U.S. Cities - City-Data Homepage  
City-Data Forum
City-Data.com Homepage

Bridge Statistics for Welsh, Louisiana (LA) - Condition, Traffic, Stress, Structural Evaluation, Project Costs

Back to: Welsh, LA, Louisiana, Louisiana forum, All US cities.





National Bridge Inventory (NBI) Statistics
Number of bridges: 14
Total length: 48 meters (157ft)
Total costs: $3,074,000
Total average daily traffic: 137,070
Total average daily truck traffic: 29,091
National Bridge Inventory (NBI) Registered Bridges for Welsh
No street view available for this location

New bridges - Historical Statistics

  • 1930-1939: 1
  • 1940-1949: 0
  • 1950-1959: 0
  • 1960-1969: 7
  • 1970-1979: 2
  • 1980-1989: 3
  • 1990-1999: 1

Average Daily Traffic

Bridge Condition - Deck

Bridge Condition - Superstructure

Bridge Condition - Substructure

Bridge Condition - Channel

Bridge Condition - Culverts

Find on map >>   Show street view

Structure Number: 72700030609811,  Location: 1.92 MI EAST OF LA 1131 (Lat: 30.232028,  Lng: -92.833278),  Route carried "on" structure: US 90,  Year Built: 1934,  Status: Open,  Structure Length: 0.82m (2.69ft),  Average Daily Traffic: 3,500 (year 2011),  Truck Traffic: 12%,  Average Future Daily Traffic: 2,100 (year 2032),  Design Load: H 15,  Features Intersected: DRAIN
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 15.784,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 2.4m (7.9ft),  Curb-To-Curb Width: 7.0m (23.0ft),  Out-to-Out Width: 12.1m (39.7ft)

Condition: Channel: Fair,  Culverts: Fair,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.43m (4.69ft),  Designated Inspection Frequency: Every 12 months,  Inspection Date: July 11,  Bridge Improvement Cost: $122,000,  Roadway Improvement Cost: $12,000,  Total Project Cost: $183,000 ( Estimate for 2012),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 72700030610101,  Location: 2.22 MI EAST OF LA 1131 (Lat: 30.232028,  Lng: -92.828444),  Route carried "on" structure: US 90,  Year Built: 1992,  Status: Open,  Structure Length: 4.88m (16.01ft),  Average Daily Traffic: 3,500 (year 2011),  Average Future Daily Traffic: 2,100 (year 2032),  Design Load: HS 20,  Features Intersected: EAST BAYOU LACASSINE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 16.251,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 8,  Length of Maximum Span: 6.1m (20.0ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 14.3m (46.9ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Satisfactory,  Operating Rating: 72.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 43.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 10,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 72700030700151,  Location: 0.2 MI EAST JCT 99 (Lat: 30.232056,  Lng: -92.819278),  Route carried "on" structure: US 90,  Year Built: 1985,  Status: Open,  Structure Length: 3.05m (10.01ft),  Average Daily Traffic: 4,700 (year 2011),  Truck Traffic: 12%,  Average Future Daily Traffic: 2,820 (year 2032),  Design Load: HS 20,  Features Intersected: EAST BAYOU LACASSINE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.241,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Skew: 6 degrees,  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 5,  Number Of Approach Spans: 5,  Length of Maximum Span: 6.1m (20.0ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.0m (42.7ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Satisfactory,  Operating Rating: 67.5 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 40.5 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 10,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 72701980301001,  Location: LA 99 OVER I-10 (Lat: 30.246472,  Lng: -92.821639),  Route carried "on" structure: State highway 99,  Year Built: 1964,  Status: Open,  Structure Length: 6.77m (22.21ft),  Average Daily Traffic: 1,680 (year 2011),  Truck Traffic: 14%,  Average Future Daily Traffic: 1,008 (year 2032),  Design Load: H 15,  Features Intersected: LA 99 OVER I-10
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.609,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 13.1m (43.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 22.9m (75.1ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 10.3m (33.8ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Operating Rating: 68.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 10,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 72704500309991,  Location: 9.2 MI EAST OF US 165 (Lat: 30.246889,  Lng: -92.830250),  Route carried "on" structure: Interstate 10,  Year Built: 1964,  Status: Open,  Structure Length: 5.49m (18.01ft),  Average Daily Traffic: 21,780 (year 2011),  Truck Traffic: 23%,  Average Future Daily Traffic: 13,068 (year 2032),  Design Load: HS 20,  Features Intersected: E. LACASSINE BAYOU
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 16.074,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.7m (44.9ft),  Skew: 10 degrees,  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 9,  Length of Maximum Span: 6.1m (20.0ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 10.3m (33.8ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 61.2 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 36.9 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.40m (21.00ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 10,  Bridge Improvement Cost: $546,000,  Roadway Improvement Cost: $54,000,  Total Project Cost: $819,000 ( Estimate for 2012),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 72704500309992,  Location: 9.2 MI EAST OF US 165 (Lat: 30.246889,  Lng: -92.830250),  Route carried "on" structure: Interstate 10,  Year Built: 1964,  Status: Open,  Structure Length: 5.49m (18.01ft),  Average Daily Traffic: 21,780 (year 2011),  Truck Traffic: 23%,  Average Future Daily Traffic: 13,068 (year 2032),  Design Load: HS 20,  Features Intersected: E. LACASSINE BAYOU
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 16.074,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Skew: 10 degrees,  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 9,  Length of Maximum Span: 6.1m (20.0ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 10.3m (33.8ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 61.2 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 36.9 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.40m (21.00ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 10,  Bridge Improvement Cost: $546,000,  Roadway Improvement Cost: $54,000,  Total Project Cost: $819,000 ( Estimate for 2012),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 72704500309994,  Location: 9.2 MI EAST OF US 165 (Lat: 30.246889,  Lng: -92.830250),  Route carried "on" structure: Interstate 10,  Year Built: 1964,  Status: Open,  Structure Length: 5.49m (18.01ft),  Average Daily Traffic: 3,630 (year 2011),  Truck Traffic: 23%,  Average Future Daily Traffic: 2,178 (year 2032),  Design Load: H 15,  Features Intersected: E. LACASSINE BAYOU
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 16.074,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 9,  Length of Maximum Span: 6.1m (20.0ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 9.1m (29.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 66.6 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 39.6 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.40m (21.00ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 10,  Bridge Improvement Cost: $546,000,  Roadway Improvement Cost: $54,000,  Total Project Cost: $819,000 ( Estimate for 2012),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 72704500311771,  Location: 8.2 MI WEST OF LA 26 (Lat: 30.247139,  Lng: -92.800500),  Route carried "on" structure: Interstate 10,  Year Built: 1964,  Status: Open,  Structure Length: 0.82m (2.69ft),  Average Daily Traffic: 37,000 (year 2011),  Truck Traffic: 23%,  Average Future Daily Traffic: 22,200 (year 2032),  Design Load: HS 20,  Features Intersected: DRAIN
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 18.938,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 7.6m (24.9ft),  Skew: 10 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 2.4m (7.9ft),  Curb-To-Curb Width: 23.2m (76.1ft),  Out-to-Out Width: 91.4m (299.9ft)

Condition: Channel: Very good,  Culverts: Good,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 10,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 72730138924921,  Location: 0.36 MI. E. OF INT. (Lat: 30.230000,  Lng: -92.820000),  Route carried "on" structure: County highway ,  Year Built: 1970,  Status: Posted for load,  Structure Length: 2.32m (7.61ft),  Average Daily Traffic: 300 (year 1977),  Average Future Daily Traffic: 180 (year 2032),  Design Load: HS 20,  Features Intersected: CREEK,  Facility Carried by Structure: LOCAL ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 5.8m (19.0ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.9m (3.0ft),  Curb-To-Curb Width: 7.8m (25.6ft),  Out-to-Out Width: 8.7m (28.5ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Fair,  Channel: Good,  Operating Rating: 42.3 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 25.2 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 10,  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 72730144924871,  Location: 0.52 MI. E. OF INT. (Lat: 30.240000,  Lng: -92.811667),  Route carried "on" structure: County highway ,  Year Built: 1970,  Status: Posted for load,  Structure Length: 1.77m (5.81ft),  Average Daily Traffic: 1,000 (year 1977),  Average Future Daily Traffic: 600 (year 2032),  Design Load: H 15,  Features Intersected: DRAINAGE CANAL,  Facility Carried by Structure: LOCAL ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Wood or Timber,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 6.1m (20.0ft),  Curb or Sidewalk Widths: Left: 0.1m (0.3ft),  Right: 0.1m (0.3ft),  Curb-To-Curb Width: 6.9m (22.6ft),  Out-to-Out Width: 7.7m (25.3ft)

Condition: Deck: Satisfactory,  Superstructure: Poor,  Substructure: Fair,  Channel: Very good,  Operating Rating: 22.5 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 15.3 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 10.0 - 19.9% below),  Length Of Structure Improvement: 2.47m (8.10ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 10,  Bridge Improvement Cost: $147,000,  Roadway Improvement Cost: $14,000,  Total Project Cost: $220,000 ( Estimate for 2012),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 72730145924851,  Location: 0.62 MI. N. OF IN\. (Lat: 30.241667,  Lng: -92.808333),  Route carried "on" structure: County highway ,  Year Built: 1968,  Status: Posted for load,  Structure Length: 1.71m (5.61ft),  Average Daily Traffic: 200 (year 1977),  Average Future Daily Traffic: 120 (year 2032),  Design Load: H 10,  Features Intersected: CREEK,  Facility Carried by Structure: LOCAL ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Wood or Timber,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 5.8m (19.0ft),  Curb or Sidewalk Widths: Left: 0.1m (0.3ft),  Right: 0.1m (0.3ft),  Curb-To-Curb Width: 5.7m (18.7ft),  Out-to-Out Width: 6.6m (21.7ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Very good,  Operating Rating: 18.0 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 11.7 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 30.0 - 39.9% below),  Length Of Structure Improvement: 2.41m (7.91ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 10,  Bridge Improvement Cost: $143,000,  Roadway Improvement Cost: $14,000,  Total Project Cost: $214,000 ( Estimate for 2012),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 72730146924711,  Location: 0.35 M EAST OF LA 99 (Lat: 30.243333,  Lng: -92.785000),  Route carried "on" structure: County highway ,  Year Built: 1983,  Status: Open,  Structure Length: 1.74m (5.71ft),  Average Daily Traffic: 500 (year 1989),  Average Future Daily Traffic: 300 (year 2032),  Design Load: HS 20,  Features Intersected: WELCH DRAINAGE CANAL,  Facility Carried by Structure: LOCAL ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 5.8m (19.0ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.1m (3.6ft),  Curb-To-Curb Width: 7.5m (24.6ft),  Out-to-Out Width: 9.6m (31.5ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Good,  Channel: Good,  Operating Rating: 39.6 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 10,  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 72730146924821,  Location: 0.3 M EAST OF LA 99 (Lat: 30.243333,  Lng: -92.803333),  Route carried "on" structure: County highway ,  Year Built: 1983,  Status: Open,  Structure Length: 1.74m (5.71ft),  Average Daily Traffic: 500 (year 1989),  Average Future Daily Traffic: 300 (year 2032),  Design Load: HS 20,  Features Intersected: WELCH DRAINAGE CANAL,  Facility Carried by Structure: LOCAL ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 5.8m (19.0ft),  Curb or Sidewalk Widths: Left: 1.1m (3.6ft),  Right: 0.0m,  Curb-To-Curb Width: 7.5m (24.6ft),  Out-to-Out Width: 9.6m (31.5ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 39.6 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 10,  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 72701980301001,  Location: LA 99 OVER I-10 (Lat: 30.246472,  Lng: -92.821639),  Route carried "under" structure: Interstate 10,  Year Built: 1964,  Structure Length: 6.77m (22.21ft),  Average Daily Traffic: 37,000 (year 2011),  Truck Traffic: 23%,  Features Intersected: LA 99 OVER I-10,  Facility Carried by Structure: LA0099
Minimum Vertical Clearance: 4.97m (16.31ft),  Kilometerpoint: 16.878,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 22.9m (75.1ft)

Jump to a detailed profile or search site with Google Custom Search
Business Search - 14 Million verified businesses
Search for: near: 

Discuss this city on our hugely popular Louisiana forum

Back to: Welsh, LA, Louisiana, All US cities.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2013 Advameg, Inc.