U.S. Cities - City-Data Homepage  
City-Data Forum
City-Data.com Homepage

Bridge Statistics for Vestavia Hills, Alabama (AL) - Condition, Traffic, Stress, Structural Evaluation, Project Costs

Back to: Vestavia Hills, AL, Alabama, Alabama forum, All US cities.





National Bridge Inventory (NBI) Statistics
Number of bridges: 17
Total length: 58 meters (190ft)
Total costs: $34,150,000
Total average daily traffic: 512,796
Total average daily truck traffic: 46,304
National Bridge Inventory (NBI) Registered Bridges for Vestavia Hills

New bridges - Historical Statistics

  • 1920-1929: 1
  • 1930-1939: 1
  • 1940-1949: 2
  • 1950-1959: 0
  • 1960-1969: 3
  • 1970-1979: 7
  • 1980-1989: 3

Reconstructed bridges - Historical Statistics

  • 1940-1949: 3
  • 1950-1959: 0
  • 1960-1969: 0
  • 1970-1979: 0
  • 1980-1989: 3

Average Daily Traffic

Bridge Condition - Deck

Bridge Condition - Superstructure

Bridge Condition - Substructure

Bridge Condition - Channel

Bridge Condition - Culverts

Find on map >>

Structure Number: 1307,  Location: ROCKY RIDGE (Lat: 33.416667,  Lng: -86.766667),  Route carried "on" structure: County highway 113,  Year Built: 1935,  Status: Open,  Structure Length: 1.98m (6.50ft),  Average Daily Traffic: 10,860 (year 2007),  Truck Traffic: 15%,  Average Future Daily Traffic: 15,150 (year 2027),  Features Intersected: SHADES CREEK,  Facility Carried by Structure: ROCKY RIDGE RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Skew: 6 degrees,  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 10.1m (33.1ft),  Curb or Sidewalk Widths: Left: 0.3m (1.0ft),  Right: 0.3m (1.0ft),  Curb-To-Curb Width: 7.6m (24.9ft),  Out-to-Out Width: 8.2m (26.9ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 14.5 metric tons,  Inventory Rating: 10.9 metric tons,  Structural Evaluation: High priority of replacement,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 2.72m (8.92ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2007,  Bridge Improvement Cost: $290,000,  Roadway Improvement Cost: $29,000,  Total Project Cost: $435,000 ( Estimate for 2008),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 4713,  Location: .9 MI. NO. I-65 (Lat: 33.416667,  Lng: -86.783333),  Route carried "on" structure: US 31,  Year Built: 1926,  Year Reconstructed: 1954,  Status: Open,  Structure Length: 0.64m (2.10ft),  Average Daily Traffic: 29,160 (year 2007),  Truck Traffic: 3%,  Average Future Daily Traffic: 28,955 (year 2027),  Features Intersected: PATTON CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 429.856,  Lanes on structure: 8,  Owner: State Highway Agency,  Approaching Roadway Width: 30.5m (100.1ft),  Skew: 10 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Good,  Culverts: Fair,  Operating Rating: 14.5 metric tons,  Inventory Rating: 10.9 metric tons,  Structural Evaluation: High priority of replacement,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.26m (4.13ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2006,  Bridge Improvement Cost: $560,000,  Roadway Improvement Cost: $56,000,  Total Project Cost: $840,000 ( Estimate for 2008),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 4728,  Location: .6 MI. NO. I-65 (Lat: 33.416667,  Lng: -86.800000),  Route carried "on" structure: US 31,  Year Built: 1942,  Year Reconstructed: 1954,  Status: Open,  Structure Length: 2.41m (7.91ft),  Average Daily Traffic: 14,580 (year 2007),  Truck Traffic: 3%,  Average Future Daily Traffic: 14,477 (year 2027),  Design Load: H 20,  Features Intersected: CAMP BRANCH
Minimum Vertical Clearance: 7.56m (24.80ft),  Kilometerpoint: 429.508,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 7.9m (25.9ft),  Curb-To-Curb Width: 11.0m (36.1ft),  Out-to-Out Width: 12.5m (41.0ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 30.8 metric tons,  Inventory Rating: 22.7 metric tons,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.27m (10.73ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2006,  Bridge Improvement Cost: $532,000,  Roadway Improvement Cost: $53,000,  Total Project Cost: $798,000 ( Estimate for 2008),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>

Structure Number: 4729,  Location: .6 MI. NO. I-65 (Lat: 33.416667,  Lng: -86.800000),  Route carried "on" structure: US 31,  Year Built: 1942,  Year Reconstructed: 1954,  Status: Open,  Structure Length: 1.56m (5.12ft),  Average Daily Traffic: 14,580 (year 2007),  Truck Traffic: 3%,  Average Future Daily Traffic: 14,477 (year 2027),  Design Load: H 20,  Features Intersected: CAMP BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 429.508,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 3.7m (12.1ft),  Curb-To-Curb Width: 12.4m (40.7ft),  Out-to-Out Width: 13.4m (44.0ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 30.8 metric tons,  Inventory Rating: 22.7 metric tons,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.24m (7.35ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2006,  Bridge Improvement Cost: $373,000,  Roadway Improvement Cost: $37,000,  Total Project Cost: $559,000 ( Estimate for 2008)
Find on map >>

Structure Number: 8823,  Location: VESTRIDGE DR & US 31 (Lat: 33.433333,  Lng: -86.783333),  Route carried "on" structure: City street ,  Year Built: 1965,  Status: Open,  Structure Length: 0.64m (2.10ft),  Average Daily Traffic: 3,100 (year 2006),  Truck Traffic: 1%,  Average Future Daily Traffic: 5,000 (year 2026),  Design Load: H 15,  Features Intersected: BRANCH,  Facility Carried by Structure: VESTRIDGE DR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.100,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 22.7 metric tons,  Inventory Rating: 17.1 metric tons,  Structural Evaluation: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 1.26m (4.13ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2006,  Bridge Improvement Cost: $172,000,  Roadway Improvement Cost: $17,000,  Total Project Cost: $258,000 ( Estimate for 2008)
Find on map >>

Structure Number: 8933,  Location: CAHABA HEIGHTS (Lat: 33.450000,  Lng: -86.733333),  Route carried "on" structure: County highway ,  Year Built: 1965,  Status: Open,  Structure Length: 0.92m (3.02ft),  Average Daily Traffic: 405 (year 2006),  Truck Traffic: 2%,  Average Future Daily Traffic: 530 (year 2026),  Design Load: H 20,  Features Intersected: LITTLE SHADES CREEK,  Facility Carried by Structure: PIPE LINE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.8m (22.3ft),  Material/Design: Prestressed concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.6m (15.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 8.3m (27.2ft),  Out-to-Out Width: 8.7m (28.5ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 30.8 metric tons,  Inventory Rating: 22.7 metric tons,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.59m (5.22ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2006,  Bridge Improvement Cost: $181,000,  Roadway Improvement Cost: $18,000,  Total Project Cost: $271,000 ( Estimate for 2008),  Deck Structure Type: Concrete Precast Panels
Find on map >>

Structure Number: 10227,  Location: 0.25 MI W ROCKY RIDGE RD (Lat: 33.416667,  Lng: -86.766667),  Route carried "on" structure: County highway ,  Year Built: 1970,  Status: Open,  Structure Length: 3.11m (10.20ft),  Average Daily Traffic: 5,026 (year 2007),  Truck Traffic: 8%,  Average Future Daily Traffic: 6,835 (year 2027),  Design Load: HS 20,  Features Intersected: LITTLE SHADES CREEK,  Facility Carried by Structure: MORGAN DR VESTAVIA
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.8m (28.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 8.8m (28.9ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 43.5 metric tons,  Inventory Rating: 32.7 metric tons,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 3.95m (12.96ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2007,  Bridge Improvement Cost: $483,000,  Roadway Improvement Cost: $48,000,  Total Project Cost: $724,000 ( Estimate for 2008),  Deck Structure Type: Concrete Precast Panels
Find on map >>

Structure Number: 12205,  Location: TANGLEWOOD DR @ VESTAVIA (Lat: 33.450000,  Lng: -86.766667),  Route carried "on" structure: City street ,  Year Built: 1979,  Status: Open,  Structure Length: 0.64m (2.10ft),  Average Daily Traffic: 1,550 (year 2006),  Truck Traffic: 1%,  Average Future Daily Traffic: 2,000 (year 2026),  Design Load: H 15,  Features Intersected: BRANCH,  Facility Carried by Structure: TANGLEWOOD DR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.100,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 18.0m (59.1ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 22.7 metric tons,  Inventory Rating: 17.1 metric tons,  Structural Evaluation: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.26m (4.13ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2006,  Bridge Improvement Cost: $245,000,  Roadway Improvement Cost: $25,000,  Total Project Cost: $368,000 ( Estimate for 2008)
Find on map >>

Structure Number: 14298,  Location: .3 MI N JCT US 31 (Lat: 33.400000,  Lng: -86.800000),  Route carried "on" structure: County highway ,  Year Built: 1987,  Status: Open,  Structure Length: 2.13m (6.99ft),  Average Daily Traffic: 20,880 (year 2006),  Truck Traffic: 15%,  Average Future Daily Traffic: 29,200 (year 2026),  Design Load: HS 20,  Features Intersected: LITTLE SHADES CREEK,  Facility Carried by Structure: COLUMBIANA ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.100,  Lanes on structure: 5,  Owner: County Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Skew: 4 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 5.3m (17.4ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 43.6 metric tons,  Inventory Rating: 32.7 metric tons,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.91m (9.55ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2006,  Bridge Improvement Cost: $1,135,000,  Roadway Improvement Cost: $114,000,  Total Project Cost: $1,703,000 ( Estimate for 2008)
Find on map >>

Structure Number: 14418,  Location: HOOVER INTERCHANGE (Lat: 33.401389,  Lng: -86.806389),  Route carried "on" structure: Interstate 65,  Year Built: 1972,  Year Reconstructed: 1988,  Status: Open,  Structure Length: 9.69m (31.79ft),  Average Daily Traffic: 117,930 (year 2007),  Truck Traffic: 11%,  Average Future Daily Traffic: 122,529 (year 2027),  Design Load: HS 20,  Features Intersected: U.S.31
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 405.474,  Lanes on structure: 8,  Lanes under structure: 7,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 41.1m (134.8ft),  Skew: 30 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 43.3m (142.1ft),  Curb-To-Curb Width: 39.3m (128.9ft),  Out-to-Out Width: 41.1m (134.8ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Operating Rating: 59.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 10.63m (34.88ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2006,  Bridge Improvement Cost: $5,689,000,  Roadway Improvement Cost: $569,000,  Total Project Cost: $8,534,000 ( Estimate for 2008),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>

Structure Number: 14419,  Location: .1 MI. NO. HOOVER INTER (Lat: 33.425278,  Lng: -86.826111),  Route carried "on" structure: Interstate 65,  Year Built: 1972,  Year Reconstructed: 1988,  Status: Open,  Structure Length: 2.14m (7.02ft),  Average Daily Traffic: 122,040 (year 2007),  Truck Traffic: 10%,  Average Future Daily Traffic: 125,945 (year 2028),  Design Load: HS 20,  Features Intersected: PATTONS CK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 405.651,  Lanes on structure: 6,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 57.9m (190.0ft),  Skew: 2 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 43.5 metric tons,  Inventory Rating: 32.7 metric tons,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 2.91m (9.55ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2008,  Bridge Improvement Cost: $5,805,000,  Roadway Improvement Cost: $581,000,  Total Project Cost: $8,708,000 ( Estimate for 2008),  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>

Structure Number: 1442,  Location: I65 & TYLER ROAD (Lat: 33.409444,  Lng: -86.825556),  Route carried "on" structure: Interstate 65,  Year Built: 1972,  Year Reconstructed: 1988,  Status: Open,  Structure Length: 5.79m (19.00ft),  Average Daily Traffic: 122,040 (year 2007),  Truck Traffic: 10%,  Average Future Daily Traffic: 125,945 (year 2027),  Design Load: HS 20,  Features Intersected: TYLER ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 405.976,  Lanes on structure: 7,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 42.4m (139.1ft),  Skew: 31 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 23.5m (77.1ft),  Curb-To-Curb Width: 39.3m (128.9ft),  Out-to-Out Width: 39.6m (129.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 76.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 45.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 6.82m (22.38ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2006,  Bridge Improvement Cost: $3,522,000,  Roadway Improvement Cost: $352,000,  Total Project Cost: $5,283,000 ( Estimate for 2008),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>

Structure Number: 14668,  Location: JCT DOLLY RIDGE RD (Lat: 33.450000,  Lng: -86.733333),  Route carried "on" structure: County highway 523,  Year Built: 1988,  Status: Open,  Structure Length: 0.92m (3.02ft),  Average Daily Traffic: 15,060 (year 2008),  Truck Traffic: 5%,  Average Future Daily Traffic: 21,100 (year 2028),  Design Load: HS 20,  Features Intersected: LITTLE SHADES CREEK,  Facility Carried by Structure: CAHABA HEIGHTS RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Skew: 2 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 2.7m (8.9ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 43.6 metric tons,  Inventory Rating: 32.7 metric tons,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.58m (5.18ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2008,  Bridge Improvement Cost: $819,000,  Roadway Improvement Cost: $82,000,  Total Project Cost: $1,229,000 ( Estimate for 2008)
Find on map >>

Structure Number: 15799,  Location: .1 MI E I459 N (Lat: 33.483333,  Lng: -86.700000),  Route carried "on" structure: County highway ,  Year Built: 1984,  Status: Open,  Structure Length: 9.47m (31.07ft),  Average Daily Traffic: 2,625 (year 2007),  Truck Traffic: 10%,  Average Future Daily Traffic: 3,600 (year 2027),  Design Load: HS 20,  Features Intersected: OLD OVERTON RD,CAHABA R,  Facility Carried by Structure: LIBERTY PARKWAY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 5,  Lanes under structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 19.2m (63.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 22.9m (75.1ft),  Curb or Sidewalk Widths: Left: 0.3m (1.0ft),  Right: 0.3m (1.0ft),  Curb-To-Curb Width: 19.2m (63.0ft),  Out-to-Out Width: 20.4m (66.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 43.6 metric tons,  Inventory Rating: 32.7 metric tons,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Superior to present desirable criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 10.42m (34.19ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 48 months,  Inspection Date: April 2007,  Underwater Inspection Date: November 2006,  Bridge Improvement Cost: $2,768,000,  Roadway Improvement Cost: $277,000,  Total Project Cost: $4,152,000 ( Estimate for 2008),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>

Structure Number: 19819,  Location: 0.25MI FROM ROCKY RIDGE R (Lat: 33.450000,  Lng: -86.766667),  Route carried "on" structure: City street ,  Year Built: 1960,  Status: Open,  Structure Length: 0.62m (2.03ft),  Average Daily Traffic: 300 (year 2006),  Average Future Daily Traffic: 420 (year 2026),  Design Load: HS 20,  Features Intersected: BRANCH,  Facility Carried by Structure: TANGLEWOOD CIRCLE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.2m (10.5ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 14.6m (47.9ft)

Condition: Channel: Fair,  Culverts: Good,  Operating Rating: 43.6 metric tons,  Inventory Rating: 32.7 metric tons,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.23m (4.04ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2006,  Bridge Improvement Cost: $192,000,  Roadway Improvement Cost: $19,000,  Total Project Cost: $288,000 ( Estimate for 2008)
Find on map >>

Structure Number: 14418,  Location: I 65 OVER US 31 (Lat: 33.401389,  Lng: -86.806389),  Route carried "under" structure: US 31,  Year Built: 1972,  Structure Length: 9.69m (31.79ft),  Average Daily Traffic: 29,160 (year 2007),  Truck Traffic: 3%,  Features Intersected: U.S.31,  Facility Carried by Structure: I65
Minimum Vertical Clearance: 5.15m (16.90ft),  Kilometerpoint: 428.488,  Lanes on structure: 6,  Lanes under structure: 7,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 43.3m (142.1ft)

Find on map >>

Structure Number: 1442,  Location: I65 OVER TYLER ROAD (Lat: 33.409444,  Lng: -86.825556),  Route carried "under" structure: City street ,  Year Built: 1972,  Structure Length: 5.79m (19.00ft),  Average Daily Traffic: 3,500 (year 2002),  Truck Traffic: 2%,  Features Intersected: TYLER ROAD,  Facility Carried by Structure: I65
Minimum Vertical Clearance: 5.11m (16.77ft),  Kilometerpoint: 0.161,  Lanes on structure: 7,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 23.5m (77.1ft)

Discuss this city on our hugely popular Alabama forum

Back to: Vestavia Hills, AL, Alabama, All US cities.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2009 Advameg, Inc.