National Bridge Inventory (NBI) Statistics
Number of bridges: 11
Total length: 27 meters (89ft)
Total costs: $3,648,000
Total average daily traffic: 91,737
Total average daily truck traffic: 1,892
National Bridge Inventory (NBI) Registered Bridges for Upton

New bridges - Historical Statistics

  • 1920-1929: 1
  • 1930-1939: 1
  • 1940-1949: 0
  • 1950-1959: 9

Reconstructed bridges - Historical Statistics

  • 1940-1949: 1
  • 1950-1959: 0
  • 1960-1969: 0
  • 1970-1979: 0
  • 1980-1989: 0
  • 1990-1999: 1

Average Daily Traffic

Bridge Condition - Deck

Bridge Condition - Superstructure

Bridge Condition - Substructure

Bridge Condition - Channel

Find on map >>

Structure Number: U010011HWMUNNBI,  Location: .8MI. S.W. OF MENDON ST. (Lat: 42.149450,  Lng: -71.616197),  Route carried "on" structure: City street ,  Year Built: 1959,  Status: Open,  Structure Length: 2.35m (7.71ft),  Average Daily Traffic: 800 (year 2007),  Truck Traffic: 3%,  Average Future Daily Traffic: 1,263 (year 2028),  Features Intersected: WATER WEST RIVER,  Facility Carried by Structure: HWY WEST RIV ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.835,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 21.9m (71.9ft),  Curb or Sidewalk Widths: Left: 0.7m (2.3ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 9.0m (29.5ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 33.9 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 14.9 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 2.40m (7.87ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2007,  Bridge Improvement Cost: $386,000,  Roadway Improvement Cost: $39,000,  Total Project Cost: $580,000 ( Estimate for 2006),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: U010051DJMUNNBI,  Location: .2MI. WST. OF MAPLE AVE. (Lat: 42.156981,  Lng: -71.622939),  Route carried "on" structure: City street ,  Year Built: 1959,  Status: Posted for load,  Structure Length: 1.98m (6.50ft),  Average Daily Traffic: 20,000 (year 2007),  Truck Traffic: 3%,  Average Future Daily Traffic: 31,586 (year 2028),  Features Intersected: WATER WEST RIVER,  Facility Carried by Structure: HWY PLEASANT ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.076,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 18.3m (60.0ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 0.8m (2.6ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 10.3m (33.8ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Good,  Operating Rating: 34.3 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 15.5 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: High priority of corrective action,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.00m (6.56ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2007,  Bridge Improvement Cost: $368,000,  Roadway Improvement Cost: $37,000,  Total Project Cost: $553,000 ( Estimate for 2006),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>

Structure Number: U010061HXMUNNBI,  Location: 500 FEET E. OF GLEN AVE (Lat: 42.167222,  Lng: -71.627528),  Route carried "on" structure: City street ,  Year Built: 1956,  Status: Open,  Structure Length: 0.70m (2.30ft),  Average Daily Traffic: 500 (year 2007),  Truck Traffic: 1%,  Average Future Daily Traffic: 790 (year 2028),  Design Load: H 15,  Features Intersected: WATER WEST RIVER,  Facility Carried by Structure: HWY HARTFORD AVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.692,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 7.6m (24.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.7m (22.0ft),  Curb or Sidewalk Widths: Left: 0.3m (1.0ft),  Right: 0.3m (1.0ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Satisfactory,  Inventory Rating: 59.7 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 0.80m (2.62ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 36 months,  Inspection Date: January 2007,  Underwater Inspection Date: September 2007,  Bridge Improvement Cost: $148,000,  Roadway Improvement Cost: $15,000,  Total Project Cost: $223,000 ( Estimate for 2006),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>

Structure Number: U010101HYMUNNBI,  Location: 0.5M N OF RT140VIA MECNIC (Lat: 42.182389,  Lng: -71.628194),  Route carried "on" structure: City street ,  Year Built: 1956,  Status: Open,  Structure Length: 0.67m (2.20ft),  Average Daily Traffic: 300 (year 2007),  Truck Traffic: 1%,  Average Future Daily Traffic: 474 (year 2028),  Design Load: H 15,  Features Intersected: WATER WARREN BROOK,  Facility Carried by Structure: HWY FOWLER ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.129,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.0m (19.7ft),  Curb or Sidewalk Widths: Left: 0.3m (1.0ft),  Right: 0.3m (1.0ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 7.3m (24.0ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 71.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 54.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 0.70m (2.30ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 36 months,  Inspection Date: April 2007,  Underwater Inspection Date: September 2007,  Bridge Improvement Cost: $129,000,  Roadway Improvement Cost: $13,000,  Total Project Cost: $194,000 ( Estimate for 2006),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>

Structure Number: U010121LXMHDNBI,  Location: 1.1 MI STH OF GRAFTON TL (Lat: 42.172228,  Lng: -71.628167),  Route carried "on" structure: State highway 140,  Year Built: 1928,  Year Reconstructed: 1952,  Status: Open,  Structure Length: 0.88m (2.89ft),  Average Daily Traffic: 9,000 (year 2008),  Truck Traffic: 10%,  Average Future Daily Traffic: 14,214 (year 2029),  Features Intersected: WATER WARREN BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 101.707,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 2 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.6m (24.9ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 16.1m (52.8ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 50.9 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 31.3 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.90m (2.95ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2008,  Bridge Improvement Cost: $259,000,  Roadway Improvement Cost: $26,000,  Total Project Cost: $389,000 ( Estimate for 2006),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: U010131J0MUNNBI,  Location: 200 FT.SOUTH OF ST.140 (Lat: 42.172244,  Lng: -71.629164),  Route carried "on" structure: City street ,  Year Built: 1937,  Status: Posted for load,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 400 (year 2006),  Truck Traffic: 1%,  Average Future Daily Traffic: 632 (year 2027),  Design Load: H 15,  Features Intersected: WATER WEST RIVER,  Facility Carried by Structure: HWY GLEN AVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.140,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.2m (26.9ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.4m (27.6ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 36.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 21.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.00m (3.28ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2006,  Bridge Improvement Cost: $150,000,  Roadway Improvement Cost: $16,000,  Total Project Cost: $226,000 ( Estimate for 2006),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: U0101523WMHDNBI,  Location: 50 FT.WST. OF ST.140 (Lat: 42.172908,  Lng: -71.630517),  Route carried "on" structure: Other road ,  Year Built: 1952,  Status: Open,  Structure Length: 0.70m (2.30ft),  Average Daily Traffic: 4,400 (year 2007),  Truck Traffic: 8%,  Average Future Daily Traffic: 6,949 (year 2028),  Design Load: H 20,  Features Intersected: WATER WEST RIVER,  Facility Carried by Structure: HWY WILLIAMS ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.161,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 2 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.1m (20.0ft),  Curb or Sidewalk Widths: Left: 1.6m (5.2ft),  Right: 0.0m,  Curb-To-Curb Width: 9.2m (30.2ft),  Out-to-Out Width: 11.6m (38.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 44.1 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 0.80m (2.62ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 48 months,  Inspection Date: June 2007,  Underwater Inspection Date: October 2005,  Bridge Improvement Cost: $144,000,  Roadway Improvement Cost: $15,000,  Total Project Cost: $217,000 ( Estimate for 2006),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>

Structure Number: U010191J1MUNNBI,  Location: .3 MILES SOUTH OF ST 140 (Lat: 42.167614,  Lng: -71.603514),  Route carried "on" structure: City street ,  Year Built: 1956,  Status: Open,  Structure Length: 0.70m (2.30ft),  Average Daily Traffic: 300 (year 2006),  Truck Traffic: 1%,  Average Future Daily Traffic: 474 (year 2027),  Design Load: H 15,  Features Intersected: WATER CENTER BROOK,  Facility Carried by Structure: HWY STATION ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.451,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.1m (20.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 5.5m (18.0ft),  Out-to-Out Width: 6.1m (20.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Inventory Rating: 57.0 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 0.80m (2.62ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2006,  Bridge Improvement Cost: $189,000,  Roadway Improvement Cost: $19,000,  Total Project Cost: $284,000 ( Estimate for 2006),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>

Structure Number: U010204N7MTANBI,  Location: 2MI.S.ST30 K29 (Lat: 42.228764,  Lng: -71.621750),  Route carried "on" structure: Interstate 90,  Year Built: 1957,  Year Reconstructed: 1995,  Status: Open,  Structure Length: 6.07m (19.91ft),  Average Daily Traffic: 100 (year 1997),  Truck Traffic: 1%,  Average Future Daily Traffic: 158 (year 2027),  Design Load: H 20,  Features Intersected: I 90,  Facility Carried by Structure: HWY NORTH ST
Minimum Vertical Clearance: 4.62m (15.16ft),  Kilometerpoint: 164.953,  Lanes on structure: 2,  Lanes under structure: 6,  Owner: State Toll Authority,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 19.2m (63.0ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 0.8m (2.6ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 10.5m (34.4ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 44.1 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.10m (20.01ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2006,  Bridge Improvement Cost: $654,000,  Roadway Improvement Cost: $66,000,  Total Project Cost: $982,000 ( Estimate for 2006),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>

Structure Number: U010204N7MTANBI,  Location: AT MILE 102.5 (Lat: 42.233333,  Lng: -71.616667),  Route carried "under" structure: Interstate 90,  Year Built: 1957,  Structure Length: 6.07m (19.91ft),  Average Daily Traffic: 27,926 (year 0 ),  Features Intersected: I 90 EB,  Facility Carried by Structure: HWY NORTH ST
Minimum Vertical Clearance: 4.27m (14.01ft),  Kilometerpoint: 164.953,  Lanes on structure: 2,  Lanes under structure: 3,  Toll: On toll road,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 19.2m (63.0ft)

Find on map >>

Structure Number: U010204N7MTANBI,  Location: AT MILE 102.5 (Lat: 42.233333,  Lng: -71.616667),  Route carried "under" structure: Interstate 90,  Year Built: 1957,  Structure Length: 6.07m (19.91ft),  Average Daily Traffic: 28,011 (year 0 ),  Features Intersected: I 90 WB,  Facility Carried by Structure: HWY NORTH ST
Minimum Vertical Clearance: 4.27m (14.01ft),  Kilometerpoint: 164.953,  Lanes on structure: 2,  Lanes under structure: 3,  Toll: On toll road,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 19.2m (63.0ft)

Discuss this city on our hugely popular Massachusetts forum

Back to: Upton, MA, Massachusetts, All US cities.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2009 Advameg, Inc.