![]() |
Bridge Statistics for Washington, Missouri (MO) - Condition, Traffic, Stress, Structural Evaluation, Project CostsBack to: Washington, MO, Missouri, Missouri forum, All US cities. National Bridge Inventory (NBI) Statistics Number of bridges: 13 Total length: 21 meters (69ft) Total costs: $818,000 Total average daily traffic: 93,822 Total average daily truck traffic: 7,893 Total future (year 2027) average daily traffic: 182,385 National Bridge Inventory (NBI) Registered Bridges for Washington
Bridge Condition - Deck Bridge Condition - Superstructure Bridge Condition - Substructure Bridge Condition - Channel Bridge Condition - Culverts Find on map >>
Structure Number: 1784, Location: S 1925 T 44 N R 1 W (Lat: 38.538333, Lng: -91.028333), Route carried "on" structure: State highway 100, Year Built: 1969, Status: Open, Structure Length: 0.81m (2.66ft), Average Daily Traffic: 17,600 (year 2006), Truck Traffic: 10%, Average Future Daily Traffic: 36,960 (year 2027), Design Load: H 20, Features Intersected: MASSEY FK CR Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 114.806, Lanes on structure: 2, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 13.4m (44.0ft), Skew: 2 degrees, Material/Design: Concrete continuous, Design/Construction: Culvert, Number Of Spans In Main Unit: 2, Length of Maximum Span: 3.7m (12.1ft) Condition: Channel: Good, Culverts: Satisfactory, Operating Rating: 49.5 metric tons, Inventory Rating: 22.5 metric tons, Structural Evaluation: Somewhat better than minimum adequacy, Waterway Adequacy: Equal to present minimum criteria, Approach Roadway Alignment: Equal to present minimum criteria, Designated Inspection Frequency: Every 24 months, Inspection Date: November 2006 Find on map >>
Structure Number: 1785, Location: S 1925 T 44 N R 1 W (Lat: 38.535000, Lng: -91.023333), Route carried "on" structure: State highway 100, Year Built: 1969, Status: Open, Structure Length: 0.74m (2.43ft), Average Daily Traffic: 17,600 (year 2006), Truck Traffic: 10%, Average Future Daily Traffic: 36,960 (year 2027), Design Load: H 20, Features Intersected: MASSEY CR BR Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 115.232, Lanes on structure: 2, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 13.4m (44.0ft), Skew: 1 degrees, Material/Design: Concrete continuous, Design/Construction: Culvert, Number Of Spans In Main Unit: 2, Length of Maximum Span: 3.4m (11.2ft) Condition: Channel: Satisfactory, Culverts: Satisfactory, Structural Evaluation: Equal to present minimum criteria, Waterway Adequacy: Equal to present minimum criteria, Approach Roadway Alignment: Equal to present desirable criteria, Designated Inspection Frequency: Every 24 months, Inspection Date: November 2006 Find on map >>
Structure Number: 23962, Location: S 16 T 44 N R 1 W (Lat: 38.570000, Lng: -91.040000), Route carried "on" structure: City street , Year Built: 1980, Status: Posted for load, Structure Length: 5.24m (17.19ft), Average Daily Traffic: 2,500 (year 2007), Truck Traffic: 10%, Average Future Daily Traffic: 4,000 (year 2027), Design Load: H 15, Features Intersected: ST JOHN'S CR, Facility Carried by Structure: W LINK INDUSTR'L Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.483, Lanes on structure: 2, Owner: County Highway Agency, Maintenance Responsibility: City or Municipal Highway Agency, Approaching Roadway Width: 8.5m (27.9ft), Material/Design: Steel, Design/Construction: Girder and Floorbeam System, Number Of Spans In Main Unit: 4, Length of Maximum Span: 15.5m (50.9ft), Curb-To-Curb Width: 8.0m (26.2ft), Out-to-Out Width: 8.9m (29.2ft) Condition: Deck: Poor, Superstructure: Serious, Substructure: Poor, Channel: Satisfactory, Operating Rating: 26.1 metric tons, Inventory Rating: 16.2 metric tons, Structural Evaluation: High priority of corrective action, Deck Geometry: High priority of corrective action, Waterway Adequacy: Equal to present desirable criteria, Approach Roadway Alignment: Equal to present minimum criteria, Length Of Structure Improvement: 0.63m (2.07ft), Designated Inspection Frequency: Every 12 months, Inspection Date: March 2007, Bridge Improvement Cost: $441,000, Roadway Improvement Cost: $44,000, Total Project Cost: $662,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 23964, Location: S 26 T 44 N R 1 W (Lat: 38.536667, Lng: -90.995000), Route carried "on" structure: City street , Year Built: 1988, Status: Open, Structure Length: 0.82m (2.69ft), Average Daily Traffic: 1,000 (year 2007), Truck Traffic: 1%, Average Future Daily Traffic: 1,600 (year 2027), Features Intersected: BR OF BUSCH CR, Facility Carried by Structure: WASHINGTON HTS Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.805, Lanes on structure: 2, Owner: City or Municipal Highway Agency, Approaching Roadway Width: 11.0m (36.1ft), Skew: 2 degrees, Material/Design: Concrete, Design/Construction: Culvert, Number Of Spans In Main Unit: 2, Length of Maximum Span: 4.0m (13.1ft) Condition: Channel: Satisfactory, Culverts: Satisfactory, Operating Rating: 49.5 metric tons, Method Used To Determine Operating Rating: Allowable Stress (AS), Inventory Rating: 16.2 metric tons, Method Used To Determine Inventory Rating: Allowable Stress (AS), Structural Evaluation: Meets minimum limits, Waterway Adequacy: Equal to present desirable criteria, Approach Roadway Alignment: Better than present minimum criteria, Designated Inspection Frequency: Every 24 months, Inspection Date: March 2007 Find on map >>
Structure Number: 23965, Location: S 24 T 44 N R 1 W (Lat: 38.541667, Lng: -90.986667), Route carried "on" structure: City street , Year Built: 1990, Status: Open, Structure Length: 2.04m (6.69ft), Average Daily Traffic: 2,000 (year 2007), Truck Traffic: 2%, Average Future Daily Traffic: 3,200 (year 2027), Design Load: HS 20, Features Intersected: BUSCH CR, Facility Carried by Structure: INTERNATONAL Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.966, Lanes on structure: 2, Owner: City or Municipal Highway Agency, Approaching Roadway Width: 10.7m (35.1ft), Material/Design: Concrete, Design/Construction: Culvert, Number Of Spans In Main Unit: 4, Length of Maximum Span: 4.9m (16.1ft) Condition: Channel: Good, Culverts: Satisfactory, Operating Rating: 58.5 metric tons, Method Used To Determine Operating Rating: Allowable Stress (AS), Inventory Rating: 32.4 metric tons, Method Used To Determine Inventory Rating: Allowable Stress (AS), Structural Evaluation: Equal to present minimum criteria, Waterway Adequacy: Equal to present desirable criteria, Approach Roadway Alignment: Equal to present desirable criteria, Designated Inspection Frequency: Every 24 months, Inspection Date: March 2007 Find on map >>
Structure Number: 23967, Location: S E OF MO RIVER BRIDGE (Lat: 38.448333, Lng: -91.003333), Route carried "on" structure: City street , Year Built: 1979, Status: Posted for load, Structure Length: 2.93m (9.61ft), Average Daily Traffic: 5,000 (year 2007), Truck Traffic: 5%, Average Future Daily Traffic: 8,000 (year 2027), Design Load: H 20, Features Intersected: BUSCH CR, Facility Carried by Structure: SOUTH POINT RD Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Owner: City or Municipal Highway Agency, Approaching Roadway Width: 13.1m (43.0ft), Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 3, Length of Maximum Span: 9.8m (32.2ft), Curb-To-Curb Width: 15.2m (49.9ft), Out-to-Out Width: 16.1m (52.8ft) Condition: Deck: Good, Superstructure: Good, Substructure: Satisfactory, Channel: Satisfactory, Operating Rating: 41.4 metric tons, Method Used To Determine Operating Rating: Allowable Stress (AS), Inventory Rating: 27.9 metric tons, Method Used To Determine Inventory Rating: Allowable Stress (AS), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Superior to present desirable criteria, Waterway Adequacy: Equal to present minimum criteria, Approach Roadway Alignment: Equal to present desirable criteria, Designated Inspection Frequency: Every 24 months, Inspection Date: March 2007, Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete Find on map >>
Structure Number: 23968, Location: AT EIGHTH STREET (Lat: 38.448333, Lng: -91.000000), Route carried "on" structure: City street , Year Built: 1939, Year Reconstructed: 1977, Status: Posted for load, Structure Length: 1.07m (3.51ft), Average Daily Traffic: 15,000 (year 2007), Truck Traffic: 5%, Average Future Daily Traffic: 24,000 (year 2027), Design Load: H 20, Features Intersected: BUSCH CR, Facility Carried by Structure: JEFFERSON ST Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 3, Owner: City or Municipal Highway Agency, Approaching Roadway Width: 14.6m (47.9ft), Material/Design: Concrete, Design/Construction: Box Beam or Girders - Single/Spread, Number Of Spans In Main Unit: 1, Length of Maximum Span: 10.7m (35.1ft), Curb or Sidewalk Widths: Left: 1.2m (3.9ft), Right: 1.2m (3.9ft), Curb-To-Curb Width: 14.9m (48.9ft), Out-to-Out Width: 17.4m (57.1ft) Condition: Deck: Satisfactory, Superstructure: Poor, Substructure: Satisfactory, Channel: Satisfactory, Operating Rating: 33.3 metric tons, Method Used To Determine Operating Rating: Allowable Stress (AS), Inventory Rating: 18.0 metric tons, Method Used To Determine Inventory Rating: Allowable Stress (AS), Structural Evaluation: Meets minimum limits, Deck Geometry: Equal to present minimum criteria, Waterway Adequacy: Equal to present desirable criteria, Approach Roadway Alignment: Equal to present minimum criteria, Length Of Structure Improvement: 0.17m (0.56ft), Designated Inspection Frequency: Every 24 months, Inspection Date: March 2007, Bridge Improvement Cost: $104,000, Roadway Improvement Cost: $10,000, Total Project Cost: $156,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 28191, Location: S 22 T 44 N R 1 W (Lat: 38.448333, Lng: -91.000000), Route carried "on" structure: City street , Year Built: 1996, Status: Open, Structure Length: 0.91m (2.99ft), Average Daily Traffic: 1,000 (year 2007), Truck Traffic: 5%, Average Future Daily Traffic: 1,600 (year 2027), Design Load: HS 20, Features Intersected: BUSCH CR, Facility Carried by Structure: STAFFORD ST Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.161, Lanes on structure: 2, Owner: City or Municipal Highway Agency, Approaching Roadway Width: 12.2m (40.0ft), Material/Design: Concrete, Design/Construction: Culvert, Number Of Spans In Main Unit: 3, Length of Maximum Span: 2.7m (8.9ft), Curb-To-Curb Width: 12.2m (40.0ft), Out-to-Out Width: 14.0m (45.9ft) Condition: Channel: Good, Culverts: Very good, Operating Rating: 34.2 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 18.0 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: Equal to present desirable criteria, Waterway Adequacy: Equal to present desirable criteria, Approach Roadway Alignment: Equal to present desirable criteria, Designated Inspection Frequency: Every 24 months, Inspection Date: March 2007, Deck Structure Type: Concrete Cast-file-Place Find on map >>
Structure Number: 29731, Location: S 22 T 44 N R 1 W (Lat: 38.551667, Lng: -91.010000), Route carried "on" structure: City street , Year Built: 2003, Status: Open, Structure Length: 0.98m (3.22ft), Average Daily Traffic: 1,250 (year 2007), Truck Traffic: 1%, Average Future Daily Traffic: 2,000 (year 2027), Design Load: HS 20, Features Intersected: BUSCH CR, Facility Carried by Structure: LOCUST ST Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.161, Lanes on structure: 2, Owner: City or Municipal Highway Agency, Approaching Roadway Width: 9.1m (29.9ft), Skew: 1 degrees, Material/Design: Concrete continuous, Design/Construction: Culvert, Number Of Spans In Main Unit: 2, Length of Maximum Span: 4.4m (14.4ft), Curb-To-Curb Width: 9.1m (29.9ft), Out-to-Out Width: 11.9m (39.0ft) Condition: Channel: Very good, Culverts: Good, Operating Rating: 57.6 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 34.2 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Better than present minimum criteria, Deck Geometry: Somewhat better than minimum adequacy, Waterway Adequacy: Equal to present desirable criteria, Approach Roadway Alignment: Equal to present desirable criteria, Designated Inspection Frequency: Every 24 months, Inspection Date: March 2007, Deck Structure Type: Concrete Cast-file-Place Find on map >>
Structure Number: 3086, Location: S 22 T 44 N R 1 W (Lat: 38.550000, Lng: -91.008333), Route carried "on" structure: City street , Year Built: 2004, Status: Open, Structure Length: 2.36m (7.74ft), Average Daily Traffic: 1,500 (year 2007), Truck Traffic: 5%, Average Future Daily Traffic: 2,400 (year 2027), Design Load: HS 20, Features Intersected: BUSCH CR, Facility Carried by Structure: SUNNYSIDE ST Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.322, Lanes on structure: 2, Owner: City or Municipal Highway Agency, Approaching Roadway Width: 10.7m (35.1ft), Material/Design: Prestressed concrete, Design/Construction: Box Beam or Girders - Multiple, Number Of Spans In Main Unit: 1, Length of Maximum Span: 22.9m (75.1ft), Curb-To-Curb Width: 10.8m (35.4ft), Out-to-Out Width: 14.6m (47.9ft) Condition: Deck: Excellent, Superstructure: Excellent, Substructure: Excellent, Channel: Excellent, Structural Evaluation: Superior to present desirable criteria, Deck Geometry: Equal to present minimum criteria, Waterway Adequacy: Superior to present desirable criteria, Approach Roadway Alignment: Equal to present desirable criteria, Designated Inspection Frequency: Every 24 months, Inspection Date: March 2007, Deck Structure Type: Concrete Precast Panels, Wearing Surface/Protective System: Wearing Surface: Bituminous, Membrane: Preformed Fabric Find on map >>
Structure Number: 32098, Location: S 26 T 44 N R 2 W (Lat: 38.531111, Lng: -91.112222), Route carried "on" structure: County highway , Year Built: 2005, Status: Open, Structure Length: 2.01m (6.59ft), Average Daily Traffic: 50 (year 2007), Truck Traffic: 10%, Average Future Daily Traffic: 90 (year 2027), Design Load: HS 20, Features Intersected: LONG BR CR, Facility Carried by Structure: ST JOHN'S CR RD Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.966, Lanes on structure: 2, Owner: County Highway Agency, Approaching Roadway Width: 7.3m (24.0ft), Skew: 3 degrees, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 1, Length of Maximum Span: 19.2m (63.0ft), Curb-To-Curb Width: 7.3m (24.0ft), Out-to-Out Width: 8.1m (26.6ft) Condition: Deck: Excellent, Superstructure: Excellent, Substructure: Excellent, Channel: Excellent, Operating Rating: 70.2 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 41.4 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Superior to present desirable criteria, Deck Geometry: Equal to present minimum criteria, Waterway Adequacy: Superior to present desirable criteria, Approach Roadway Alignment: Equal to present desirable criteria, Designated Inspection Frequency: Every 24 months, Inspection Date: August 2007, Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Deck Protection: Epoxy Coated Reinforcing Find on map >>
Structure Number: 368, Location: S 22 T 44 N R 1 W (Lat: 38.548333, Lng: -91.006667), Route carried "on" structure: State highway 47, Year Built: 1961, Year Reconstructed: 1998, Status: Open, Structure Length: 0.77m (2.53ft), Average Daily Traffic: 15,575 (year 2006), Truck Traffic: 10%, Average Future Daily Traffic: 32,707 (year 2027), Design Load: HS 20, Features Intersected: BUSCH CR Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 91.852, Lanes on structure: 5, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 25.0m (82.0ft), Skew: 2 degrees, Material/Design: Concrete continuous, Design/Construction: Culvert, Number Of Spans In Main Unit: 2, Length of Maximum Span: 3.4m (11.2ft) Condition: Channel: Good, Culverts: Good, Operating Rating: 29.7 metric tons, Inventory Rating: 18.0 metric tons, Structural Evaluation: Meets minimum limits, Waterway Adequacy: Equal to present minimum criteria, Approach Roadway Alignment: Equal to present desirable criteria, Designated Inspection Frequency: Every 24 months, Inspection Date: November 2006 Find on map >>
Structure Number: 448, Location: S 27 T 44 N R 1 W (Lat: 38.531667, Lng: -91.010000), Route carried "on" structure: State highway 47, Year Built: 1961, Year Reconstructed: 1998, Status: Open, Structure Length: 0.89m (2.92ft), Average Daily Traffic: 13,747 (year 2006), Truck Traffic: 10%, Average Future Daily Traffic: 28,868 (year 2027), Design Load: HS 20, Features Intersected: BR BUSCH CR Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 93.701, Lanes on structure: 5, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 25.0m (82.0ft), Material/Design: Concrete continuous, Design/Construction: Culvert, Number Of Spans In Main Unit: 2, Length of Maximum Span: 4.3m (14.1ft) Condition: Channel: Good, Culverts: Good, Operating Rating: 29.7 metric tons, Inventory Rating: 18.0 metric tons, Structural Evaluation: Meets minimum limits, Waterway Adequacy: Equal to present minimum criteria, Approach Roadway Alignment: Equal to present desirable criteria, Designated Inspection Frequency: Every 24 months, Inspection Date: November 2006 Discuss this city on our hugely popular Missouri forum Back to: Washington, MO, Missouri, All US cities.
|
![]() |