013),  Truck Traffic: 27%,  Average Future Daily Traffic: 1,385 (year 2033),  Design Load: HS 20,  Features Intersected: BOWLIN CRK.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 310.972,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 10.4m (34.1ft),  Out-to-Out Width: 11.2m (36.7ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 51.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 30.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 2.84m (9.32ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $700,000,  Roadway Improvement Cost: $70,000,  Total Project Cost: $770,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 13238,  Location: 0.4 MI.W.OF AL 110 (Lat: 32.137931,  Lng: -85.766478),  Route carried "on" structure: US 82,  Year Built: 1984,  Status: Open,  Structure Length: 0.73m (2.40ft),  Average Daily Traffic: 1,070 (year 2013),  Truck Traffic: 27%,  Average Future Daily Traffic: 1,385 (year 2033),  Design Load: HS 20,  Features Intersected: SLAUGHTER CRK.RELIEF
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 314.134,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 53.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.38m (4.53ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $374,000,  Roadway Improvement Cost: $37,000,  Total Project Cost: $411,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 13239,  Location: 0.35 MI.W.OF AL 110 (Lat: 32.138819,  Lng: -85.766181),  Route carried "on" structure: US 82,  Year Built: 1984,  Status: Open,  Structure Length: 2.07m (6.79ft),  Average Daily Traffic: 1,070 (year 2013),  Truck Traffic: 27%,  Average Future Daily Traffic: 1,385 (year 2033),  Design Load: HS 20,  Features Intersected: SLAUGHTER CRK.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 314.231,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 10.4m (34.1ft),  Out-to-Out Width: 11.2m (36.7ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 55.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 2.84m (9.32ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Underwater Inspection Date: September 2021,  Bridge Improvement Cost: $700,000,  Roadway Improvement Cost: $70,000,  Total Project Cost: $770,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 13606,  Location: 4.2 MI.N.OF AL 239 (Lat: 32.127333,  Lng: -85.713550),  Route carried "on" structure: US 29,  Year Built: 1985,  Status: Open,  Structure Length: 4.15m (13.62ft),  Average Daily Traffic: 2,850 (year 2013),  Truck Traffic: 10%,  Average Future Daily Traffic: 3,961 (year 2033),  Design Load: HS 20,  Features Intersected: CONECUH RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 228.855,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 11.7m (38.4ft),  Out-to-Out Width: 12.5m (41.0ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 59.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 5.12m (16.80ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $1,439,000,  Roadway Improvement Cost: $144,000,  Total Project Cost: $1,583,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 14321,  Location: 2.6 MI. N. OF US 82 JCT (Lat: 32.177525,  Lng: -85.708228),  Route carried "on" structure: US 29,  Year Built: 1926,  Year Reconstructed: 1988,  Status: Open,  Structure Length: 0.67m (2.20ft),  Average Daily Traffic: 2,560 (year 2013),  Truck Traffic: 7%,  Average Future Daily Traffic: 3,558 (year 2033),  Design Load: HS 20,  Features Intersected: CUBAHATCHEE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 234.935,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Fair,  Operating Rating: 63.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 38.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.30m (4.27ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $473,000,  Roadway Improvement Cost: $47,000,  Total Project Cost: $520,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 1905,  Location: SEC 15 T13 R23 (Lat: 32.101844,  Lng: -85.723028),  Route carried "on" structure: County highway 31,  Year Built: 2003,  Status: Open,  Structure Length: 6.10m (20.01ft),  Average Daily Traffic: 420 (year 2014),  Truck Traffic: 7%,  Average Future Daily Traffic: 620 (year 2034),  Design Load: HS 20,  Features Intersected: CONECUH RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 12.2m (40.0ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.1m (29.9ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 76.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 45.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.14m (23.43ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $1,468,000,  Roadway Improvement Cost: $147,000,  Total Project Cost: $1,615,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 19051,  Location: SEC 26 T13 R23 (Lat: 32.080681,  Lng: -85.712339),  Route carried "on" structure: County highway 31,  Year Built: 2003,  Status: Open,  Structure Length: 4.15m (13.62ft),  Average Daily Traffic: 420 (year 2014),  Truck Traffic: 7%,  Average Future Daily Traffic: 620 (year 2034),  Design Load: HS 20,  Features Intersected: LITTLE CONECUH RIVER
Minimum Vertical Clearance: 30.18m (99.02ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.1m (29.9ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Channel: Good,  Operating Rating: 74.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 44.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.11m (16.77ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $1,051,000,  Roadway Improvement Cost: $105,000,  Total Project Cost: $1,156,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 19052,  Location: SEC 26 T13 R23 (Lat: 32.078544,  Lng: -85.712283),  Route carried "on" structure: County highway 31,  Year Built: 2003,  Status: Open,  Structure Length: 4.15m (13.62ft),  Average Daily Traffic: 420 (year 2014),  Truck Traffic: 7%,  Average Future Daily Traffic: 620 (year 2034),  Design Load: HS 20,  Features Intersected: LITTLE CONECUH RIVER REL
Minimum Vertical Clearance: 30.18m (99.02ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.1m (29.9ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Channel: Good,  Operating Rating: 74.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 44.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 5.11m (16.77ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $1,051,000,  Roadway Improvement Cost: $105,000,  Total Project Cost: $1,156,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels
Discuss Union Springs, Alabama (AL) on our hugely popular Alabama forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.