  • National Bridge Inventory (NBI) Statistics
  • 24Number of bridges
  • 197ft / 60.4mTotal length
  • $6,178,000Total costs
  • 21,084Total average daily traffic
  • 1,276Total average daily truck traffic
  • 34,720Total future (year 2040) average daily traffic
  • National Bridge Inventory (NBI) Registered Bridges for Wartrace
  • No street view available for this location

New bridges in Wartrace, TN - historical statistics
  • New bridges - historical statistics
  • 21930-1939
  • 31940-1949
  • 11950-1959
  • 41960-1969
  • 21970-1979
  • 71980-1989
  • 52000-2009
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 27.3%Very good
  • 9.1%Good
  • 18.2%Satisfactory
  • 27.3%Fair
  • 18.2%Poor
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 9.1%Very good
  • 27.3%Good
  • 27.3%Satisfactory
  • 36.4%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 27.3%Very good
  • 27.3%Satisfactory
  • 18.2%Fair
  • 18.2%Poor
  • 9.1%Serious
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 4.2%Excellent
  • 37.5%Very good
  • 45.8%Good
  • 8.3%Satisfactory
  • 4.2%Fair
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 76.9%Good
  • 15.4%Satisfactory
  • 7.7%Fair
Find on map >>   Show street view

Structure Number: 2020080009,  Location: 6 M. NE. SHELBYVILLE. (Lat: 35.528767,  Lng: -86.370783),  Route carried "on" structure: County highway 2008,  Year Built: 1984,  Status: Open,  Structure Length: 1.37m (4.49ft),  Average Daily Traffic: 465 (year 2020),  Truck Traffic: 3%,  Average Future Daily Traffic: 640 (year 2041),  Design Load: HS 20,  Features Intersected: PANNELL CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 9.141,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 4.9m (16.1ft),  Skew: 3 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.7m (12.1ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 7.8m (25.6ft)

Condition: Channel: Very good,  Culverts: Good,  Operating Rating: 53.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 2020100005,  Location: 3.5 M. NE. WARTRACE (Lat: 35.568867,  Lng: -86.291883),  Route carried "on" structure: County highway 2010,  Year Built: 1960,  Status: Open,  Structure Length: 1.25m (4.10ft),  Average Daily Traffic: 804 (year 2020),  Truck Traffic: 4%,  Average Future Daily Traffic: 2,208 (year 2041),  Features Intersected: MORGAN CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.051,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 5.8m (19.0ft),  Curb-To-Curb Width: 7.4m (24.3ft),  Out-to-Out Width: 8.0m (26.2ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 48.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 28.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.25m (4.10ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $112,000,  Roadway Improvement Cost: $12,000,  Total Project Cost: $169,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 20A1290001,  Location: 1.8 M. E. WARTRACE. (Lat: 35.520333,  Lng: -86.300861),  Route carried "on" structure: County highway 129,  Year Built: 2004,  Status: Open,  Structure Length: 0.92m (3.02ft),  Average Daily Traffic: 850 (year 2019),  Truck Traffic: 2%,  Average Future Daily Traffic: 1,360 (year 2041),  Design Load: HS 20,  Features Intersected: KNOB CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.927,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 3 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.7m (12.1ft),  Curb-To-Curb Width: 8.4m (27.6ft),  Out-to-Out Width: 14.1m (46.3ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 44.1 metric tons,  Method Used To Determine Operating Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 20A1290003,  Location: 3 M. E. WARTRACE. (Lat: 35.517267,  Lng: -86.286033),  Route carried "on" structure: County highway 129,  Year Built: 2003,  Status: Open,  Structure Length: 1.16m (3.81ft),  Average Daily Traffic: 850 (year 2019),  Truck Traffic: 2%,  Average Future Daily Traffic: 1,360 (year 2041),  Design Load: HS 20,  Features Intersected: KNOB CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.324,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.7m (28.5ft),  Skew: 6 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.7m (12.1ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 8.6m (28.2ft)

Condition: Channel: Very good,  Culverts: Good,  Operating Rating: 44.1 metric tons,  Method Used To Determine Operating Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 20A1290005,  Location: 1.5 M. E. WARTRACE (Lat: 35.521183,  Lng: -86.305667),  Route carried "on" structure: County highway 129,  Year Built: 2001,  Status: Open,  Structure Length: 0.78m (2.56ft),  Average Daily Traffic: 850 (year 2019),  Truck Traffic: 2%,  Average Future Daily Traffic: 1,360 (year 2041),  Design Load: HS 20,  Features Intersected: KNOB CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.478,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.2m (17.1ft),  Skew: 4 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft),  Curb-To-Curb Width: 8.4m (27.6ft),  Out-to-Out Width: 10.2m (33.5ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 44.1 metric tons,  Method Used To Determine Operating Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 20A1420003,  Location: 6 M. NE. SHELBYVILLE. (Lat: 35.531072,  Lng: -86.373242),  Route carried "on" structure: County highway 468,  Year Built: 1960,  Status: Posted for load,  Structure Length: 0.91m (2.99ft),  Average Daily Traffic: 130 (year 2022),  Truck Traffic: 2%,  Average Future Daily Traffic: 208 (year 2042),  Design Load: H 15,  Features Intersected: PANNELL CREEK,  Facility Carried by Structure: NFA A142
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 7.088,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.8m (19.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.1m (29.9ft),  Curb-To-Curb Width: 5.5m (18.0ft),  Out-to-Out Width: 5.8m (19.0ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Serious,  Channel: Satisfactory,  Operating Rating: 41.8 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 32.1 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: High priority of corrective action,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.58m (5.18ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Bridge Improvement Cost: $326,000,  Roadway Improvement Cost: $33,000,  Total Project Cost: $490,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 20A1430003,  Location: 2 M. W. WARTRACE. (Lat: 35.521050,  Lng: -86.364617),  Route carried "on" structure: County highway 143,  Year Built: 1987,  Status: Open,  Structure Length: 1.13m (3.71ft),  Average Daily Traffic: 70 (year 2022),  Truck Traffic: 2%,  Average Future Daily Traffic: 112 (year 2041),  Design Load: HS 20,  Features Intersected: PANNELL BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.863,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Skew: 3 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.6m (15.1ft),  Curb-To-Curb Width: 7.2m (23.6ft),  Out-to-Out Width: 8.4m (27.6ft)

Condition: Channel: Very good,  Culverts: Good,  Operating Rating: 89.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 20A1700001,  Location: 3 M. NE. WARTRACE. (Lat: 35.554633,  Lng: -86.281783),  Route carried "on" structure: County highway 170,  Year Built: 1940,  Status: Posted for load,  Structure Length: 1.10m (3.61ft),  Average Daily Traffic: 70 (year 2022),  Truck Traffic: 2%,  Average Future Daily Traffic: 112 (year 2041),  Design Load: H 15,  Features Intersected: STRAIGHT CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.147,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 5.8m (19.0ft),  Curb-To-Curb Width: 6.1m (20.0ft),  Out-to-Out Width: 6.7m (22.0ft)

Condition: Deck: Poor,  Superstructure: Fair,  Substructure: Poor,  Channel: Satisfactory,  Operating Rating: 32.4 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 25.2 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.10m (3.61ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $156,000,  Roadway Improvement Cost: $16,000,  Total Project Cost: $235,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Gravel
Find on map >>   Show street view

Structure Number: 20A1870001,  Location: 1 M. S. WARTRACE. (Lat: 35.510683,  Lng: -86.324850),  Route carried "on" structure: County highway 187,  Year Built: 1960,  Status: Open,  Structure Length: 3.44m (11.29ft),  Average Daily Traffic: 120 (year 2022),  Truck Traffic: 2%,  Average Future Daily Traffic: 192 (year 2041),  Design Load: H 15,  Features Intersected: GARRISON FORK CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.410,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 4.3m (14.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 4.0m (13.1ft),  Curb-To-Curb Width: 3.7m (12.1ft),  Out-to-Out Width: 4.3m (14.1ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Very good,  Operating Rating: 32.4 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 24.3 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: High priority of corrective action,  Length Of Structure Improvement: 3.44m (11.29ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $366,000,  Roadway Improvement Cost: $37,000,  Total Project Cost: $550,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 20A1880001,  Location: 2 M. S. WARTRACE. (Lat: 35.484917,  Lng: -86.316533),  Route carried "on" structure: County highway 188,  Year Built: 1960,  Status: Open,  Structure Length: 0.79m (2.59ft),  Average Daily Traffic: 270 (year 2022),  Truck Traffic: 2%,  Average Future Daily Traffic: 432 (year 2041),  Features Intersected: DRY RUN BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.661,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 2 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft),  Curb-To-Curb Width: 7.2m (23.6ft),  Out-to-Out Width: 7.9m (25.9ft)

Condition: Channel: Very good,  Culverts: Good,  Operating Rating: 38.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 24.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.79m (2.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Bridge Improvement Cost: $46,000,  Roadway Improvement Cost: $5,000,  Total Project Cost: $70,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 20A1880003,  Location: 2.1 M. S. WARTRACE. (Lat: 35.493250,  Lng: -86.340017),  Route carried "on" structure: County highway 188,  Year Built: 2000,  Status: Open,  Structure Length: 5.12m (16.80ft),  Average Daily Traffic: 120 (year 2022),  Truck Traffic: 2%,  Average Future Daily Traffic: 192 (year 2041),  Design Load: HS 20,  Features Intersected: GARRISON FORK CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.945,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 17.1m (56.1ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.0m (26.2ft)

Condition: Deck: Very good,  Superstructure: Good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 59.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 20A1970001,  Location: 3 M. S. WARTRACE (Lat: 35.480167,  Lng: -86.325217),  Route carried "on" structure: County highway 197,  Year Built: 1986,  Status: Open,  Structure Length: 6.89m (22.60ft),  Average Daily Traffic: 170 (year 2022),  Truck Traffic: 2%,  Average Future Daily Traffic: 272 (year 2041),  Design Load: HS 20,  Features Intersected: DUCK RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.016,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 22.9m (75.1ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 7.3m (24.0ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Fair,  Channel: Good,  Operating Rating: 88.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.89m (22.60ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: January 2021,  Underwater Inspection Date: June 2020,  Bridge Improvement Cost: $1,033,000,  Roadway Improvement Cost: $104,000,  Total Project Cost: $1,550,000 ( Estimate for 2021),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Galvanized Reinforcing
Find on map >>   Show street view

Structure Number: 20A1990001,  Location: 3.5 M NE JCT SR16&SR64 (Lat: 35.486033,  Lng: -86.336233),  Route carried "on" structure: County highway 199,  Year Built: 1984,  Status: Open,  Structure Length: 5.49m (18.01ft),  Average Daily Traffic: 250 (year 2022),  Truck Traffic: 2%,  Average Future Daily Traffic: 400 (year 2041),  Design Load: HS 20,  Features Intersected: HARRISON FORK CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.589,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.4m (21.0ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 18.3m (60.0ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 8.6m (28.2ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 52.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 20A6640001,  Location: 1 M. S. WARTRACE. (Lat: 35.511550,  Lng: -86.337117),  Route carried "on" structure: County highway 664,  Year Built: 1940,  Status: Posted for load,  Structure Length: 2.96m (9.71ft),  Average Daily Traffic: 20 (year 2022),  Truck Traffic: 2%,  Average Future Daily Traffic: 32 (year 2042),  Design Load: H 10,  Features Intersected: STOKES BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.182,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 4.6m (15.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 14.6m (47.9ft),  Curb-To-Curb Width: 6.1m (20.0ft),  Out-to-Out Width: 6.4m (21.0ft)

Condition: Deck: Very good,  Superstructure: Fair,  Substructure: Poor,  Channel: Good,  Operating Rating: 13.6 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 10.4 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: High priority of replacement,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 0.1 - 9.9% below),  Length Of Structure Improvement: 3.86m (12.66ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $668,000,  Roadway Improvement Cost: $67,000,  Total Project Cost: $1,003,000 ( Estimate for 2022),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 2E00290029,  Location: .4 MI.S.OF WARTRACE (Lat: 35.520556,  Lng: -86.318358),  Route carried "on" structure: State highway 269,  Year Built: 1940,  Status: Posted for load,  Structure Length: 5.18m (16.99ft),  Average Daily Traffic: 1,307 (year 2020),  Truck Traffic: 4%,  Average Future Daily Traffic: 2,464 (year 2040),  Design Load: H 15,  Features Intersected: GARRISON FORK CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 17.075,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 15.8m (51.8ft),  Curb-To-Curb Width: 6.1m (20.0ft),  Out-to-Out Width: 6.9m (22.6ft)

Condition: Deck: Poor,  Superstructure: Fair,  Substructure: Fair,  Channel: Good,  Operating Rating: 38.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 23.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 5.18m (16.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $547,000,  Roadway Improvement Cost: $55,000,  Total Project Cost: $821,000 ( Estimate for 2020),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 2E00290031,  Location: 2 MI. SOUTH OF WARTRACE (Lat: 35.509400,  Lng: -86.304786),  Route carried "on" structure: State highway 269,  Year Built: 1952,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 733 (year 2020),  Truck Traffic: 4%,  Average Future Daily Traffic: 1,008 (year 2041),  Design Load: H 15,  Features Intersected: BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 19.554,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 3.0m (9.8ft),  Curb-To-Curb Width: 6.2m (20.3ft),  Out-to-Out Width: 7.0m (23.0ft)

Condition: Channel: Fair,  Culverts: Good,  Operating Rating: 51.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 24.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.98m (3.22ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $85,000,  Roadway Improvement Cost: $9,000,  Total Project Cost: $128,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 2S42890011,  Location: .9 MILE SOUTH OF WARTRACE (Lat: 35.519083,  Lng: -86.310056),  Route carried "on" structure: State highway 269,  Year Built: 2005,  Status: Open,  Structure Length: 1.94m (6.36ft),  Average Daily Traffic: 733 (year 2020),  Truck Traffic: 4%,  Average Future Daily Traffic: 1,008 (year 2041),  Design Load: HS 20,  Features Intersected: KNOB CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 17.864,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Skew: 1 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 6.4m (21.0ft),  Curb-To-Curb Width: 12.6m (41.3ft),  Out-to-Out Width: 22.0m (72.2ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 44.1 metric tons,  Method Used To Determine Operating Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 2S42890015,  Location: IN WARTRACE CITY LIMITS (Lat: 35.527739,  Lng: -86.340258),  Route carried "on" structure: State highway 269,  Year Built: 1930,  Status: Posted for load,  Structure Length: 6.86m (22.51ft),  Average Daily Traffic: 1,290 (year 2020),  Truck Traffic: 4%,  Average Future Daily Traffic: 1,760 (year 2041),  Design Load: H 15,  Features Intersected: WARTRACE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 14.677,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 13.1m (43.0ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 8.1m (26.6ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 32.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 19.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 6.86m (22.51ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $483,000,  Roadway Improvement Cost: $49,000,  Total Project Cost: $725,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 2S42890017,  Location: 1.1 MI.N.OF WARTRACE (Lat: 35.539767,  Lng: -86.346578),  Route carried "on" structure: State highway 269,  Year Built: 1930,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 1,290 (year 2020),  Truck Traffic: 4%,  Average Future Daily Traffic: 1,760 (year 2041),  Design Load: H 15,  Features Intersected: HURRICANE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 13.068,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.6m (15.1ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.0m (26.2ft)

Condition: Channel: Very good,  Culverts: Good,  Operating Rating: 69.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 24.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 0.98m (3.22ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $92,000,  Roadway Improvement Cost: $10,000,  Total Project Cost: $139,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 2SR0640029,  Location: .8 MI.S.OF WARTRACE (Lat: 35.510083,  Lng: -86.336572),  Route carried "on" structure: State highway 64,  Year Built: 1976,  Status: Open,  Structure Length: 1.16m (3.81ft),  Average Daily Traffic: 2,850 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 4,688 (year 2041),  Design Load: HS 20,  Features Intersected: STOKES BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 33.024,  Lanes on structure: 2,  Base Highway Network: Yes (Inventory Route: 2SR0640,  Subroute: 2),  Owner: State Highway Agency,  Approaching Roadway Width: 12.8m (42.0ft),  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 44.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020
Find on map >>   Show street view

Structure Number: 2SR0640031,  Location: .1 MI.W.OF WARTRACE (Lat: 35.519714,  Lng: -86.334236),  Route carried "on" structure: State highway 64,  Year Built: 1979,  Status: Posted for load,  Structure Length: 6.61m (21.69ft),  Average Daily Traffic: 2,850 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 4,560 (year 2041),  Design Load: H 15,  Features Intersected: WARTRACE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 34.070,  Lanes on structure: 2,  Base Highway Network: Yes (Inventory Route: 2SR0640,  Subroute: 2),  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 20.4m (66.9ft),  Curb-To-Curb Width: 14.6m (47.9ft),  Out-to-Out Width: 15.8m (51.8ft)

Condition: Deck: Very good,  Superstructure: Good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 22.4 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 17.2 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Meets minimum limits,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: 2SR0640033,  Location: 2.8 MI.N.OF WARTRACE (Lat: 35.554258,  Lng: -86.299228),  Route carried "on" structure: State highway 64,  Year Built: 1983,  Status: Open,  Structure Length: 1.07m (3.51ft),  Average Daily Traffic: 1,664 (year 2020),  Truck Traffic: 11%,  Average Future Daily Traffic: 2,864 (year 2041),  Design Load: HS 20,  Features Intersected: BATES BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 40.057,  Lanes on structure: 2,  Base Highway Network: Yes (Inventory Route: 2SR0640,  Subroute: 2),  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 1 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.6m (15.1ft)

Condition: Channel: Excellent,  Culverts: Fair,  Operating Rating: 54.0 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.07m (3.51ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $198,000,  Roadway Improvement Cost: $20,000,  Total Project Cost: $298,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 2SR0640035,  Location: 11.9 MI.NE.OF SHELBYVILLE (Lat: 35.565511,  Lng: -86.286328),  Route carried "on" structure: State highway 64,  Year Built: 1983,  Status: Open,  Structure Length: 1.58m (5.18ft),  Average Daily Traffic: 1,664 (year 2020),  Truck Traffic: 11%,  Average Future Daily Traffic: 2,864 (year 2041),  Design Load: HS 20,  Features Intersected: MORGAN BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 41.843,  Lanes on structure: 2,  Base Highway Network: Yes (Inventory Route: 2SR0640,  Subroute: 2),  Owner: State Highway Agency,  Approaching Roadway Width: 11.3m (37.1ft),  Skew: 1 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 4.6m (15.1ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 13.0m (42.7ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 56.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 2SR0640045,  Location: 5 M. NE. WARTRACE (Lat: 35.559253,  Lng: -86.290550),  Route carried "on" structure: State highway 64,  Year Built: 1988,  Status: Open,  Structure Length: 0.73m (2.40ft),  Average Daily Traffic: 1,664 (year 2020),  Truck Traffic: 11%,  Average Future Daily Traffic: 2,864 (year 2041),  Design Load: HS 20,  Features Intersected: HAWKINS BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 41.055,  Lanes on structure: 2,  Base Highway Network: Yes (Inventory Route: 2SR0640,  Subroute: 2),  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 54.0 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020