![]() |
Bridge Statistics for Weiser, Idaho (ID) - Condition, Traffic, Stress, Structural Evaluation, Project CostsBack to: Weiser, ID, Idaho, Idaho forum, All US cities. National Bridge Inventory (NBI) Statistics Number of bridges: 10 Total length: 59 meters (194ft) Total costs: $9,752,000 Total average daily traffic: 29,110 Total average daily truck traffic: 2,562 National Bridge Inventory (NBI) Registered Bridges for Weiser
Bridge Condition - Deck Bridge Condition - Superstructure Bridge Condition - Substructure Bridge Condition - Channel Find on map >>
Structure Number: 1381, Location: IN WEISER (Lat: 44.243333, Lng: -116.982500), Route carried "on" structure: Spur US 95, Year Built: 1953, Status: Open, Structure Length: 27.74m (91.01ft), Average Daily Traffic: 3,200 (year 2006), Truck Traffic: 11%, Average Future Daily Traffic: 4,800 (year 2026), Design Load: HS 15, Features Intersected: SNAKE RIVER;WEISER BR. Minimum Vertical Clearance: 30.48m (100.00ft), Kilometerpoint: 0.000, Lanes on structure: 2, Base Highway Network: Yes (Inventory Route: USS, Subroute: 1), Owner: State Highway Agency, Approaching Roadway Width: 7.9m (25.9ft), Material/Design: Steel continuous, Design/Construction: Girder and Floorbeam System, Number Of Spans In Main Unit: 6, Number Of Approach Spans: 2, Length of Maximum Span: 43.0m (141.1ft), Curb or Sidewalk Widths: Left: 0.5m (1.6ft), Right: 0.5m (1.6ft), Curb-To-Curb Width: 7.9m (25.9ft), Out-to-Out Width: 9.3m (30.5ft) Condition: Deck: Fair, Superstructure: Satisfactory, Substructure: Poor, Channel: Satisfactory, Operating Rating: 37.8 metric tons, Method Used To Determine Operating Rating: Allowable Stress (AS), Inventory Rating: 27.0 metric tons, Method Used To Determine Inventory Rating: Allowable Stress (AS), Structural Evaluation: Meets minimum limits, Deck Geometry: High priority of corrective action, Waterway Adequacy: Equal to present desirable criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 30.51m (100.10ft), Designated Inspection Frequency: Every 12 months, Critical Feature Inspection Frequency: Every 12 months, Underwater Inspection Frequency: Every 60 months, Inspection Date: June 2007, Critical Feature Inspection Date: June 2007, Underwater Inspection Date: August 2006, Bridge Improvement Cost: $3,804,000, Roadway Improvement Cost: $380,000, Total Project Cost: $5,706,000 ( Estimate for 2003), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete Find on map >>
Structure Number: 18125, Location: 0.1 S. WEISER SCL (Lat: 44.242500, Lng: -116.958056), Route carried "on" structure: US 95, Year Built: 1935, Status: Open, Structure Length: 9.51m (31.20ft), Average Daily Traffic: 7,000 (year 2006), Truck Traffic: 9%, Average Future Daily Traffic: 10,500 (year 2026), Design Load: H 15, Features Intersected: WEISER RIVER Minimum Vertical Clearance: 30.48m (100.00ft), Kilometerpoint: 131.201, Lanes on structure: 2, Base Highway Network: Yes (Inventory Route: US0, Subroute: 1), Owner: State Highway Agency, Approaching Roadway Width: 8.2m (26.9ft), Material/Design: Concrete, Design/Construction: Tee Beam, Number Of Spans In Main Unit: 6, Length of Maximum Span: 15.5m (50.9ft), Curb or Sidewalk Widths: Left: 1.5m (4.9ft), Right: 0.0m, Curb-To-Curb Width: 7.9m (25.9ft), Out-to-Out Width: 9.6m (31.5ft) Condition: Deck: Poor, Superstructure: Poor, Substructure: Poor, Channel: Fair, Operating Rating: 42.6 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 25.4 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Meets minimum limits, Deck Geometry: High priority of corrective action, Waterway Adequacy: Equal to present minimum criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 10.06m (33.01ft), Designated Inspection Frequency: Every 12 months, Inspection Date: September 2007, Bridge Improvement Cost: $1,380,000, Roadway Improvement Cost: $138,000, Total Project Cost: $2,070,000 ( Estimate for 2003), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 18133, Location: IN WEISER (Lat: 44.251944, Lng: -116.957778), Route carried "on" structure: US 95, Year Built: 1999, Status: Open, Structure Length: 1.31m (4.30ft), Average Daily Traffic: 3,500 (year 2006), Truck Traffic: 13%, Average Future Daily Traffic: 5,250 (year 2026), Design Load: HS 25, Features Intersected: MONROE CREEK Minimum Vertical Clearance: 30.48m (100.00ft), Kilometerpoint: 132.294, Lanes on structure: 2, Base Highway Network: Yes (Inventory Route: US0, Subroute: 3), Owner: State Highway Agency, Approaching Roadway Width: 13.4m (44.0ft), Skew: 2 degrees, Material/Design: Concrete, Design/Construction: Frame, Number Of Spans In Main Unit: 1, Length of Maximum Span: 12.5m (41.0ft), Curb-To-Curb Width: 14.6m (47.9ft), Out-to-Out Width: 17.2m (56.4ft) Condition: Deck: Good, Superstructure: Good, Substructure: Good, Channel: Very good, Operating Rating: 89.8 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 70.8 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Better than present minimum criteria, Deck Geometry: Superior to present desirable criteria, Waterway Adequacy: Equal to present desirable criteria, Approach Roadway Alignment: Equal to present desirable criteria, Designated Inspection Frequency: Every 24 months, Inspection Date: September 2007, Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 18135, Location: IN WEISER (Lat: 44.256111, Lng: -116.968333), Route carried "on" structure: City street 3881, Year Built: 1977, Status: Open, Structure Length: 0.82m (2.69ft), Average Daily Traffic: 3,900 (year 2006), Truck Traffic: 8%, Average Future Daily Traffic: 5,850 (year 2026), Design Load: HS 20, Features Intersected: GALLOWAY CANAL Minimum Vertical Clearance: 30.48m (100.00ft), Kilometerpoint: 133.619, Lanes on structure: 2, Owner: City or Municipal Highway Agency, Approaching Roadway Width: 10.4m (34.1ft), Material/Design: Steel, Design/Construction: Culvert, Number Of Spans In Main Unit: 1, Length of Maximum Span: 7.0m (23.0ft), Curb-To-Curb Width: 31.1m (102.0ft), Out-to-Out Width: 36.6m (120.1ft) Condition: Channel: Satisfactory, Culverts: Good, Operating Rating: 45.0 metric tons, Inventory Rating: 32.4 metric tons, Structural Evaluation: Better than present minimum criteria, Deck Geometry: Superior to present desirable criteria, Waterway Adequacy: Equal to present desirable criteria, Approach Roadway Alignment: Better than present minimum criteria, Designated Inspection Frequency: Every 24 months, Inspection Date: November 2007 Find on map >>
Structure Number: 28695, Location: IN WEISER (Lat: 44.246389, Lng: -116.981111), Route carried "on" structure: County highway , Year Built: 1960, Status: Open, Structure Length: 4.66m (15.29ft), Average Daily Traffic: 1,400 (year 2006), Truck Traffic: 13%, Average Future Daily Traffic: 2,100 (year 2026), Design Load: HS 20, Features Intersected: US 95 SPUR; WEISER IC, Facility Carried by Structure: COUNTY ROAD Minimum Vertical Clearance: 30.48m (100.00ft), Kilometerpoint: 0.045, Lanes on structure: 2, Lanes under structure: 4, Owner: State Highway Agency, Approaching Roadway Width: 8.5m (27.9ft), Material/Design: Concrete, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 4, Length of Maximum Span: 12.8m (42.0ft), Curb or Sidewalk Widths: Left: 0.5m (1.6ft), Right: 0.5m (1.6ft), Curb-To-Curb Width: 8.5m (27.9ft), Out-to-Out Width: 10.0m (32.8ft) Condition: Deck: Good, Superstructure: Satisfactory, Substructure: Fair, Operating Rating: 34.2 metric tons, Method Used To Determine Operating Rating: Allowable Stress (AS), Inventory Rating: 24.3 metric tons, Method Used To Determine Inventory Rating: Allowable Stress (AS), Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: Somewhat better than minimum adequacy, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 4.66m (15.29ft), Designated Inspection Frequency: Every 24 months, Inspection Date: June 2007, Bridge Improvement Cost: $581,000, Roadway Improvement Cost: $58,000, Total Project Cost: $872,000 ( Estimate for 2003), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 2872, Location: IN WEISER (Lat: 44.246944, Lng: -116.980833), Route carried "on" structure: City street , Year Built: 1960, Status: Open, Structure Length: 4.85m (15.91ft), Average Daily Traffic: 1,910 (year 2006), Truck Traffic: 10%, Average Future Daily Traffic: 2,865 (year 2026), Design Load: HS 20, Features Intersected: US 95 SPUR;COMMERCIAL UP, Facility Carried by Structure: W. COMMERCIAL ST. Minimum Vertical Clearance: 30.48m (100.00ft), Kilometerpoint: 161.085, Lanes on structure: 2, Lanes under structure: 4, Owner: State Highway Agency, Approaching Roadway Width: 8.5m (27.9ft), Skew: 1 degrees, Material/Design: Concrete, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 4, Length of Maximum Span: 13.1m (43.0ft), Curb or Sidewalk Widths: Left: 0.5m (1.6ft), Right: 0.5m (1.6ft), Curb-To-Curb Width: 8.5m (27.9ft), Out-to-Out Width: 10.0m (32.8ft) Condition: Deck: Good, Superstructure: Satisfactory, Substructure: Fair, Operating Rating: 34.2 metric tons, Method Used To Determine Operating Rating: Allowable Stress (AS), Inventory Rating: 24.3 metric tons, Method Used To Determine Inventory Rating: Allowable Stress (AS), Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: Somewhat better than minimum adequacy, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 4.66m (15.29ft), Designated Inspection Frequency: Every 24 months, Inspection Date: June 2007, Bridge Improvement Cost: $520,000, Roadway Improvement Cost: $52,000, Total Project Cost: $780,000 ( Estimate for 2003), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 2879, Location: IN WEISER;WEST 7TH ST (Lat: 44.257778, Lng: -116.979722), Route carried "on" structure: City street , Year Built: 1955, Year Reconstructed: 1975, Status: Open, Structure Length: 0.70m (2.30ft), Average Daily Traffic: 500 (year 2006), Truck Traffic: 10%, Average Future Daily Traffic: 750 (year 2026), Design Load: H 15, Features Intersected: GALLOWAY CANAL, Facility Carried by Structure: WEST 7TH STREET Minimum Vertical Clearance: 30.48m (100.00ft), Kilometerpoint: 162.107, Lanes on structure: 2, Owner: City or Municipal Highway Agency, Approaching Roadway Width: 12.5m (41.0ft), Material/Design: Concrete, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 1, Length of Maximum Span: 6.4m (21.0ft), Curb or Sidewalk Widths: Left: 0.9m (3.0ft), Right: 0.0m, Curb-To-Curb Width: 12.6m (41.3ft), Out-to-Out Width: 13.6m (44.6ft) Condition: Deck: Satisfactory, Superstructure: Fair, Substructure: Fair, Channel: Satisfactory, Operating Rating: 35.1 metric tons, Method Used To Determine Operating Rating: Allowable Stress (AS), Inventory Rating: 19.8 metric tons, Method Used To Determine Inventory Rating: Allowable Stress (AS), Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: Superior to present desirable criteria, Waterway Adequacy: Superior to present desirable criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 0.70m (2.30ft), Designated Inspection Frequency: Every 24 months, Inspection Date: November 2007, Bridge Improvement Cost: $110,000, Roadway Improvement Cost: $11,000, Total Project Cost: $166,000 ( Estimate for 2005), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 288, Location: AT WEISER SCL (Lat: 44.258611, Lng: -116.983333), Route carried "on" structure: City street , Year Built: 1950, Year Reconstructed: 1975, Status: Open, Structure Length: 0.76m (2.49ft), Average Daily Traffic: 100 (year 2006), Truck Traffic: 10%, Average Future Daily Traffic: 150 (year 2026), Design Load: H 15, Features Intersected: GALLOWAY CANAL, Facility Carried by Structure: WEST 9TH STREET Minimum Vertical Clearance: 30.48m (100.00ft), Kilometerpoint: 162.152, Lanes on structure: 2, Owner: City or Municipal Highway Agency, Approaching Roadway Width: 5.5m (18.0ft), Skew: 3 degrees, Material/Design: Prestressed concrete, Design/Construction: Tee Beam, Number Of Spans In Main Unit: 1, Length of Maximum Span: 7.0m (23.0ft), Curb or Sidewalk Widths: Left: 0.2m (0.7ft), Right: 0.2m (0.7ft), Curb-To-Curb Width: 4.9m (16.1ft), Out-to-Out Width: 5.3m (17.4ft) Condition: Deck: Good, Superstructure: Fair, Substructure: Fair, Channel: Good, Operating Rating: 36.0 metric tons, Method Used To Determine Operating Rating: Allowable Stress (AS), Inventory Rating: 26.1 metric tons, Method Used To Determine Inventory Rating: Allowable Stress (AS), Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: High priority of corrective action, Waterway Adequacy: Equal to present desirable criteria, Approach Roadway Alignment: Meets minimum limits, Length Of Structure Improvement: 0.76m (2.49ft), Designated Inspection Frequency: Every 24 months, Inspection Date: November 2007, Bridge Improvement Cost: $105,000, Roadway Improvement Cost: $11,000, Total Project Cost: $158,000 ( Estimate for 2005), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 28695, Location: IN WEISER (Lat: 44.246389, Lng: -116.981111), Route carried "under" structure: Spur US 95, Year Built: 1960, Structure Length: 4.66m (15.29ft), Average Daily Traffic: 3,800 (year 2006), Truck Traffic: 5%, Features Intersected: US 95 SPUR; WEISER IC, Facility Carried by Structure: COUNTY ROAD Minimum Vertical Clearance: 0.48m (1.57ft), Kilometerpoint: 0.212, Lanes on structure: 2, Lanes under structure: 4, Material/Design: Concrete, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 12.8m (42.0ft) Find on map >>
Structure Number: 2872, Location: IN WEISER (Lat: 44.246944, Lng: -116.980833), Route carried "under" structure: Spur US 95, Year Built: 1960, Structure Length: 4.85m (15.91ft), Average Daily Traffic: 3,800 (year 2006), Truck Traffic: 5%, Features Intersected: US 95 SPUR;COMMERCIAL UP, Facility Carried by Structure: W. COMMERCIAL ST. Minimum Vertical Clearance: 0.48m (1.57ft), Kilometerpoint: 0.291, Lanes on structure: 2, Lanes under structure: 4, Material/Design: Concrete, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 13.1m (43.0ft) Discuss this city on our hugely popular Idaho forum Back to: Weiser, ID, Idaho, All US cities.
|
![]() |