Bridge Statistics for West Bridgewater, Massachusetts (MA) - Condition, Traffic, Stress, Structural Evaluation, Project Costs

Back to: West Bridgewater, MA, Massachusetts, Massachusetts forum, All US cities.





National Bridge Inventory (NBI) Statistics
Number of bridges: 14
Total length: 25 meters (82ft)
Total costs: $14,370,000
Total average daily traffic: 296,790
Total average daily truck traffic: 29,937
Total future (year 2027) average daily traffic: 468,721
National Bridge Inventory (NBI) Registered Bridges for West Bridgewater

New bridges - Historical Statistics

  • Before 1900: 3
  • 1900-1909: 0
  • 1910-1919: 0
  • 1920-1929: 0
  • 1930-1939: 1
  • 1940-1949: 2
  • 1950-1959: 5
  • 1960-1969: 2
  • 1970-1979: 1

Reconstructed bridges - Historical Statistics

  • 1940-1949: 1
  • 1950-1959: 0
  • 1960-1969: 2

Average Daily Traffic

Bridge Condition - Deck

Bridge Condition - Superstructure

Bridge Condition - Substructure

Bridge Condition - Channel

Find on map >>

Structure Number: W1800146EMHDNBI,  Location: 0.2 M S OF RTE 106 (Lat: 42.017258,  Lng: -71.003475),  Route carried "on" structure: State highway 28,  Year Built: 1897,  Year Reconstructed: 1947,  Status: Posted for load,  Structure Length: 1.19m (3.90ft),  Average Daily Traffic: 28,700 (year 2006),  Truck Traffic: 6%,  Average Future Daily Traffic: 45,326 (year 2027),  Design Load: H 20,  Features Intersected: WATER TOWN RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 153.608,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.9m (39.0ft),  Skew: 1 degrees,  Material/Design: Masonry,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.4m (34.1ft),  Curb or Sidewalk Widths: Left: 1.9m (6.2ft),  Right: 0.3m (1.0ft),  Curb-To-Curb Width: 15.3m (50.2ft),  Out-to-Out Width: 18.4m (60.4ft)

Condition: Superstructure: Good,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 40.1 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 18.9 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.20m (3.94ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 36 months,  Inspection Date: December 2006,  Underwater Inspection Date: September 2007,  Bridge Improvement Cost: $395,000,  Roadway Improvement Cost: $40,000,  Total Project Cost: $593,000 ( Estimate for 2006),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: W1800244QMUNNBI,  Location: .2 MI S OF RTE 28 (Lat: 42.015831,  Lng: -71.009467),  Route carried "on" structure: City street ,  Year Built: 1850,  Year Reconstructed: 1974,  Status: Posted for load,  Structure Length: 1.16m (3.81ft),  Design Load: H 20,  Features Intersected: WATER TOWN RIVER,  Facility Carried by Structure: HWY ARCH ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Masonry,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.4m (11.2ft),  Curb-To-Curb Width: 6.3m (20.7ft),  Out-to-Out Width: 7.3m (24.0ft)

Condition: Superstructure: Fair,  Substructure: Fair,  Channel: Good,  Operating Rating: 3.0 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 2.3 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: High priority of corrective action,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 1.20m (3.94ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2007,  Bridge Improvement Cost: $157,000,  Roadway Improvement Cost: $16,000,  Total Project Cost: $236,000 ( Estimate for 2006)
Find on map >>

Structure Number: W1800444VMUNNBI,  Location: .01 M FROM RIVER ST (Lat: 42.013206,  Lng: -71.015958),  Route carried "on" structure: City street ,  Year Built: 1968,  Status: Open,  Structure Length: 1.01m (3.31ft),  Average Daily Traffic: 3,900 (year 2007),  Truck Traffic: 7%,  Average Future Daily Traffic: 6,159 (year 2028),  Features Intersected: WATER TOWN RIVER,  Facility Carried by Structure: HWY FOREST ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.706,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.3m (14.1ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 11.2m (36.7ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.70m (2.30ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2007,  Bridge Improvement Cost: $303,000,  Roadway Improvement Cost: $31,000,  Total Project Cost: $455,000 ( Estimate for 2006)
Find on map >>

Structure Number: W1800644TMUNNBI,  Location: 1.05M FROM RIVER ST (Lat: 42.001167,  Lng: -71.018900),  Route carried "on" structure: City street ,  Year Built: 1978,  Status: Open,  Structure Length: 1.28m (4.20ft),  Average Daily Traffic: 100 (year 2007),  Truck Traffic: 2%,  Average Future Daily Traffic: 158 (year 2028),  Features Intersected: WATER TOWN RIVER,  Facility Carried by Structure: HWY FOREST ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.016,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Wood or Timber,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.9m (39.0ft),  Curb-To-Curb Width: 5.3m (17.4ft),  Out-to-Out Width: 5.6m (18.4ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Very good,  Operating Rating: 38.0 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 25.8 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.30m (4.27ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2007,  Bridge Improvement Cost: $130,000,  Roadway Improvement Cost: $14,000,  Total Project Cost: $196,000 ( Estimate for 2006),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: W1800742MMUNNBI,  Location: .1 MI FROM E BRIDGEWATER (Lat: 42.038108,  Lng: -70.988519),  Route carried "on" structure: City street ,  Year Built: 1875,  Status: Open,  Structure Length: 0.91m (2.99ft),  Average Daily Traffic: 6,750 (year 2007),  Truck Traffic: 8%,  Average Future Daily Traffic: 10,660 (year 2028),  Features Intersected: WATER SALISBURY PLAIN R,  Facility Carried by Structure: HWY BELMONT ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.080,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 7.0m (23.0ft),  Material/Design: Masonry,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.1m (29.9ft),  Curb-To-Curb Width: 7.1m (23.3ft),  Out-to-Out Width: 9.1m (29.9ft)

Condition: Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 71.6 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 44.3 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 1.00m (3.28ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2007,  Bridge Improvement Cost: $270,000,  Roadway Improvement Cost: $28,000,  Total Project Cost: $406,000 ( Estimate for 2006)
Find on map >>

Structure Number: W1801144WMUNNBI,  Location: .1 MI N OF BRIDGEWATER (Lat: 41.992000,  Lng: -71.026403),  Route carried "on" structure: City street ,  Year Built: 1947,  Status: Open,  Structure Length: 1.74m (5.71ft),  Average Daily Traffic: 3,100 (year 2007),  Truck Traffic: 8%,  Average Future Daily Traffic: 4,896 (year 2028),  Design Load: H 15,  Features Intersected: WATER TOWN RIVER,  Facility Carried by Structure: HWY SCOTLAND ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.113,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 5.5m (18.0ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.7m (28.5ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Serious,  Channel: Fair,  Operating Rating: 43.8 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 22.8 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: High priority of corrective action,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.50m (8.20ft),  Designated Inspection Frequency: Every 6 months,  Underwater Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 6 months,  Inspection Date: May 2007,  Underwater Inspection Date: September 2006,  Other Special Inspection Date: November 2007,  Bridge Improvement Cost: $881,000,  Roadway Improvement Cost: $89,000,  Total Project Cost: $1,322,000 ( Estimate for 2006),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: W180123W2MHDNBI,  Location: .5 MI E OF ST 138 (Lat: 42.010928,  Lng: -71.058550),  Route carried "on" structure: State highway 106,  Year Built: 1948,  Status: Open,  Structure Length: 0.94m (3.08ft),  Average Daily Traffic: 49,000 (year 2006),  Truck Traffic: 12%,  Average Future Daily Traffic: 77,386 (year 2027),  Design Load: H 20,  Features Intersected: WATER HOCKOMOCK RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 24.600,  Lanes on structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Masonry,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.4m (30.8ft),  Curb or Sidewalk Widths: Left: 2.4m (7.9ft),  Right: 0.3m (1.0ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 15.9m (52.2ft)

Condition: Superstructure: Fair,  Substructure: Poor,  Channel: Poor,  Operating Rating: 76.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 45.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.00m (3.28ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 24 months,  Inspection Date: August 2006,  Underwater Inspection Date: June 2006,  Bridge Improvement Cost: $284,000,  Roadway Improvement Cost: $29,000,  Total Project Cost: $427,000 ( Estimate for 2006)
Find on map >>

Structure Number: W1801342NMUNNBI,  Location: .2 MI E OF EASTON (Lat: 42.039594,  Lng: -71.063072),  Route carried "on" structure: City street ,  Year Built: 1967,  Status: Open,  Structure Length: 1.80m (5.91ft),  Average Daily Traffic: 6,900 (year 2006),  Truck Traffic: 15%,  Average Future Daily Traffic: 10,897 (year 2027),  Design Load: H 20,  Features Intersected: WATER COWESSETT BROOK,  Facility Carried by Structure: HWY WALNUT ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.402,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 5.8m (19.0ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 0.4m (1.3ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 11.9m (39.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 45.1 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 28.6 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.90m (6.23ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2006,  Bridge Improvement Cost: $404,000,  Roadway Improvement Cost: $41,000,  Total Project Cost: $607,000 ( Estimate for 2006),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>

Structure Number: W1801444UMUNNBI,  Location: .2 MI W OF RTE 24 (Lat: 42.024183,  Lng: -71.060594),  Route carried "on" structure: City street ,  Year Built: 1935,  Status: Open,  Structure Length: 1.19m (3.90ft),  Average Daily Traffic: 6,000 (year 2006),  Truck Traffic: 2%,  Average Future Daily Traffic: 9,476 (year 2027),  Features Intersected: WATER COWESSETT BROOK,  Facility Carried by Structure: HWY WEST ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.274,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 2 degrees,  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.9m (16.1ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 0.6m (2.0ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 9.8m (32.2ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 44.1 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.20m (3.94ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 36 months,  Inspection Date: May 2006,  Underwater Inspection Date: Febuary 2007,  Bridge Improvement Cost: $222,000,  Roadway Improvement Cost: $23,000,  Total Project Cost: $334,000 ( Estimate for 2006),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: W180163MWMHDNBI,  Location: .1 MI N OF BRIDGEWATER TL (Lat: 41.990525,  Lng: -71.029264),  Route carried "on" structure: State highway 24,  Year Built: 1952,  Year Reconstructed: 1974,  Status: Open,  Structure Length: 1.46m (4.79ft),  Average Daily Traffic: 75,000 (year 2007),  Truck Traffic: 10%,  Average Future Daily Traffic: 118,448 (year 2028),  Features Intersected: WATER TOWN RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 41.391,  Lanes on structure: 6,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 33.5m (109.9ft),  Skew: 20 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 14.0m (45.9ft),  Curb-To-Curb Width: 29.3m (96.1ft),  Out-to-Out Width: 36.8m (120.7ft)

Condition: Deck: Good,  Superstructure: Poor,  Substructure: Fair,  Channel: Good,  Operating Rating: 46.0 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 20.4 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.20m (7.22ft),  Designated Inspection Frequency: Every 12 months,  Underwater Inspection Frequency: Every 36 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: May 2007,  Underwater Inspection Date: August 2005,  Other Special Inspection Date: May 2007,  Bridge Improvement Cost: $1,938,000,  Roadway Improvement Cost: $194,000,  Total Project Cost: $2,908,000 ( Estimate for 2006),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>

Structure Number: W180173W1MHDNBI,  Location: .75 MI SO OF WEST ST (Lat: 42.014356,  Lng: -71.044383),  Route carried "on" structure: State highway 106,  Year Built: 1954,  Status: Open,  Structure Length: 3.69m (12.11ft),  Average Daily Traffic: 34,700 (year 2008),  Truck Traffic: 13%,  Average Future Daily Traffic: 54,802 (year 2029),  Design Load: H 20,  Features Intersected: ST 24
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 25.794,  Lanes on structure: 4,  Lanes under structure: 8,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 17.1m (56.1ft),  Skew: 20 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 17.7m (58.1ft),  Curb or Sidewalk Widths: Left: 1.1m (3.6ft),  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 17.2m (56.4ft),  Out-to-Out Width: 21.3m (69.9ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 43.9 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 24.0 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.70m (12.14ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2008,  Bridge Improvement Cost: $1,407,000,  Roadway Improvement Cost: $141,000,  Total Project Cost: $2,111,000 ( Estimate for 2006),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>

Structure Number: W180183MXMHDNBI,  Location: 1 MI N BRIDGEWATER T L (Lat: 42.002661,  Lng: -71.036969),  Route carried "on" structure: State highway 24,  Year Built: 1953,  Status: Open,  Structure Length: 1.40m (4.59ft),  Average Daily Traffic: 74,940 (year 2008),  Truck Traffic: 10%,  Average Future Daily Traffic: 118,353 (year 2027),  Design Load: H 20,  Features Intersected: HWY S ELM ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 43.000,  Lanes on structure: 6,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 30.5m (100.1ft),  Skew: 30 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 13.4m (44.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 30.5m (100.1ft),  Out-to-Out Width: 36.9m (121.1ft)

Condition: Deck: Satisfactory,  Superstructure: Poor,  Substructure: Satisfactory,  Operating Rating: 47.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 30.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Superior to present desirable criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.50m (4.92ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2008,  Bridge Improvement Cost: $988,000,  Roadway Improvement Cost: $99,000,  Total Project Cost: $1,483,000 ( Estimate for 2006),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>

Structure Number: W180193WWMHDNBI,  Location: .8 MI NORTH OF ST106 (Lat: 42.022725,  Lng: -71.048764),  Route carried "on" structure: Other road ,  Year Built: 1953,  Status: Posted for load,  Structure Length: 3.96m (12.99ft),  Average Daily Traffic: 5,200 (year 2008),  Truck Traffic: 6%,  Average Future Daily Traffic: 8,212 (year 2029),  Design Load: H 20,  Features Intersected: ST 24,  Facility Carried by Structure: HWY WEST ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.287,  Lanes on structure: 2,  Lanes under structure: 6,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 19.5m (64.0ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 0.3m (1.0ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 11.6m (38.1ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 33.7 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 18.4 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of corrective action,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 4.00m (13.12ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2008,  Bridge Improvement Cost: $829,000,  Roadway Improvement Cost: $83,000,  Total Project Cost: $1,244,000 ( Estimate for 2006),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>

Structure Number: W180203YRMHDNBI,  Location: .2 MI EAST OF MANLEY ROAD (Lat: 42.041175,  Lng: -71.054925),  Route carried "on" structure: Other road ,  Year Built: 1953,  Status: Open,  Structure Length: 3.81m (12.50ft),  Average Daily Traffic: 2,500 (year 2008),  Truck Traffic: 12%,  Average Future Daily Traffic: 3,948 (year 2029),  Design Load: H 20,  Features Intersected: ST 24,  Facility Carried by Structure: HWY WALNUT ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 6,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 17.7m (58.1ft),  Curb or Sidewalk Widths: Left: 1.4m (4.6ft),  Right: 0.3m (1.0ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 11.6m (38.1ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 44.1 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.90m (12.80ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2008,  Bridge Improvement Cost: $1,365,000,  Roadway Improvement Cost: $137,000,  Total Project Cost: $2,048,000 ( Estimate for 2006),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up

Discuss this city on our hugely popular Massachusetts forum