Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Wales, New York (NY)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 13Number of bridges
  • 128ft / 39.2mTotal length
  • $29,213,000Total costs
  • 36,890Total average daily traffic
  • 3,926Total average daily truck traffic
  • 38,482Total future (year 2037) average daily traffic
  • National Bridge Inventory (NBI) Registered Bridges for Wales
  • No street view available for this location

New bridges in Wales, NY - historical statistics
  • New bridges - historical statistics
  • 11940-1949
  • 11960-1969
  • 11970-1979
  • 41980-1989
  • 51990-1999
  • 12000-2009
Average Bridge Daily Traffic in Wales, NY
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 22.2%Very good
  • 33.3%Good
  • 22.2%Satisfactory
  • 22.2%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 11.1%Excellent
  • 55.6%Very good
  • 33.3%Good
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 44.4%Very good
  • 44.4%Good
  • 11.1%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 30.8%Very good
  • 23.1%Good
  • 23.1%Satisfactory
  • 23.1%Fair
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 50.0%Very good
  • 50.0%Good
Find on map >>   Show street view

Structure Number: 101187,  Location: 5.0 MI SE JCT RTS 16&78 (Lat: 42.701553,  Lng: -78.573781),  Route carried "on" structure: State highway 16,  Year Built: 1990,  Status: Open,  Structure Length: 3.54m (11.61ft),  Average Daily Traffic: 9,333 (year 2020),  Truck Traffic: 14%,  Average Future Daily Traffic: 9,421 (year 2040),  Design Load: HS 20,  Features Intersected: CAZENOVIA CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 21.110,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 35.0m (114.8ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 14.0m (45.9ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 92.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 55.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.53m (11.58ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $2,010,000,  Roadway Improvement Cost: $1,177,000,  Total Project Cost: $3,187,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 10161,  Location: 3.2 MI E JCT RT 20A & 400 (Lat: 42.768178,  Lng: -78.530669),  Route carried "on" structure: US 20A,  Year Built: 1989,  Status: Open,  Structure Length: 3.23m (10.60ft),  Average Daily Traffic: 3,625 (year 2017),  Truck Traffic: 8%,  Average Future Daily Traffic: 3,823 (year 2040),  Design Load: HS 20,  Features Intersected: BUFFALO CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 23.540,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 31.6m (103.7ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 2.1m (6.9ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 16.3m (53.5ft)

Condition: Deck: Fair,  Superstructure: Good,  Substructure: Very good,  Channel: Good,  Inventory Rating: 50.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.23m (10.60ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $1,787,000,  Roadway Improvement Cost: $1,047,000,  Total Project Cost: $2,834,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 101611,  Location: 5.6 MI E JCT US20A &SH400 (Lat: 42.769703,  Lng: -78.487469),  Route carried "on" structure: US 20A,  Year Built: 1948,  Status: Open,  Structure Length: 0.67m (2.20ft),  Average Daily Traffic: 3,625 (year 2017),  Truck Traffic: 8%,  Average Future Daily Traffic: 3,823 (year 2040),  Design Load: HS 20,  Features Intersected: STONY BOTTM CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 27.353,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.7m (44.9ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.4m (21.0ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 77.1 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 0.67m (2.20ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $254,000,  Roadway Improvement Cost: $149,000,  Total Project Cost: $403,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 103016,  Location: 7.2 MI SE JCT RTS 78 400 (Lat: 42.721983,  Lng: -78.468011),  Route carried "on" structure: State highway 78,  Year Built: 1995,  Status: Open,  Structure Length: 1.58m (5.18ft),  Average Daily Traffic: 4,251 (year 2020),  Truck Traffic: 11%,  Average Future Daily Traffic: 4,293 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: SHELDON CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.579,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 4.8m (15.7ft)

Condition: Channel: Fair,  Culverts: Very good,  Operating Rating: 67.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.58m (5.18ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $591,000,  Roadway Improvement Cost: $346,000,  Total Project Cost: $936,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 103017,  Location: 3.9 MI SE JCT SH78 &SH400 (Lat: 42.758997,  Lng: -78.519092),  Route carried "on" structure: State highway 78,  Year Built: 1995,  Status: Open,  Structure Length: 0.85m (2.79ft),  Average Daily Traffic: 4,251 (year 2020),  Truck Traffic: 11%,  Average Future Daily Traffic: 4,293 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: STONY BOTTM CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.742,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.2m (26.9ft)

Condition: Channel: Very good,  Culverts: Good,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 89.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.85m (2.79ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $288,000,  Roadway Improvement Cost: $168,000,  Total Project Cost: $456,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 103018,  Location: 3.8 MI SE JCT RTS 78 &400 (Lat: 42.759219,  Lng: -78.520325),  Route carried "on" structure: State highway 78,  Year Built: 1995,  Status: Open,  Structure Length: 4.97m (16.31ft),  Average Daily Traffic: 4,251 (year 2020),  Truck Traffic: 11%,  Average Future Daily Traffic: 4,293 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: BUFFALO CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.838,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 49.0m (160.8ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 12.8m (42.0ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 74.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 44.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.96m (16.27ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $2,347,000,  Roadway Improvement Cost: $1,375,000,  Total Project Cost: $3,722,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 103019,  Location: 3.4 MI SE JCT RTS 78 +400 (Lat: 42.760603,  Lng: -78.529142),  Route carried "on" structure: State highway 78,  Year Built: 1964,  Status: Open,  Structure Length: 1.52m (4.99ft),  Average Daily Traffic: 4,251 (year 2020),  Truck Traffic: 11%,  Average Future Daily Traffic: 4,293 (year 2040),  Design Load: HS 20,  Features Intersected: HUNTER CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 7.594,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.7m (44.9ft),  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 4.5m (14.8ft)

Condition: Channel: Fair,  Culverts: Very good,  Operating Rating: 65.8 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 50.9 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present desirable criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.52m (4.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $1,480,000,  Roadway Improvement Cost: $866,000,  Total Project Cost: $2,346,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 332793,  Location: .6 MILE S OF WALES CENTER (Lat: 42.759339,  Lng: -78.531292),  Route carried "on" structure: County highway ,  Year Built: 1971,  Status: Open,  Structure Length: 4.60m (15.09ft),  Average Daily Traffic: 977 (year 2017),  Truck Traffic: 7%,  Average Future Daily Traffic: 986 (year 2040),  Design Load: HS 20,  Features Intersected: HUNTER CREEK,  Facility Carried by Structure: HUNTERS CREEK RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 13.886,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 22.2m (72.8ft),  Curb or Sidewalk Widths: Left: 0.4m (1.3ft),  Right: 0.4m (1.3ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 10.0m (32.8ft)

Condition: Deck: Fair,  Superstructure: Very good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 69.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 41.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.60m (15.09ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $1,892,000,  Roadway Improvement Cost: $1,108,000,  Total Project Cost: $3,000,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: 3328,  Location: 4.4 MI SE OF EAST AURORA (Lat: 42.736303,  Lng: -78.548411),  Route carried "on" structure: County highway ,  Year Built: 1987,  Status: Open,  Structure Length: 4.21m (13.81ft),  Average Daily Traffic: 1,277 (year 2019),  Truck Traffic: 4%,  Average Future Daily Traffic: 1,788 (year 2039),  Design Load: HS 20,  Features Intersected: HUNTER CREEK,  Facility Carried by Structure: CENTER LINE RD.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.577,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 41.1m (134.8ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 10.4m (34.1ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Very good,  Inventory Rating: 78.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.20m (13.78ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $1,931,000,  Roadway Improvement Cost: $1,131,000,  Total Project Cost: $3,061,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 332815,  Location: 1.6 MI SE OF WALES CENTER (Lat: 42.748294,  Lng: -78.508239),  Route carried "on" structure: Other road ,  Year Built: 2001,  Status: Open,  Structure Length: 4.72m (15.49ft),  Average Daily Traffic: 210 (year 2018),  Truck Traffic: 7%,  Average Future Daily Traffic: 294 (year 2038),  Features Intersected: BUFFALO CREEK,  Facility Carried by Structure: MERLAU ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.816,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 45.7m (149.9ft),  Curb-To-Curb Width: 8.8m (28.9ft),  Out-to-Out Width: 9.8m (32.2ft)

Condition: Deck: Very good,  Superstructure: Excellent,  Substructure: Very good,  Channel: Very good,  Operating Rating: 70.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 42.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.72m (15.49ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $1,597,000,  Roadway Improvement Cost: $935,000,  Total Project Cost: $2,532,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 332817,  Location: 2 MILES NE OF SOUTH WALES (Lat: 42.722122,  Lng: -78.541425),  Route carried "on" structure: County highway ,  Year Built: 1983,  Status: Open,  Structure Length: 1.58m (5.18ft),  Average Daily Traffic: 269 (year 2017),  Truck Traffic: 5%,  Average Future Daily Traffic: 377 (year 2037),  Design Load: HS 20,  Features Intersected: HUNTERS CREEK,  Facility Carried by Structure: WARNER HILL ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.942,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 15.2m (49.9ft),  Curb-To-Curb Width: 10.4m (34.1ft),  Out-to-Out Width: 11.0m (36.1ft)

Condition: Deck: Satisfactory,  Superstructure: Very good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 93.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 56.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.58m (5.18ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $1,212,000,  Roadway Improvement Cost: $710,000,  Total Project Cost: $1,921,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 33282,  Location: 3.4 MI SE OF WALES CENTER (Lat: 42.736594,  Lng: -78.479361),  Route carried "on" structure: County highway ,  Year Built: 1983,  Status: Open,  Structure Length: 3.05m (10.01ft),  Average Daily Traffic: 347 (year 2018),  Truck Traffic: 6%,  Average Future Daily Traffic: 486 (year 2038),  Design Load: HS 20,  Features Intersected: BUFFALO CREEK,  Facility Carried by Structure: CENTERLINE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 7.257,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 14.9m (48.9ft),  Curb-To-Curb Width: 8.6m (28.2ft),  Out-to-Out Width: 8.6m (28.2ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Fair,  Channel: Fair,  Operating Rating: 70.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 42.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.04m (9.97ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: July 2020,  Underwater Inspection Date: June 2019,  Bridge Improvement Cost: $893,000,  Roadway Improvement Cost: $523,000,  Total Project Cost: $1,415,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 332821,  Location: 2.7 MI SE OF WALES CENTER (Lat: 42.746189,  Lng: -78.488067),  Route carried "on" structure: County highway ,  Year Built: 1999,  Status: Open,  Structure Length: 4.72m (15.49ft),  Average Daily Traffic: 223 (year 2018),  Truck Traffic: 3%,  Average Future Daily Traffic: 312 (year 2038),  Design Load: HS 25 or greater,  Features Intersected: BUFFALO CREEK,  Facility Carried by Structure: EAST CREEK ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.905,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 45.7m (149.9ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 10.4m (34.1ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Satisfactory,  Inventory Rating: 78.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 4.72m (15.49ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $2,144,000,  Roadway Improvement Cost: $1,256,000,  Total Project Cost: $3,400,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Discuss Wales, New York (NY) on our hugely popular New York forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.