![]() |
Bridge Statistics for Venice, Illinois (IL) - Condition, Traffic, Stress, Structural Evaluation, Project CostsBack to: Venice, IL, Illinois, Illinois forum, All US cities. National Bridge Inventory (NBI) Statistics Number of bridges: 10 Total length: 226 meters (741ft) Total costs: $8,184,000 Total average daily traffic: 50,600 Total average daily truck traffic: 6,379 National Bridge Inventory (NBI) Registered Bridges for Venice
Bridge Condition - Superstructure Bridge Condition - Substructure Find on map >>
Structure Number: 60015514411, Location: NEAR E C L VENICE (Lat: 38.677119, Lng: -90.161039), Route carried "on" structure: Other road 9097, Year Built: 1936, Year Reconstructed: 1990, Status: Open, Structure Length: 30.42m (99.80ft), Average Daily Traffic: 6,600 (year 2006), Truck Traffic: 7%, Average Future Daily Traffic: 12,825 (year 2021), Design Load: HS 20, Features Intersected: ICG,N&W RR Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 5.873, Lanes on structure: 4, Owner: City or Municipal Highway Agency, Approaching Roadway Width: 18.9m (62.0ft), Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 16, Length of Maximum Span: 25.3m (83.0ft), Curb or Sidewalk Widths: Left: 1.2m (3.9ft), Right: 1.2m (3.9ft), Curb-To-Curb Width: 15.8m (51.8ft), Out-to-Out Width: 18.9m (62.0ft) Condition: Deck: Good, Superstructure: Very good, Substructure: Good, Operating Rating: 58.5 metric tons, Method Used To Determine Operating Rating: Allowable Stress (AS), Inventory Rating: 35.1 metric tons, Method Used To Determine Inventory Rating: Allowable Stress (AS), Structural Evaluation: Better than present minimum criteria, Deck Geometry: Meets minimum limits, Underclear: Somewhat better than minimum adequacy, Approach Roadway Alignment: Better than present minimum criteria, Designated Inspection Frequency: Every 48 months, Inspection Date: November 2007, Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete, Deck Protection: Epoxy Coated Reinforcing Find on map >>
Structure Number: 60600214602, Location: VENICE (Lat: 38.665022, Lng: -90.182553), Route carried "on" structure: Other road 9105, Year Built: 1910, Year Reconstructed: 2005, Status: Open, Structure Length: 174.74m (573.29ft), Average Daily Traffic: 5,000 (year 2007), Truck Traffic: 10%, Average Future Daily Traffic: 13,900 (year 2027), Design Load: HS 20, Features Intersected: MISS RIVER, Facility Carried by Structure: SALISBURY ST/FAU91 Minimum Vertical Clearance: 5.99m (19.65ft), Kilometerpoint: 0.016, Lanes on structure: 2, Owner: State Highway Agency, Approaching Roadway Width: 10.4m (34.1ft), Navigation Control: Yes ( Vertical Clearance: 14.6m (47.9ft), Horizontal Clearance: 152.4m (500.0ft)), Material/Design: Steel, Design/Construction: Truss - Thru, Number Of Spans In Main Unit: 3, Number Of Approach Spans: 31, Length of Maximum Span: 157.7m (517.4ft), Curb-To-Curb Width: 7.3m (24.0ft), Out-to-Out Width: 14.4m (47.2ft) Condition: Deck: Good, Superstructure: Satisfactory, Substructure: Satisfactory, Channel: Very good, Structural Evaluation: High priority of corrective action, Deck Geometry: High priority of replacement, Waterway Adequacy: Superior to present desirable criteria, Approach Roadway Alignment: Equal to present desirable criteria, Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below), Length Of Structure Improvement: 192.48m (631.50ft), Designated Inspection Frequency: Every 24 months, Inspection Date: October 2007, Bridge Improvement Cost: $7,440,000, Roadway Improvement Cost: $744,000, Total Project Cost: $8,184,000 ( Estimate for 2003), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete, Deck Protection: Epoxy Coated Reinforcing Find on map >>
Structure Number: 60820022477, Location: NE OF MCKINLEY BR (Lat: 38.671558, Lng: -90.175017), Route carried "under" structure: State highway 3, Year Built: 1969, Structure Length: 2.32m (7.61ft), Average Daily Traffic: 3,000 (year 2007), Truck Traffic: 17%, Features Intersected: BROADWAY IN VENICE, Facility Carried by Structure: ICG RR SPUR Minimum Vertical Clearance: 4.42m (14.50ft), Kilometerpoint: 241.688, Lanes under structure: 2, Material/Design: Steel continuous, Design/Construction: Girder and Floorbeam System, Length of Maximum Span: 21.3m (69.9ft) Find on map >>
Structure Number: 60820122569, Location: NE OF MCKINLEY BR (Lat: 38.671525, Lng: -90.174667), Route carried "under" structure: State highway 3, Year Built: 1969, Structure Length: 2.32m (7.61ft), Average Daily Traffic: 3,000 (year 2007), Truck Traffic: 17%, Features Intersected: BROADWAY IN VENICE, Facility Carried by Structure: ICG RR MAINLINE Minimum Vertical Clearance: 0.45m (1.48ft), Kilometerpoint: 24.164, Lanes under structure: 2, Material/Design: Steel continuous, Design/Construction: Girder and Floorbeam System, Length of Maximum Span: 21.3m (69.9ft) Find on map >>
Structure Number: 60820222707, Location: NE OF MCKINLEY BR (Lat: 38.671536, Lng: -90.174783), Route carried "under" structure: State highway 3, Year Built: 1969, Structure Length: 2.32m (7.61ft), Average Daily Traffic: 3,000 (year 2007), Truck Traffic: 17%, Features Intersected: BROADWAY IN VENICE, Facility Carried by Structure: CONRAIL MAINLINE Minimum Vertical Clearance: 4.42m (14.50ft), Kilometerpoint: 241.656, Lanes under structure: 2, Material/Design: Steel continuous, Design/Construction: Girder and Floorbeam System, Length of Maximum Span: 21.3m (69.9ft) Find on map >>
Structure Number: 6082032288, Location: NE OF MCKINLEY BR (Lat: 38.671550, Lng: -90.174900), Route carried "under" structure: State highway 3, Year Built: 1969, Structure Length: 2.32m (7.61ft), Average Daily Traffic: 3,000 (year 2007), Truck Traffic: 17%, Features Intersected: BROADWAY IN VENICE, Facility Carried by Structure: N&W RR 2-MAINLINE Minimum Vertical Clearance: 4.42m (14.50ft), Kilometerpoint: 241.672, Lanes under structure: 2, Material/Design: Steel continuous, Design/Construction: Girder and Floorbeam System, Length of Maximum Span: 21.3m (69.9ft) Find on map >>
Structure Number: 6099102455, Location: .25 N ST CLAIR CO L (Lat: 38.662611, Lng: -90.169647), Route carried "under" structure: State highway 3, Year Built: 1919, Structure Length: 4.51m (14.80ft), Average Daily Traffic: 9,000 (year 2007), Truck Traffic: 11%, Features Intersected: ILL 3, Facility Carried by Structure: TRRA RR Minimum Vertical Clearance: 0.47m (1.54ft), Kilometerpoint: 240.159, Lanes under structure: 2, Material/Design: Steel, Length of Maximum Span: 14.0m (45.9ft) Find on map >>
Structure Number: 60991124551, Location: .50 N ST CLAIR CO L (Lat: 38.666508, Lng: -90.170211), Route carried "under" structure: State highway 3, Year Built: 1910, Structure Length: 2.38m (7.81ft), Average Daily Traffic: 9,000 (year 2007), Truck Traffic: 11%, Features Intersected: ILL 3, Facility Carried by Structure: ILL TERM RR Minimum Vertical Clearance: 12.19m (39.99ft), Kilometerpoint: 24.061, Lanes under structure: 2, Material/Design: Steel, Length of Maximum Span: 20.7m (67.9ft) Find on map >>
Structure Number: 60993012076, Location: 0.72 M N MC KINLEY B (Lat: 38.676444, Lng: -90.174014), Route carried "under" structure: State highway 3, Year Built: 1901, Structure Length: 3.41m (11.19ft), Average Daily Traffic: 6,100 (year 2007), Truck Traffic: 21%, Features Intersected: ILL RTE 3, Facility Carried by Structure: TRRA RAILROADS Minimum Vertical Clearance: 7.01m (23.00ft), Kilometerpoint: 24.238, Lanes under structure: 6, Material/Design: Steel, Design/Construction: Girder and Floorbeam System, Length of Maximum Span: 19.8m (65.0ft) Find on map >>
Structure Number: 60993112078, Location: 0.9 MI E MERCHANT BR (Lat: 38.676600, Lng: -90.169853), Route carried "under" structure: Other road 9106, Year Built: 1901, Structure Length: 1.89m (6.20ft), Average Daily Traffic: 2,900 (year 2006), Truck Traffic: 4%, Features Intersected: KLEIN AVE FAU 9106, Facility Carried by Structure: TRRA RAILROADS Minimum Vertical Clearance: 5.33m (17.49ft), Kilometerpoint: 0.306, Lanes under structure: 2, Material/Design: Steel, Length of Maximum Span: 18.9m (62.0ft) Discuss this city on our hugely popular Illinois forum Back to: Venice, IL, Illinois, All US cities.
|
![]() |