National Bridge Inventory (NBI) Statistics
Number of bridges: 48
Total length: 265 meters (869ft)
Total costs: $71,175,000
Total average daily traffic: 560,088
Total average daily truck traffic: 85,520
National Bridge Inventory (NBI) Registered Bridges for Van Buren

New bridges - Historical Statistics

  • 1950-1959: 6
  • 1960-1969: 10
  • 1970-1979: 18
  • 1980-1989: 10
  • 1990-1999: 3
  • 2000-2009: 1

Reconstructed bridges - Historical Statistics

  • 1970-1979: 1
  • 1980-1989: 6

Average Daily Traffic

Average Truck Traffic (%)

Bridge Condition - Deck

Bridge Condition - Superstructure

Bridge Condition - Substructure

Bridge Condition - Channel

Find on map >>

Structure Number: 1053691,  Location: JCT OF RTS I-690 SB + 31 (Lat: 43.151258,  Lng: -76.357147),  Route carried "on" structure: State highway 690,  Year Built: 1969,  Status: Open,  Structure Length: 4.29m (14.07ft),  Average Daily Traffic: 8,559 (year 2007),  Truck Traffic: 7%,  Average Future Daily Traffic: 11,983 (year 2027),  Design Load: HS 20,  Features Intersected: RTE 31
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 8.249,  Lanes on structure: 2,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.5m (37.7ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 41.1m (134.8ft),  Curb-To-Curb Width: 9.5m (31.2ft),  Out-to-Out Width: 10.6m (34.8ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 92.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 55.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.29m (14.07ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2007,  Bridge Improvement Cost: $1,722,000,  Roadway Improvement Cost: $1,024,000,  Total Project Cost: $2,746,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>

Structure Number: 1053692,  Location: JCT OF RTS I-690 NB + 31 (Lat: 43.151272,  Lng: -76.356608),  Route carried "on" structure: State highway 690,  Year Built: 1969,  Status: Open,  Structure Length: 4.29m (14.07ft),  Average Daily Traffic: 10,178 (year 2006),  Truck Traffic: 7%,  Average Future Daily Traffic: 14,249 (year 2026),  Design Load: HS 20,  Features Intersected: RTE 31
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.801,  Lanes on structure: 2,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.5m (37.7ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 41.1m (134.8ft),  Curb-To-Curb Width: 9.5m (31.2ft),  Out-to-Out Width: 10.6m (34.8ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 92.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 55.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.29m (14.07ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2007,  Bridge Improvement Cost: $1,722,000,  Roadway Improvement Cost: $1,024,000,  Total Project Cost: $2,746,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>

Structure Number: 1053711,  Location: JCT OF RTS 690 SB + 370 (Lat: 43.163083,  Lng: -76.363761),  Route carried "on" structure: State highway 690,  Year Built: 1969,  Status: Open,  Structure Length: 4.41m (14.47ft),  Average Daily Traffic: 19,399 (year 2004),  Truck Traffic: 7%,  Average Future Daily Traffic: 27,159 (year 2024),  Design Load: HS 20,  Features Intersected: RTE 370
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 8.378,  Lanes on structure: 2,  Lanes under structure: 5,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.1m (39.7ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 42.3m (138.8ft),  Curb-To-Curb Width: 9.5m (31.2ft),  Out-to-Out Width: 10.6m (34.8ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Operating Rating: 98.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 59.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.41m (14.47ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2007,  Bridge Improvement Cost: $1,015,000,  Roadway Improvement Cost: $604,000,  Total Project Cost: $1,619,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>

Structure Number: 1053712,  Location: JCT OF RTS 690 NB + 370 (Lat: 43.163100,  Lng: -76.363547),  Route carried "on" structure: State highway 690,  Year Built: 1969,  Status: Open,  Structure Length: 4.41m (14.47ft),  Average Daily Traffic: 5,762 (year 2002),  Truck Traffic: 7%,  Average Future Daily Traffic: 8,067 (year 2022),  Design Load: HS 20,  Features Intersected: RTE 370
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 8.378,  Lanes on structure: 2,  Lanes under structure: 5,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.1m (39.7ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 42.3m (138.8ft),  Curb-To-Curb Width: 9.5m (31.2ft),  Out-to-Out Width: 10.6m (34.8ft)

Condition: Deck: Fair,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 98.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 59.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.41m (14.47ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2007,  Bridge Improvement Cost: $1,015,000,  Roadway Improvement Cost: $604,000,  Total Project Cost: $1,619,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>

Structure Number: 1061731,  Location: EXIT 4 OF I690 (Lat: 43.112792,  Lng: -76.267369),  Route carried "on" structure: Interstate 690,  Year Built: 1971,  Year Reconstructed: 1989,  Status: Open,  Structure Length: 3.20m (10.50ft),  Average Daily Traffic: 15,309 (year 2002),  Truck Traffic: 20%,  Average Future Daily Traffic: 21,433 (year 2022),  Design Load: HS 20,  Features Intersected: JN GLN RMP E-CR81
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.706,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.5m (37.7ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 31.0m (101.7ft),  Curb-To-Curb Width: 11.3m (37.1ft),  Out-to-Out Width: 12.3m (40.4ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 87.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 51.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.20m (10.50ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2006,  Bridge Improvement Cost: $1,702,000,  Roadway Improvement Cost: $1,012,000,  Total Project Cost: $2,714,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>

Structure Number: 1061732,  Location: .1 MI NW JCT I690 NB & I9 (Lat: 43.112903,  Lng: -76.267236),  Route carried "on" structure: Interstate 690,  Year Built: 1971,  Year Reconstructed: 1989,  Status: Open,  Structure Length: 3.26m (10.70ft),  Average Daily Traffic: 15,309 (year 2002),  Truck Traffic: 20%,  Average Future Daily Traffic: 21,433 (year 2022),  Design Load: HS 20,  Features Intersected: JOHN GLENN RAMP E
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.706,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.1m (43.0ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 30.7m (100.7ft),  Curb or Sidewalk Widths: Left: 0.4m (1.3ft),  Right: 0.4m (1.3ft),  Curb-To-Curb Width: 12.9m (42.3ft),  Out-to-Out Width: 13.9m (45.6ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Operating Rating: 80.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 48.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.26m (10.70ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2006,  Bridge Improvement Cost: $1,702,000,  Roadway Improvement Cost: $1,012,000,  Total Project Cost: $2,714,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>

Structure Number: 1061741,  Location: BETWEEN EXITS 3 & 4 - I69 (Lat: 43.113119,  Lng: -76.270031),  Route carried "on" structure: Interstate 690,  Year Built: 1971,  Year Reconstructed: 1989,  Status: Open,  Structure Length: 3.74m (12.27ft),  Average Daily Traffic: 15,309 (year 2002),  Truck Traffic: 20%,  Average Future Daily Traffic: 21,433 (year 2022),  Design Load: HS 20,  Features Intersected: JOHN GLENN RAMP F
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.704,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 10.9m (35.8ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 35.9m (117.8ft),  Curb-To-Curb Width: 11.3m (37.1ft),  Out-to-Out Width: 12.3m (40.4ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 53.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.74m (12.27ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2006,  Bridge Improvement Cost: $1,702,000,  Roadway Improvement Cost: $1,012,000,  Total Project Cost: $2,714,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>

Structure Number: 1061742,  Location: BETWEEN EXITS 3 & 4 - I69 (Lat: 43.113317,  Lng: -76.270089),  Route carried "on" structure: Interstate 690,  Year Built: 1971,  Year Reconstructed: 1989,  Status: Open,  Structure Length: 3.74m (12.27ft),  Average Daily Traffic: 15,309 (year 2002),  Truck Traffic: 20%,  Average Future Daily Traffic: 21,433 (year 2022),  Design Load: HS 20,  Features Intersected: JOHN GLENN RAMP F
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.704,  Lanes on structure: 3,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 15.2m (49.9ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 35.9m (117.8ft),  Curb-To-Curb Width: 13.9m (45.6ft),  Out-to-Out Width: 14.9m (48.9ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 83.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 49.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.74m (12.27ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2006,  Bridge Improvement Cost: $1,702,000,  Roadway Improvement Cost: $1,012,000,  Total Project Cost: $2,714,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>

Structure Number: 1061751,  Location: BETWEEN EXITS 1 & 2- I690 (Lat: 43.111764,  Lng: -76.286144),  Route carried "on" structure: Interstate 690,  Year Built: 1971,  Year Reconstructed: 1989,  Status: Open,  Structure Length: 2.80m (9.19ft),  Average Daily Traffic: 22,592 (year 2002),  Truck Traffic: 20%,  Average Future Daily Traffic: 31,629 (year 2022),  Design Load: HS 20,  Features Intersected: JONES RD - CR 28
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.438,  Lanes on structure: 3,  Lanes under structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 14.0m (45.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 26.8m (87.9ft),  Curb-To-Curb Width: 13.9m (45.6ft),  Out-to-Out Width: 15.0m (49.2ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 78.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 46.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.80m (9.19ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2006,  Bridge Improvement Cost: $1,702,000,  Roadway Improvement Cost: $1,012,000,  Total Project Cost: $2,714,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>

Structure Number: 1061752,  Location: BETWEEN EXITS 1 & 2- I690 (Lat: 43.111986,  Lng: -76.286119),  Route carried "on" structure: Interstate 690,  Year Built: 1971,  Year Reconstructed: 1989,  Status: Open,  Structure Length: 2.80m (9.19ft),  Average Daily Traffic: 22,592 (year 2002),  Truck Traffic: 20%,  Average Future Daily Traffic: 31,629 (year 2022),  Design Load: HS 20,  Features Intersected: JONES RD - CR 28
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.438,  Lanes on structure: 3,  Lanes under structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 14.0m (45.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 26.8m (87.9ft),  Curb-To-Curb Width: 13.9m (45.6ft),  Out-to-Out Width: 15.0m (49.2ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 77.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 46.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.80m (9.19ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2006,  Bridge Improvement Cost: $1,702,000,  Roadway Improvement Cost: $1,012,000,  Total Project Cost: $2,714,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>

Structure Number: 106179,  Location: .1 MI N JCT I690 & I90 (Lat: 43.112928,  Lng: -76.269961),  Route carried "on" structure: Ramp State highway 690,  Year Built: 1971,  Status: Open,  Structure Length: 3.20m (10.50ft),  Average Daily Traffic: 3,018 (year 2003),  Truck Traffic: 7%,  Average Future Daily Traffic: 4,323 (year 2023),  Design Load: HS 20,  Features Intersected: JOHN GLENN RAMP F
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 162.348,  Lanes on structure: 1,  Lanes under structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 30.4m (99.7ft),  Curb-To-Curb Width: 7.8m (25.6ft),  Out-to-Out Width: 8.7m (28.5ft)

Condition: Deck: Satisfactory,  Superstructure: Poor,  Substructure: Good,  Operating Rating: 83.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 49.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Better than present minimum criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.20m (10.50ft),  Designated Inspection Frequency: Every 12 months,  Inspection Date: August 2007,  Bridge Improvement Cost: $741,000,  Roadway Improvement Cost: $443,000,  Total Project Cost: $1,184,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>

Structure Number: 106181,  Location: 3.5 MI NW JCT I690 & I90 (Lat: 43.129117,  Lng: -76.319367),  Route carried "on" structure: County highway ,  Year Built: 1971,  Status: Open,  Structure Length: 7.07m (23.20ft),  Average Daily Traffic: 5,184 (year 2000),  Truck Traffic: 5%,  Average Future Daily Traffic: 7,258 (year 2020),  Design Load: HS 20,  Features Intersected: RTE 690,  Facility Carried by Structure: VAN BUREN RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 4 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 36.5m (119.8ft),  Curb or Sidewalk Widths: Left: 0.4m (1.3ft),  Right: 0.4m (1.3ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 10.6m (34.8ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Very good,  Operating Rating: 84.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 50.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.07m (23.20ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2006,  Bridge Improvement Cost: $741,000,  Roadway Improvement Cost: $443,000,  Total Project Cost: $1,184,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>

Structure Number: 106182,  Location: 4.5 MI NW JCT SH 690 & I9 (Lat: 43.137294,  Lng: -76.335050),  Route carried "on" structure: County highway ,  Year Built: 1971,  Status: Open,  Structure Length: 7.07m (23.20ft),  Average Daily Traffic: 1,295 (year 1999),  Truck Traffic: 4%,  Average Future Daily Traffic: 1,813 (year 2019),  Design Load: HS 20,  Features Intersected: RTE 690,  Facility Carried by Structure: CANTON ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 35.9m (117.8ft),  Curb-To-Curb Width: 9.0m (29.5ft),  Out-to-Out Width: 9.9m (32.5ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 85.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 50.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.07m (23.20ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2006,  Bridge Improvement Cost: $741,000,  Roadway Improvement Cost: $443,000,  Total Project Cost: $1,184,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>

Structure Number: 107315,  Location: 0.3MI E INTRCH 39 OVR 90I (Lat: 43.111325,  Lng: -76.264939),  Route carried "on" structure: Ramp Other road ,  Year Built: 1987,  Status: Open,  Structure Length: 7.80m (25.59ft),  Average Daily Traffic: 7,812 (year 2002),  Truck Traffic: 20%,  Average Future Daily Traffic: 11,271 (year 2022),  Design Load: HS 20,  Features Intersected: RTE I90,  Facility Carried by Structure: FR.RTE 48 TO 690I
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 12.1m (39.7ft),  Skew: 4 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 38.1m (125.0ft),  Curb-To-Curb Width: 12.0m (39.4ft),  Out-to-Out Width: 13.0m (42.7ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 48.1 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.80m (25.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2007,  Bridge Improvement Cost: $2,191,000,  Roadway Improvement Cost: $1,271,000,  Total Project Cost: $3,462,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>

Structure Number: 107316,  Location: 1M W.RT48&690I OVER 690I (Lat: 43.113042,  Lng: -76.290358),  Route carried "on" structure: Ramp Other road ,  Year Built: 1987,  Status: Open,  Structure Length: 7.19m (23.59ft),  Average Daily Traffic: 9,190 (year 2000),  Truck Traffic: 20%,  Average Future Daily Traffic: 13,259 (year 2020),  Design Load: HS 20,  Features Intersected: RTE I690,  Facility Carried by Structure: TOLL ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 5,  Toll: On toll road,  Owner: State Highway Agency,  Approaching Roadway Width: 16.1m (52.8ft),  Skew: 29 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 36.8m (120.7ft),  Curb-To-Curb Width: 15.3m (50.2ft),  Out-to-Out Width: 17.0m (55.8ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Fair,  Operating Rating: 96.5 metric tons,  Inventory Rating: 32.6 metric tons,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.19m (23.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2007,  Bridge Improvement Cost: $2,634,000,  Roadway Improvement Cost: $1,528,000,  Total Project Cost: $4,162,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>

Structure Number: 331296,  Location: 3 MI EAST BALDWINSVILLE (Lat: 43.150539,  Lng: -76.377275),  Route carried "on" structure: County highway ,  Year Built: 1988,  Status: Open,  Structure Length: 1.61m (5.28ft),  Average Daily Traffic: 855 (year 2003),  Truck Traffic: 6%,  Average Future Daily Traffic: 1,074 (year 2023),  Design Load: HS 20,  Features Intersected: DEAD CREEK,  Facility Carried by Structure: CR272 W DEADCK RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 10.3m (33.8ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 15.2m (49.9ft),  Curb-To-Curb Width: 10.3m (33.8ft),  Out-to-Out Width: 10.9m (35.8ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Excellent,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 53.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.61m (5.28ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2006,  Bridge Improvement Cost: $348,000,  Roadway Improvement Cost: $207,000,  Total Project Cost: $555,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>

Structure Number: 331322,  Location: .5 MI SE JCT SH 173 & I90 (Lat: 43.085172,  Lng: -76.329172),  Route carried "on" structure: State highway ,  Year Built: 2001,  Status: Open,  Structure Length: 2.66m (8.73ft),  Average Daily Traffic: 12,284 (year 1994),  Truck Traffic: 9%,  Average Future Daily Traffic: 15,165 (year 2014),  Design Load: HS 25,  Features Intersected: CSX TRANS/AMTRAK,  Facility Carried by Structure: Ramp Interstate 3 173
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.749,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 14.4m (47.2ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 24.2m (79.4ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 14.4m (47.2ft),  Out-to-Out Width: 18.0m (59.1ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Excellent,  Inventory Rating: 71.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Superior to present desirable criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 2.66m (8.73ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2007,  Bridge Improvement Cost: $776,000,  Roadway Improvement Cost: $461,000,  Total Project Cost: $1,237,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>

Structure Number: 336151,  Location: 4.5MI NE JORDAN NEAR RT31 (Lat: 43.096331,  Lng: -76.388453),  Route carried "on" structure: County highway ,  Year Built: 1992,  Status: Open,  Structure Length: 0.79m (2.59ft),  Average Daily Traffic: 1,634 (year 1999),  Truck Traffic: 9%,  Average Future Daily Traffic: 2,017 (year 2019),  Features Intersected: DEAD CREEK,  Facility Carried by Structure: CR204 IONIA CRNS
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 10.0m (32.8ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.3m (24.0ft),  Curb-To-Curb Width: 10.3m (33.8ft),  Out-to-Out Width: 10.9m (35.8ft)

Condition: Superstructure: Very good,  Substructure: Very good,  Channel: Satisfactory,  Operating Rating: 77.8 metric tons,  Inventory Rating: 32.6 metric tons,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.79m (2.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2006,  Bridge Improvement Cost: $461,000,  Roadway Improvement Cost: $309,000,  Total Project Cost: $770,000 ( Estimate for 2007),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 4053701,  Location: 1.7 MI W SH 48 & CANAL (Lat: 43.161575,  Lng: -76.363008),  Route carried "on" structure: State highway 690,  Year Built: 1969,  Status: Open,  Structure Length: 13.25m (43.47ft),  Average Daily Traffic: 8,559 (year 2007),  Truck Traffic: 7%,  Average Future Daily Traffic: 11,983 (year 2027),  Design Load: HS 20,  Features Intersected: ERIE CANAL/SEN RV
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 8.204,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 10.9m (35.8ft),  Navigation Control: Yes ( Vertical Clearance: 6.0m (19.7ft), Horizontal Clearance: 60.9m (199.8ft)),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 64.0m (210.0ft),  Curb-To-Curb Width: 9.6m (31.5ft),  Out-to-Out Width: 10.6m (34.8ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Poor,  Channel: Good,  Operating Rating: 74.4 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 38.1 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 13.25m (43.47ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: October 2006,  Underwater Inspection Date: June 2007,  Bridge Improvement Cost: $3,028,000,  Roadway Improvement Cost: $1,756,000,  Total Project Cost: $4,784,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>

Structure Number: 4053702,  Location: 1.7 MI W SH 48 & CANAL (Lat: 43.161700,  Lng: -76.362728),  Route carried "on" structure: State highway 690,  Year Built: 1969,  Status: Open,  Structure Length: 13.25m (43.47ft),  Average Daily Traffic: 8,559 (year 2007),  Truck Traffic: 7%,  Average Future Daily Traffic: 11,983 (year 2027),  Design Load: HS 20,  Features Intersected: ERIE CANAL/SEN RV
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 8.204,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 10.9m (35.8ft),  Navigation Control: Yes ( Vertical Clearance: 6.0m (19.7ft), Horizontal Clearance: 60.9m (199.8ft)),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 64.0m (210.0ft),  Curb-To-Curb Width: 9.6m (31.5ft),  Out-to-Out Width: 10.6m (34.8ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Poor,  Channel: Good,  Operating Rating: 74.4 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 38.1 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 13.25m (43.47ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: October 2006,  Underwater Inspection Date: June 2007,  Bridge Improvement Cost: $3,028,000,  Roadway Improvement Cost: $1,756,000,  Total Project Cost: $4,784,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>

Structure Number: 503914,  Location: .3 MI NW OF WARNERS (Lat: 43.088556,  Lng: -76.338178),  Route carried "on" structure: State highway ,  Year Built: 1954,  Status: Open,  Structure Length: 10.82m (35.50ft),  Average Daily Traffic: 3,027 (year 2005),  Truck Traffic: 9%,  Average Future Daily Traffic: 3,737 (year 2025),  Design Load: HS 20+Mod,  Features Intersected: RTE I90,  Facility Carried by Structure: Warners Rd Rte173
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.935,  Lanes on structure: 2,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Toll Authority,  Approaching Roadway Width: 9.4m (30.8ft),  Skew: 5 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 32.9m (107.9ft),  Curb or Sidewalk Widths: Left: 0.7m (2.3ft),  Right: 0.7m (2.3ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 10.0m (32.8ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Fair,  Operating Rating: 47.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 28.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 10.82m (35.50ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2006,  Bridge Improvement Cost: $2,343,000,  Roadway Improvement Cost: $1,359,000,  Total Project Cost: $3,702,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 551024,  Location: .7M WEST OF EXIT 39 TOLL (Lat: 43.106789,  Lng: -76.288894),  Route carried "on" structure: County highway ,  Year Built: 1999,  Status: Open,  Structure Length: 8.14m (26.71ft),  Average Daily Traffic: 3,990 (year 1999),  Truck Traffic: 5%,  Average Future Daily Traffic: 5,586 (year 2019),  Design Load: HS 25,  Features Intersected: RTE I90,  Facility Carried by Structure: VAN BUREN RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 3,  Lanes under structure: 6,  Owner: State Toll Authority,  Approaching Roadway Width: 14.3m (46.9ft),  Skew: 3 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 41.4m (135.8ft),  Curb-To-Curb Width: 14.3m (46.9ft),  Out-to-Out Width: 14.9m (48.9ft)

Condition: Deck: Very good,  Superstructure: Excellent,  Substructure: Very good,  Operating Rating: 93.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 56.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 8.14m (26.71ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2007,  Bridge Improvement Cost: $3,120,000,  Roadway Improvement Cost: $2,125,000,  Total Project Cost: $5,245,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Galvanized Reinforcing
Find on map >>

Structure Number: 551025,  Location: 3.5MI W INT 39 ON I90 (Lat: 43.089458,  Lng: -76.329633),  Route carried "on" structure: County highway ,  Year Built: 1954,  Status: Open,  Structure Length: 6.58m (21.59ft),  Average Daily Traffic: 2,430 (year 2003),  Truck Traffic: 8%,  Average Future Daily Traffic: 2,803 (year 2023),  Design Load: HS 20+Mod,  Features Intersected: RTE I90,  Facility Carried by Structure: CANTON STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Toll Authority,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 19.2m (63.0ft),  Curb or Sidewalk Widths: Left: 1.2m (3.9ft),  Right: 1.2m (3.9ft),  Curb-To-Curb Width: 10.3m (33.8ft),  Out-to-Out Width: 13.4m (44.0ft)

Condition: Deck: Fair,  Superstructure: Good,  Substructure: Fair,  Operating Rating: 37.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 15.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 6.58m (21.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2006,  Bridge Improvement Cost: $1,901,000,  Roadway Improvement Cost: $1,131,000,  Total Project Cost: $3,032,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 551026,  Location: 0.5 MI N OF MEMPHIS (Lat: 43.089594,  Lng: -76.377781),  Route carried "on" structure: County highway ,  Year Built: 1954,  Year Reconstructed: 1981,  Status: Open,  Structure Length: 7.52m (24.67ft),  Average Daily Traffic: 902 (year 2003),  Truck Traffic: 9%,  Average Future Daily Traffic: 1,114 (year 2023),  Design Load: HS 20+Mod,  Features Intersected: RTE I90,  Facility Carried by Structure: BENNETTS CRNRS RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Toll Authority,  Approaching Roadway Width: 10.0m (32.8ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 25.3m (83.0ft),  Curb or Sidewalk Widths: Left: 0.7m (2.3ft),  Right: 0.7m (2.3ft),  Curb-To-Curb Width: 9.4m (30.8ft),  Out-to-Out Width: 10.0m (32.8ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 80.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 48.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 7.52m (24.67ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2006,  Bridge Improvement Cost: $1,901,000,  Roadway Improvement Cost: $1,131,000,  Total Project Cost: $3,032,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>

Structure Number: 552334,  Location: OVER 90I AT INTRCH.39 (Lat: 43.106728,  Lng: -76.287989),  Route carried "on" structure: Ramp Other road ,  Year Built: 1987,  Status: Open,  Structure Length: 7.07m (23.20ft),  Average Daily Traffic: 5,317 (year 2003),  Truck Traffic: 20%,  Average Future Daily Traffic: 7,671 (year 2023),  Design Load: HS 20,  Features Intersected: RTE I90, EXIT 39 EB RAMP,  Facility Carried by Structure: EXIT 39 RAMP
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 5,  Toll: On toll road,  Owner: State Toll Authority,  Approaching Roadway Width: 15.2m (49.9ft),  Skew: 20 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 37.8m (124.0ft),  Curb-To-Curb Width: 15.4m (50.5ft),  Out-to-Out Width: 17.0m (55.8ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 53.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.07m (23.20ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2007,  Bridge Improvement Cost: $2,482,000,  Roadway Improvement Cost: $1,440,000,  Total Project Cost: $3,922,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>

Structure Number: 552335,  Location: 1M W.RT48&690I ON JONS RD (Lat: 43.108856,  Lng: -76.288225),  Route carried "on" structure: Ramp County highway ,  Year Built: 1987,  Status: Open,  Structure Length: 3.84m (12.60ft),  Average Daily Traffic: 3,542 (year 2005),  Truck Traffic: 4%,  Average Future Daily Traffic: 4,959 (year 2025),  Design Load: HS 20,  Features Intersected: JONES ROAD,  Facility Carried by Structure: INTERCHANGE #39 R
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 3,  Toll: On toll road,  Owner: State Highway Agency,  Approaching Roadway Width: 28.3m (92.8ft),  Skew: 21 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 37.7m (123.7ft),  Curb-To-Curb Width: 29.0m (95.1ft),  Out-to-Out Width: 30.0m (98.4ft)

Condition: Deck: Very good,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 78.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 46.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.84m (12.60ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2007,  Bridge Improvement Cost: $2,482,000,  Roadway Improvement Cost: $1,440,000,  Total Project Cost: $3,922,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>

Structure Number: 1053691,  Location: JCT OF RTS I-690 SB + 31 (Lat: 43.151258,  Lng: -76.357147),  Route carried "under" structure: State highway 31,  Year Built: 1969,  Structure Length: 4.29m (14.07ft),  Average Daily Traffic: 3,395 (year 2006),  Truck Traffic: 5%,  Features Intersected: RTE 31,  Facility Carried by Structure: RTE 690
Minimum Vertical Clearance: 4.62m (15.16ft),  Kilometerpoint: 1.852,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 41.1m (134.8ft)

Find on map >>

Structure Number: 1053692,  Location: JCT OF RTS I-690 NB + 31 (Lat: 43.151272,  Lng: -76.356608),  Route carried "under" structure: State highway 31,  Year Built: 1969,  Structure Length: 4.29m (14.07ft),  Average Daily Traffic: 3,395 (year 2006),  Truck Traffic: 5%,  Features Intersected: RTE 31,  Facility Carried by Structure: RTE 690
Minimum Vertical Clearance: 0.51m (1.67ft),  Kilometerpoint: 18.536,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 41.1m (134.8ft)

Find on map >>

Structure Number: 1053711,  Location: JCT OF RTS 690 SB + 370 (Lat: 43.163083,  Lng: -76.363761),  Route carried "under" structure: State highway 370,  Year Built: 1969,  Structure Length: 4.41m (14.47ft),  Average Daily Traffic: 8,118 (year 2006),  Truck Traffic: 6%,  Features Intersected: RTE 370,  Facility Carried by Structure: RTE 690
Minimum Vertical Clearance: 4.72m (15.49ft),  Kilometerpoint: 9.364,  Lanes on structure: 2,  Lanes under structure: 5,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 42.3m (138.8ft)

Find on map >>

Structure Number: 1053712,  Location: JCT OF RTS 690 NB + 370 (Lat: 43.163100,  Lng: -76.363547),  Route carried "under" structure: State highway 370,  Year Built: 1969,  Structure Length: 4.41m (14.47ft),  Average Daily Traffic: 8,118 (year 2006),  Truck Traffic: 6%,  Features Intersected: RTE 370,  Facility Carried by Structure: RTE 690
Minimum Vertical Clearance: 4.74m (15.55ft),  Kilometerpoint: 0.938,  Lanes on structure: 2,  Lanes under structure: 5,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 42.3m (138.8ft)

Find on map >>

Structure Number: 1061731,  Location: EXIT 4 OF I690 (Lat: 43.112792,  Lng: -76.267369),  Route carried "under" structure: Ramp County highway ,  Year Built: 1971,  Structure Length: 3.20m (10.50ft),  Average Daily Traffic: 3,550 (year 1975),  Truck Traffic: 7%,  Features Intersected: JN GLN RMP E-CR81,  Facility Carried by Structure: RTE I690
Minimum Vertical Clearance: 4.62m (15.16ft),  Kilometerpoint: 173.772,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 31.0m (101.7ft)

Find on map >>

Structure Number: 1061732,  Location: .1 MI NW JCT I690 NB & I9 (Lat: 43.112903,  Lng: -76.267236),  Route carried "under" structure: Ramp County highway ,  Year Built: 1971,  Structure Length: 3.26m (10.70ft),  Average Daily Traffic: 3,550 (year 1975),  Truck Traffic: 7%,  Features Intersected: JOHN GLENN RAMP E,  Facility Carried by Structure: RTE I690
Minimum Vertical Clearance: 5.43m (17.81ft),  Kilometerpoint: 173.772,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 30.7m (100.7ft)

Find on map >>

Structure Number: 1061741,  Location: BETWEEN EXITS 3 & 4 - I69 (Lat: 43.113119,  Lng: -76.270031),  Route carried "under" structure: Ramp Other road ,  Year Built: 1971,  Structure Length: 3.74m (12.27ft),  Average Daily Traffic: 4,750 (year 1975),  Truck Traffic: 7%,  Features Intersected: JOHN GLENN RAMP F,  Facility Carried by Structure: RTE I690
Minimum Vertical Clearance: 5.28m (17.32ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 35.9m (117.8ft)

Find on map >>

Structure Number: 1061742,  Location: BETWEEN EXITS 3 & 4 - I69 (Lat: 43.113317,  Lng: -76.270089),  Route carried "under" structure: Ramp Other road ,  Year Built: 1971,  Structure Length: 3.74m (12.27ft),  Average Daily Traffic: 4,750 (year 1975),  Truck Traffic: 7%,  Features Intersected: JOHN GLENN RAMP F,  Facility Carried by Structure: RTE I690
Minimum Vertical Clearance: 6.04m (19.82ft),  Kilometerpoint: 0.000,  Lanes on structure: 3,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 35.9m (117.8ft)

Find on map >>

Structure Number: 1061751,  Location: BETWEEN EXITS 1 & 2- I690 (Lat: 43.111764,  Lng: -76.286144),  Route carried "under" structure: County highway ,  Year Built: 1971,  Structure Length: 2.80m (9.19ft),  Average Daily Traffic: 3,542 (year 2005),  Truck Traffic: 4%,  Features Intersected: JONES RD - CR 28,  Facility Carried by Structure: RTE I690
Minimum Vertical Clearance: 5.63m (18.47ft),  Kilometerpoint: 0.000,  Lanes on structure: 3,  Lanes under structure: 3,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 26.8m (87.9ft)

Find on map >>

Structure Number: 1061752,  Location: BETWEEN EXITS 1 & 2- I690 (Lat: 43.111986,  Lng: -76.286119),  Route carried "under" structure: County highway ,  Year Built: 1971,  Structure Length: 2.80m (9.19ft),  Average Daily Traffic: 3,542 (year 2005),  Truck Traffic: 4%,  Features Intersected: JONES RD - CR 28,  Facility Carried by Structure: RTE I690
Minimum Vertical Clearance: 4.92m (16.14ft),  Kilometerpoint: 0.000,  Lanes on structure: 3,  Lanes under structure: 3,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 26.8m (87.9ft)

Find on map >>

Structure Number: 106179,  Location: .1 MI N JCT I690 & I90 (Lat: 43.112928,  Lng: -76.269961),  Route carried "under" structure: Ramp County highway ,  Year Built: 1971,  Structure Length: 3.20m (10.50ft),  Average Daily Traffic: 4,750 (year 1975),  Truck Traffic: 7%,  Features Intersected: JOHN GLENN RAMP F,  Facility Carried by Structure: RTE 690
Minimum Vertical Clearance: 4.36m (14.30ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 30.4m (99.7ft)

Find on map >>

Structure Number: 106181,  Location: 3.5 MI NW JCT I690 & I90 (Lat: 43.129117,  Lng: -76.319367),  Route carried "under" structure: State highway 690,  Year Built: 1971,  Structure Length: 7.07m (23.20ft),  Average Daily Traffic: 20,355 (year 2006),  Truck Traffic: 7%,  Features Intersected: RTE 690,  Facility Carried by Structure: VAN BUREN RD
Minimum Vertical Clearance: 5.61m (18.41ft),  Kilometerpoint: 3.073,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 36.5m (119.8ft)

Find on map >>

Structure Number: 106182,  Location: 4.5 MI NW JCT SH 690 & I9 (Lat: 43.137294,  Lng: -76.335050),  Route carried "under" structure: State highway 690,  Year Built: 1971,  Structure Length: 7.07m (23.20ft),  Average Daily Traffic: 20,355 (year 2006),  Truck Traffic: 7%,  Features Intersected: RTE 690,  Facility Carried by Structure: CANTON ST
Minimum Vertical Clearance: 5.23m (17.16ft),  Kilometerpoint: 4.553,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 35.9m (117.8ft)

Find on map >>

Structure Number: 107315,  Location: 0.3MI E INTRCH 39 OVR 90I (Lat: 43.111325,  Lng: -76.264939),  Route carried "under" structure: Interstate 90,  Year Built: 1987,  Structure Length: 7.80m (25.59ft),  Average Daily Traffic: 32,044 (year 2006),  Truck Traffic: 20%,  Features Intersected: RTE I90
Minimum Vertical Clearance: 5.74m (18.83ft),  Kilometerpoint: 19.388,  Lanes on structure: 2,  Lanes under structure: 4,  Toll: On toll road,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 38.1m (125.0ft)

Find on map >>

Structure Number: 107316,  Location: 1M W.RT48&690I OVER 690I (Lat: 43.113042,  Lng: -76.290358),  Route carried "under" structure: State highway 690,  Year Built: 1987,  Structure Length: 7.19m (23.59ft),  Average Daily Traffic: 23,318 (year 2006),  Truck Traffic: 7%,  Features Intersected: RTE I690,  Facility Carried by Structure: TOLL ROAD
Minimum Vertical Clearance: 5.61m (18.41ft),  Kilometerpoint: 0.274,  Lanes on structure: 2,  Lanes under structure: 5,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 36.8m (120.7ft)

Find on map >>

Structure Number: 503914,  Location: .3 MI NW OF WARNERS (Lat: 43.088556,  Lng: -76.338178),  Route carried "under" structure: Interstate 90,  Year Built: 1954,  Structure Length: 10.82m (35.50ft),  Average Daily Traffic: 36,236 (year 2007),  Truck Traffic: 23%,  Features Intersected: RTE I90,  Facility Carried by Structure: Warners Rd Rte173
Minimum Vertical Clearance: 5.05m (16.57ft),  Kilometerpoint: 13.129,  Lanes on structure: 2,  Lanes under structure: 4,  Toll: On toll road,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 32.9m (107.9ft)

Find on map >>

Structure Number: 551024,  Location: .7M WEST OF EXIT 39 TOLL (Lat: 43.106789,  Lng: -76.288894),  Route carried "under" structure: Interstate 90,  Year Built: 1999,  Structure Length: 8.14m (26.71ft),  Average Daily Traffic: 35,791 (year 2006),  Truck Traffic: 20%,  Features Intersected: RTE I90,  Facility Carried by Structure: VAN BUREN RD
Minimum Vertical Clearance: 4.72m (15.49ft),  Kilometerpoint: 17.731,  Lanes on structure: 3,  Lanes under structure: 6,  Toll: On toll road,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 41.4m (135.8ft)

Find on map >>

Structure Number: 551025,  Location: 3.5MI W INT 39 ON I90 (Lat: 43.089458,  Lng: -76.329633),  Route carried "under" structure: Interstate 90,  Year Built: 1954,  Structure Length: 6.58m (21.59ft),  Average Daily Traffic: 36,236 (year 2007),  Truck Traffic: 20%,  Features Intersected: RTE I90,  Facility Carried by Structure: CANTON STREET
Minimum Vertical Clearance: 5.66m (18.57ft),  Kilometerpoint: 13.837,  Lanes on structure: 2,  Lanes under structure: 4,  Toll: On toll road,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 19.2m (63.0ft)

Find on map >>

Structure Number: 551026,  Location: 0.5 MI N OF MEMPHIS (Lat: 43.089594,  Lng: -76.377781),  Route carried "under" structure: Interstate 90,  Year Built: 1954,  Structure Length: 7.52m (24.67ft),  Average Daily Traffic: 36,236 (year 2007),  Truck Traffic: 23%,  Features Intersected: RTE I90,  Facility Carried by Structure: BENNETTS CRNRS RD
Minimum Vertical Clearance: 4.34m (14.24ft),  Kilometerpoint: 9.879,  Lanes on structure: 2,  Lanes under structure: 4,  Toll: On toll road,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 25.3m (83.0ft)

Find on map >>

Structure Number: 552334,  Location: OVER 90I AT INTRCH.39 (Lat: 43.106728,  Lng: -76.287989),  Route carried "under" structure: Interstate 90,  Year Built: 1987,  Structure Length: 7.07m (23.20ft),  Average Daily Traffic: 35,791 (year 2006),  Truck Traffic: 20%,  Features Intersected: RTE I90, EXIT 39 EB RAMP,  Facility Carried by Structure: EXIT 39 RAMP
Minimum Vertical Clearance: 5.72m (18.77ft),  Kilometerpoint: 17.796,  Lanes on structure: 2,  Lanes under structure: 4,  Toll: On toll road,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 37.8m (124.0ft)

Find on map >>

Structure Number: 552334,  Location: OVER 90I AT INTRCH.39 (Lat: 43.106728,  Lng: -76.287989),  Route carried "under" structure: Ramp Interstate ,  Year Built: 1987,  Structure Length: 7.07m (23.20ft),  Average Daily Traffic: 2,500 (year 2007),  Truck Traffic: 20%,  Features Intersected: RTE I90, EXIT 39 EB RAMP,  Facility Carried by Structure: EXIT 39 RAMP
Minimum Vertical Clearance: 5.82m (19.09ft),  Kilometerpoint: 465.822,  Lanes on structure: 2,  Lanes under structure: 1,  Toll: On toll road,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 37.8m (124.0ft)

Find on map >>

Structure Number: 552335,  Location: 1M W.RT48&690I ON JONS RD (Lat: 43.108856,  Lng: -76.288225),  Route carried "under" structure: Other road ,  Year Built: 1987,  Structure Length: 3.84m (12.60ft),  Average Daily Traffic: 1,850 (year 1971),  Truck Traffic: 5%,  Features Intersected: JONES ROAD,  Facility Carried by Structure: INTERCHANGE #39 R
Minimum Vertical Clearance: 4.67m (15.32ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 3,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 37.7m (123.7ft)

Discuss this city on our hugely popular New York forum

Back to: Van Buren, NY, New York, All US cities.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2009 Advameg, Inc.