U.S. Cities - City-Data Homepage  
City-Data Forum
City-Data.com Homepage

Bridge Statistics for Wallingford, Connecticut (CT) - Condition, Traffic, Stress, Structural Evaluation, Project Costs

Back to: Wallingford, CT, Connecticut, Connecticut forum, All US cities.





Parts: 1, 2


National Bridge Inventory (NBI) Statistics
Number of bridges: 62
Total length: 254 meters (833ft)
Total costs: $90,000
Total average daily traffic: 1,409,023
Total average daily truck traffic: 120,927
National Bridge Inventory (NBI) Registered Bridges for Wallingford

New bridges - Historical Statistics

  • Before 1900: 1
  • 1900-1909: 1
  • 1910-1919: 2
  • 1920-1929: 0
  • 1930-1939: 3
  • 1940-1949: 11
  • 1950-1959: 1
  • 1960-1969: 29
  • 1970-1979: 0
  • 1980-1989: 3
  • 1990-1999: 5
  • 2000-2009: 6

Reconstructed bridges - Historical Statistics

  • 1980-1989: 4
  • 1990-1999: 4
  • 2000-2009: 2

Average Daily Traffic

Average Truck Traffic (%)

Bridge Condition - Deck

Bridge Condition - Superstructure

Bridge Condition - Substructure

Bridge Condition - Channel

Bridge Condition - Culverts

Find on map >>

Structure Number: 434,  Location: 1.23 MI SOUTH OF MERIDEN (Lat: 41.496667,  Lng: -72.810000),  Route carried "on" structure: State highway 15,  Year Built: 1998,  Status: Open,  Structure Length: 3.35m (10.99ft),  Average Daily Traffic: 47,400 (year 2005),  Truck Traffic: 5%,  Average Future Daily Traffic: 23,700 (year 2026),  Design Load: HS 20,  Features Intersected: US ROUTE 5
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 98.262,  Lanes on structure: 5,  Lanes under structure: 5,  Owner: State Highway Agency,  Approaching Roadway Width: 25.3m (83.0ft),  Skew: 24 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 31.7m (104.0ft),  Curb-To-Curb Width: 25.4m (83.3ft),  Out-to-Out Width: 27.4m (89.9ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Inventory Rating: 58.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.01m (0.03ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2007,  Bridge Improvement Cost: $1,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $2,000 ( Estimate for 2000),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>

Structure Number: 791,  Location: 0.7 MI N OF NO HAVEN T.L (Lat: 41.458333,  Lng: -72.836667),  Route carried "on" structure: State highway 15,  Year Built: 1947,  Year Reconstructed: 1988,  Status: Posted for load-capacity,  Structure Length: 1.74m (5.71ft),  Average Daily Traffic: 41,500 (year 2004),  Truck Traffic: 5%,  Average Future Daily Traffic: 20,750 (year 2026),  Design Load: HS 20,  Features Intersected: QUINNIPIAC STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 93.933,  Lanes on structure: 5,  Lanes under structure: 3,  Owner: State Highway Agency,  Approaching Roadway Width: 25.9m (85.0ft),  Skew: 31 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 15.2m (49.9ft),  Curb-To-Curb Width: 29.2m (95.8ft),  Out-to-Out Width: 29.6m (97.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Inventory Rating: 67.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.01m (0.03ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2006,  Bridge Improvement Cost: $1,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $2,000 ( Estimate for 2000),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>

Structure Number: 792,  Location: AT EXIT 65 OF ROUTE 15 NB (Lat: 41.458333,  Lng: -72.833333),  Route carried "on" structure: State highway 150,  Year Built: 1947,  Year Reconstructed: 1988,  Status: Open,  Structure Length: 3.17m (10.40ft),  Average Daily Traffic: 13,700 (year 2004),  Truck Traffic: 3%,  Average Future Daily Traffic: 6,850 (year 2026),  Design Load: HS 20,  Features Intersected: ROUTE 15
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 9.316,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 14.9m (48.9ft),  Curb or Sidewalk Widths: Left: 1.7m (5.6ft),  Right: 1.7m (5.6ft),  Curb-To-Curb Width: 10.1m (33.1ft),  Out-to-Out Width: 14.2m (46.6ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 65.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 0.01m (0.03ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2007,  Bridge Improvement Cost: $1,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $2,000 ( Estimate for 2000),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>

Structure Number: 793A,  Location: 1 MI NO OF JCT ROUTE 150 (Lat: 41.473333,  Lng: -72.825000),  Route carried "on" structure: State highway 15,  Year Built: 1946,  Status: Posted for load-capacity,  Structure Length: 3.26m (10.70ft),  Average Daily Traffic: 23,800 (year 2004),  Truck Traffic: 5%,  Average Future Daily Traffic: 11,900 (year 2026),  Design Load: HS 20,  Features Intersected: QUINNIPIAC RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 95.993,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 9.4m (30.8ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 15.5m (50.9ft),  Curb-To-Curb Width: 9.6m (31.5ft),  Out-to-Out Width: 11.3m (37.1ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 57.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.01m (0.03ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2006,  Bridge Improvement Cost: $1,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $2,000 ( Estimate for 2000),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 793B,  Location: 1 MI. NO. OF JCT RTE 150 (Lat: 41.473333,  Lng: -72.825000),  Route carried "on" structure: State highway 15,  Year Built: 1946,  Year Reconstructed: 1990,  Status: Posted for load-capacity,  Structure Length: 3.26m (10.70ft),  Average Daily Traffic: 22,950 (year 2003),  Truck Traffic: 5%,  Average Future Daily Traffic: 11,475 (year 2026),  Design Load: HS 20,  Features Intersected: QUINNIPIAC RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 95.993,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 15.5m (50.9ft),  Curb-To-Curb Width: 10.0m (32.8ft),  Out-to-Out Width: 11.2m (36.7ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Satisfactory,  Inventory Rating: 72.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.01m (0.03ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2006,  Bridge Improvement Cost: $1,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $2,000 ( Estimate for 2000),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>

Structure Number: 794,  Location: 1.4 MI S OF MERIDEN TL (Lat: 41.496667,  Lng: -72.813333),  Route carried "on" structure: State highway 15,  Year Built: 1946,  Status: Posted for load-capacity,  Structure Length: 1.01m (3.31ft),  Average Daily Traffic: 48,800 (year 2006),  Truck Traffic: 5%,  Average Future Daily Traffic: 24,400 (year 2026),  Design Load: HS 20,  Features Intersected: ROUTE 68
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 97.972,  Lanes on structure: 4,  Lanes under structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Skew: 30 degrees,  Material/Design: Concrete,  Design/Construction: Frame,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.1m (33.1ft),  Curb-To-Curb Width: 21.4m (70.2ft),  Out-to-Out Width: 28.3m (92.8ft)

Condition: Superstructure: Good,  Substructure: Good,  Operating Rating: 89.1 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 62.1 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.01m (0.03ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2007,  Bridge Improvement Cost: $1,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $2,000 ( Estimate for 2000)
Find on map >>

Structure Number: 795,  Location: 600 FT SOUTH OF ROUTE 5 (Lat: 41.495000,  Lng: -72.810000),  Route carried "on" structure: State highway 15,  Year Built: 1947,  Year Reconstructed: 1989,  Status: Posted for load-capacity,  Structure Length: 2.35m (7.71ft),  Average Daily Traffic: 47,400 (year 2005),  Truck Traffic: 5%,  Average Future Daily Traffic: 23,700 (year 2026),  Design Load: HS 20,  Features Intersected: AMTRAK RAILROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 98.181,  Lanes on structure: 6,  Owner: State Highway Agency,  Approaching Roadway Width: 18.9m (62.0ft),  Skew: 33 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 21.0m (68.9ft),  Curb-To-Curb Width: 28.1m (92.2ft),  Out-to-Out Width: 31.2m (102.4ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 89.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 68.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.01m (0.03ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2007,  Bridge Improvement Cost: $1,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $2,000 ( Estimate for 2000),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>

Structure Number: 796,  Location: 0.53 MI N OF RTE 68 (Lat: 41.491667,  Lng: -72.801667),  Route carried "on" structure: City street ,  Year Built: 1947,  Status: Open,  Structure Length: 4.42m (14.50ft),  Average Daily Traffic: 6,125 (year 2006),  Truck Traffic: 5%,  Average Future Daily Traffic: 3,063 (year 2026),  Design Load: HS 20,  Features Intersected: ROUTE 15,  Facility Carried by Structure: YALE AVENUE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 10.7m (35.1ft),  Skew: 4 degrees,  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 20.7m (67.9ft),  Curb or Sidewalk Widths: Left: 0.3m (1.0ft),  Right: 0.3m (1.0ft),  Curb-To-Curb Width: 10.7m (35.1ft),  Out-to-Out Width: 12.3m (40.4ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Good,  Operating Rating: 62.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 37.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 0.01m (0.03ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2006,  Bridge Improvement Cost: $1,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $2,000 ( Estimate for 2000),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>

Structure Number: 1378,  Location: 1.35 MILES SOUTH OF I-91 (Lat: 41.401667,  Lng: -72.800000),  Route carried "on" structure: State highway 150,  Year Built: 1938,  Year Reconstructed: 1995,  Status: Open,  Structure Length: 1.31m (4.30ft),  Average Daily Traffic: 5,600 (year 2006),  Truck Traffic: 3%,  Average Future Daily Traffic: 2,800 (year 2026),  Design Load: HS 20,  Features Intersected: MUDDY RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.590,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.5m (41.0ft),  Curb-To-Curb Width: 8.7m (28.5ft),  Out-to-Out Width: 9.9m (32.5ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 55.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.01m (0.03ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2007,  Bridge Improvement Cost: $1,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $2,000 ( Estimate for 2000),  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>

Structure Number: 1379,  Location: 1.5 MI NE OF I-91 (Lat: 41.458333,  Lng: -72.813333),  Route carried "on" structure: State highway 150,  Year Built: 1914,  Status: Open,  Structure Length: 0.79m (2.59ft),  Average Daily Traffic: 10,200 (year 2006),  Truck Traffic: 3%,  Average Future Daily Traffic: 5,100 (year 2026),  Design Load: HS 20,  Features Intersected: WHARTON BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 7.273,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 10.7m (35.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.4m (21.0ft),  Curb or Sidewalk Widths: Left: 2.4m (7.9ft),  Right: 2.7m (8.9ft),  Curb-To-Curb Width: 10.7m (35.1ft),  Out-to-Out Width: 16.3m (53.5ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 58.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.01m (0.03ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2007,  Bridge Improvement Cost: $1,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $2,000 ( Estimate for 2000),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 1381,  Location: AT JCT RTE 68 & RTE 150 (Lat: 41.496667,  Lng: -72.818333),  Route carried "on" structure: State highway 150,  Year Built: 1951,  Year Reconstructed: 1988,  Status: Open,  Structure Length: 3.66m (12.01ft),  Average Daily Traffic: 14,100 (year 2004),  Truck Traffic: 3%,  Average Future Daily Traffic: 7,050 (year 2026),  Design Load: HS 20,  Features Intersected: QUINNIPIAC RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 12.969,  Lanes on structure: 3,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 16.8m (55.1ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.7m (5.6ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 14.3m (46.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 89.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 56.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.01m (0.03ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 48 months,  Inspection Date: August 2006,  Underwater Inspection Date: March 2005,  Bridge Improvement Cost: $1,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $2,000 ( Estimate for 2000),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>

Structure Number: 1867,  Location: 3 MILE WEST OF I-91 X-CRS (Lat: 41.486667,  Lng: -72.810000),  Route carried "on" structure: State highway 68,  Year Built: 1965,  Status: Open,  Structure Length: 8.75m (28.71ft),  Average Daily Traffic: 17,700 (year 2006),  Truck Traffic: 6%,  Average Future Daily Traffic: 8,850 (year 2026),  Design Load: HS 20,  Features Intersected: AMTRAK & US ROUTE 5
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 23.475,  Lanes on structure: 2,  Lanes under structure: 3,  Owner: State Highway Agency,  Approaching Roadway Width: 13.7m (44.9ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 29.9m (98.1ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 15.1m (49.5ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 77.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 45.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 0.01m (0.03ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2007,  Bridge Improvement Cost: $1,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $2,000 ( Estimate for 2000),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>

Structure Number: 3121,  Location: .19 MI N N.HAVEN T.L. (Lat: 41.420000,  Lng: -72.825000),  Route carried "on" structure: Interstate 91,  Year Built: 1965,  Status: Open,  Structure Length: 1.74m (5.71ft),  Average Daily Traffic: 40,050 (year 2004),  Truck Traffic: 9%,  Average Future Daily Traffic: 20,025 (year 2026),  Design Load: HS 20,  Features Intersected: POND HILL ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 17.377,  Lanes on structure: 4,  Lanes under structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 18.9m (62.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 15.2m (49.9ft),  Curb-To-Curb Width: 18.9m (62.0ft),  Out-to-Out Width: 20.7m (67.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 89.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 56.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.01m (0.03ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2006,  Bridge Improvement Cost: $1,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $2,000 ( Estimate for 2000),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>

Structure Number: 3122,  Location: 0.19 MI N OF N.HAVEN T.L. (Lat: 41.421667,  Lng: -72.823333),  Route carried "on" structure: Interstate 91,  Year Built: 1965,  Status: Open,  Structure Length: 1.74m (5.71ft),  Average Daily Traffic: 40,050 (year 2004),  Truck Traffic: 9%,  Average Future Daily Traffic: 20,025 (year 2026),  Design Load: HS 20,  Features Intersected: POND HILL ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 17.377,  Lanes on structure: 4,  Lanes under structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 18.9m (62.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 15.2m (49.9ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 18.9m (62.0ft),  Out-to-Out Width: 20.7m (67.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Inventory Rating: 55.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.01m (0.03ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2006,  Bridge Improvement Cost: $1,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $2,000 ( Estimate for 2000),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>

Structure Number: 3124,  Location: ROUTE 91S O/TR 91807 (Lat: 41.423333,  Lng: -72.825000),  Route carried "on" structure: Interstate 91,  Year Built: 1965,  Status: Open,  Structure Length: 1.49m (4.89ft),  Average Daily Traffic: 35,650 (year 2006),  Truck Traffic: 9%,  Average Future Daily Traffic: 17,825 (year 2026),  Design Load: HS 20,  Features Intersected: I-91 TR 807
Minimum Vertical Clearance: 5.38m (17.65ft),  Kilometerpoint: 17.570,  Lanes on structure: 3,  Lanes under structure: 1,  Owner: State Highway Agency,  Approaching Roadway Width: 15.2m (49.9ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.5m (41.0ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 15.2m (49.9ft),  Out-to-Out Width: 17.1m (56.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Inventory Rating: 55.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.01m (0.03ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2007,  Bridge Improvement Cost: $1,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $2,000 ( Estimate for 2000),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 3125,  Location: 0.5 MI S OF EXIT 91 SB (Lat: 41.423333,  Lng: -72.825000),  Route carried "on" structure: Ramp State highway 702,  Year Built: 1965,  Status: Open,  Structure Length: 7.53m (24.70ft),  Average Daily Traffic: 4,800 (year 2006),  Truck Traffic: 8%,  Average Future Daily Traffic: 2,400 (year 2026),  Design Load: HS 20,  Features Intersected: INTERSTATE-91 SOUTHBOUND
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.175,  Lanes on structure: 1,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 25.9m (85.0ft),  Curb-To-Curb Width: 8.4m (27.6ft),  Out-to-Out Width: 9.6m (31.5ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Fair,  Operating Rating: 89.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 63.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 0.01m (0.03ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2007,  Bridge Improvement Cost: $1,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $2,000 ( Estimate for 2000),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>

Structure Number: 3126,  Location: 1 MI SOUTH OF ROUTE 150 (Lat: 41.423333,  Lng: -72.823333),  Route carried "on" structure: Interstate 91,  Year Built: 1965,  Status: Open,  Structure Length: 6.55m (21.49ft),  Average Daily Traffic: 35,650 (year 2006),  Truck Traffic: 14%,  Average Future Daily Traffic: 17,825 (year 2026),  Design Load: HS 20,  Features Intersected: INTERSTATE-91 TR 807
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 17.570,  Lanes on structure: 3,  Lanes under structure: 1,  Owner: State Highway Agency,  Approaching Roadway Width: 15.5m (50.9ft),  Skew: 13 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 27.7m (90.9ft),  Curb-To-Curb Width: 15.8m (51.8ft),  Out-to-Out Width: 16.9m (55.4ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 72.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 43.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.01m (0.03ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2007,  Bridge Improvement Cost: $1,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $2,000 ( Estimate for 2000),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>

Structure Number: 3127,  Location: .50 MI SOUTH OF ROUTE 150 (Lat: 41.428333,  Lng: -72.813333),  Route carried "on" structure: City street ,  Year Built: 1965,  Status: Open,  Structure Length: 8.60m (28.22ft),  Average Daily Traffic: 3,510 (year 2007),  Truck Traffic: 2%,  Average Future Daily Traffic: 1,755 (year 2026),  Design Load: HS 20,  Features Intersected: INTERSTATE-91,  Facility Carried by Structure: HARRISON ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.354,  Lanes on structure: 2,  Lanes under structure: 6,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 7 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 27.4m (89.9ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 1.7m (5.6ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 12.1m (39.7ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Inventory Rating: 54.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 0.01m (0.03ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2007,  Bridge Improvement Cost: $1,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $2,000 ( Estimate for 2000),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>

Structure Number: 3128A,  Location: 1.7 MI N OF NO HVN T.L. (Lat: 41.433333,  Lng: -72.803333),  Route carried "on" structure: Interstate 91,  Year Built: 1965,  Status: Open,  Structure Length: 2.01m (6.59ft),  Average Daily Traffic: 36,150 (year 2006),  Truck Traffic: 5%,  Average Future Daily Traffic: 18,075 (year 2026),  Design Load: H 20,  Features Intersected: ROUTE 150
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 19.775,  Lanes on structure: 3,  Lanes under structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 15.2m (49.9ft),  Skew: 13 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 17.7m (58.1ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 15.2m (49.9ft),  Out-to-Out Width: 17.1m (56.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 80.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 48.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.01m (0.03ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2007,  Bridge Improvement Cost: $1,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $2,000 ( Estimate for 2000),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 3128B,  Location: 1.7 MI N OF NO HAVEN T.L. (Lat: 41.433333,  Lng: -72.803333),  Route carried "on" structure: Interstate 91,  Year Built: 1965,  Status: Open,  Structure Length: 2.01m (6.59ft),  Average Daily Traffic: 35,150 (year 2006),  Truck Traffic: 9%,  Average Future Daily Traffic: 17,575 (year 2026),  Design Load: H 20,  Features Intersected: ROUTE 150
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 19.791,  Lanes on structure: 3,  Lanes under structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 15.2m (49.9ft),  Skew: 13 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 17.7m (58.1ft),  Curb-To-Curb Width: 15.7m (51.5ft),  Out-to-Out Width: 16.8m (55.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 81.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 48.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.01m (0.03ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2007,  Bridge Improvement Cost: $1,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $2,000 ( Estimate for 2000),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>

Structure Number: 3129,  Location: .76 MI SO OF RTE 68 (Lat: 41.445000,  Lng: -72.791667),  Route carried "on" structure: State highway 738,  Year Built: 1965,  Status: Open,  Structure Length: 9.39m (30.81ft),  Average Daily Traffic: 9,000 (year 2006),  Truck Traffic: 4%,  Average Future Daily Traffic: 4,500 (year 2026),  Design Load: HS 20,  Features Intersected: INTERSTATE-91
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.175,  Lanes on structure: 2,  Lanes under structure: 6,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 26.8m (87.9ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.9m (45.6ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 61.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.01m (0.03ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2007,  Bridge Improvement Cost: $1,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $2,000 ( Estimate for 2000),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 313,  Location: 1.77 SOUTH OF ROUTE 68 (Lat: 41.455000,  Lng: -72.780000),  Route carried "on" structure: City street ,  Year Built: 1965,  Status: Open,  Structure Length: 8.78m (28.81ft),  Average Daily Traffic: 1,600 (year 2006),  Truck Traffic: 4%,  Average Future Daily Traffic: 800 (year 2026),  Design Load: HS 20,  Features Intersected: INTERSTATE-91,  Facility Carried by Structure: NEW ROCK HILL ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.354,  Lanes on structure: 2,  Lanes under structure: 6,  Owner: State Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 31.7m (104.0ft),  Curb or Sidewalk Widths: Left: 1.7m (5.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 12.0m (39.4ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 89.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 55.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.01m (0.03ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2007,  Bridge Improvement Cost: $1,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $2,000 ( Estimate for 2000),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>

Structure Number: 3131,  Location: betwn exits 14 & 15, I-91 (Lat: 41.466667,  Lng: -72.775000),  Route carried "on" structure: City street ,  Year Built: 1965,  Status: Open,  Structure Length: 11.19m (36.71ft),  Average Daily Traffic: 5,670 (year 2007),  Truck Traffic: 2%,  Average Future Daily Traffic: 2,835 (year 2026),  Design Load: HS 20,  Features Intersected: INTERSTATE-91,  Facility Carried by Structure: DURHAM ROAD #1
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 36.524,  Lanes on structure: 2,  Lanes under structure: 6,  Owner: State Highway Agency,  Approaching Roadway Width: 9.4m (30.8ft),  Skew: 1 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 35.1m (115.2ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 10.8m (35.4ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 68.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.01m (0.03ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2007,  Bridge Improvement Cost: $1,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $2,000 ( Estimate for 2000),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>

Structure Number: 3132,  Location: 1.0 MI NORTH OF DURHAM RD (Lat: 41.480000,  Lng: -72.770000),  Route carried "on" structure: State highway 68,  Year Built: 2004,  Status: Open,  Structure Length: 10.39m (34.09ft),  Average Daily Traffic: 18,900 (year 2005),  Truck Traffic: 3%,  Average Future Daily Traffic: 9,450 (year 2026),  Design Load: HS 20,  Features Intersected: INTERSTATE-91
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 27.031,  Lanes on structure: 6,  Lanes under structure: 6,  Owner: State Highway Agency,  Approaching Roadway Width: 24.1m (79.1ft),  Skew: 2 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 50.9m (167.0ft),  Curb or Sidewalk Widths: Left: 1.7m (5.6ft),  Right: 1.7m (5.6ft),  Curb-To-Curb Width: 24.0m (78.7ft),  Out-to-Out Width: 28.2m (92.5ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 87.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 52.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.01m (0.03ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2006,  Bridge Improvement Cost: $1,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $2,000 ( Estimate for 2000),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>

Structure Number: 3133,  Location: .54 MI NORTH OF RTE 68 (Lat: 41.488333,  Lng: -72.766667),  Route carried "on" structure: City street ,  Year Built: 1965,  Status: Open,  Structure Length: 9.48m (31.10ft),  Average Daily Traffic: 1,404 (year 2007),  Truck Traffic: 2%,  Average Future Daily Traffic: 702 (year 2026),  Design Load: HS 20,  Features Intersected: INTERSTATE-91,  Facility Carried by Structure: CARPENTER LANE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 6,  Owner: State Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 30.2m (99.1ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 10.8m (35.4ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 59.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.01m (0.03ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2007,  Bridge Improvement Cost: $1,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $2,000 ( Estimate for 2000),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>

Structure Number: 3137,  Location: I-91 TR 805 (Lat: 41.423333,  Lng: -72.826667),  Route carried "on" structure: Ramp Interstate 91,  Year Built: 1965,  Status: Open,  Structure Length: 2.07m (6.79ft),  Average Daily Traffic: 4,800 (year 2006),  Truck Traffic: 9%,  Average Future Daily Traffic: 2,400 (year 2026),  Design Load: HS 20,  Features Intersected: POND HILL ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.062,  Lanes on structure: 2,  Lanes under structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 18.3m (60.0ft),  Curb-To-Curb Width: 13.1m (43.0ft),  Out-to-Out Width: 14.3m (46.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 86.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 51.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 0.01m (0.03ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2007,  Bridge Improvement Cost: $1,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $2,000 ( Estimate for 2000),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>

Structure Number: 3138,  Location: 0.7 MI WEST OF I91 (Lat: 41.423333,  Lng: -72.826667),  Route carried "on" structure: Ramp State highway 702,  Year Built: 1965,  Status: Open,  Structure Length: 1.86m (6.10ft),  Average Daily Traffic: 4,800 (year 2006),  Truck Traffic: 5%,  Average Future Daily Traffic: 2,400 (year 2026),  Design Load: HS 20,  Features Intersected: POND HILL ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.062,  Lanes on structure: 2,  Lanes under structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Skew: 21 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 16.5m (54.1ft),  Curb-To-Curb Width: 17.5m (57.4ft),  Out-to-Out Width: 18.5m (60.7ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 59.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.01m (0.03ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2007,  Bridge Improvement Cost: $1,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $2,000 ( Estimate for 2000),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>

Structure Number: 3293,  Location: 150' EAST OF ROUTE 150 (Lat: 41.490000,  Lng: -72.816667),  Route carried "on" structure: State highway 68,  Year Built: 1965,  Status: Open,  Structure Length: 4.57m (14.99ft),  Average Daily Traffic: 21,900 (year 2004),  Truck Traffic: 4%,  Average Future Daily Traffic: 10,950 (year 2026),  Design Load: HS 20,  Features Intersected: QUINNIPIAC RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 22.623,  Lanes on structure: 3,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 14.9m (48.9ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.9m (45.6ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 76.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.01m (0.03ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2006,  Bridge Improvement Cost: $1,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $2,000 ( Estimate for 2000),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>

Structure Number: 3437,  Location: .63 MI E OF DURHAM TL (Lat: 41.470000,  Lng: -72.746667),  Route carried "on" structure: State highway 68,  Year Built: 1967,  Status: Open,  Structure Length: 3.32m (10.89ft),  Average Daily Traffic: 14,000 (year 2004),  Truck Traffic: 3%,  Average Future Daily Traffic: 7,000 (year 2026),  Design Load: HS 20,  Features Intersected: P&W RR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 29.670,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 5 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 31.1m (102.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.3m (43.6ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 89.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.01m (0.03ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2006,  Bridge Improvement Cost: $1,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $2,000 ( Estimate for 2000),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>

Structure Number: 3733,  Location: .1 MI EAST OF SO ELM ST (Lat: 41.440000,  Lng: -72.823333),  Route carried "on" structure: City street ,  Year Built: 1900,  Year Reconstructed: 2000,  Status: Open,  Structure Length: 0.82m (2.69ft),  Average Daily Traffic: 4,510 (year 2007),  Truck Traffic: 5%,  Average Future Daily Traffic: 2,255 (year 2026),  Design Load: HS 20,  Features Intersected: WHARTON BROOK,  Facility Carried by Structure: POND HILL ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.089,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.3m (24.0ft),  Curb or Sidewalk Widths: Left: 2.1m (6.9ft),  Right: 2.1m (6.9ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 14.3m (46.9ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 44.1 metric tons,  Inventory Rating: 32.4 metric tons,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.01m (0.03ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2007,  Bridge Improvement Cost: $1,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $2,000 ( Estimate for 2000),  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 3734,  Location: .5 MI EAST,ON RAMP 15 SB (Lat: 41.456667,  Lng: -72.835000),  Route carried "on" structure: City street ,  Year Built: 1938,  Year Reconstructed: 1996,  Status: Posted for load,  Structure Length: 3.84m (12.60ft),  Average Daily Traffic: 7,630 (year 2007),  Truck Traffic: 1%,  Average Future Daily Traffic: 3,815 (year 2026),  Design Load: HS 20,  Features Intersected: QUINNIPIAC RIVER,  Facility Carried by Structure: QUINNIPIAC STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.995,  Lanes on structure: 3,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 18.3m (60.0ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 11.0m (36.1ft),  Out-to-Out Width: 14.8m (48.6ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Good,  Operating Rating: 29.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 18.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 20.0 - 29.9% below),  Length Of Structure Improvement: 0.01m (0.03ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2007,  Bridge Improvement Cost: $1,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $2,000 ( Estimate for 2000),  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>

Structure Number: 3735,  Location: .1 MI EAST OF RTE 15 (Lat: 41.458333,  Lng: -72.835000),  Route carried "on" structure: City street ,  Year Built: 1915,  Status: Open,  Structure Length: 1.13m (3.71ft),  Average Daily Traffic: 7,630 (year 2007),  Truck Traffic: 4%,  Average Future Daily Traffic: 3,815 (year 2026),  Features Intersected: WALLACE RACEWAY,  Facility Carried by Structure: QUINNIPIAC STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.998,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.1m (33.1ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 8.8m (28.9ft),  Out-to-Out Width: 12.8m (42.0ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 52.2 metric tons,  Inventory Rating: 30.6 metric tons,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.01m (0.03ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2007,  Bridge Improvement Cost: $1,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $2,000 ( Estimate for 2000),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 4055,  Location: OFF ROUTE 5 (Lat: 41.436667,  Lng: -72.830000),  Route carried "on" structure: City street ,  Year Built: 1964,  Status: Open,  Structure Length: 1.65m (5.41ft),  Average Daily Traffic: 2,000 (year 1993),  Truck Traffic: 2%,  Average Future Daily Traffic: 1,000 (year 2026),  Design Load: HS 20,  Features Intersected: AMTRAK RAILROAD,  Facility Carried by Structure: JOHN STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.805,  Lanes on structure: 2,  Maintenance Responsibility: Local Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 15.5m (50.9ft),  Curb or Sidewalk Widths: Left: 1.1m (3.6ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 8.3m (27.2ft),  Out-to-Out Width: 10.9m (35.8ft)

Condition: Deck: Fair,  Superstructure: Good,  Substructure: Good,  Operating Rating: 52.2 metric tons,  Inventory Rating: 30.6 metric tons,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.01m (0.03ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2007,  Bridge Improvement Cost: $1,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $2,000 ( Estimate for 2000),  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 4392,  Location: 100' EAST OF RTE 15 (Lat: 41.431667,  Lng: -72.850000),  Route carried "on" structure: City street ,  Year Built: 1982,  Status: Open,  Structure Length: 3.60m (11.81ft),  Average Daily Traffic: 5,936 (year 2007),  Truck Traffic: 3%,  Average Future Daily Traffic: 2,968 (year 2026),  Design Load: HS 20,  Features Intersected: QUINNIPIAC RIVER,  Facility Carried by Structure: TOELLES ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.352,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Material/Design: Steel,  Design/Construction: Girder and Floorbeam System,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 34.4m (112.9ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Good,  Operating Rating: 83.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 50.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.01m (0.03ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: March 2007,  Critical Feature Inspection Date: March 2007,  Bridge Improvement Cost: $1,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $2,000 ( Estimate for 2000),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>

Structure Number: 4419,  Location: .25 MI EAST OF SO ELM ST (Lat: 41.450000,  Lng: -72.813333),  Route carried "on" structure: City street ,  Year Built: 2006,  Status: Posted for load,  Structure Length: 1.19m (3.90ft),  Average Daily Traffic: 354 (year 2007),  Truck Traffic: 2%,  Average Future Daily Traffic: 177 (year 2026),  Design Load: HS 20,  Features Intersected: WHARTON BROOK,  Facility Carried by Structure: WALL STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.963,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.7m (35.1ft),  Curb or Sidewalk Widths: Left: 3.0m (9.8ft),  Right: 1.7m (5.6ft),  Curb-To-Curb Width: 8.4m (27.6ft),  Out-to-Out Width: 13.9m (45.6ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Good,  Operating Rating: 44.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 0.1 - 9.9% below),  Length Of Structure Improvement: 0.01m (0.03ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2007,  Bridge Improvement Cost: $1,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $2,000 ( Estimate for 2000),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 4831,  Location: .25 MI E OF WHIRLWIND HLL (Lat: 41.438333,  Lng: -72.770000),  Route carried "on" structure: City street ,  Year Built: 1945,  Year Reconstructed: 2002,  Status: Open,  Structure Length: 0.88m (2.89ft),  Average Daily Traffic: 456 (year 2007),  Truck Traffic: 2%,  Average Future Daily Traffic: 228 (year 2026),  Design Load: HS 20,  Features Intersected: MUDDY RIVER,  Facility Carried by Structure: SCARD ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.113,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.6m (24.9ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 9.9m (32.5ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Good,  Channel: Good,  Operating Rating: 73.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 43.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.01m (0.03ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2007,  Bridge Improvement Cost: $1,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $2,000 ( Estimate for 2000),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>

Structure Number: 4832,  Location: .25 MI SO OF E CENTER ST (Lat: 41.445000,  Lng: -72.780000),  Route carried "on" structure: City street ,  Year Built: 1938,  Status: Open,  Structure Length: 0.82m (2.69ft),  Average Daily Traffic: 1,140 (year 2007),  Truck Traffic: 2%,  Average Future Daily Traffic: 570 (year 2026),  Features Intersected: MUDDY RIVER,  Facility Carried by Structure: NORTHFORD ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.129,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 6.4m (21.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.7m (22.0ft),  Curb-To-Curb Width: 8.0m (26.2ft),  Out-to-Out Width: 8.8m (28.9ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Good,  Channel: Good,  Operating Rating: 89.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 54.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 0.01m (0.03ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2007,  Bridge Improvement Cost: $1,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $2,000 ( Estimate for 2000),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 4834,  Location: 0.1 Mi. West of Rte 150 (Lat: 41.401667,  Lng: -72.803333),  Route carried "on" structure: City street ,  Year Built: 2007,  Status: Open,  Structure Length: 0.88m (2.89ft),  Average Daily Traffic: 468 (year 2007),  Truck Traffic: 7%,  Average Future Daily Traffic: 234 (year 2026),  Features Intersected: MUDDY RIVER,  Facility Carried by Structure: W DAYTON HILL RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.080,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Concrete,  Design/Construction: Frame,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.8m (28.9ft),  Curb or Sidewalk Widths: Left: 1.1m (3.6ft),  Right: 1.2m (3.9ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 10.3m (33.8ft)

Condition: Superstructure: Very good,  Substructure: Very good,  Channel: Good,  Operating Rating: 52.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 31.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: High priority of corrective action,  Length Of Structure Improvement: 0.01m (0.03ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2007,  Bridge Improvement Cost: $1,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $2,000 ( Estimate for 2000),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 5908,  Location: 1/4 MILE NORTH JCT RTE 15 (Lat: 41.486667,  Lng: -72.810000),  Route carried "on" structure: US 5,  Year Built: 1989,  Year Reconstructed: 2007,  Status: Open,  Structure Length: 0.88m (2.89ft),  Average Daily Traffic: 26,800 (year 2004),  Truck Traffic: 4%,  Average Future Daily Traffic: 13,400 (year 2026),  Design Load: HS 20,  Features Intersected: MEETING HOUSE BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 22.767,  Lanes on structure: 6,  Owner: State Highway Agency,  Approaching Roadway Width: 21.6m (70.9ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.9m (25.9ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 21.7m (71.2ft),  Out-to-Out Width: 24.2m (79.4ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Satisfactory,  Channel: Satisfactory,  Inventory Rating: 56.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.01m (0.03ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2007,  Bridge Improvement Cost: $1,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $2,000 ( Estimate for 2000),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>

Structure Number: 5919,  Location: 300' WEST OF ROUTE 71 (Lat: 41.495000,  Lng: -72.818333),  Route carried "on" structure: City street ,  Year Built: 1989,  Status: Open,  Structure Length: 3.54m (11.61ft),  Average Daily Traffic: 2,900 (year 2007),  Truck Traffic: 4%,  Average Future Daily Traffic: 1,450 (year 2026),  Design Load: HS 20,  Features Intersected: QUINNIPIAC RIVER,  Facility Carried by Structure: OAK STREET # 2
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 9 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 33.5m (109.9ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.7m (5.6ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 11.8m (38.7ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 89.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 57.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 0.01m (0.03ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2007,  Bridge Improvement Cost: $1,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $2,000 ( Estimate for 2000),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>

Structure Number: 6073,  Location: 600 FEET EAST OF ROUTE 15 (Lat: 41.457525,  Lng: -72.831667),  Route carried "on" structure: State highway 150,  Year Built: 1991,  Status: Open,  Structure Length: 3.14m (10.30ft),  Average Daily Traffic: 9,400 (year 2004),  Truck Traffic: 3%,  Average Future Daily Traffic: 4,700 (year 2026),  Design Load: HS 20,  Features Intersected: QUINNIPIAC RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 9.075,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 29.6m (97.1ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 10.4m (34.1ft),  Out-to-Out Width: 14.7m (48.2ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 89.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 79.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.01m (0.03ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2006,  Bridge Improvement Cost: $1,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $2,000 ( Estimate for 2000),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>

Structure Number: 612,  Location: 0.5 MI E OF INTERSTATE-91 (Lat: 41.480000,  Lng: -72.765000),  Route carried "on" structure: State highway 68,  Year Built: 1992,  Status: Open,  Structure Length: 1.46m (4.79ft),  Average Daily Traffic: 15,300 (year 2004),  Truck Traffic: 3%,  Average Future Daily Traffic: 7,650 (year 2026),  Design Load: HS 20,  Features Intersected: MUDDY RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 27.643,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 12.5m (41.0ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 14.6m (47.9ft),  Curb-To-Curb Width: 12.5m (41.0ft),  Out-to-Out Width: 13.7m (44.9ft)

Condition: Superstructure: Fair,  Substructure: Good,  Channel: Very good,  Operating Rating: 52.2 metric tons,  Inventory Rating: 30.6 metric tons,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 0.01m (0.03ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 24 months,  Inspection Date: March 2007,  Other Special Inspection Date: March 2007,  Bridge Improvement Cost: $1,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $2,000 ( Estimate for 2000)

Parts: 1, 2

Discuss this city on our hugely popular Connecticut forum

Back to: Wallingford, CT, Connecticut, All US cities.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2009 Advameg, Inc.