U.S. Cities - City-Data Homepage  
City-Data Forum
City-Data.com Homepage

Bridge Statistics for Washington, New Hampshire (NH) - Condition, Traffic, Stress, Structural Evaluation, Project Costs

Back to: Washington, NH, New Hampshire, New Hampshire forum, All US cities.





National Bridge Inventory (NBI) Statistics
Number of bridges: 13
Total length: 8 meters (26ft)
Total costs: $19,500,000
Total average daily traffic: 6,920
Total average daily truck traffic: 548
Total future (year 2026) average daily traffic: 10,243
National Bridge Inventory (NBI) Registered Bridges for Washington

New bridges - Historical Statistics

  • 1920-1929: 5
  • 1930-1939: 2
  • 1940-1949: 0
  • 1950-1959: 0
  • 1960-1969: 0
  • 1970-1979: 0
  • 1980-1989: 4
  • 1990-1999: 1
  • 2000-2009: 1

Reconstructed bridges - Historical Statistics

  • 1940-1949: 1
  • 1950-1959: 0
  • 1960-1969: 1
  • 1970-1979: 1
  • 1980-1989: 3
  • 1990-1999: 1

Bridge Condition - Deck

Bridge Condition - Superstructure

Bridge Condition - Substructure

Bridge Condition - Channel

Bridge Condition - Culverts

Find on map >>

Structure Number: 265005000043,  Location: TOWN RD 0.54 MI MARLOW TL (Lat: 43.147881,  Lng: -72.164331),  Route carried "on" structure: Other road ,  Year Built: 1920,  Year Reconstructed: 2001,  Status: Open,  Structure Length: 1.39m (4.56ft),  Average Daily Traffic: 90 (year 2004),  Truck Traffic: 4%,  Average Future Daily Traffic: 133 (year 2026),  Design Load: HS 25,  Features Intersected: ASHUELOT RIVER,  Facility Carried by Structure: MARLOW ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.869,  Lanes on structure: 1,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 4.3m (14.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 8.5m (27.9ft),  Curb or Sidewalk Widths: Left: 0.1m (0.3ft),  Right: 0.1m (0.3ft),  Curb-To-Curb Width: 4.9m (16.1ft),  Out-to-Out Width: 4.9m (16.1ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 61.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 47.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.39m (4.56ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2007,  Bridge Improvement Cost: $1,000,000,  Roadway Improvement Cost: $100,000,  Total Project Cost: $1,500,000 ( Estimate for 2008),  Deck Structure Type: Corrugated Steel,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>

Structure Number: 265009300152,  Location: 1.85 MI. S. GOSHEN TL (Lat: 43.225419,  Lng: -72.118897),  Route carried "on" structure: State highway 31,  Year Built: 1935,  Year Reconstructed: 1983,  Status: Open,  Structure Length: 1.01m (3.31ft),  Average Daily Traffic: 570 (year 2007),  Truck Traffic: 10%,  Average Future Daily Traffic: 844 (year 2026),  Design Load: H 15,  Features Intersected: ASHUELOT RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 13.100,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.5m (27.9ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 10.2m (33.5ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Good,  Channel: Very good,  Operating Rating: 22.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 16.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.01m (3.31ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2008,  Bridge Improvement Cost: $1,000,000,  Roadway Improvement Cost: $100,000,  Total Project Cost: $1,500,000 ( Estimate for 2008),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 265012700075,  Location: 3.75 MI. N. WINDSOR TL (Lat: 43.170300,  Lng: -72.089317),  Route carried "on" structure: State highway 31,  Year Built: 1933,  Year Reconstructed: 1980,  Status: Open,  Structure Length: 0.49m (1.61ft),  Average Daily Traffic: 1,800 (year 2007),  Truck Traffic: 10%,  Average Future Daily Traffic: 2,664 (year 2026),  Design Load: H 15,  Features Intersected: BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.148,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 6.4m (21.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 4.3m (14.1ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 10.9m (35.8ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Very good,  Channel: Good,  Operating Rating: 20.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 11.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: High priority of replacement,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.49m (1.61ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2008,  Bridge Improvement Cost: $1,000,000,  Roadway Improvement Cost: $100,000,  Total Project Cost: $1,500,000 ( Estimate for 2008),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 265012800073,  Location: 3.7 MI. NW WINDSOR TL (Lat: 43.168714,  Lng: -72.087869),  Route carried "on" structure: State highway 31,  Year Built: 1924,  Year Reconstructed: 1993,  Status: Open,  Structure Length: 0.55m (1.80ft),  Average Daily Traffic: 1,800 (year 2007),  Truck Traffic: 10%,  Average Future Daily Traffic: 2,664 (year 2026),  Design Load: HS 25,  Features Intersected: HALFMOON POND OUTLET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.890,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 6.4m (21.0ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 4.6m (15.1ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.7m (31.8ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 77.1 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 46.3 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.55m (1.80ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2008,  Bridge Improvement Cost: $1,000,000,  Roadway Improvement Cost: $100,000,  Total Project Cost: $1,500,000 ( Estimate for 2008),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>

Structure Number: 265013100075,  Location: 0.23 MI NH 31 (Lat: 43.170975,  Lng: -72.085453),  Route carried "on" structure: Other road ,  Year Built: 1987,  Status: Posted for load,  Structure Length: 0.37m (1.21ft),  Average Daily Traffic: 200 (year 1984),  Truck Traffic: 4%,  Average Future Daily Traffic: 296 (year 2026),  Features Intersected: HALFMOON POND OUTLET,  Facility Carried by Structure: MILL STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.370,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 4.9m (16.1ft),  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Good,  Culverts: Poor,  Operating Rating: 1.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 0.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 20.0 - 29.9% below),  Length Of Structure Improvement: 0.37m (1.21ft),  Designated Inspection Frequency: Every 12 months,  Inspection Date: October 2007,  Bridge Improvement Cost: $1,000,000,  Roadway Improvement Cost: $100,000,  Total Project Cost: $1,500,000 ( Estimate for 2008)
Find on map >>

Structure Number: 265013100083,  Location: 0.55 MI NH 31 (Lat: 43.174833,  Lng: -72.085239),  Route carried "on" structure: Other road ,  Year Built: 1920,  Year Reconstructed: 1960,  Status: Temporarily open,  Structure Length: 0.69m (2.26ft),  Average Daily Traffic: 100 (year 1984),  Truck Traffic: 4%,  Average Future Daily Traffic: 148 (year 2026),  Design Load: H 15,  Features Intersected: HALFMOON POND OUTLET,  Facility Carried by Structure: HALFMOON POND RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.885,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 4.9m (16.1ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.3m (20.7ft),  Curb or Sidewalk Widths: Left: 0.1m (0.3ft),  Right: 0.1m (0.3ft),  Curb-To-Curb Width: 5.3m (17.4ft),  Out-to-Out Width: 6.0m (19.7ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Fair,  Channel: Good,  Operating Rating: 41.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 30.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 0.69m (2.26ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2007,  Bridge Improvement Cost: $1,000,000,  Roadway Improvement Cost: $100,000,  Total Project Cost: $1,500,000 ( Estimate for 2008),  Deck Structure Type: Wood or Timber
Find on map >>

Structure Number: 265016500041,  Location: 0.09MI NH 31 (Lat: 43.146239,  Lng: -72.054833),  Route carried "on" structure: Other road ,  Year Built: 1987,  Status: Open,  Structure Length: 0.34m (1.12ft),  Average Daily Traffic: 20 (year 1984),  Truck Traffic: 4%,  Average Future Daily Traffic: 30 (year 2026),  Features Intersected: HIGHLAND LAKE OUTLET,  Facility Carried by Structure: DOLE SCHOOL HS RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.145,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 3.4m (11.2ft)

Condition: Channel: Good,  Culverts: Fair,  Operating Rating: 9.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 6.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: High priority of replacement,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 20.0 - 29.9% below),  Length Of Structure Improvement: 0.34m (1.12ft),  Designated Inspection Frequency: Every 12 months,  Inspection Date: October 2007,  Bridge Improvement Cost: $1,000,000,  Roadway Improvement Cost: $100,000,  Total Project Cost: $1,500,000 ( Estimate for 2008)
Find on map >>

Structure Number: 265017700046,  Location: .7 MI. W. WINDSOR TL (Lat: 43.147375,  Lng: -72.042958),  Route carried "on" structure: State highway 31,  Year Built: 1928,  Year Reconstructed: 1980,  Status: Open,  Structure Length: 0.64m (2.10ft),  Average Daily Traffic: 1,800 (year 2004),  Truck Traffic: 4%,  Average Future Daily Traffic: 2,664 (year 2026),  Design Load: H 15,  Features Intersected: SHEDD BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.078,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 6.4m (21.0ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 4.6m (15.1ft),  Curb-To-Curb Width: 8.1m (26.6ft),  Out-to-Out Width: 9.1m (29.9ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 45.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 27.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.64m (2.10ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2008,  Bridge Improvement Cost: $1,000,000,  Roadway Improvement Cost: $100,000,  Total Project Cost: $1,500,000 ( Estimate for 2008),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 265018000046,  Location: ADJACENT NH 31 (Lat: 43.147147,  Lng: -72.040150),  Route carried "on" structure: Other road ,  Year Built: 1980,  Status: Open,  Structure Length: 0.40m (1.31ft),  Average Daily Traffic: 50 (year 1984),  Truck Traffic: 4%,  Average Future Daily Traffic: 74 (year 2026),  Features Intersected: SHEDD BROOK,  Facility Carried by Structure: SMITH POND ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.016,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 4.0m (13.1ft)

Condition: Channel: Good,  Culverts: Poor,  Operating Rating: 39.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 27.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 0.40m (1.31ft),  Designated Inspection Frequency: Every 12 months,  Inspection Date: October 2007,  Bridge Improvement Cost: $1,000,000,  Roadway Improvement Cost: $100,000,  Total Project Cost: $1,500,000 ( Estimate for 2008)
Find on map >>

Structure Number: 265018600126,  Location: 0.7 MI FR EAST WASH. RD (Lat: 43.200878,  Lng: -72.030233),  Route carried "on" structure: Other road ,  Year Built: 1980,  Status: Open,  Structure Length: 0.52m (1.71ft),  Average Daily Traffic: 20 (year 1987),  Truck Traffic: 4%,  Average Future Daily Traffic: 30 (year 2026),  Features Intersected: WOODWARD BROOK,  Facility Carried by Structure: AYERS POND ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.016,  Lanes on structure: 1,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 3.7m (12.1ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 3.4m (11.2ft),  Curb-To-Curb Width: 4.5m (14.8ft),  Out-to-Out Width: 4.9m (16.1ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Poor,  Channel: Satisfactory,  Operating Rating: 27.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 20.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 0.52m (1.71ft),  Designated Inspection Frequency: Every 12 months,  Inspection Date: October 2007,  Bridge Improvement Cost: $1,000,000,  Roadway Improvement Cost: $100,000,  Total Project Cost: $1,500,000 ( Estimate for 2008),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Wood or Timber
Find on map >>

Structure Number: 265019300104,  Location: .3 MI FROM TOWN RD (Lat: 43.189261,  Lng: -72.024478),  Route carried "on" structure: Other road ,  Year Built: 1998,  Status: Open,  Structure Length: 0.38m (1.25ft),  Average Daily Traffic: 20 (year 1984),  Average Future Daily Traffic: 30 (year 2026),  Features Intersected: ISLAND POND OUTLET,  Facility Carried by Structure: PURLING BECK ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.032,  Lanes on structure: 1,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 4.0m (13.1ft),  Material/Design: Aluminum, Iron,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 3.8m (12.5ft),  Curb-To-Curb Width: 5.5m (18.0ft)

Condition: Channel: Good,  Culverts: Excellent,  Operating Rating: 44.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 26.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 0.38m (1.25ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2006,  Bridge Improvement Cost: $1,000,000,  Roadway Improvement Cost: $100,000,  Total Project Cost: $1,500,000 ( Estimate for 2008)
Find on map >>

Structure Number: 265019500109,  Location: 0.13 MI FR EAST WASH. RD (Lat: 43.191831,  Lng: -72.021539),  Route carried "on" structure: Other road ,  Year Built: 2002,  Status: Open,  Structure Length: 0.72m (2.36ft),  Average Daily Traffic: 400 (year 2004),  Truck Traffic: 10%,  Average Future Daily Traffic: 592 (year 2026),  Design Load: HS 25,  Features Intersected: WOODWARD BROOK,  Facility Carried by Structure: E WASHINGTON ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 7.773,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 6.4m (21.0ft),  Skew: 3 degrees,  Material/Design: Wood or Timber,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.0m (19.7ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 7.9m (25.9ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Very good,  Channel: Very good,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 64.4 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 0.72m (2.36ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2006,  Bridge Improvement Cost: $1,000,000,  Roadway Improvement Cost: $100,000,  Total Project Cost: $1,500,000 ( Estimate for 2008),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 265019800106,  Location: 0.04 MI FR EAST WASH. RD (Lat: 43.189906,  Lng: -72.018922),  Route carried "on" structure: Other road ,  Year Built: 1920,  Year Reconstructed: 1954,  Status: Open,  Structure Length: 1.01m (3.31ft),  Average Daily Traffic: 50 (year 1984),  Truck Traffic: 4%,  Average Future Daily Traffic: 74 (year 2026),  Features Intersected: BEARDS BROOK,  Facility Carried by Structure: PURLING BECK ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.370,  Lanes on structure: 1,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 4.0m (13.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.1m (29.9ft),  Curb-To-Curb Width: 4.3m (14.1ft),  Out-to-Out Width: 5.1m (16.7ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 20.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 15.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.01m (3.31ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2006,  Bridge Improvement Cost: $1,000,000,  Roadway Improvement Cost: $100,000,  Total Project Cost: $1,500,000 ( Estimate for 2008),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete

Discuss this city on our hugely popular New Hampshire forum

Back to: Washington, NH, New Hampshire, All US cities.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2009 Advameg, Inc.