National Bridge Inventory (NBI) Statistics
Number of bridges: 12
Total length: 26 meters (85ft)
Total costs: $17,419,000
Total average daily traffic: 115,957
Total average daily truck traffic: 5,600
Total future (year 2016) average daily traffic: 137,941
National Bridge Inventory (NBI) Registered Bridges for Wappinger
No street view available for this location

New bridges - Historical Statistics

  • 1930-1939: 1
  • 1940-1949: 0
  • 1950-1959: 1
  • 1960-1969: 2
  • 1970-1979: 0
  • 1980-1989: 5
  • 1990-1999: 3

Average Daily Traffic

Bridge Condition - Deck

Bridge Condition - Superstructure

Bridge Condition - Substructure

Bridge Condition - Channel

Bridge Condition - Culverts

Find on map >>   Show street view

Structure Number: 100522,  Location: 5.4 MI N JCT RTS 9 & 52 (Lat: 41.608842,  Lng: -73.911286),  Route carried "on" structure: US 9,  Year Built: 1990,  Status: Open,  Structure Length: 6.49m (21.29ft),  Average Daily Traffic: 45,400 (year 2009),  Truck Traffic: 5%,  Average Future Daily Traffic: 46,157 (year 2031),  Design Load: HS 20,  Features Intersected: WAPPINGER LAKE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 13.870,  Lanes on structure: 6,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 10.9m (35.8ft),  Skew: 20 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 31.6m (103.7ft),  Curb-To-Curb Width: 22.7m (74.5ft),  Out-to-Out Width: 28.5m (93.5ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Good,  Operating Rating: 76.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 45.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.49m (21.29ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: September 11,  Underwater Inspection Date: September 2008,  Bridge Improvement Cost: $2,366,000,  Roadway Improvement Cost: $1,386,000,  Total Project Cost: $3,752,000 ( Estimate for 2011),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 100637,  Location: 5.8 MI N.JCT 9D+I84 (Lat: 41.585358,  Lng: -73.922417),  Route carried "on" structure: State highway 9D,  Year Built: 1984,  Status: Open,  Structure Length: 1.31m (4.30ft),  Average Daily Traffic: 16,800 (year 2009),  Truck Traffic: 5%,  Average Future Daily Traffic: 17,069 (year 2031),  Design Load: HS 20,  Features Intersected: HUNTER CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 19.646,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.1m (39.7ft),  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.1m (39.7ft),  Curb-To-Curb Width: 12.1m (39.7ft),  Out-to-Out Width: 12.9m (42.3ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 83.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 51.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.31m (4.30ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 11,  Bridge Improvement Cost: $542,000,  Roadway Improvement Cost: $317,000,  Total Project Cost: $859,000 ( Estimate for 2011),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 103229,  Location: 1.9 MI N JCT SH 52 & SH82 (Lat: 41.564675,  Lng: -73.847900),  Route carried "on" structure: State highway 82,  Year Built: 1934,  Status: Open,  Structure Length: 3.05m (10.01ft),  Average Daily Traffic: 10,000 (year 2010),  Truck Traffic: 5%,  Average Future Daily Traffic: 14,000 (year 2030),  Design Load: HS 25,  Features Intersected: SPROUT CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.993,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Truss - Thru,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 30.5m (100.1ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 9.3m (30.5ft)

Condition: Deck: Poor,  Superstructure: Poor,  Substructure: Fair,  Channel: Poor,  Operating Rating: 85.6 metric tons,  Inventory Rating: 24.4 metric tons,  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 3.05m (10.01ft),  Designated Inspection Frequency: Every 12 months,  Critical Feature Inspection Frequency: Every 12 months,  Inspection Date: June 11,  Critical Feature Inspection Date: June 11,  Bridge Improvement Cost: $3,261,000,  Roadway Improvement Cost: $1,910,000,  Total Project Cost: $5,171,000 ( Estimate for 2011),  Deck Structure Type: Steel plate,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 107273,  Location: 2.5MI SE OF NEW HACKENSAC (Lat: 41.620692,  Lng: -73.867597),  Route carried "on" structure: State highway 376,  Year Built: 1982,  Status: Open,  Structure Length: 0.67m (2.20ft),  Average Daily Traffic: 7,200 (year 2009),  Truck Traffic: 5%,  Average Future Daily Traffic: 9,490 (year 2031),  Design Load: HS 20,  Features Intersected: BIG BLACK STREAM
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 12.051,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.5m (37.7ft),  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft),  Curb-To-Curb Width: 10.9m (35.8ft),  Out-to-Out Width: 12.1m (39.7ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 74.5 metric tons,  Inventory Rating: 29.3 metric tons,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 0.67m (2.20ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 11,  Bridge Improvement Cost: $80,000,  Roadway Improvement Cost: $47,000,  Total Project Cost: $127,000 ( Estimate for 2011),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 334396,  Location: 1 MI W OF NEW HACKENSACK (Lat: 41.624894,  Lng: -73.892889),  Route carried "on" structure: County highway ,  Year Built: 1955,  Status: Open,  Structure Length: 3.26m (10.70ft),  Average Daily Traffic: 7,700 (year 2010),  Truck Traffic: 5%,  Average Future Daily Traffic: 10,780 (year 2030),  Features Intersected: WAPPINGER CREEK,  Facility Carried by Structure: COUNTY ROAD 110
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.692,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.2m (26.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 31.6m (103.7ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 9.7m (31.8ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 91.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 54.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 3.26m (10.70ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 11,  Bridge Improvement Cost: $2,505,000,  Roadway Improvement Cost: $1,467,000,  Total Project Cost: $3,972,000 ( Estimate for 2011),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 334397,  Location: 2.4 MI SE OF NEW HACKSACK (Lat: 41.617264,  Lng: -73.823800),  Route carried "on" structure: Other road ,  Year Built: 1993,  Status: Open,  Structure Length: 2.01m (6.59ft),  Average Daily Traffic: 3,450 (year 2010),  Truck Traffic: 5%,  Average Future Daily Traffic: 4,875 (year 2031),  Design Load: HS 20,  Features Intersected: SPROUT CREEK,  Facility Carried by Structure: ROBINSON LANE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.6m (24.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 19.8m (65.0ft),  Curb-To-Curb Width: 9.2m (30.2ft),  Out-to-Out Width: 10.0m (32.8ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 76.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 57.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.01m (6.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 11,  Bridge Improvement Cost: $436,000,  Roadway Improvement Cost: $255,000,  Total Project Cost: $691,000 ( Estimate for 2011),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 334398,  Location: 1.0 MI N.OF HUGHSONVILLE (Lat: 41.593636,  Lng: -73.926253),  Route carried "on" structure: County highway ,  Year Built: 1986,  Status: Open,  Structure Length: 1.03m (3.38ft),  Average Daily Traffic: 359 (year 1998),  Truck Traffic: 3%,  Average Future Daily Traffic: 503 (year 2018),  Features Intersected: HUNTER CREEK,  Facility Carried by Structure: COUNTY ROAD 91
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.7m (31.8ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 9.7m (31.8ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Good,  Channel: Fair,  Operating Rating: 79.5 metric tons,  Inventory Rating: 32.6 metric tons,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.03m (3.38ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 11,  Bridge Improvement Cost: $218,000,  Roadway Improvement Cost: $128,000,  Total Project Cost: $346,000 ( Estimate for 2011),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 334399,  Location: 2.2 MI W OF HOPEWELL JCT (Lat: 41.583311,  Lng: -73.853197),  Route carried "on" structure: Other road ,  Year Built: 1986,  Status: Open,  Structure Length: 1.82m (5.97ft),  Average Daily Traffic: 2,348 (year 1996),  Truck Traffic: 3%,  Average Future Daily Traffic: 3,287 (year 2016),  Features Intersected: SPROUT CREEK,  Facility Carried by Structure: BROWN ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 16.4m (53.8ft),  Curb-To-Curb Width: 8.9m (29.2ft),  Out-to-Out Width: 9.8m (32.2ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 84.3 metric tons,  Inventory Rating: 32.6 metric tons,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.82m (5.97ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 11,  Bridge Improvement Cost: $389,000,  Roadway Improvement Cost: $228,000,  Total Project Cost: $617,000 ( Estimate for 2011),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 3344,  Location: IN THE TOWN OF WAPPINGER (Lat: 41.597122,  Lng: -73.844672),  Route carried "on" structure: Other road ,  Year Built: 1995,  Status: Open,  Structure Length: 1.92m (6.30ft),  Average Daily Traffic: 2,100 (year 1996),  Truck Traffic: 3%,  Average Future Daily Traffic: 2,940 (year 2016),  Design Load: HS 25,  Features Intersected: SPROUT CREEK,  Facility Carried by Structure: MONTFORT ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.0m (23.0ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 18.8m (61.7ft),  Curb-To-Curb Width: 8.0m (26.2ft),  Out-to-Out Width: 8.8m (28.9ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Very good,  Channel: Satisfactory,  Operating Rating: 65.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 43.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.92m (6.30ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 10,  Bridge Improvement Cost: $365,000,  Roadway Improvement Cost: $214,000,  Total Project Cost: $579,000 ( Estimate for 2011),  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 334401,  Location: 2.1 MI N OF BRINCKERHOFF (Lat: 41.573636,  Lng: -73.855767),  Route carried "on" structure: County highway ,  Year Built: 1966,  Status: Open,  Structure Length: 2.68m (8.79ft),  Average Daily Traffic: 9,100 (year 2011),  Truck Traffic: 5%,  Average Future Daily Traffic: 12,740 (year 2031),  Features Intersected: SPROUT CREEK,  Facility Carried by Structure: COUNTY ROAD 28
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 8.737,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 25.9m (85.0ft),  Curb-To-Curb Width: 8.8m (28.9ft),  Out-to-Out Width: 10.0m (32.8ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 91.0 metric tons,  Inventory Rating: 32.6 metric tons,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.68m (8.79ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 11,  Bridge Improvement Cost: $580,000,  Roadway Improvement Cost: $340,000,  Total Project Cost: $920,000 ( Estimate for 2011),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 334402,  Location: 0.5MI E OF HUGHSONVILLE (Lat: 41.579828,  Lng: -73.919583),  Route carried "on" structure: Other road ,  Year Built: 1984,  Status: Open,  Structure Length: 0.67m (2.20ft),  Average Daily Traffic: 6,500 (year 2009),  Truck Traffic: 5%,  Average Future Daily Traffic: 9,100 (year 2029),  Features Intersected: MILLWOOD CREEK,  Facility Carried by Structure: COUNTY ROAD 28
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.347,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft),  Curb-To-Curb Width: 10.2m (33.5ft),  Out-to-Out Width: 10.9m (35.8ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 74.7 metric tons,  Inventory Rating: 32.6 metric tons,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.67m (2.20ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 11,  Bridge Improvement Cost: $82,000,  Roadway Improvement Cost: $48,000,  Total Project Cost: $130,000 ( Estimate for 2011),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 336823,  Location: 0.2 MI NW INT CR104/CR110 (Lat: 41.616753,  Lng: -73.882922),  Route carried "on" structure: County highway ,  Year Built: 1969,  Status: Open,  Structure Length: 1.24m (4.07ft),  Average Daily Traffic: 5,000 (year 2009),  Truck Traffic: 3%,  Average Future Daily Traffic: 7,000 (year 2029),  Design Load: H 20,  Features Intersected: GREEN'S POND OUTL,  Facility Carried by Structure: COUNTY ROAD 110
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.6m (11.8ft)

Condition: Channel: Fair,  Culverts: Satisfactory,  Operating Rating: 72.5 metric tons,  Inventory Rating: 32.6 metric tons,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.24m (4.07ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 11,  Bridge Improvement Cost: $161,000,  Roadway Improvement Cost: $94,000,  Total Project Cost: $255,000 ( Estimate for 2011),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Jump to a detailed profile or search site with Google Custom Search
Business Search - 14 Million verified businesses
Search for: near: 

Discuss this city on our hugely popular New York forum

Back to: Wappinger, NY, New York, All US cities.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2013 Advameg, Inc.