U.S. Cities - City-Data Homepage  
City-Data Forum
City-Data.com Homepage

Bridge Statistics for West Bountiful, Utah (UT) - Condition, Traffic, Stress, Structural Evaluation, Project Costs

Back to: West Bountiful, UT, Utah, Utah forum, All US cities.





National Bridge Inventory (NBI) Statistics
Number of bridges: 10
Total length: 39 meters (128ft)
Total costs: $4,966,000
Total average daily traffic: 196,015
Total average daily truck traffic: 39,732
National Bridge Inventory (NBI) Registered Bridges for West Bountiful

New bridges - Historical Statistics

  • 1950-1959: 6
  • 1960-1969: 2
  • 1970-1979: 0
  • 1980-1989: 1
  • 1990-1999: 0
  • 2000-2009: 1

Average Daily Traffic

Average Truck Traffic (%)

Bridge Condition - Deck

Bridge Condition - Superstructure

Bridge Condition - Substructure

Bridge Condition - Channel

Find on map >>

Structure Number: 11001E,  Location: 1800 N.800 W.,W.BOUNTIFUL (Lat: 40.911250,  Lng: -111.902236),  Route carried "on" structure: City street ,  Year Built: 1968,  Status: Open,  Structure Length: 0.82m (2.69ft),  Average Daily Traffic: 1,000 (year 2002),  Truck Traffic: 1%,  Average Future Daily Traffic: 1,215 (year 2022),  Features Intersected: STORM SEWER CANAL,  Facility Carried by Structure: 800 WEST STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 2.4m (7.9ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 12.8m (42.0ft),  Out-to-Out Width: 17.1m (56.1ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 32.4 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.50m (4.92ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2008,  Bridge Improvement Cost: $163,000,  Roadway Improvement Cost: $16,000,  Total Project Cost: $269,000 ( Estimate for 2000),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 11012F,  Location: 350 N.1450 W.,W.BOUNTIFUL (Lat: 40.893250,  Lng: -111.921194),  Route carried "on" structure: City street ,  Year Built: 1988,  Status: Open,  Structure Length: 1.34m (4.40ft),  Average Daily Traffic: 150 (year 2002),  Truck Traffic: 5%,  Average Future Daily Traffic: 182 (year 2022),  Features Intersected: MILL CREEK,  Facility Carried by Structure: 1450 WEST STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.0m (23.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.5m (41.0ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 9.1m (29.9ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Good,  Operating Rating: 32.4 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.00m (6.56ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2008,  Bridge Improvement Cost: $120,000,  Roadway Improvement Cost: $12,000,  Total Project Cost: $198,000 ( Estimate for 2000),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 11014E,  Location: 1700 N.1100 W.W.BOUNTIFUL (Lat: 40.910028,  Lng: -111.910778),  Route carried "on" structure: City street ,  Year Built: 1968,  Status: Open,  Structure Length: 0.81m (2.66ft),  Average Daily Traffic: 525 (year 2002),  Truck Traffic: 2%,  Average Future Daily Traffic: 638 (year 2022),  Features Intersected: STORM SEWER CANAL,  Facility Carried by Structure: 1100 WEST STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.0m (23.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 2.4m (7.9ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 32.4 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.50m (4.92ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2008,  Bridge Improvement Cost: $99,000,  Roadway Improvement Cost: $10,000,  Total Project Cost: $164,000 ( Estimate for 2000),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 11024E,  Location: 1450 WEST 150 NORTH (Lat: 40.890889,  Lng: -111.920525),  Route carried "on" structure: City street ,  Year Built: 2004,  Status: Open,  Structure Length: 0.75m (2.46ft),  Average Daily Traffic: 50 (year 2004),  Average Future Daily Traffic: 61 (year 2024),  Design Load: HS 20,  Features Intersected: MILL CREEK,  Facility Carried by Structure: 150 NORTH STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 14.6m (47.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 2.5m (8.2ft),  Curb-To-Curb Width: 14.6m (47.9ft),  Out-to-Out Width: 15.2m (49.9ft)

Condition: Channel: Very good,  Culverts: Good,  Operating Rating: 32.4 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2008
Find on map >>

Structure Number: D 631B,  Location: 600 W.400 N.-W.BOUNTIFUL (Lat: 40.893778,  Lng: -111.895750),  Route carried "on" structure: State highway 106,  Year Built: 1959,  Status: Open,  Structure Length: 6.28m (20.60ft),  Average Daily Traffic: 14,000 (year 2002),  Truck Traffic: 2%,  Average Future Daily Traffic: 17,010 (year 2022),  Design Load: HS 20,  Features Intersected: UPRR & W.BNTFUL CITY ST.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.272,  Lanes on structure: 2,  Lanes under structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 22 degrees,  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 17.1m (56.1ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 15.3m (50.2ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 32.4 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: High priority of replacement,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 7.30m (23.95ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2007,  Bridge Improvement Cost: $722,000,  Roadway Improvement Cost: $72,000,  Total Project Cost: $1,191,000 ( Estimate for 2000),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 1D 615,  Location: 500 SO.INTCHG.,BOUNTIFUL (Lat: 40.884028,  Lng: -111.896472),  Route carried "on" structure: Interstate 15,  Year Built: 1959,  Year Reconstructed: 2000,  Status: Open,  Structure Length: 5.85m (19.19ft),  Average Daily Traffic: 74,515 (year 2002),  Truck Traffic: 26%,  Average Future Daily Traffic: 90,536 (year 2022),  Design Load: HS 20,  Features Intersected: SR-68, 500 SOUTH STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 509.952,  Lanes on structure: 4,  Lanes under structure: 5,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 19.8m (65.0ft),  Skew: 30 degrees,  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 22.9m (75.1ft),  Curb-To-Curb Width: 19.5m (64.0ft),  Out-to-Out Width: 20.0m (65.6ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 32.4 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: High priority of replacement,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.90m (22.64ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2007,  Bridge Improvement Cost: $953,000,  Roadway Improvement Cost: $95,000,  Total Project Cost: $1,572,000 ( Estimate for 2001),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>

Structure Number: 3D 615,  Location: 500 SO.INTCHG.,BOUNTIFUL (Lat: 40.884611,  Lng: -111.896833),  Route carried "on" structure: Interstate 15,  Year Built: 1959,  Year Reconstructed: 2000,  Status: Open,  Structure Length: 5.85m (19.19ft),  Average Daily Traffic: 74,515 (year 2002),  Truck Traffic: 26%,  Average Future Daily Traffic: 90,536 (year 2022),  Design Load: HS 20,  Features Intersected: SR-68, 500 SOUTH STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 510.011,  Lanes on structure: 4,  Lanes under structure: 5,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 19.8m (65.0ft),  Skew: 30 degrees,  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 22.9m (75.1ft),  Curb-To-Curb Width: 19.5m (64.0ft),  Out-to-Out Width: 20.0m (65.6ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 32.4 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: High priority of replacement,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.90m (22.64ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2007,  Bridge Improvement Cost: $953,000,  Roadway Improvement Cost: $95,000,  Total Project Cost: $1,572,000 ( Estimate for 2001),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>

Structure Number: D 631B,  Location: 600 W.400 N.-W.BOUNTIFUL (Lat: 40.893778,  Lng: -111.895750),  Route carried "under" structure: City street ,  Year Built: 1959,  Structure Length: 6.28m (20.60ft),  Average Daily Traffic: 1,100 (year 2002),  Truck Traffic: 7%,  Features Intersected: UPRR & W.BNTFUL CITY ST.,  Facility Carried by Structure: SR-106, 400 NO.ST.
Minimum Vertical Clearance: 7.32m (24.02ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Length of Maximum Span: 17.1m (56.1ft)

Find on map >>

Structure Number: 1D 615,  Location: 500 SO.INTCHG.,BOUNTIFUL (Lat: 40.884028,  Lng: -111.896472),  Route carried "under" structure: State highway 68,  Year Built: 1959,  Structure Length: 5.85m (19.19ft),  Average Daily Traffic: 15,080 (year 2002),  Truck Traffic: 2%,  Features Intersected: SR-68, 500 SOUTH STREET,  Facility Carried by Structure: I-15 (SR-15) NBL
Minimum Vertical Clearance: 5.26m (17.26ft),  Kilometerpoint: 112.636,  Lanes on structure: 4,  Lanes under structure: 5,  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Length of Maximum Span: 22.9m (75.1ft)

Find on map >>

Structure Number: 3D 615,  Location: 500 SO.INTCHG.,BOUNTIFUL (Lat: 40.884611,  Lng: -111.896833),  Route carried "under" structure: State highway 68,  Year Built: 1959,  Structure Length: 5.85m (19.19ft),  Average Daily Traffic: 15,080 (year 2002),  Truck Traffic: 2%,  Features Intersected: SR-68, 500 SOUTH STREET,  Facility Carried by Structure: I-15 (SR-15) SBL
Minimum Vertical Clearance: 5.26m (17.26ft),  Kilometerpoint: 112.617,  Lanes on structure: 4,  Lanes under structure: 5,  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Length of Maximum Span: 22.9m (75.1ft)

Discuss this city on our hugely popular Utah forum

Back to: West Bountiful, UT, Utah, All US cities.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2009 Advameg, Inc.