U.S. Cities - City-Data Homepage  
City-Data Forum
City-Data.com Homepage

Bridge Statistics for Weirton, West Virginia (WV) - Condition, Traffic, Stress, Structural Evaluation, Project Costs

Back to: Weirton, WV, West Virginia, West Virginia forum, All US cities.





National Bridge Inventory (NBI) Statistics
Number of bridges: 41
Total length: 607 meters (1,991ft)
Total costs: $30,926,000
Total average daily traffic: 360,131
Total average daily truck traffic: 32,599
National Bridge Inventory (NBI) Registered Bridges for Weirton
No street view available for this location

New bridges - Historical Statistics

  • 1920-1929: 2
  • 1930-1939: 0
  • 1940-1949: 1
  • 1950-1959: 1
  • 1960-1969: 6
  • 1970-1979: 1
  • 1980-1989: 10
  • 1990-1999: 16
  • 2000-2009: 4

Reconstructed bridges - Historical Statistics

  • 1960-1969: 1
  • 1970-1979: 0
  • 1980-1989: 0
  • 1990-1999: 1

Average Daily Traffic

Bridge Condition - Deck

Bridge Condition - Superstructure

Bridge Condition - Substructure

Bridge Condition - Channel

Find on map >>   Show street view

Structure Number: 5A001,  Location: 0.12 MI SOUTH JCT US 22 (Lat: 4.042572,  Lng: -80.568519),  Route carried "on" structure: County highway 100,  Year Built: 1971,  Status: Open,  Structure Length: 12.93m (42.42ft),  Average Daily Traffic: 6,800 (year 2008),  Truck Traffic: 10%,  Average Future Daily Traffic: 10,132 (year 2028),  Design Load: HS 20,  Features Intersected: HARMON CK & PANHANDLE TR,  Facility Carried by Structure: COUNTY ROUTE 1
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.287,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 15.9m (52.2ft),  Skew: 4 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 3,  Length of Maximum Span: 36.6m (120.1ft),  Curb or Sidewalk Widths: Left: 0.3m (1.0ft),  Right: 0.3m (1.0ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 14.7m (48.2ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Very good,  Operating Rating: 71.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 43.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 12.92m (42.39ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 11,  Bridge Improvement Cost: $918,000,  Roadway Improvement Cost: $10,000,  Total Project Cost: $928,000 ( Estimate for 2009),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 5A041,  Location: 0.02 MI NORTH US 22 (Lat: 4.043219,  Lng: -80.526581),  Route carried "on" structure: State highway 10500,  Year Built: 1966,  Status: Open,  Structure Length: 6.62m (21.72ft),  Average Daily Traffic: 8,200 (year 2008),  Truck Traffic: 5%,  Average Future Daily Traffic: 10,004 (year 2028),  Design Load: HS 20,  Features Intersected: WV ROUTE 105,  Facility Carried by Structure: WEST VIRGINIA 105
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.048,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 3,  Length of Maximum Span: 17.9m (58.7ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Deck: Serious,  Superstructure: Fair,  Substructure: Poor,  Operating Rating: 68.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 6.71m (22.01ft),  Designated Inspection Frequency: Every 12 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: July 11,  Other Special Inspection Date: March 10,  Bridge Improvement Cost: $1,144,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $2,638,000 ( Estimate for 2010),  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 5A052,  Location: 0.01 MILE WEST JCT WV 2 (Lat: 4.040178,  Lng: -80.605161),  Route carried "on" structure: Ramp US 2200,  Year Built: 1984,  Status: Open,  Structure Length: 12.97m (42.55ft),  Average Daily Traffic: 2,100 (year 2008),  Truck Traffic: 11%,  Average Future Daily Traffic: 3,192 (year 2028),  Design Load: HS 20,  Features Intersected: RAILROAD,  Facility Carried by Structure: RAMP A FROM US 22
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.788,  Lanes on structure: 1,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 9 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 3,  Length of Maximum Span: 38.3m (125.7ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.5m (31.2ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Very good,  Operating Rating: 83.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 49.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 12.98m (42.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 10,  Bridge Improvement Cost: $358,000,  Total Project Cost: $358,000 ( Estimate for 2010),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 5A054,  Location: 0.09 MILE WEST JCT WV 2 (Lat: 4.040397,  Lng: -80.605150),  Route carried "on" structure: US 2200,  Year Built: 1984,  Status: Open,  Structure Length: 18.11m (59.42ft),  Average Daily Traffic: 30,000 (year 2008),  Truck Traffic: 11%,  Average Future Daily Traffic: 45,600 (year 2028),  Design Load: HS 20,  Features Intersected: US ROUTE 22,  Facility Carried by Structure: US ROUTE 22
Minimum Vertical Clearance: 5.56m (18.24ft),  Kilometerpoint: 0.708,  Lanes on structure: 4,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 22.9m (75.1ft),  Skew: 36 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 65.5m (214.9ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 23.0m (75.5ft),  Out-to-Out Width: 25.1m (82.3ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Satisfactory,  Operating Rating: 84.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 50.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 18.11m (59.42ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 10,  Bridge Improvement Cost: $1,408,000,  Total Project Cost: $1,408,000 ( Estimate for 2010),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 5A055,  Location: 0.01 MI WEST JCT WV 2 (Lat: 4.040408,  Lng: -80.605019),  Route carried "on" structure: Ramp US 2200,  Year Built: 1984,  Status: Open,  Structure Length: 15.19m (49.84ft),  Average Daily Traffic: 2,100 (year 2008),  Truck Traffic: 11%,  Average Future Daily Traffic: 2,562 (year 2028),  Design Load: HS 20,  Features Intersected: US 22 RAMP B,  Facility Carried by Structure: RAMP B TO US 22 WB
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.949,  Lanes on structure: 1,  Lanes under structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 9 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 4,  Length of Maximum Span: 36.6m (120.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.5m (31.2ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Fair,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 72.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 15.21m (49.90ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 10,  Bridge Improvement Cost: $419,000,  Total Project Cost: $419,000 ( Estimate for 2008),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 5A056,  Location: 0.16 MI NORTH OF US 22 (Lat: 4.042158,  Lng: -80.595669),  Route carried "on" structure: Ramp State highway 200,  Year Built: 1988,  Status: Open,  Structure Length: 16.23m (53.25ft),  Average Daily Traffic: 5,800 (year 2005),  Truck Traffic: 5%,  Average Future Daily Traffic: 8,642 (year 2025),  Design Load: HS 25,  Features Intersected: MITTAL STEEL & RAILROAD,  Facility Carried by Structure: W.VA. ROUTE 2
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.290,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Skew: 9 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 4,  Length of Maximum Span: 41.1m (134.8ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 9.3m (30.5ft),  Out-to-Out Width: 10.5m (34.4ft)

Condition: Deck: Very good,  Superstructure: Good,  Substructure: Very good,  Operating Rating: 79.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 48.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 16.22m (53.22ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 10,  Bridge Improvement Cost: $495,000,  Total Project Cost: $495,000 ( Estimate for 2008),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 5A057,  Location: 0.01 MI S. OF CR 507 (Lat: 4.042400,  Lng: -80.594711),  Route carried "on" structure: Ramp State highway 200,  Year Built: 1988,  Status: Open,  Structure Length: 4.84m (15.88ft),  Average Daily Traffic: 8,500 (year 2005),  Truck Traffic: 5%,  Average Future Daily Traffic: 12,920 (year 2025),  Design Load: HS 25,  Features Intersected: HARMON CREEK,  Facility Carried by Structure: WV 2 SOUTH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.048,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 5 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 18.4m (60.4ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 9.4m (30.8ft),  Out-to-Out Width: 10.5m (34.4ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Very good,  Operating Rating: 55.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.85m (15.91ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: June 10,  Bridge Improvement Cost: $148,000,  Total Project Cost: $148,000 ( Estimate for 2010),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 5A058,  Location: 0.01 MI. E. JCT WV 2 (Lat: 4.042433,  Lng: -80.594000),  Route carried "on" structure: County highway 217,  Year Built: 1988,  Status: Open,  Structure Length: 2.20m (7.22ft),  Average Daily Traffic: 20 (year 2005),  Average Future Daily Traffic: 30 (year 2025),  Design Load: HS 25,  Features Intersected: HARMON CREEK,  Facility Carried by Structure: CO RT 2/17
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.016,  Lanes on structure: 3,  Owner: State Highway Agency,  Approaching Roadway Width: 12.8m (42.0ft),  Skew: 1 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 10.4m (34.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 13.1m (43.0ft),  Out-to-Out Width: 13.9m (45.6ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Good,  Operating Rating: 59.0 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 39.0 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 2.19m (7.19ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: November 2008,  Bridge Improvement Cost: $50,000,  Total Project Cost: $50,000 ( Estimate for 2008),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 5A059,  Location: 0.05 MI. SO. JCT CR 2/17 (Lat: 4.042408,  Lng: -80.594469),  Route carried "on" structure: State highway 200,  Year Built: 1988,  Status: Open,  Structure Length: 4.21m (13.81ft),  Average Daily Traffic: 16,700 (year 2008),  Truck Traffic: 5%,  Average Future Daily Traffic: 25,384 (year 2028),  Design Load: HS 25,  Features Intersected: HARMON CREEK,  Facility Carried by Structure: WV 2 RAMP E
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 26.130,  Lanes on structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 14.6m (47.9ft),  Skew: 4 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 15.9m (52.2ft),  Curb-To-Curb Width: 13.0m (42.7ft),  Out-to-Out Width: 14.1m (46.3ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 52.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 30.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 4.21m (13.81ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 10,  Bridge Improvement Cost: $178,000,  Total Project Cost: $178,000 ( Estimate for 2008),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 5A06,  Location: At Ohio State Line (Lat: 4.021036,  Lng: -80.225000),  Route carried "on" structure: US 22,  Year Built: 1990,  Status: Open,  Structure Length: 59.88m (196.46ft),  Average Daily Traffic: 30,000 (year 2008),  Truck Traffic: 11%,  Average Future Daily Traffic: 45,600 (year 2028),  Design Load: HS 20,  Features Intersected: US Route 22
Minimum Vertical Clearance: 5.18m (16.99ft),  Kilometerpoint: 0.016,  Lanes on structure: 6,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 29.0m (95.1ft),  Skew: 30 degrees,  Navigation Control: Yes ( Vertical Clearance: 21.0m (68.9ft), Horizontal Clearance: 243.8m (799.9ft)),  Material/Design: Steel continuous,  Design/Construction: Stayed Girder,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 5,  Length of Maximum Span: 249.9m (819.9ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 24.7m (81.0ft),  Out-to-Out Width: 28.0m (91.9ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 49.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 31.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Meets minimum limits,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 60.11m (197.21ft),  Designated Inspection Frequency: Every 12 months,  Critical Feature Inspection Frequency: Every 12 months,  Underwater Inspection Frequency: Every 60 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: October 11,  Critical Feature Inspection Date: October 11,  Underwater Inspection Date: September 10,  Other Special Inspection Date: October 11,  Bridge Improvement Cost: $9,957,000,  Roadway Improvement Cost: $8,000,000,  Total Project Cost: $17,957,000 ( Estimate for 2011),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 5A064,  Location: 2.11 MI. E. OHIO ST LINE (Lat: 4.042178,  Lng: -80.594400),  Route carried "on" structure: State highway 200,  Year Built: 1993,  Status: Open,  Structure Length: 21.92m (71.92ft),  Average Daily Traffic: 7,300 (year 2008),  Truck Traffic: 5%,  Average Future Daily Traffic: 11,096 (year 2028),  Design Load: HS 25,  Features Intersected: US 22 RAMP G,  Facility Carried by Structure: WV 2 N RAMP E
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 25.857,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Skew: 9 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 7,  Length of Maximum Span: 39.6m (129.9ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 10.3m (33.8ft),  Out-to-Out Width: 11.4m (37.4ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Satisfactory,  Operating Rating: 62.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 37.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 21.92m (71.92ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 11,  Bridge Improvement Cost: $733,000,  Total Project Cost: $733,000 ( Estimate for 2009),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 5A065,  Location: 0.06 MI WEST JCT WV 2 (Lat: 4.042158,  Lng: -80.596181),  Route carried "on" structure: Ramp US 2200,  Year Built: 1993,  Status: Open,  Structure Length: 16.48m (54.07ft),  Average Daily Traffic: 2,100 (year 2011),  Truck Traffic: 11%,  Average Future Daily Traffic: 3,192 (year 2031),  Design Load: HS 25,  Features Intersected: RAMP G (US 22),  Facility Carried by Structure: US 22 RAMP
Minimum Vertical Clearance: 4.90m (16.08ft),  Kilometerpoint: 1.818,  Lanes on structure: 1,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Skew: 39 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 5,  Length of Maximum Span: 31.2m (102.4ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 6.9m (22.6ft),  Out-to-Out Width: 8.0m (26.2ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 77.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 46.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 16.46m (54.00ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 11,  Bridge Improvement Cost: $240,000,  Total Project Cost: $240,000 ( Estimate for 2009),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 5A066,  Location: 0.17 MI EAST JCT WV 2 (Lat: 4.042250,  Lng: -80.593981),  Route carried "on" structure: Ramp US 2200,  Year Built: 1993,  Status: Open,  Structure Length: 9.09m (29.82ft),  Average Daily Traffic: 2,061 (year 2011),  Truck Traffic: 10%,  Average Future Daily Traffic: 4,472 (year 2031),  Design Load: HS 25,  Features Intersected: NS, ARCELOR-MITTAL RR,  Facility Carried by Structure: EXIT #2 WB (US 22)
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.188,  Lanes on structure: 1,  Owner: State Highway Agency,  Approaching Roadway Width: 7.0m (23.0ft),  Skew: 9 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 4,  Length of Maximum Span: 21.7m (71.2ft),  Curb-To-Curb Width: 6.9m (22.6ft),  Out-to-Out Width: 8.0m (26.2ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 80.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 49.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 15.18m (49.80ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 11,  Bridge Improvement Cost: $224,000,  Total Project Cost: $224,000 ( Estimate for 2009),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 5A067,  Location: 0.15 mi. West jct CR 1 (Lat: 4.042794,  Lng: -80.568400),  Route carried "on" structure: US 22,  Year Built: 1993,  Status: Open,  Structure Length: 23.76m (77.95ft),  Average Daily Traffic: 30,000 (year 2008),  Truck Traffic: 11%,  Average Future Daily Traffic: 45,600 (year 2028),  Design Load: HS 25,  Features Intersected: US 22
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.859,  Lanes on structure: 4,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.1m (43.0ft),  Skew: 32 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Number Of Approach Spans: 2,  Length of Maximum Span: 36.9m (121.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 25.8m (84.6ft),  Out-to-Out Width: 27.6m (90.6ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 80.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 48.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Superior to present desirable criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 23.77m (77.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 11,  Bridge Improvement Cost: $1,315,000,  Total Project Cost: $1,315,000 ( Estimate for 2011),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 5A069,  Location: 0.01 mi. West jct CR 1 (Lat: 4.023089,  Lng: -80.203800),  Route carried "on" structure: Ramp US 22,  Year Built: 1993,  Status: Open,  Structure Length: 15.40m (50.52ft),  Average Daily Traffic: 1,300 (year 2006),  Truck Traffic: 10%,  Average Future Daily Traffic: 1,755 (year 2026),  Design Load: HS 25,  Features Intersected: Ramp D (US22)
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.811,  Lanes on structure: 1,  Lanes under structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 4 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Number Of Approach Spans: 2,  Length of Maximum Span: 42.1m (138.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 6.9m (22.6ft),  Out-to-Out Width: 8.0m (26.2ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Excellent,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 62.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 15.39m (50.49ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 11,  Bridge Improvement Cost: $231,000,  Total Project Cost: $231,000 ( Estimate for 2011),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 5A07,  Location: 0.09 mi. West jct CR 1 (Lat: 4.023089,  Lng: -80.203800),  Route carried "on" structure: Ramp US 22,  Year Built: 1993,  Status: Open,  Structure Length: 13.70m (44.95ft),  Average Daily Traffic: 1,500 (year 2006),  Truck Traffic: 10%,  Average Future Daily Traffic: 2,480 (year 2026),  Design Load: HS 25,  Features Intersected: RAMP C(US 22)
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.875,  Lanes on structure: 2,  Lanes under structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 8.2m (26.9ft),  Skew: 3 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 3,  Length of Maximum Span: 41.1m (134.8ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 9.4m (30.8ft),  Out-to-Out Width: 10.5m (34.4ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Good,  Operating Rating: 68.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 13.72m (45.01ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 11,  Bridge Improvement Cost: $277,000,  Total Project Cost: $277,000 ( Estimate for 2011),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 5A082,  Location: 0.02 mi. North jct US22 (Lat: 4.043072,  Lng: -80.549019),  Route carried "on" structure: County highway 1300,  Year Built: 2007,  Status: Open,  Structure Length: 6.81m (22.34ft),  Average Daily Traffic: 10,000 (year 2008),  Truck Traffic: 3%,  Average Future Daily Traffic: 14,900 (year 2028),  Design Load: HS 25,  Features Intersected: US Route 22,  Facility Carried by Structure: County Route 13
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.209,  Lanes on structure: 5,  Lanes under structure: 3,  Owner: State Highway Agency,  Approaching Roadway Width: 20.1m (65.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 1,  Length of Maximum Span: 37.9m (124.3ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 0.0m,  Curb-To-Curb Width: 20.1m (65.9ft),  Out-to-Out Width: 22.3m (73.2ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Operating Rating: 49.9 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 38.1 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 11,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 15A031,  Location: 0.38 MI S JCT WV 105 (Lat: 4.045989,  Lng: -80.588489),  Route carried "on" structure: State highway 200,  Year Built: 1966,  Year Reconstructed: 1998,  Status: Open,  Structure Length: 43.55m (142.88ft),  Average Daily Traffic: 11,600 (year 2008),  Truck Traffic: 6%,  Average Future Daily Traffic: 14,152 (year 2028),  Design Load: HS 20,  Features Intersected: MITTAL STEEL PLANT,  Facility Carried by Structure: W VA. RT 2(X)
Minimum Vertical Clearance: 6.81m (22.34ft),  Kilometerpoint: 1.786,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: Railroad,  Approaching Roadway Width: 24.4m (80.1ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 19,  Length of Maximum Span: 24.0m (78.7ft),  Curb or Sidewalk Widths: Left: 1.3m (4.3ft),  Right: 1.3m (4.3ft),  Curb-To-Curb Width: 15.2m (49.9ft),  Out-to-Out Width: 18.4m (60.4ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Satisfactory,  Operating Rating: 64.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 38.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of corrective action,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 43.56m (142.91ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 10,  Bridge Improvement Cost: $1,300,000,  Roadway Improvement Cost: $20,000,  Total Project Cost: $1,320,000 ( Estimate for 2010),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 15A041,  Location: 0.45 MI S OF WV 105 (Lat: 4.045872,  Lng: -80.588461),  Route carried "on" structure: State highway 200,  Year Built: 1998,  Status: Open,  Structure Length: 11.15m (36.58ft),  Average Daily Traffic: 11,600 (year 2008),  Truck Traffic: 6%,  Average Future Daily Traffic: 18,676 (year 2028),  Design Load: HS 25,  Features Intersected: MITTAL STEEL RR & YARD,  Facility Carried by Structure: WV 2
Minimum Vertical Clearance: 7.42m (24.34ft),  Kilometerpoint: 1.673,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 15.2m (49.9ft),  Skew: 9 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 4,  Length of Maximum Span: 29.6m (97.1ft),  Curb or Sidewalk Widths: Left: 1.3m (4.3ft),  Right: 1.3m (4.3ft),  Curb-To-Curb Width: 15.2m (49.9ft),  Out-to-Out Width: 18.4m (60.4ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 59.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 11.00m (36.09ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 10,  Bridge Improvement Cost: $549,000,  Roadway Improvement Cost: $50,000,  Total Project Cost: $599,000 ( Estimate for 2008),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 15A043,  Location: 0.06 mi. South jct. CR11 (Lat: 4.048367,  Lng: -80.536769),  Route carried "on" structure: County highway 1500,  Year Built: 2001,  Status: Open,  Structure Length: 2.24m (7.35ft),  Average Daily Traffic: 2,900 (year 2008),  Truck Traffic: 8%,  Average Future Daily Traffic: 4,060 (year 2028),  Design Load: HS 25,  Features Intersected: Kings Creek,  Facility Carried by Structure: County Route 15
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.121,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 8.8m (28.9ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 21.3m (69.9ft),  Curb-To-Curb Width: 9.3m (30.5ft),  Out-to-Out Width: 9.3m (30.5ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 57.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Meets minimum limits,  Designated Inspection Frequency: Every 48 months,  Inspection Date: November 11,  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 15A045,  Location: 0.25 M WEST CR 11/1 (Lat: 4.050508,  Lng: -80.562731),  Route carried "on" structure: County highway 1100,  Year Built: 2007,  Status: Open,  Structure Length: 2.19m (7.19ft),  Average Daily Traffic: 1,300 (year 2008),  Truck Traffic: 8%,  Average Future Daily Traffic: 1,820 (year 2028),  Design Load: HS 25,  Features Intersected: KINGS CREEK,  Facility Carried by Structure: COUNTY ROUTE 11
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.779,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 19.5m (64.0ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 10.3m (33.8ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 78.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 46.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 11,  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 15A997,  Location: 0.10 MILE EAST OF WV2 (Lat: 4.044839,  Lng: -80.585861),  Route carried "on" structure: City street N1635,  Year Built: 1927,  Year Reconstructed: 1968,  Status: Posted for load,  Structure Length: 8.38m (27.49ft),  Average Daily Traffic: 500 (year 2011),  Truck Traffic: 8%,  Average Future Daily Traffic: 700 (year 2031),  Features Intersected: CITY STREET LEE AVENUE,  Facility Carried by Structure: LEE AVENUE CITY ST
Minimum Vertical Clearance: 6.71m (22.01ft),  Kilometerpoint: 0.016,  Lanes on structure: 2,  Lanes under structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 5.8m (19.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 14,  Length of Maximum Span: 14.9m (48.9ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.0m (3.3ft),  Curb-To-Curb Width: 5.8m (19.0ft),  Out-to-Out Width: 6.6m (21.7ft)

Condition: Deck: Serious,  Superstructure: Serious,  Substructure: Fair,  Operating Rating: 9.1 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 4.5 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: High priority of replacement,  Deck Geometry: High priority of replacement,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 8.38m (27.49ft),  Designated Inspection Frequency: Every 12 months,  Critical Feature Inspection Frequency: Every 12 months,  Inspection Date: July 11,  Critical Feature Inspection Date: July 11,  Bridge Improvement Cost: $629,000,  Roadway Improvement Cost: $566,000,  Total Project Cost: $1,408,000 ( Estimate for 2010),  Deck Structure Type: Steel plate,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 5A026,  Location: 0.96 MI WEST JCT WV 2 (Lat: 4.041756,  Lng: -80.608789),  Route carried "under" structure: Alternate County highway 50700,  Year Built: 1945,  Structure Length: 2.20m (7.22ft),  Features Intersected: MITTAL STEEL RR,  Facility Carried by Structure: RR TRACKS
Minimum Vertical Clearance: 7.19m (23.59ft),  Kilometerpoint: 0.821,  Lanes under structure: 2,  Length of Maximum Span: 20.7m (67.9ft)

Structure Number: 5A041,  Location: 0.02 MI NORTH US 22,  Route carried "under" structure: US ,  Year Built: 1966,  Structure Length: 6.62m (21.72ft),  Average Daily Traffic: 20,300 (year 8 ),  Truck Traffic: 11%,  Features Intersected: WV ROUTE 105,  Facility Carried by Structure: WEST VIRGINIA 105
Kilometerpoint: 0.885,  Lanes on structure: 2,  Lanes under structure: 4,  Length of Maximum Span: 17.9m (58.7ft)

Structure Number: 5A054,  Location: 0.09 MILE WEST JCT WV 2,  Route carried "under" structure: Ramp State highway ,  Year Built: 1984,  Structure Length: 18.11m (59.42ft),  Average Daily Traffic: 8,500 (year 5 ),  Truck Traffic: 5%,  Features Intersected: US ROUTE 22,  Facility Carried by Structure: US ROUTE 22
Kilometerpoint: 1.352,  Lanes on structure: 4,  Lanes under structure: 2,  Length of Maximum Span: 65.5m (214.9ft)

Structure Number: 5A055,  Location: 0.01 MI WEST JCT WV 2,  Route carried "under" structure: US ,  Year Built: 1984,  Structure Length: 15.19m (49.84ft),  Average Daily Traffic: 30,000 (year 8 ),  Truck Traffic: 11%,  Features Intersected: US 22 RAMP B,  Facility Carried by Structure: RAMP B TO US 22 WB
Kilometerpoint: 0.885,  Lanes on structure: 1,  Lanes under structure: 4,  Length of Maximum Span: 36.6m (120.1ft)

Structure Number: 5A055,  Location: 0.01 MI WEST JCT WV 2,  Route carried "under" structure: Ramp State highway ,  Year Built: 1984,  Structure Length: 15.19m (49.84ft),  Average Daily Traffic: 8,500 (year 5 ),  Truck Traffic: 5%,  Features Intersected: US 22 RAMP B,  Facility Carried by Structure: RAMP B TO US 22 WB
Kilometerpoint: 1.352,  Lanes on structure: 1,  Lanes under structure: 2,  Length of Maximum Span: 36.6m (120.1ft)

Structure Number: 5A06,  Location: At Ohio State Line,  Route carried "under" structure: State highway ,  Year Built: 1990,  Structure Length: 59.88m (196.46ft),  Average Daily Traffic: 4,500 (year 8 ),  Truck Traffic: 6%,  Features Intersected: US Route 22,  Facility Carried by Structure: US Route 22
Kilometerpoint: 0.000,  Lanes on structure: 6,  Lanes under structure: 4,  Length of Maximum Span: 249.9m (819.9ft)

Structure Number: 5A064,  Location: 2.11 MI. E. OHIO ST LINE,  Route carried "under" structure: US ,  Year Built: 1993,  Structure Length: 21.92m (71.92ft),  Average Daily Traffic: 30,000 (year 8 ),  Truck Traffic: 11%,  Features Intersected: US 22 RAMP G,  Facility Carried by Structure: WV 2 N RAMP E
Kilometerpoint: 1.915,  Lanes on structure: 2,  Lanes under structure: 4,  Length of Maximum Span: 39.6m (129.9ft)

Structure Number: 5A064,  Location: 2.11 MI. E. OHIO ST LINE,  Route carried "under" structure: Ramp US ,  Year Built: 1993,  Structure Length: 21.92m (71.92ft),  Average Daily Traffic: 2,100 (year 8 ),  Truck Traffic: 10%,  Features Intersected: US 22 RAMP G,  Facility Carried by Structure: WV 2 N RAMP E
Kilometerpoint: 1.834,  Lanes on structure: 2,  Lanes under structure: 2,  Length of Maximum Span: 39.6m (129.9ft)

Structure Number: 5A065,  Location: 0.06 MI WEST JCT WV 2,  Route carried "under" structure: US ,  Year Built: 1993,  Structure Length: 16.48m (54.07ft),  Average Daily Traffic: 30,000 (year 8 ),  Truck Traffic: 11%,  Features Intersected: RAMP G (US 22),  Facility Carried by Structure: US 22 RAMP
Kilometerpoint: 1.866,  Lanes on structure: 1,  Lanes under structure: 4,  Length of Maximum Span: 31.2m (102.4ft)

Structure Number: 5A067,  Location: 0.15 mi. West jct CR 1,  Route carried "under" structure: County highway ,  Year Built: 1993,  Structure Length: 23.76m (77.95ft),  Average Daily Traffic: 6,800 (year 8 ),  Truck Traffic: 3%,  Features Intersected: US 22,  Facility Carried by Structure: US 22 EB & WB
Kilometerpoint: 0.949,  Lanes on structure: 4,  Lanes under structure: 2,  Length of Maximum Span: 36.9m (121.1ft)

Structure Number: 5A067,  Location: 0.15 mi. West jct CR 1,  Route carried "under" structure: County highway ,  Year Built: 1993,  Structure Length: 23.76m (77.95ft),  Average Daily Traffic: 800 (year 8 ),  Truck Traffic: 3%,  Features Intersected: US 22,  Facility Carried by Structure: US 22 EB & WB
Kilometerpoint: 1.046,  Lanes on structure: 4,  Lanes under structure: 2,  Length of Maximum Span: 36.9m (121.1ft)

Structure Number: 5A069,  Location: 0.01 mi. West jct CR 1,  Route carried "under" structure: County highway ,  Year Built: 1993,  Structure Length: 15.40m (50.52ft),  Average Daily Traffic: 800 (year 8 ),  Truck Traffic: 3%,  Features Intersected: Ramp D (US22),  Facility Carried by Structure: Ramp D (US22)
Kilometerpoint: 1.062,  Lanes on structure: 1,  Lanes under structure: 2,  Length of Maximum Span: 42.1m (138.1ft)

Structure Number: 5A07,  Location: 0.09 mi. West jct CR 1,  Route carried "under" structure: County highway ,  Year Built: 1993,  Structure Length: 13.70m (44.95ft),  Average Daily Traffic: 800 (year 8 ),  Truck Traffic: 3%,  Features Intersected: RAMP C(US 22),  Facility Carried by Structure: Ramp C (US22)
Kilometerpoint: 1.046,  Lanes on structure: 2,  Lanes under structure: 2,  Length of Maximum Span: 41.1m (134.8ft)

Structure Number: 5A082,  Location: 0.02 mi. North jct US22,  Route carried "under" structure: US ,  Year Built: 2007,  Structure Length: 6.81m (22.34ft),  Average Daily Traffic: 24,500 (year 8 ),  Truck Traffic: 11%,  Features Intersected: US Route 22,  Facility Carried by Structure: County Route 13
Kilometerpoint: 6.935,  Lanes on structure: 5,  Lanes under structure: 5,  Length of Maximum Span: 37.9m (124.3ft)

Find on map >>   Show street view

Structure Number: 15A035,  Location: .73 MI SOUTH JCT WV 105 (Lat: 4.045378,  Lng: -80.588319),  Route carried "under" structure: State highway 200,  Year Built: 1950,  Structure Length: 1.95m (6.40ft),  Features Intersected: WEST VA ROUTE 2,  Facility Carried by Structure: WALKWAY
Minimum Vertical Clearance: 7.77m (25.49ft),  Kilometerpoint: 1.223,  Lanes under structure: 4,  Length of Maximum Span: 19.5m (64.0ft)

Find on map >>   Show street view

Structure Number: 15A037,  Location: .62 MI SOUTH JCT WV 105 (Lat: 4.045686,  Lng: -80.588111),  Route carried "under" structure: State highway 200,  Year Built: 1960,  Structure Length: 1.95m (6.40ft),  Features Intersected: WEST VA RT 2,  Facility Carried by Structure: PIPELINE
Minimum Vertical Clearance: 7.75m (25.43ft),  Kilometerpoint: 0.014,  Lanes under structure: 4,  Length of Maximum Span: 19.5m (64.0ft)

Find on map >>   Show street view

Structure Number: 15A038,  Location: 0.46 MI SOUTH JCT WV 105 (Lat: 4.045803,  Lng: -80.588011),  Route carried "under" structure: State highway 200,  Year Built: 1965,  Structure Length: 2.74m (8.99ft),  Features Intersected: WEST VA ROUTE 2,  Facility Carried by Structure: OVERHEAD PIPELINE
Minimum Vertical Clearance: 7.67m (25.16ft),  Kilometerpoint: 1.657,  Lanes under structure: 4,  Length of Maximum Span: 27.4m (89.9ft)

Find on map >>   Show street view

Structure Number: 15A039,  Location: .29 MI SOUTH JCT WV 105 (Lat: 4.045969,  Lng: -80.588300),  Route carried "under" structure: State highway 200,  Year Built: 1965,  Structure Length: 3.29m (10.79ft),  Features Intersected: WEST VA RT 2,  Facility Carried by Structure: OVERHEAD PIPELINE
Minimum Vertical Clearance: 11.28m (37.01ft),  Kilometerpoint: 1.931,  Lanes under structure: 4,  Length of Maximum Span: 32.9m (107.9ft)

Structure Number: 15A997,  Location: 0.10 MILE EAST OF WV2,  Route carried "under" structure: Other road ,  Year Built: 1927,  Structure Length: 8.38m (27.49ft),  Average Daily Traffic: 150 (year 11 ),  Truck Traffic: 9%,  Features Intersected: CITY STREET LEE AVENUE,  Facility Carried by Structure: LEE AVENUE CITY ST
Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 1,  Length of Maximum Span: 14.9m (48.9ft)

Jump to a detailed profile or search site with Google Custom Search
Business Search - 14 Million verified businesses
Search for: near: 

Discuss this city on our hugely popular West Virginia forum

Back to: Weirton, WV, West Virginia, All US cities.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2013 Advameg, Inc.