Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Walpole, New Hampshire (NH)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 14Number of bridges
  • 217ft / 66.1mTotal length
  • $43,988,000Total costs
  • 38,194Total average daily traffic
  • 2,526Total average daily truck traffic
  • 56,520Total future (year 2042) average daily traffic
  • National Bridge Inventory (NBI) Registered Bridges for Walpole
  • No street view available for this location

New bridges in Walpole, NH - historical statistics
  • New bridges - historical statistics
  • 21910-1919
  • 21930-1939
  • 21950-1959
  • 31960-1969
  • 21980-1989
  • 22000-2009
  • 12010-2019
Reconstructed bridges in Walpole, NH - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11960-1969
  • 01970-1979
  • 11980-1989
  • 11990-1999
  • 02000-2009
  • 12010-2019
Average Bridge Daily Traffic in Walpole, NH
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 33.3%Very good
  • 33.3%Good
  • 22.2%Satisfactory
  • 11.1%Imminent failure
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 55.6%Very good
  • 22.2%Good
  • 11.1%Satisfactory
  • 11.1%Imminent failure
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 22.2%Very good
  • 44.4%Good
  • 11.1%Satisfactory
  • 11.1%Fair
  • 11.1%Imminent failure
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 7.7%Very good
  • 46.2%Good
  • 23.1%Satisfactory
  • 7.7%Fair
  • 7.7%Poor
  • 7.7%Failed
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 20.0%Very good
  • 20.0%Good
  • 60.0%Satisfactory
Find on map >>   Show street view

Structure Number: 241005400163,  Location: VERMONT STATE LINE (Lat: 45.007919,  Lng: -71.507547),  Route carried "on" structure: State highway ,  Year Built: 1930,  Year Reconstructed: 2018,  Status: Open,  Structure Length: 7.07m (23.20ft),  Average Daily Traffic: 481 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 711 (year 2042),  Design Load: H 15,  Features Intersected: CONNECTICUT RIVER,  Facility Carried by Structure: BRIDGE STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.303,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Steel,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 10,  Length of Maximum Span: 41.5m (136.2ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 9.9m (32.5ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 39.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 23.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.07m (23.20ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Critical Feature Inspection Date: May 2020,  Bridge Improvement Cost: $2,718,000,  Roadway Improvement Cost: $200,000,  Total Project Cost: $3,142,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Galvanized Reinforcing
Find on map >>   Show street view

Structure Number: 262005800043,  Location: VERMONT STATE LINE (Lat: 43.138097,  Lng: -72.448317),  Route carried "on" structure: State highway 12,  Year Built: 1983,  Status: Open,  Structure Length: 19.35m (63.48ft),  Average Daily Traffic: 6,836 (year 2020),  Truck Traffic: 4%,  Average Future Daily Traffic: 10,117 (year 2042),  Design Load: HS 20+Mod,  Features Intersected: CONNECTICUT RIVER,NECRR,  Facility Carried by Structure: CHURCH STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.064,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 68.3m (224.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 12.0m (39.4ft),  Out-to-Out Width: 14.8m (48.6ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 71.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 42.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 19.35m (63.48ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: June 2020,  Underwater Inspection Date: August 2017,  Bridge Improvement Cost: $2,718,000,  Roadway Improvement Cost: $200,000,  Total Project Cost: $3,142,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 262006200052,  Location: VERMONT STATE LINE (Lat: 43.135314,  Lng: -72.440122),  Route carried "on" structure: State highway 12,  Year Built: 1930,  Year Reconstructed: 1974,  Status: Closed,  Structure Length: 7.01m (23.00ft),  Average Daily Traffic: 6,100 (year 2017),  Truck Traffic: 4%,  Average Future Daily Traffic: 9,028 (year 2042),  Design Load: H 15,  Features Intersected: CONNECTICUT RIVER,  Facility Carried by Structure: BRIDGE STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.043,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 32.6m (107.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 1.4m (4.6ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 9.9m (32.5ft)

Condition: Deck: Imminent failure,  Superstructure: Imminent failure,  Substructure: Imminent failure,  Channel: Failed,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Meets minimum limits,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 7.01m (23.00ft),  Designated Inspection Frequency: Every 8 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $2,718,000,  Roadway Improvement Cost: $200,000,  Total Project Cost: $3,142,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 262006500105,  Location: .22 MI SE LANGDON TL (Lat: 43.132142,  Lng: -72.390161),  Route carried "on" structure: State highway 123,  Year Built: 1919,  Status: Open,  Structure Length: 1.80m (5.91ft),  Average Daily Traffic: 2,460 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 3,640 (year 2042),  Design Load: H 15,  Features Intersected: COLD RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 92.370,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 6.4m (21.0ft),  Material/Design: Steel,  Design/Construction: Girder and Floorbeam System,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 16.8m (55.1ft),  Curb-To-Curb Width: 6.4m (21.0ft),  Out-to-Out Width: 7.1m (23.3ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 20.9 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 12.7 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 1.80m (5.91ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Critical Feature Inspection Date: June 2020,  Bridge Improvement Cost: $2,718,000,  Roadway Improvement Cost: $200,000,  Total Project Cost: $3,142,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 262007800066,  Location: 1.34MI SE VT SL (Lat: 43.121819,  Lng: -72.426489),  Route carried "on" structure: State highway 123,  Year Built: 2008,  Status: Open,  Structure Length: 3.29m (10.79ft),  Average Daily Traffic: 2,460 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 3,640 (year 2042),  Design Load: HS 25 or greater,  Features Intersected: COLD RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 96.471,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 8.2m (26.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 32.0m (105.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 10.4m (34.1ft),  Out-to-Out Width: 11.7m (38.4ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Good,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 50.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 3.29m (10.79ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $2,718,000,  Roadway Improvement Cost: $200,000,  Total Project Cost: $3,142,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 262008200065,  Location: .1MI FROM JCT RT 123 (Lat: 43.119172,  Lng: -72.429650),  Route carried "on" structure: State highway 12,  Year Built: 1960,  Year Reconstructed: 2003,  Status: Open,  Structure Length: 6.96m (22.83ft),  Average Daily Traffic: 6,010 (year 2020),  Truck Traffic: 9%,  Average Future Daily Traffic: 8,894 (year 2042),  Design Load: HS 25 or greater,  Features Intersected: COLD RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 62.183,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Skew: 2 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 24.4m (80.1ft),  Curb or Sidewalk Widths: Left: 0.1m (0.3ft),  Right: 0.1m (0.3ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 14.3m (46.9ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Fair,  Channel: Very good,  Operating Rating: 56.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.96m (22.83ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $2,718,000,  Roadway Improvement Cost: $200,000,  Total Project Cost: $3,142,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 262013200062,  Location: VERMONT STATE LINE (Lat: 43.084300,  Lng: -72.433311),  Route carried "on" structure: State highway 123,  Year Built: 1910,  Year Reconstructed: 1989,  Status: Open,  Structure Length: 14.26m (46.78ft),  Average Daily Traffic: 5,698 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 8,433 (year 2042),  Design Load: HS 25 or greater,  Features Intersected: CONNECTICUT RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 101.410,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 48.2m (158.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.6m (31.5ft)

Condition: Deck: Satisfactory,  Superstructure: Very good,  Substructure: Good,  Channel: Good,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 59.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 14.26m (46.78ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $2,718,000,  Roadway Improvement Cost: $200,000,  Total Project Cost: $3,142,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 262018200064,  Location: 0.46 NNE OF NH RTE 12 JCT (Lat: 43.048167,  Lng: -72.434517),  Route carried "on" structure: Other road ,  Year Built: 2008,  Status: Open,  Structure Length: 1.01m (3.31ft),  Average Daily Traffic: 202 (year 2020),  Truck Traffic: 4%,  Average Future Daily Traffic: 298 (year 2042),  Design Load: HS 25 or greater,  Features Intersected: GREAT BROOK,  Facility Carried by Structure: OLD KEENE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.760,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.8m (32.2ft)

Condition: Channel: Poor,  Culverts: Very good,  Operating Rating: 75.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 53.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.01m (3.31ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $2,718,000,  Roadway Improvement Cost: $200,000,  Total Project Cost: $3,142,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: 262018200068,  Location: 0.22 MI FR OLD KEENE RD (Lat: 43.048467,  Lng: -72.430222),  Route carried "on" structure: Other road ,  Year Built: 2010,  Status: Open,  Structure Length: 0.88m (2.89ft),  Average Daily Traffic: 214 (year 2020),  Truck Traffic: 4%,  Average Future Daily Traffic: 316 (year 2042),  Features Intersected: GREAT BROOK,  Facility Carried by Structure: MILL ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.357,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.6m (24.9ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 7.6m (24.9ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Fair,  Inventory Rating: 78.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 0.88m (2.89ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $2,718,000,  Roadway Improvement Cost: $200,000,  Total Project Cost: $3,142,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 262018300081,  Location: 5.52 MI SURRY TL (Lat: 43.047186,  Lng: -72.419383),  Route carried "on" structure: State highway ,  Year Built: 1968,  Status: Open,  Structure Length: 0.61m (2.00ft),  Average Daily Traffic: 316 (year 2020),  Truck Traffic: 4%,  Average Future Daily Traffic: 467 (year 2042),  Design Load: H 20,  Features Intersected: GREAT BROOK,  Facility Carried by Structure: COUNTY ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.166,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.1m (20.0ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 53.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.61m (2.00ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $2,718,000,  Roadway Improvement Cost: $200,000,  Total Project Cost: $3,142,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 262018600072,  Location: 1.9 MI FR WESTMORELAND T (Lat: 43.044881,  Lng: -72.427853),  Route carried "on" structure: Other road ,  Year Built: 1950,  Status: Open,  Structure Length: 0.67m (2.20ft),  Average Daily Traffic: 284 (year 2020),  Truck Traffic: 4%,  Average Future Daily Traffic: 420 (year 2042),  Features Intersected: GREAT BROOK,  Facility Carried by Structure: WENTWORTH ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.001,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.7m (22.0ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 58.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 0.67m (2.20ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $2,718,000,  Roadway Improvement Cost: $200,000,  Total Project Cost: $3,142,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 262019600046,  Location: 1.4 MI FR WESTMORELAND T (Lat: 43.038294,  Lng: -72.454022),  Route carried "on" structure: Other road ,  Year Built: 1950,  Status: Open,  Structure Length: 1.07m (3.51ft),  Average Daily Traffic: 111 (year 2020),  Truck Traffic: 4%,  Average Future Daily Traffic: 164 (year 2042),  Features Intersected: GREAT BROOK,  Facility Carried by Structure: SOUTH RIVER ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.205,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 6.4m (21.0ft),  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.6m (15.1ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 76.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 45.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 1.07m (3.51ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $2,718,000,  Roadway Improvement Cost: $200,000,  Total Project Cost: $3,142,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 26202080006,  Location: .8MI WESTMORELAND TL (Lat: 43.031003,  Lng: -72.439208),  Route carried "on" structure: State highway 12,  Year Built: 1960,  Status: Open,  Structure Length: 1.46m (4.79ft),  Average Daily Traffic: 6,934 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 10,262 (year 2042),  Design Load: HS 20,  Features Intersected: NHRR(ABD)
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 51.768,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Frame,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 13.4m (44.0ft),  Curb-To-Curb Width: 12.1m (39.7ft),  Out-to-Out Width: 13.3m (43.6ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 49.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 24.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.46m (4.79ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $2,718,000,  Roadway Improvement Cost: $200,000,  Total Project Cost: $3,142,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 262021600047,  Location: 0.4 MI FR WESTMORELAND T (Lat: 43.024814,  Lng: -72.453192),  Route carried "on" structure: Other road ,  Year Built: 1980,  Status: Open,  Structure Length: 0.64m (2.10ft),  Average Daily Traffic: 88 (year 2020),  Truck Traffic: 4%,  Average Future Daily Traffic: 130 (year 2042),  Features Intersected: HOUGHTON BROOK,  Facility Carried by Structure: SOUTH RIVER ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.668,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 6.4m (21.0ft),  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 27.4 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 16.5 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.64m (2.10ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $2,718,000,  Roadway Improvement Cost: $200,000,  Total Project Cost: $3,142,000 ( Estimate for 2022)
Discuss Walpole, New Hampshire (NH) on our hugely popular New Hampshire forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.