National Bridge Inventory (NBI) Statistics
Number of bridges: 61
Total length: 359 meters (1,178ft)
Total costs: $80,513,000
Total average daily traffic: 816,903
Total average daily truck traffic: 63,007
National Bridge Inventory (NBI) Registered Bridges for Vestal

New bridges - Historical Statistics

  • 1920-1929: 3
  • 1930-1939: 5
  • 1940-1949: 4
  • 1950-1959: 8
  • 1960-1969: 26
  • 1970-1979: 3
  • 1980-1989: 6
  • 1990-1999: 5
  • 2000-2009: 1

Reconstructed bridges - Historical Statistics

  • 1960-1969: 3
  • 1970-1979: 0
  • 1980-1989: 6
  • 1990-1999: 5
  • 2000-2009: 2

Average Daily Traffic

Bridge Condition - Deck

Bridge Condition - Superstructure

Bridge Condition - Substructure

Bridge Condition - Channel

Bridge Condition - Culverts

Find on map >>

Structure Number: 1012971,  Location: 3.5 MI W JCT RTS 17 + 26 (Lat: 42.069136,  Lng: -76.103047),  Route carried "on" structure: State highway 17,  Year Built: 1969,  Status: Open,  Structure Length: 2.65m (8.69ft),  Average Daily Traffic: 26,895 (year 2006),  Truck Traffic: 9%,  Average Future Daily Traffic: 37,032 (year 2026),  Design Load: HS 20+Mod,  Features Intersected: TRACY CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.069,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.5m (37.7ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 24.9m (81.7ft),  Curb-To-Curb Width: 11.8m (38.7ft),  Out-to-Out Width: 12.7m (41.7ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Good,  Channel: Good,  Operating Rating: 53.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 31.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.65m (8.69ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2006,  Bridge Improvement Cost: $3,575,000,  Roadway Improvement Cost: $2,074,000,  Total Project Cost: $5,649,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>

Structure Number: 1012972,  Location: 3.5 MI W JCT RTS 17 + 26 (Lat: 42.068847,  Lng: -76.102978),  Route carried "on" structure: State highway 17,  Year Built: 1969,  Status: Open,  Structure Length: 2.65m (8.69ft),  Average Daily Traffic: 26,895 (year 2006),  Truck Traffic: 9%,  Average Future Daily Traffic: 37,032 (year 2026),  Design Load: HS 20+Mod,  Features Intersected: TRACY CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.069,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.5m (37.7ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 24.9m (81.7ft),  Curb-To-Curb Width: 11.8m (38.7ft),  Out-to-Out Width: 12.7m (41.7ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Good,  Channel: Good,  Operating Rating: 53.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 31.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.65m (8.69ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2006,  Bridge Improvement Cost: $3,575,000,  Roadway Improvement Cost: $2,074,000,  Total Project Cost: $5,649,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>

Structure Number: 1012999,  Location: JCT RTS 26 + 434 (Lat: 42.089211,  Lng: -76.042764),  Route carried "on" structure: State highway 26,  Year Built: 1964,  Year Reconstructed: 2005,  Status: Open,  Structure Length: 9.41m (30.87ft),  Average Daily Traffic: 8,982 (year 2007),  Truck Traffic: 6%,  Average Future Daily Traffic: 11,210 (year 2027),  Design Load: HS 20,  Features Intersected: RTE 434, EX-D.L.& W RWY.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 10.814,  Lanes on structure: 6,  Lanes under structure: 5,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 24.9m (81.7ft),  Skew: 21 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 19.5m (64.0ft),  Curb-To-Curb Width: 24.8m (81.4ft),  Out-to-Out Width: 26.6m (87.3ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Very good,  Operating Rating: 77.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 46.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 9.41m (30.87ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2007,  Bridge Improvement Cost: $2,134,000,  Roadway Improvement Cost: $1,189,000,  Total Project Cost: $3,323,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>

Structure Number: 1013009,  Location: JCT SH 201 & SH 434 (Lat: 42.095647,  Lng: -75.971450),  Route carried "on" structure: State highway 201,  Year Built: 1952,  Year Reconstructed: 1974,  Status: Open,  Structure Length: 3.47m (11.38ft),  Average Daily Traffic: 32,234 (year 2006),  Truck Traffic: 9%,  Average Future Daily Traffic: 44,383 (year 2026),  Design Load: HS 20,  Features Intersected: RTE 434
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.336,  Lanes on structure: 2,  Lanes under structure: 5,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 15.8m (51.8ft),  Skew: 30 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 16.4m (53.8ft),  Curb or Sidewalk Widths: Left: 0.7m (2.3ft),  Right: 0.8m (2.6ft),  Curb-To-Curb Width: 17.9m (58.7ft),  Out-to-Out Width: 20.1m (65.9ft)

Condition: Deck: Poor,  Superstructure: Fair,  Substructure: Fair,  Operating Rating: 62.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 30.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.47m (11.38ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2006,  Bridge Improvement Cost: $1,505,000,  Roadway Improvement Cost: $895,000,  Total Project Cost: $2,400,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 1014349,  Location: 0.2 MI N JCT RTS 201+434 (Lat: 42.097953,  Lng: -75.971292),  Route carried "on" structure: State highway 201,  Year Built: 1954,  Year Reconstructed: 1974,  Status: Open,  Structure Length: 1.40m (4.59ft),  Average Daily Traffic: 32,234 (year 2006),  Truck Traffic: 9%,  Average Future Daily Traffic: 44,383 (year 2026),  Design Load: HS 20,  Features Intersected: OLD VESTAL ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.348,  Lanes on structure: 5,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 16.4m (53.8ft),  Skew: 37 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 13.4m (44.0ft),  Curb or Sidewalk Widths: Left: 1.2m (3.9ft),  Right: 1.2m (3.9ft),  Curb-To-Curb Width: 20.2m (66.3ft),  Out-to-Out Width: 23.3m (76.4ft)

Condition: Deck: Poor,  Superstructure: Satisfactory,  Substructure: Fair,  Operating Rating: 60.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.40m (4.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2006,  Bridge Improvement Cost: $704,000,  Roadway Improvement Cost: $419,000,  Total Project Cost: $1,123,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 1014359,  Location: JCT RTE 201+SUSQUEHANNA R (Lat: 42.103369,  Lng: -75.969306),  Route carried "on" structure: State highway 201,  Year Built: 1954,  Year Reconstructed: 2004,  Status: Open,  Structure Length: 42.91m (140.78ft),  Average Daily Traffic: 34,954 (year 2007),  Truck Traffic: 9%,  Average Future Daily Traffic: 48,128 (year 2027),  Design Load: HS 20,  Features Intersected: BOLAND DRIVE, SUSQUEHANN
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.832,  Lanes on structure: 4,  Lanes under structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 99.9m (327.8ft),  Skew: 22 degrees,  Material/Design: Steel,  Design/Construction: Mixed types,  Number Of Spans In Main Unit: 8,  Length of Maximum Span: 56.0m (183.7ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 28.7m (94.2ft),  Out-to-Out Width: 29.4m (96.5ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Very good,  Channel: Good,  Operating Rating: 40.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 26.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: High priority of corrective action,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 42.91m (140.78ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: November 2006,  Critical Feature Inspection Date: November 2006,  Underwater Inspection Date: July 1997,  Bridge Improvement Cost: $704,000,  Roadway Improvement Cost: $419,000,  Total Project Cost: $1,123,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>

Structure Number: 10184,  Location: 6.3 MI S JCT SH26 & SH434 (Lat: 42.006664,  Lng: -76.001094),  Route carried "on" structure: State highway 26,  Year Built: 1976,  Status: Open,  Structure Length: 1.03m (3.38ft),  Average Daily Traffic: 4,750 (year 2007),  Truck Traffic: 6%,  Average Future Daily Traffic: 5,928 (year 2027),  Design Load: HS 20,  Features Intersected: TRIB CHOCONUT CRK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.969,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 10.6m (34.8ft),  Skew: 1 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.8m (15.7ft),  Curb-To-Curb Width: 12.4m (40.7ft),  Out-to-Out Width: 13.1m (43.0ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 76.0 metric tons,  Inventory Rating: 32.6 metric tons,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.03m (3.38ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2007,  Bridge Improvement Cost: $292,000,  Roadway Improvement Cost: $174,000,  Total Project Cost: $466,000 ( Estimate for 2007),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 101841,  Location: 4.4 MI S JCT RTS 26 & 434 (Lat: 42.032475,  Lng: -76.014753),  Route carried "on" structure: State highway 26,  Year Built: 1997,  Status: Open,  Structure Length: 1.21m (3.97ft),  Average Daily Traffic: 4,750 (year 2007),  Truck Traffic: 6%,  Average Future Daily Traffic: 5,928 (year 2027),  Design Load: HS 25,  Features Intersected: SUGAR CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.968,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.1m (39.7ft),  Skew: 2 degrees,  Material/Design: Concrete,  Design/Construction: Frame,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.5m (37.7ft),  Curb-To-Curb Width: 12.1m (39.7ft),  Out-to-Out Width: 12.8m (42.0ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Satisfactory,  Operating Rating: 68.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.21m (3.97ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2007,  Bridge Improvement Cost: $336,000,  Roadway Improvement Cost: $200,000,  Total Project Cost: $536,000 ( Estimate for 2007),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 1018431,  Location: JCT SH 26 & SUSQUEHANNA R (Lat: 42.094664,  Lng: -76.043861),  Route carried "on" structure: State highway 26,  Year Built: 1964,  Year Reconstructed: 1995,  Status: Open,  Structure Length: 30.21m (99.11ft),  Average Daily Traffic: 16,579 (year 2007),  Truck Traffic: 6%,  Average Future Daily Traffic: 20,692 (year 2027),  Design Load: HS 20,  Features Intersected: OLD VESTL RD-CR44, SUSQU
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 11.643,  Lanes on structure: 3,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 9,  Length of Maximum Span: 56.3m (184.7ft),  Curb-To-Curb Width: 13.2m (43.3ft),  Out-to-Out Width: 14.1m (46.3ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 65.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 30.21m (99.11ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: December 2007,  Underwater Inspection Date: June 2006,  Bridge Improvement Cost: $3,640,000,  Roadway Improvement Cost: $2,029,000,  Total Project Cost: $5,669,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>

Structure Number: 1018432,  Location: JCT SH 26 & SUSQUEHANNA R (Lat: 42.094686,  Lng: -76.043739),  Route carried "on" structure: State highway 26,  Year Built: 1964,  Year Reconstructed: 1995,  Status: Open,  Structure Length: 30.21m (99.11ft),  Average Daily Traffic: 16,579 (year 2007),  Truck Traffic: 6%,  Average Future Daily Traffic: 20,692 (year 2027),  Design Load: HS 20,  Features Intersected: OLD VESTL RD-CR44, SUSQU
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 11.643,  Lanes on structure: 3,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 9,  Length of Maximum Span: 56.3m (184.7ft),  Curb-To-Curb Width: 13.2m (43.3ft),  Out-to-Out Width: 14.1m (46.3ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 65.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 30.21m (99.11ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: December 2007,  Underwater Inspection Date: June 2006,  Bridge Improvement Cost: $3,640,000,  Roadway Improvement Cost: $2,029,000,  Total Project Cost: $5,669,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>

Structure Number: 1054781,  Location: 2.0 MI W JCT RTS 17 + 26 (Lat: 42.079314,  Lng: -76.077842),  Route carried "on" structure: State highway 17,  Year Built: 1969,  Status: Open,  Structure Length: 3.99m (13.09ft),  Average Daily Traffic: 26,895 (year 2006),  Truck Traffic: 9%,  Average Future Daily Traffic: 37,032 (year 2026),  Design Load: HS 20+Mod,  Features Intersected: CASTLE GARDENS RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.063,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.8m (38.7ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 13.7m (44.9ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 51.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 30.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.99m (13.09ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2007,  Bridge Improvement Cost: $1,224,000,  Roadway Improvement Cost: $728,000,  Total Project Cost: $1,952,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>

Structure Number: 1054782,  Location: 2.0 MI W JCT RTS 17 + 26 (Lat: 42.079103,  Lng: -76.077697),  Route carried "on" structure: State highway 17,  Year Built: 1969,  Status: Open,  Structure Length: 3.87m (12.70ft),  Average Daily Traffic: 26,895 (year 2006),  Truck Traffic: 9%,  Average Future Daily Traffic: 37,032 (year 2026),  Design Load: HS 20+Mod,  Features Intersected: CASTLE GARDENS RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.063,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.5m (37.7ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 13.7m (44.9ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Operating Rating: 59.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: High priority of replacement,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.87m (12.70ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2007,  Bridge Improvement Cost: $1,224,000,  Roadway Improvement Cost: $728,000,  Total Project Cost: $1,952,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>

Structure Number: 1054791,  Location: 1 MI W JCT SH 17 & SH 26 (Lat: 42.085919,  Lng: -76.063397),  Route carried "on" structure: State highway 17,  Year Built: 1969,  Status: Open,  Structure Length: 6.40m (21.00ft),  Average Daily Traffic: 26,895 (year 2006),  Truck Traffic: 9%,  Average Future Daily Traffic: 37,032 (year 2026),  Design Load: HS 20+Mod,  Features Intersected: CHOCONUT CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.050,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.5m (37.7ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 21.0m (68.9ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 80.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 48.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.40m (21.00ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: August 2007,  Underwater Inspection Date: November 2007,  Bridge Improvement Cost: $1,224,000,  Roadway Improvement Cost: $728,000,  Total Project Cost: $1,952,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>

Structure Number: 1054792,  Location: 1 MI W JCT SH 17 & SH 26 (Lat: 42.085564,  Lng: -76.063328),  Route carried "on" structure: State highway 17,  Year Built: 1969,  Status: Open,  Structure Length: 6.40m (21.00ft),  Average Daily Traffic: 26,895 (year 2006),  Truck Traffic: 9%,  Average Future Daily Traffic: 37,032 (year 2026),  Design Load: HS 20+Mod,  Features Intersected: CHOCONUT CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.050,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.8m (38.7ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 21.0m (68.9ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 81.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 49.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.40m (21.00ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2007,  Bridge Improvement Cost: $1,224,000,  Roadway Improvement Cost: $728,000,  Total Project Cost: $1,952,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>

Structure Number: 1054801,  Location: 0.6 MI W JCT RTS 17 + 26 (Lat: 42.088589,  Lng: -76.053756),  Route carried "on" structure: State highway 17,  Year Built: 1969,  Status: Open,  Structure Length: 5.02m (16.47ft),  Average Daily Traffic: 26,895 (year 2006),  Truck Traffic: 9%,  Average Future Daily Traffic: 37,032 (year 2026),  Design Load: HS 20+Mod,  Features Intersected: NORTH MAIN STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.058,  Lanes on structure: 2,  Lanes under structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 10.9m (35.8ft),  Skew: 4 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 25.6m (84.0ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 51.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 30.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.02m (16.47ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2007,  Bridge Improvement Cost: $1,224,000,  Roadway Improvement Cost: $728,000,  Total Project Cost: $1,952,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>

Structure Number: 1054802,  Location: 0.6 MI W JCT RTS 17 + 26 (Lat: 42.088336,  Lng: -76.053731),  Route carried "on" structure: State highway 17,  Year Built: 1969,  Status: Open,  Structure Length: 4.96m (16.27ft),  Average Daily Traffic: 26,895 (year 2006),  Truck Traffic: 9%,  Average Future Daily Traffic: 37,032 (year 2026),  Design Load: HS 20+Mod,  Features Intersected: NORTH MAIN STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.058,  Lanes on structure: 2,  Lanes under structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.8m (38.7ft),  Skew: 4 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 25.6m (84.0ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Satisfactory,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 56.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.96m (16.27ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2007,  Bridge Improvement Cost: $1,224,000,  Roadway Improvement Cost: $728,000,  Total Project Cost: $1,952,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>

Structure Number: 1054811,  Location: JCT SH 17 & SH 26 (Lat: 42.091919,  Lng: -76.043425),  Route carried "on" structure: State highway 26,  Year Built: 1994,  Status: Open,  Structure Length: 6.49m (21.29ft),  Average Daily Traffic: 10,651 (year 2005),  Truck Traffic: 5%,  Average Future Daily Traffic: 13,896 (year 2025),  Design Load: HS 25,  Features Intersected: RTE 17
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 11.166,  Lanes on structure: 3,  Lanes under structure: 6,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.8m (42.0ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 32.6m (107.0ft),  Curb-To-Curb Width: 12.9m (42.3ft),  Out-to-Out Width: 13.7m (44.9ft)

Condition: Deck: Fair,  Superstructure: Excellent,  Substructure: Good,  Operating Rating: 68.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 48.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.49m (21.29ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2006,  Bridge Improvement Cost: $761,000,  Roadway Improvement Cost: $435,000,  Total Project Cost: $1,196,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>

Structure Number: 1054812,  Location: JCT SH 17 & SH 26 (Lat: 42.091931,  Lng: -76.043303),  Route carried "on" structure: State highway 26,  Year Built: 1994,  Status: Open,  Structure Length: 6.49m (21.29ft),  Average Daily Traffic: 10,651 (year 2005),  Truck Traffic: 5%,  Average Future Daily Traffic: 13,896 (year 2025),  Design Load: HS 25,  Features Intersected: RTE 17
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 11.166,  Lanes on structure: 3,  Lanes under structure: 6,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.8m (42.0ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 32.6m (107.0ft),  Curb-To-Curb Width: 12.9m (42.3ft),  Out-to-Out Width: 13.7m (44.9ft)

Condition: Deck: Fair,  Superstructure: Excellent,  Substructure: Good,  Operating Rating: 68.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 48.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.49m (21.29ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2006,  Bridge Improvement Cost: $761,000,  Roadway Improvement Cost: $435,000,  Total Project Cost: $1,196,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>

Structure Number: 1054821,  Location: 0.8 MI E JCT RTS 17 + 26 (Lat: 42.097092,  Lng: -76.030794),  Route carried "on" structure: State highway 17,  Year Built: 1969,  Year Reconstructed: 2003,  Status: Open,  Structure Length: 5.79m (19.00ft),  Average Daily Traffic: 26,895 (year 2006),  Truck Traffic: 9%,  Average Future Daily Traffic: 37,032 (year 2026),  Design Load: HS 20+Mod,  Features Intersected: OLD VESTAL ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 7.340,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.5m (37.7ft),  Skew: 6 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 26.5m (86.9ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Very good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 55.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.79m (19.00ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2006,  Bridge Improvement Cost: $1,262,000,  Roadway Improvement Cost: $750,000,  Total Project Cost: $2,012,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>

Structure Number: 1054822,  Location: .8 MI E JCT SH 17 & SH 26 (Lat: 42.097128,  Lng: -76.030350),  Route carried "on" structure: State highway 17,  Year Built: 1969,  Year Reconstructed: 2003,  Status: Open,  Structure Length: 5.02m (16.47ft),  Average Daily Traffic: 26,895 (year 2006),  Truck Traffic: 9%,  Average Future Daily Traffic: 37,032 (year 2026),  Design Load: HS 20+Mod,  Features Intersected: OLD VESTL RD-CR44
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 7.345,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.5m (37.7ft),  Skew: 4 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 23.4m (76.8ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Very good,  Superstructure: Good,  Substructure: Fair,  Operating Rating: 59.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.02m (16.47ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2006,  Bridge Improvement Cost: $1,096,000,  Roadway Improvement Cost: $652,000,  Total Project Cost: $1,748,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>

Structure Number: 1063319,  Location: 3.4 MI W JCT RTS 434 + 26 (Lat: 42.068497,  Lng: -76.102864),  Route carried "on" structure: State highway 434,  Year Built: 1946,  Year Reconstructed: 1989,  Status: Open,  Structure Length: 2.56m (8.40ft),  Average Daily Traffic: 13,218 (year 2007),  Truck Traffic: 6%,  Average Future Daily Traffic: 16,497 (year 2027),  Design Load: HS 20,  Features Intersected: TRACY CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.837,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 20.4m (66.9ft),  Skew: 20 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 24.3m (79.7ft),  Curb-To-Curb Width: 20.2m (66.3ft),  Out-to-Out Width: 21.0m (68.9ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 49.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.56m (8.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2007,  Bridge Improvement Cost: $1,026,000,  Roadway Improvement Cost: $610,000,  Total Project Cost: $1,636,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>

Structure Number: 1063329,  Location: 1.2MI W JCT RTS 434 & 26 (Lat: 42.084097,  Lng: -76.063625),  Route carried "on" structure: State highway 434,  Year Built: 1946,  Status: Open,  Structure Length: 4.75m (15.58ft),  Average Daily Traffic: 13,218 (year 2007),  Truck Traffic: 6%,  Average Future Daily Traffic: 16,497 (year 2027),  Design Load: HS 20,  Features Intersected: CHOCONUT CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.320,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 24.3m (79.7ft),  Skew: 34 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 22.8m (74.8ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 1.2m (3.9ft),  Curb-To-Curb Width: 19.5m (64.0ft),  Out-to-Out Width: 21.8m (71.5ft)

Condition: Deck: Fair,  Superstructure: Good,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 66.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.75m (15.58ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: October 2006,  Underwater Inspection Date: December 2004,  Bridge Improvement Cost: $884,000,  Roadway Improvement Cost: $505,000,  Total Project Cost: $1,389,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 107726,  Location: 0.2 MI E RTE 201 (Lat: 42.095400,  Lng: -75.965542),  Route carried "on" structure: State highway 434,  Year Built: 1940,  Status: Open,  Structure Length: 0.82m (2.69ft),  Average Daily Traffic: 37,000 (year 2007),  Truck Traffic: 8%,  Average Future Daily Traffic: 44,496 ,  Design Load: H 20,  Features Intersected: FULLER HOLLOW CK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 339.145,  Lanes on structure: 5,  Owner: State Highway Agency,  Approaching Roadway Width: 11.8m (38.7ft),  Skew: 12 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.6m (11.8ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 72.5 metric tons,  Inventory Rating: 32.6 metric tons,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.82m (2.69ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2006,  Bridge Improvement Cost: $221,000,  Roadway Improvement Cost: $132,000,  Total Project Cost: $353,000 ( Estimate for 2007),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 222586,  Location: 3.0 MI SW OF VESTAL (Lat: 42.067303,  Lng: -76.102578),  Route carried "on" structure: City street ,  Year Built: 1935,  Year Reconstructed: 1972,  Status: Open,  Structure Length: 2.49m (8.17ft),  Average Daily Traffic: 1,844 (year 2006),  Truck Traffic: 4%,  Average Future Daily Traffic: 1,844 (year 2026),  Features Intersected: TRACY CREEK,  Facility Carried by Structure: OWEGO ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Concrete,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 16.1m (52.8ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 1.6m (5.2ft),  Curb-To-Curb Width: 7.5m (24.6ft),  Out-to-Out Width: 9.9m (32.5ft)

Condition: Superstructure: Poor,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 53.3 metric tons,  Inventory Rating: 13.6 metric tons,  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.49m (8.17ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2006,  Bridge Improvement Cost: $1,175,000,  Roadway Improvement Cost: $788,000,  Total Project Cost: $1,963,000 ( Estimate for 2007),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 222587,  Location: 3.5 MI SW OF VESTAL (Lat: 42.052556,  Lng: -76.091681),  Route carried "on" structure: City street ,  Year Built: 1969,  Status: Open,  Structure Length: 1.46m (4.79ft),  Average Daily Traffic: 191 (year 2006),  Truck Traffic: 5%,  Average Future Daily Traffic: 248 (year 2026),  Features Intersected: TRACY CREEK,  Facility Carried by Structure: ROCKWELL ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 4.8m (15.7ft),  Material/Design: Steel,  Design/Construction: Girder and Floorbeam System,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 14.0m (45.9ft),  Curb-To-Curb Width: 3.8m (12.5ft),  Out-to-Out Width: 4.2m (13.8ft)

Condition: Deck: Very good,  Superstructure: Fair,  Substructure: Fair,  Channel: Very good,  Operating Rating: 49.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 1.46m (4.79ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: April 2007,  Critical Feature Inspection Date: April 2007,  Bridge Improvement Cost: $135,000,  Roadway Improvement Cost: $81,000,  Total Project Cost: $216,000 ( Estimate for 2007),  Deck Structure Type: Open Grating
Find on map >>

Structure Number: 222588,  Location: 4.0 MI SW OF VESTAL (Lat: 42.032981,  Lng: -76.082436),  Route carried "on" structure: City street ,  Year Built: 1930,  Status: Open,  Structure Length: 0.76m (2.49ft),  Average Daily Traffic: 205 (year 2006),  Truck Traffic: 5%,  Average Future Daily Traffic: 266 (year 2026),  Features Intersected: TRACY CREEK,  Facility Carried by Structure: BAKER HILL ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 5.4m (17.7ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.0m (23.0ft),  Curb or Sidewalk Widths: Left: 0.1m (0.3ft),  Right: 0.1m (0.3ft),  Curb-To-Curb Width: 5.1m (16.7ft),  Out-to-Out Width: 5.8m (19.0ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Very good,  Operating Rating: 55.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 31.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 0.76m (2.49ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2006,  Bridge Improvement Cost: $96,000,  Roadway Improvement Cost: $57,000,  Total Project Cost: $153,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 222589,  Location: 5.0 MILES SW OF VESTAL (Lat: 42.027583,  Lng: -76.082806),  Route carried "on" structure: City street ,  Year Built: 1961,  Status: Open,  Structure Length: 1.64m (5.38ft),  Average Daily Traffic: 179 (year 2006),  Truck Traffic: 6%,  Average Future Daily Traffic: 250 (year 2026),  Features Intersected: TRACY CREEK,  Facility Carried by Structure: MASON ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 5.1m (16.7ft),  Skew: 4 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 5.1m (16.7ft),  Curb or Sidewalk Widths: Left: 0.1m (0.3ft),  Right: 0.1m (0.3ft),  Curb-To-Curb Width: 7.0m (23.0ft),  Out-to-Out Width: 7.4m (24.3ft)

Condition: Deck: Poor,  Superstructure: Poor,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 74.7 metric tons,  Inventory Rating: 19.5 metric tons,  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 1.64m (5.38ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2006,  Bridge Improvement Cost: $324,000,  Roadway Improvement Cost: $194,000,  Total Project Cost: $518,000 ( Estimate for 2007),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 22259,  Location: HAMLET OF VESTAL (Lat: 42.082281,  Lng: -76.063769),  Route carried "on" structure: City street ,  Year Built: 1929,  Year Reconstructed: 2005,  Status: Open,  Structure Length: 3.84m (12.60ft),  Average Daily Traffic: 3,135 (year 1993),  Truck Traffic: 4%,  Average Future Daily Traffic: 3,135 (year 2013),  Features Intersected: BIG CHOCONUT CRK,  Facility Carried by Structure: FRONT STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Truss - Thru,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 36.5m (119.8ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 9.6m (31.5ft)

Condition: Deck: Excellent,  Superstructure: Good,  Substructure: Very good,  Channel: Good,  Operating Rating: 43.5 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 26.3 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.84m (12.60ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: December 2007,  Critical Feature Inspection Date: December 2007,  Bridge Improvement Cost: $324,000,  Roadway Improvement Cost: $194,000,  Total Project Cost: $518,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>

Structure Number: 222591,  Location: .5 MILE SOUTH OF VESTAL (Lat: 42.071342,  Lng: -76.046817),  Route carried "on" structure: City street ,  Year Built: 1930,  Year Reconstructed: 1991,  Status: Open,  Structure Length: 3.71m (12.17ft),  Average Daily Traffic: 5,573 (year 2006),  Truck Traffic: 5%,  Average Future Daily Traffic: 7,223 (year 2026),  Features Intersected: BIG CHOCONUT CRK,  Facility Carried by Structure: MAIN STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Truss - Thru,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 36.8m (120.7ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.6m (5.2ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 7.1m (23.3ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Poor,  Operating Rating: 57.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 3.71m (12.17ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: June 2007,  Critical Feature Inspection Date: June 2007,  Bridge Improvement Cost: $573,000,  Roadway Improvement Cost: $341,000,  Total Project Cost: $914,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>

Structure Number: 222592,  Location: 2 MI. SOUTH OF VESTAL (Lat: 42.069897,  Lng: -76.041725),  Route carried "on" structure: City street ,  Year Built: 2007,  Status: Open,  Structure Length: 3.72m (12.20ft),  Average Daily Traffic: 2,068 (year 1998),  Truck Traffic: 5%,  Average Future Daily Traffic: 2,680 (year 2018),  Features Intersected: BIG CHOCONUT CRK,  Facility Carried by Structure: MAIN STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 10.7m (35.1ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Girder and Floorbeam System,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 36.3m (119.1ft),  Curb-To-Curb Width: 10.8m (35.4ft),  Out-to-Out Width: 12.5m (41.0ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Excellent,  Channel: Satisfactory,  Operating Rating: 80.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 48.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Superior to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.72m (12.20ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2006,  Bridge Improvement Cost: $573,000,  Roadway Improvement Cost: $341,000,  Total Project Cost: $914,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>

Structure Number: 222593,  Location: 1.5 MI.SE OF VESTAL (Lat: 42.064181,  Lng: -76.038119),  Route carried "on" structure: City street ,  Year Built: 1929,  Status: Open,  Structure Length: 0.82m (2.69ft),  Average Daily Traffic: 1,854 (year 2005),  Truck Traffic: 5%,  Average Future Daily Traffic: 2,403 (year 2025),  Features Intersected: MEEKER CREEK,  Facility Carried by Structure: MAIN STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 9.4m (30.8ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.6m (24.9ft),  Curb or Sidewalk Widths: Left: 0.1m (0.3ft),  Right: 0.1m (0.3ft),  Curb-To-Curb Width: 8.0m (26.2ft),  Out-to-Out Width: 8.9m (29.2ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 59.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 0.82m (2.69ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2006,  Bridge Improvement Cost: $573,000,  Roadway Improvement Cost: $341,000,  Total Project Cost: $914,000 ( Estimate for 2007),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 222594,  Location: 1.5 MILES SE OF VESTAL (Lat: 42.063078,  Lng: -76.039883),  Route carried "on" structure: City street ,  Year Built: 1968,  Status: Open,  Structure Length: 3.44m (11.29ft),  Average Daily Traffic: 1,036 (year 2006),  Truck Traffic: 5%,  Average Future Daily Traffic: 1,343 (year 2026),  Features Intersected: BIG CHOCONUT CRK,  Facility Carried by Structure: MEEKER ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 16.7m (54.8ft),  Curb or Sidewalk Widths: Left: 1.2m (3.9ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 9.5m (31.2ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 71.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 42.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 3.44m (11.29ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2006,  Bridge Improvement Cost: $573,000,  Roadway Improvement Cost: $341,000,  Total Project Cost: $914,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 222595,  Location: 1.6 MI N VESTAL CENTER (Lat: 42.053544,  Lng: -76.023942),  Route carried "on" structure: City street ,  Year Built: 1978,  Status: Open,  Structure Length: 0.91m (2.99ft),  Average Daily Traffic: 1,102 (year 2005),  Truck Traffic: 6%,  Average Future Daily Traffic: 1,375 (year 2025),  Features Intersected: SHEEDY CREEK,  Facility Carried by Structure: SHEEDY ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 7.0m (23.0ft),  Skew: 4 degrees,  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.5m (27.9ft)

Condition: Channel: Good,  Culverts: Very good,  Operating Rating: 78.6 metric tons,  Inventory Rating: 32.6 metric tons,  Structural Evaluation: Equal to present desirable criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.91m (2.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2006,  Bridge Improvement Cost: $216,000,  Roadway Improvement Cost: $128,000,  Total Project Cost: $344,000 ( Estimate for 2007),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 222598,  Location: 3.2 MILES EAST OF VESTAL (Lat: 42.091222,  Lng: -76.011178),  Route carried "on" structure: City street ,  Year Built: 1955,  Status: Open,  Structure Length: 0.73m (2.40ft),  Average Daily Traffic: 2,277 (year 1999),  Truck Traffic: 4%,  Average Future Daily Traffic: 2,277 (year 2019),  Features Intersected: WILLOW RUN CREEK,  Facility Carried by Structure: AFRICAN ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 12.4m (40.7ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.7m (22.0ft),  Curb or Sidewalk Widths: Left: 0.8m (2.6ft),  Right: 0.8m (2.6ft),  Curb-To-Curb Width: 12.4m (40.7ft),  Out-to-Out Width: 14.9m (48.9ft)

Condition: Deck: Fair,  Superstructure: Poor,  Substructure: Poor,  Channel: Satisfactory,  Operating Rating: 72.8 metric tons,  Inventory Rating: 19.5 metric tons,  Structural Evaluation: Meets minimum limits,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.73m (2.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2007,  Bridge Improvement Cost: $288,000,  Roadway Improvement Cost: $172,000,  Total Project Cost: $460,000 ( Estimate for 2007),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 222601,  Location: 1.0 MI S OF JOHNSON CITY (Lat: 42.082519,  Lng: -75.959092),  Route carried "on" structure: City street ,  Year Built: 1961,  Status: Open,  Structure Length: 0.82m (2.69ft),  Average Daily Traffic: 2,036 (year 2006),  Truck Traffic: 5%,  Average Future Daily Traffic: 2,639 (year 2026),  Design Load: H 20,  Features Intersected: FULLER HOLLOW CR.,  Facility Carried by Structure: WASHINGTON DRIVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 12.1m (39.7ft),  Material/Design: Prestressed concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.6m (24.9ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 12.4m (40.7ft),  Out-to-Out Width: 12.9m (42.3ft)

Condition: Deck: Fair,  Superstructure: Poor,  Substructure: Good,  Channel: Fair,  Operating Rating: 70.5 metric tons,  Inventory Rating: 18.8 metric tons,  Structural Evaluation: Meets minimum limits,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.82m (2.69ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2006,  Bridge Improvement Cost: $282,000,  Roadway Improvement Cost: $168,000,  Total Project Cost: $450,000 ( Estimate for 2007),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 22667,  Location: 0.5 MI NE OF VESTAL CENTR (Lat: 42.036275,  Lng: -76.008094),  Route carried "on" structure: Alternate City street ,  Year Built: 1981,  Status: Open,  Structure Length: 0.64m (2.10ft),  Average Daily Traffic: 162 (year 2006),  Truck Traffic: 6%,  Average Future Daily Traffic: 226 (year 2026),  Design Load: H 20,  Features Intersected: TRIB SUGAR CREEK,  Facility Carried by Structure: GARDNER ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 9.7m (31.8ft),  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.4m (21.0ft)

Condition: Channel: Very good,  Culverts: Very good,  Operating Rating: 74.3 metric tons,  Inventory Rating: 32.6 metric tons,  Structural Evaluation: Equal to present desirable criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.64m (2.10ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2006,  Bridge Improvement Cost: $143,000,  Roadway Improvement Cost: $85,000,  Total Project Cost: $228,000 ( Estimate for 2007),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 22694,  Location: 4.5 M SOUTH OF ENDICOTT (Lat: 42.018456,  Lng: -76.079850),  Route carried "on" structure: County highway ,  Year Built: 1985,  Status: Open,  Structure Length: 0.60m (1.97ft),  Average Daily Traffic: 50 (year 1999),  Truck Traffic: 8%,  Average Future Daily Traffic: 60 (year 2019),  Design Load: HS 20,  Features Intersected: TRACY CREEK,  Facility Carried by Structure: COLLINS ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Aluminum, Iron,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.0m (19.7ft),  Curb or Sidewalk Widths: Left: 3.0m (9.8ft),  Right: 2.4m (7.9ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 15.3m (50.2ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 76.9 metric tons,  Inventory Rating: 32.6 metric tons,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 0.60m (1.97ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2007,  Bridge Improvement Cost: $315,000,  Roadway Improvement Cost: $187,000,  Total Project Cost: $502,000 ( Estimate for 2007),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 334985,  Location: HAMLET OF VESTAL (Lat: 42.092069,  Lng: -76.055569),  Route carried "on" structure: County highway ,  Year Built: 1935,  Year Reconstructed: 1987,  Status: Open,  Structure Length: 22.70m (74.48ft),  Average Daily Traffic: 16,895 (year 2007),  Truck Traffic: 6%,  Average Future Daily Traffic: 21,087 (year 2027),  Design Load: HS 20,  Features Intersected: SUSQUEHANNA RIVER,  Facility Carried by Structure: CR 48
Minimum Vertical Clearance: 4.57m (14.99ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 14.6m (47.9ft),  Material/Design: Steel,  Design/Construction: Truss - Thru,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 74.6m (244.8ft),  Curb or Sidewalk Widths: Left: 1.6m (5.2ft),  Right: 1.6m (5.2ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 9.9m (32.5ft)

Condition: Deck: Good,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 67.1 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 45.4 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 22.70m (74.48ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: November 2006,  Critical Feature Inspection Date: November 2006,  Underwater Inspection Date: September 2006,  Bridge Improvement Cost: $4,887,000,  Roadway Improvement Cost: $2,835,000,  Total Project Cost: $7,722,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>

Structure Number: 334986,  Location: 2 MI NE OF VESTAL CENTER (Lat: 42.035883,  Lng: -76.011775),  Route carried "on" structure: County highway ,  Year Built: 1954,  Year Reconstructed: 1980,  Status: Open,  Structure Length: 0.94m (3.08ft),  Average Daily Traffic: 1,170 (year 2006),  Truck Traffic: 4%,  Average Future Daily Traffic: 1,170 (year 2026),  Design Load: H 20,  Features Intersected: SUGAR CREEK,  Facility Carried by Structure: POWDERHOUSE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.7m (31.8ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.8m (28.9ft),  Curb or Sidewalk Widths: Left: 2.2m (7.2ft),  Right: 0.0m,  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 10.6m (34.8ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 67.2 metric tons,  Inventory Rating: 28.9 metric tons,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.94m (3.08ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2006,  Bridge Improvement Cost: $4,887,000,  Roadway Improvement Cost: $2,835,000,  Total Project Cost: $7,722,000 ( Estimate for 2007),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 334987,  Location: 1.5 MI NE OF VESTAL CENTR (Lat: 42.038625,  Lng: -76.005042),  Route carried "on" structure: County highway ,  Year Built: 1984,  Status: Open,  Structure Length: 1.03m (3.38ft),  Average Daily Traffic: 1,170 (year 2006),  Truck Traffic: 4%,  Average Future Daily Traffic: 1,170 (year 2026),  Features Intersected: SUGAR CREEK,  Facility Carried by Structure: POWDERHOUSE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 10.6m (34.8ft),  Skew: 1 degrees,  Material/Design: Wood or Timber,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.0m (32.8ft),  Curb-To-Curb Width: 10.6m (34.8ft),  Out-to-Out Width: 11.0m (36.1ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Good,  Operating Rating: 53.5 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 35.4 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.03m (3.38ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2006,  Bridge Improvement Cost: $247,000,  Roadway Improvement Cost: $147,000,  Total Project Cost: $394,000 ( Estimate for 2007),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 334988,  Location: .9 MI NE OF VESTAL CENTER (Lat: 42.036861,  Lng: -76.008494),  Route carried "on" structure: County highway ,  Year Built: 1982,  Status: Open,  Structure Length: 1.00m (3.28ft),  Average Daily Traffic: 1,170 (year 2006),  Truck Traffic: 4%,  Average Future Daily Traffic: 1,170 (year 2026),  Design Load: HS 20,  Features Intersected: SUGAR CREEK,  Facility Carried by Structure: POWDERHOUSE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 10.3m (33.8ft),  Skew: 2 degrees,  Material/Design: Wood or Timber,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.0m (23.0ft),  Curb-To-Curb Width: 10.8m (35.4ft),  Out-to-Out Width: 11.2m (36.7ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Fair,  Channel: Good,  Operating Rating: 45.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 30.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.00m (3.28ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2006,  Bridge Improvement Cost: $243,000,  Roadway Improvement Cost: $144,000,  Total Project Cost: $387,000 ( Estimate for 2007),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 334989,  Location: 1.2 MI NE OF VESTAL CENTR (Lat: 42.042364,  Lng: -75.996603),  Route carried "on" structure: County highway ,  Year Built: 1982,  Status: Open,  Structure Length: 0.79m (2.59ft),  Average Daily Traffic: 1,170 (year 2006),  Truck Traffic: 4%,  Average Future Daily Traffic: 1,170 (year 2026),  Design Load: HS 20,  Features Intersected: SUGAR CREEK,  Facility Carried by Structure: POWDERHOUSE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 10.3m (33.8ft),  Skew: 4 degrees,  Material/Design: Wood or Timber,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.0m (23.0ft),  Curb-To-Curb Width: 10.8m (35.4ft),  Out-to-Out Width: 11.2m (36.7ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Good,  Channel: Good,  Operating Rating: 49.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.79m (2.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2006,  Bridge Improvement Cost: $191,000,  Roadway Improvement Cost: $114,000,  Total Project Cost: $305,000 ( Estimate for 2007),  Wearing Surface/Protective System: Wearing Surface: Bituminous

Parts: 1, 2

Discuss this city on our hugely popular New York forum

Back to: Vestal, NY, New York, All US cities.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2009 Advameg, Inc.