U.S. Cities - City-Data Homepage  
City-Data Forum
City-Data.com Homepage

Bridge Statistics for West Almond, New York (NY) - Condition, Traffic, Stress, Structural Evaluation, Project Costs

Back to: West Almond, NY, New York, New York forum, All US cities.





National Bridge Inventory (NBI) Statistics
Number of bridges: 12
Total length: 22 meters (72ft)
Total costs: $12,415,000
Total average daily traffic: 13,066
Total average daily truck traffic: 3,862
Total future (year 2022) average daily traffic: 17,973
National Bridge Inventory (NBI) Registered Bridges for West Almond

New bridges - Historical Statistics

  • 1930-1939: 1
  • 1940-1949: 1
  • 1950-1959: 0
  • 1960-1969: 3
  • 1970-1979: 4
  • 1980-1989: 0
  • 1990-1999: 1
  • 2000-2009: 2

Reconstructed bridges - Historical Statistics

  • 1960-1969: 1
  • 1970-1979: 0
  • 1980-1989: 1
  • 1990-1999: 2
  • 2000-2009: 1

Average Truck Traffic (%)

Bridge Condition - Deck

Bridge Condition - Superstructure

Bridge Condition - Substructure

Bridge Condition - Channel

Bridge Condition - Culverts

Find on map >>

Structure Number: 1061581,  Location: EXIT 32 OF I86 - W ALMOND (Lat: 42.305311,  Lng: -77.878536),  Route carried "on" structure: Interstate 86,  Year Built: 1973,  Status: Open,  Structure Length: 3.32m (10.89ft),  Average Daily Traffic: 2,862 (year 2007),  Truck Traffic: 33%,  Average Future Daily Traffic: 3,954 (year 2027),  Design Load: HS 20+Mod,  Features Intersected: COUNTY ROAD 2
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 43.749,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.8m (42.0ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 32.0m (105.0ft),  Curb-To-Curb Width: 12.4m (40.7ft),  Out-to-Out Width: 13.4m (44.0ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 86.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 51.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.32m (10.89ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2007,  Bridge Improvement Cost: $1,820,000,  Roadway Improvement Cost: $1,082,000,  Total Project Cost: $2,902,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>

Structure Number: 1061582,  Location: EXIT 32 OF I86 - W ALMOND (Lat: 42.305036,  Lng: -77.878706),  Route carried "on" structure: Interstate 86,  Year Built: 1973,  Status: Open,  Structure Length: 3.16m (10.37ft),  Average Daily Traffic: 2,862 (year 2007),  Truck Traffic: 33%,  Average Future Daily Traffic: 3,954 (year 2027),  Design Load: HS 20+Mod,  Features Intersected: COUNTY ROAD 2
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 43.749,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.8m (42.0ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 30.4m (99.7ft),  Curb-To-Curb Width: 12.4m (40.7ft),  Out-to-Out Width: 13.4m (44.0ft)

Condition: Deck: Very good,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 86.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 50.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.16m (10.37ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2007,  Bridge Improvement Cost: $1,820,000,  Roadway Improvement Cost: $1,082,000,  Total Project Cost: $2,902,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>

Structure Number: 1061681,  Location: 8.0 MI NE JCT RTS 17 + 19 (Lat: 42.298703,  Lng: -77.938764),  Route carried "on" structure: Interstate 86,  Year Built: 1973,  Year Reconstructed: 2003,  Status: Open,  Structure Length: 2.86m (9.38ft),  Average Daily Traffic: 2,775 (year 2007),  Truck Traffic: 33%,  Average Future Daily Traffic: 3,834 (year 2027),  Design Load: HS 20,  Features Intersected: MORTON ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 36.993,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 27.4m (89.9ft),  Curb-To-Curb Width: 12.4m (40.7ft),  Out-to-Out Width: 13.4m (44.0ft)

Condition: Deck: Very good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 83.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 49.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.86m (9.38ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2007,  Bridge Improvement Cost: $818,000,  Roadway Improvement Cost: $487,000,  Total Project Cost: $1,305,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>

Structure Number: 1061682,  Location: 8.0 MI NE JCT RTS 17 + 19 (Lat: 42.298011,  Lng: -77.938781),  Route carried "on" structure: Interstate 86,  Year Built: 1973,  Year Reconstructed: 2003,  Status: Open,  Structure Length: 2.86m (9.38ft),  Average Daily Traffic: 2,775 (year 2007),  Truck Traffic: 33%,  Average Future Daily Traffic: 3,834 (year 2027),  Design Load: HS 20,  Features Intersected: MORTON ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 36.993,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 27.4m (89.9ft),  Curb-To-Curb Width: 12.4m (40.7ft),  Out-to-Out Width: 13.4m (44.0ft)

Condition: Deck: Excellent,  Superstructure: Good,  Substructure: Good,  Operating Rating: 84.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 49.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.86m (9.38ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2007,  Bridge Improvement Cost: $818,000,  Roadway Improvement Cost: $487,000,  Total Project Cost: $1,305,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>

Structure Number: 221514,  Location: 2.8 MI W OF WEST ALMOND (Lat: 42.294497,  Lng: -77.938800),  Route carried "on" structure: City street ,  Year Built: 2001,  Status: Open,  Structure Length: 1.83m (6.00ft),  Average Daily Traffic: 55 (year 2003),  Truck Traffic: 6%,  Average Future Daily Traffic: 72 (year 2023),  Features Intersected: ANGELICA CREEK,  Facility Carried by Structure: MORTON ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 6.4m (21.0ft),  Skew: 1 degrees,  Material/Design: Wood or Timber,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 17.3m (56.8ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 7.5m (24.6ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Excellent,  Channel: Good,  Operating Rating: 60.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 44.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Superior to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.83m (6.00ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2007,  Bridge Improvement Cost: $488,000,  Roadway Improvement Cost: $292,000,  Total Project Cost: $780,000 ( Estimate for 2007),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 221515,  Location: IN W ALMOND (Lat: 42.301119,  Lng: -77.885572),  Route carried "on" structure: City street ,  Year Built: 1934,  Status: Posted for load,  Structure Length: 0.88m (2.89ft),  Average Daily Traffic: 12 (year 2003),  Truck Traffic: 6%,  Average Future Daily Traffic: 16 (year 2023),  Features Intersected: ANGELICA CREEK,  Facility Carried by Structure: TUCKER ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 2.4m (7.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.5m (27.9ft),  Curb-To-Curb Width: 5.3m (17.4ft),  Out-to-Out Width: 5.6m (18.4ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Channel: Fair,  Operating Rating: 27.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 16.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 20.0 - 29.9% below),  Length Of Structure Improvement: 0.88m (2.89ft),  Designated Inspection Frequency: Every 12 months,  Inspection Date: July 2007,  Bridge Improvement Cost: $107,000,  Roadway Improvement Cost: $64,000,  Total Project Cost: $171,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place
Structure Number: 227031,  Location: 1 Mile W.of West Almond,  Route carried "on" structure: Other road ,  Year Built: 2007,  Status: Open,  Structure Length: 0.73m (2.40ft),  Average Daily Traffic: 10 (year 2007),  Truck Traffic: 6%,  Average Future Daily Traffic: 13 (year 2027),  Features Intersected: Angelica Creek,  Facility Carried by Structure: South Schuyler Rd
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.3m (24.0ft),  Curb-To-Curb Width: 8.8m (28.9ft)

Condition: Channel: Good,  Culverts: Excellent,  Structural Evaluation: High priority of corrective action,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 0.73m (2.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2007,  Bridge Improvement Cost: $154,000,  Roadway Improvement Cost: $91,000,  Total Project Cost: $245,000 ( Estimate for 2007)
Find on map >>

Structure Number: 304783,  Location: 3.9 MI NE OF ANGELICA (Lat: 42.322050,  Lng: -77.945975),  Route carried "on" structure: County highway ,  Year Built: 1962,  Status: Open,  Structure Length: 1.46m (4.79ft),  Average Daily Traffic: 401 (year 2006),  Truck Traffic: 8%,  Average Future Daily Traffic: 542 (year 2026),  Design Load: HS 20+Mod,  Features Intersected: YOUNG CREEK,  Facility Carried by Structure: COUNTY ROAD 16
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.0m (19.7ft),  Skew: 4 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 6.4m (21.0ft)

Condition: Channel: Poor,  Culverts: Good,  Operating Rating: 54.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 38.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.46m (4.79ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2006,  Bridge Improvement Cost: $288,000,  Roadway Improvement Cost: $171,000,  Total Project Cost: $459,000 ( Estimate for 2007),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 304784,  Location: 4.1 MI NE OF ANGELICA (Lat: 42.321989,  Lng: -77.942567),  Route carried "on" structure: County highway ,  Year Built: 1940,  Year Reconstructed: 2000,  Status: Open,  Structure Length: 1.92m (6.30ft),  Average Daily Traffic: 401 (year 2006),  Truck Traffic: 8%,  Average Future Daily Traffic: 542 (year 2026),  Design Load: HS 25,  Features Intersected: BLACK CREEK,  Facility Carried by Structure: COUNTY ROAD 16
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Skew: 3 degrees,  Material/Design: Wood or Timber,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 18.5m (60.7ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 9.3m (30.5ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Fair,  Channel: Good,  Operating Rating: 47.2 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 29.9 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.92m (6.30ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2006,  Bridge Improvement Cost: $388,000,  Roadway Improvement Cost: $231,000,  Total Project Cost: $619,000 ( Estimate for 2007),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 304785,  Location: 5.3 MI NE OF ANGELICA (Lat: 42.346347,  Lng: -77.927067),  Route carried "on" structure: County highway ,  Year Built: 1962,  Year Reconstructed: 1974,  Status: Open,  Structure Length: 1.21m (3.97ft),  Average Daily Traffic: 401 (year 2006),  Truck Traffic: 8%,  Average Future Daily Traffic: 542 (year 2026),  Design Load: HS 20,  Features Intersected: GEORGE CREEK,  Facility Carried by Structure: COUNTY ROAD 16
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.0m (19.7ft),  Skew: 1 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 5.4m (17.7ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 59.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 11.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.21m (3.97ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2006,  Bridge Improvement Cost: $240,000,  Roadway Improvement Cost: $143,000,  Total Project Cost: $383,000 ( Estimate for 2007),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 333065,  Location: 4.3 M SW OF W ALMOND (Lat: 42.265911,  Lng: -77.954361),  Route carried "on" structure: County highway ,  Year Built: 1996,  Status: Open,  Structure Length: 0.91m (2.99ft),  Average Daily Traffic: 205 (year 2002),  Truck Traffic: 9%,  Average Future Daily Traffic: 268 (year 2022),  Design Load: HS 25,  Features Intersected: N BR PHILLIPS CRK,  Facility Carried by Structure: COUNTY ROAD 2B
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 3.6m (11.8ft),  Skew: 2 degrees,  Material/Design: Wood or Timber,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.1m (29.9ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 9.7m (31.8ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Fair,  Operating Rating: 77.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 54.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.91m (2.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2006,  Bridge Improvement Cost: $421,000,  Roadway Improvement Cost: $251,000,  Total Project Cost: $672,000 ( Estimate for 2007),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 333066,  Location: IN WEST ALMOND (Lat: 42.300506,  Lng: -77.882539),  Route carried "on" structure: County highway ,  Year Built: 1964,  Year Reconstructed: 1993,  Status: Open,  Structure Length: 0.88m (2.89ft),  Average Daily Traffic: 307 (year 2006),  Truck Traffic: 9%,  Average Future Daily Traffic: 402 (year 2026),  Design Load: HS 20,  Features Intersected: ANGELICA CREEK,  Facility Carried by Structure: COUNTY ROAD 2
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.0m (19.7ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.2m (26.9ft),  Curb-To-Curb Width: 8.6m (28.2ft),  Out-to-Out Width: 8.8m (28.9ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Good,  Operating Rating: 57.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.88m (2.89ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2006,  Bridge Improvement Cost: $421,000,  Roadway Improvement Cost: $251,000,  Total Project Cost: $672,000 ( Estimate for 2007),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Bituminous

Discuss this city on our hugely popular New York forum

Back to: West Almond, NY, New York, All US cities.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2009 Advameg, Inc.