U.S. Cities - City-Data Homepage  
City-Data Forum
City-Data.com Homepage

Bridge Statistics for Walsenburg, Colorado (CO) - Condition, Traffic, Stress, Structural Evaluation, Project Costs

Back to: Walsenburg, CO, Colorado, Colorado forum, All US cities.





National Bridge Inventory (NBI) Statistics
Number of bridges: 16
Total length: 114 meters (374ft)
Total costs: $6,155,000
Total average daily traffic: 50,513
Total average daily truck traffic: 9,183
National Bridge Inventory (NBI) Registered Bridges for Walsenburg

New bridges - Historical Statistics

  • 1930-1939: 3
  • 1940-1949: 0
  • 1950-1959: 2
  • 1960-1969: 10
  • 1970-1979: 0
  • 1980-1989: 0
  • 1990-1999: 1

Average Daily Traffic

Average Truck Traffic (%)

Bridge Condition - Deck

Bridge Condition - Superstructure

Bridge Condition - Substructure

Bridge Condition - Channel

Find on map >>

Structure Number: N-17-AC,  Location: 1.1 MI N WALSENBURG BUS R (Lat: 37.630000,  Lng: -104.768056),  Route carried "on" structure: Interstate 25A,  Year Built: 1963,  Status: Open,  Structure Length: 12.88m (42.26ft),  Average Daily Traffic: 4,150 (year 2005),  Truck Traffic: 21%,  Average Future Daily Traffic: 5,353 (year 2025),  Design Load: HS 20+Mod,  Features Intersected: SH 10 ML, RR SPUR,  Facility Carried by Structure: I 25 ML NBND
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 80.537,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.1m (43.0ft),  Skew: 10 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 7,  Length of Maximum Span: 20.4m (66.9ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 10.4m (34.1ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Satisfactory,  Operating Rating: 43.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 26.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2006,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>

Structure Number: N-17-AD,  Location: 1.15 MI N WALSENBURG BUS (Lat: 37.630278,  Lng: -104.768333),  Route carried "on" structure: Interstate 25A,  Year Built: 1963,  Status: Open,  Structure Length: 12.90m (42.32ft),  Average Daily Traffic: 4,150 (year 2005),  Truck Traffic: 21%,  Average Future Daily Traffic: 5,353 (year 2025),  Design Load: HS 20+Mod,  Features Intersected: US 160 ML, RR SPUR,  Facility Carried by Structure: I 25 ML SBND
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 80.538,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 10 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 7,  Length of Maximum Span: 20.0m (65.6ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 10.4m (34.1ft)

Condition: Deck: Fair,  Superstructure: Poor,  Substructure: Poor,  Operating Rating: 42.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 25.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 12.90m (42.32ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2006,  Bridge Improvement Cost: $2,939,000,  Roadway Improvement Cost: $294,000,  Total Project Cost: $4,409,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>

Structure Number: N-17-AE,  Location: SO CONNECT OF WALSENBURG (Lat: 37.616667,  Lng: -104.759167),  Route carried "on" structure: Business Interstate 25C,  Year Built: 1963,  Status: Open,  Structure Length: 8.17m (26.80ft),  Average Daily Traffic: 1,900 (year 2005),  Truck Traffic: 13%,  Average Future Daily Traffic: 2,641 (year 2025),  Design Load: HS 20,  Features Intersected: I 25 ML,  Facility Carried by Structure: I 25 BUS RT
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.002,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 3 degrees,  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 23.0m (75.5ft),  Curb or Sidewalk Widths: Left: 0.6m (2.0ft),  Right: 0.6m (2.0ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.8m (32.2ft)

Condition: Deck: Satisfactory,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 55.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2006,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>

Structure Number: N-17-BK,  Location: 0.8 MI NO OF JCT BUS RT (Lat: 37.626944,  Lng: -104.765833),  Route carried "on" structure: Interstate 25A,  Year Built: 1963,  Status: Open,  Structure Length: 5.61m (18.41ft),  Average Daily Traffic: 4,150 (year 2005),  Truck Traffic: 21%,  Average Future Daily Traffic: 5,353 (year 2025),  Design Load: HS 20,  Features Intersected: CUCHARAS RIVER,  Facility Carried by Structure: I 25 ML NBND
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 80.114,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 10 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 18.0m (59.1ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 10.4m (34.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 49.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.61m (18.41ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2006,  Bridge Improvement Cost: $225,000,  Roadway Improvement Cost: $23,000,  Total Project Cost: $338,000 ( Estimate for 2006),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: N-17-BL,  Location: 0.3 MI S OF SH10-WLSNBRG. (Lat: 37.627222,  Lng: -104.765833),  Route carried "on" structure: Interstate 25A,  Year Built: 1963,  Status: Open,  Structure Length: 5.61m (18.41ft),  Average Daily Traffic: 4,150 (year 2005),  Truck Traffic: 21%,  Average Future Daily Traffic: 5,353 (year 2025),  Design Load: HS 20,  Features Intersected: CUCHARAS RIVER,  Facility Carried by Structure: I 25 ML SBND
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 80.115,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 10 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 18.0m (59.1ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 10.4m (34.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 49.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.61m (18.41ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2006,  Bridge Improvement Cost: $225,000,  Roadway Improvement Cost: $23,000,  Total Project Cost: $338,000 ( Estimate for 2006),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: N-17-BM,  Location: 0.5 MI N OF SH10-WLSNBRG. (Lat: 37.625000,  Lng: -104.764722),  Route carried "on" structure: Interstate 25A,  Year Built: 1963,  Status: Open,  Structure Length: 5.67m (18.60ft),  Average Daily Traffic: 4,150 (year 2005),  Truck Traffic: 21%,  Average Future Daily Traffic: 5,353 (year 2025),  Design Load: HS 20,  Features Intersected: BEAR CREEK,  Facility Carried by Structure: I 25 ML NBND
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 79.876,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 13 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 18.0m (59.1ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 10.4m (34.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Very good,  Operating Rating: 55.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.67m (18.60ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2006,  Bridge Improvement Cost: $228,000,  Roadway Improvement Cost: $23,000,  Total Project Cost: $342,000 ( Estimate for 2006),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: N-17-BO,  Location: 0.4 MI S OF SH10-WLSNBRG (Lat: 37.625833,  Lng: -104.765000),  Route carried "on" structure: Interstate 25A,  Year Built: 1963,  Status: Open,  Structure Length: 5.67m (18.60ft),  Average Daily Traffic: 4,150 (year 2005),  Truck Traffic: 21%,  Average Future Daily Traffic: 5,353 (year 2025),  Design Load: HS 20,  Features Intersected: BEAR CREEK,  Facility Carried by Structure: I 25 ML SBND
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 79.877,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 13 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 18.0m (59.1ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 10.4m (34.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 57.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.67m (18.60ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2006,  Bridge Improvement Cost: $228,000,  Roadway Improvement Cost: $23,000,  Total Project Cost: $342,000 ( Estimate for 2006),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: N-17-D,  Location: IN WALSENBURG (Lat: 37.617222,  Lng: -104.778056),  Route carried "on" structure: Business State highway 25C,  Year Built: 1933,  Status: Open,  Structure Length: 5.55m (18.21ft),  Average Daily Traffic: 2,300 (year 2005),  Truck Traffic: 11%,  Average Future Daily Traffic: 3,197 (year 2025),  Design Load: H 15,  Features Intersected: CUCHARAS RIVER,  Facility Carried by Structure: I 25 BUS RT
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.648,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 18.0m (59.1ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.3m (4.3ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 11.5m (37.7ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 49.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 30.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.55m (18.21ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2006,  Bridge Improvement Cost: $247,000,  Roadway Improvement Cost: $25,000,  Total Project Cost: $371,000 ( Estimate for 2006),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>

Structure Number: N-17-L,  Location: 0.5 MI NO OF JCT I 25 ML (Lat: 37.616667,  Lng: -104.768056),  Route carried "on" structure: Business State highway 25C,  Year Built: 1933,  Status: Open,  Structure Length: 4.33m (14.21ft),  Average Daily Traffic: 1,900 (year 2005),  Truck Traffic: 13%,  Average Future Daily Traffic: 2,641 (year 2025),  Design Load: H 15,  Features Intersected: BEAR CREEK,  Facility Carried by Structure: I 25 BUS RT
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.864,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 18.0m (59.1ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 10.2m (33.5ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Very good,  Operating Rating: 38.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 22.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2006,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: N-17-O,  Location: IN WALSENBURG (Lat: 37.632500,  Lng: -104.788333),  Route carried "on" structure: Business State highway 25C,  Year Built: 1934,  Status: Open,  Structure Length: 0.64m (2.10ft),  Average Daily Traffic: 7,100 (year 2005),  Truck Traffic: 11%,  Average Future Daily Traffic: 9,443 (year 2025),  Design Load: H 15,  Features Intersected: CANAL,  Facility Carried by Structure: I 25 BUS RT
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.633,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft),  Out-to-Out Width: 13.4m (44.0ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 32.7 metric tons,  Inventory Rating: 32.7 metric tons,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2006
Find on map >>

Structure Number: WALSENBURG-1A,  Location: IN WALSENBURG (Lat: 37.617583,  Lng: -104.788944),  Route carried "on" structure: City street YSDRI,  Year Built: 1996,  Status: Open,  Structure Length: 4.45m (14.60ft),  Average Daily Traffic: 135 (year 2002),  Truck Traffic: 4%,  Average Future Daily Traffic: 135 (year 2022),  Design Load: HS 20+Mod,  Features Intersected: CUCHARAS RIVER,  Facility Carried by Structure: CITY ST YSIDRIO AV
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.161,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 17.1m (56.1ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.3m (30.5ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 68.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 41.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 4.45m (14.60ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2006,  Roadway Improvement Cost: $15,000,  Total Project Cost: $15,000 ( Estimate for 2006),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>

Structure Number: N-17-AC,  Location: 1.1 MI N WALSENBURG BUS R (Lat: 37.630000,  Lng: -104.768056),  Route carried "under" structure: State highway 10A,  Year Built: 1963,  Structure Length: 12.88m (42.26ft),  Average Daily Traffic: 730 (year 2005),  Truck Traffic: 14%,  Features Intersected: SH 10 ML, RR SPUR,  Facility Carried by Structure: I 25 ML NBND
Minimum Vertical Clearance: 8.05m (26.41ft),  Kilometerpoint: 0.002,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 20.4m (66.9ft)

Find on map >>

Structure Number: N-17-AD,  Location: 1.15 MI N WALSENBURG BUS (Lat: 37.630278,  Lng: -104.768333),  Route carried "under" structure: US 160B,  Year Built: 1963,  Structure Length: 12.90m (42.32ft),  Average Daily Traffic: 950 (year 2005),  Truck Traffic: 14%,  Features Intersected: US 160 ML, RR SPUR,  Facility Carried by Structure: I 25 ML SBND
Minimum Vertical Clearance: 8.05m (26.41ft),  Kilometerpoint: 492.917,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 20.0m (65.6ft)

Find on map >>

Structure Number: N-17-AE,  Location: SO CONNECT OF WALSENBURG (Lat: 37.616667,  Lng: -104.759167),  Route carried "under" structure: Interstate 25A,  Year Built: 1963,  Structure Length: 8.17m (26.80ft),  Average Daily Traffic: 10,400 (year 2005),  Truck Traffic: 21%,  Features Intersected: I 25 ML,  Facility Carried by Structure: I 25 BUS RT
Minimum Vertical Clearance: 5.82m (19.09ft),  Kilometerpoint: 78.841,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Length of Maximum Span: 23.0m (75.5ft)

Find on map >>

Structure Number: WALSENBURG-2,  Location: IN WALSENBURG (Lat: 37.618111,  Lng: -104.787139),  Route carried "under" structure: City street 9TH,  Year Built: 1950,  Structure Length: 4.57m (14.99ft),  Average Daily Traffic: 146 (year 2002),  Truck Traffic: 4%,  Features Intersected: 9TH STREET,  Facility Carried by Structure: COLO&SOUTHRN RR
Minimum Vertical Clearance: 3.79m (12.43ft),  Kilometerpoint: 0.016,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 9.1m (29.9ft)

Find on map >>

Structure Number: WALSENBURG-3,  Location: IN WALSENBURG (Lat: 37.617806,  Lng: -104.786972),  Route carried "under" structure: City street 12TH,  Year Built: 1950,  Structure Length: 4.57m (14.99ft),  Average Daily Traffic: 52 (year 2002),  Features Intersected: 12TH STREET,  Facility Carried by Structure: COLO&SOUTHRN RR
Minimum Vertical Clearance: 4.07m (13.35ft),  Kilometerpoint: 0.161,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 9.1m (29.9ft)

Discuss this city on our hugely popular Colorado forum

Back to: Walsenburg, CO, Colorado, All US cities.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2009 Advameg, Inc.