U.S. Cities - City-Data Homepage  
City-Data Forum
City-Data.com Homepage

Bridge Statistics for West Greenwich, Rhode Island (RI) - Condition, Traffic, Stress, Structural Evaluation, Project Costs

Back to: West Greenwich, RI, Rhode Island, Rhode Island forum, All US cities.





National Bridge Inventory (NBI) Statistics
Number of bridges: 16
Total length: 62 meters (203ft)
Total costs: $31,265,000
Total average daily traffic: 354,718
Total average daily truck traffic: 34,672
National Bridge Inventory (NBI) Registered Bridges for West Greenwich

New bridges - Historical Statistics

  • 1910-1919: 1
  • 1920-1929: 1
  • 1930-1939: 1
  • 1940-1949: 0
  • 1950-1959: 5
  • 1960-1969: 8

Reconstructed bridges - Historical Statistics

  • 1930-1939: 2
  • 1940-1949: 0
  • 1950-1959: 0
  • 1960-1969: 0
  • 1970-1979: 0
  • 1980-1989: 0
  • 1990-1999: 2
  • 2000-2009: 1

Average Daily Traffic

Bridge Condition - Deck

Bridge Condition - Superstructure

Bridge Condition - Substructure

Find on map >>

Structure Number: 34,  Location: 0.5 Mi E of JCT I-95 (Lat: 41.644167,  Lng: -71.614000),  Route carried "on" structure: Bypass State highway 3,  Year Built: 1918,  Year Reconstructed: 1938,  Status: Posted for load,  Structure Length: 2.41m (7.91ft),  Average Daily Traffic: 5,100 (year 2006),  Truck Traffic: 10%,  Average Future Daily Traffic: 10,039 (year 2028),  Design Load: HS 20,  Features Intersected: BIG RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 14.5m (47.6ft),  Material/Design: Concrete,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.5m (41.0ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 14.5m (47.6ft),  Out-to-Out Width: 18.3m (60.0ft)

Condition: Superstructure: Fair,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 36.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 21.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.71m (5.61ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: June 2007,  Other Special Inspection Date: August 1997,  Bridge Improvement Cost: $1,382,000,  Roadway Improvement Cost: $138,000,  Total Project Cost: $2,073,000 ( Estimate for 2007),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 36,  Location: 2.0 Mi S of JCT I-95 (Lat: 41.628667,  Lng: -71.632000),  Route carried "on" structure: State highway 3,  Year Built: 1924,  Year Reconstructed: 1939,  Status: Open,  Structure Length: 0.64m (2.10ft),  Average Daily Traffic: 18,200 (year 1995),  Truck Traffic: 10%,  Average Future Daily Traffic: 23,013 (year 2028),  Design Load: HS 20,  Features Intersected: NOOSENECK RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Base Highway Network: Yes (,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 18.3m (60.0ft),  Material/Design: Concrete,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.4m (21.0ft),  Curb or Sidewalk Widths: Left: 1.9m (6.2ft),  Right: 1.9m (6.2ft),  Curb-To-Curb Width: 19.2m (63.0ft),  Out-to-Out Width: 24.2m (79.4ft)

Condition: Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 75.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 45.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 0.64m (2.10ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2007,  Bridge Improvement Cost: $323,000,  Roadway Improvement Cost: $32,000,  Total Project Cost: $484,000 ( Estimate for 2007),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 118,  Location: URI Alton Jones Campus (Lat: 41.615167,  Lng: -71.721167),  Route carried "on" structure: State lands road ,  Year Built: 1931,  Year Reconstructed: 1990,  Status: Open,  Structure Length: 0.99m (3.25ft),  Average Daily Traffic: 300 (year 2006),  Truck Traffic: 2%,  Design Load: HS 20,  Features Intersected: EISENHOWER LAKE,  Facility Carried by Structure: WHISPER PINE RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Owner: State Highway Agency,  Approaching Roadway Width: 4.3m (14.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.1m (29.9ft),  Curb-To-Curb Width: 3.8m (12.5ft),  Out-to-Out Width: 4.3m (14.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 54.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.98m (3.22ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2006,  Bridge Improvement Cost: $27,000,  Roadway Improvement Cost: $3,000,  Total Project Cost: $41,000 ( Estimate for 2007),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>

Structure Number: 517,  Location: 1.3 Mi N of NEW LONDON TP (Lat: 41.654000,  Lng: -71.575000),  Route carried "on" structure: Interstate 95,  Year Built: 1958,  Status: Open,  Structure Length: 1.58m (5.18ft),  Average Daily Traffic: 54,100 (year 1997),  Truck Traffic: 10%,  Average Future Daily Traffic: 72,293 (year 2028),  Design Load: HS 20,  Features Intersected: HOPKINS HILL RD
Minimum Vertical Clearance: 6.71m (22.01ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 3,  Base Highway Network: Yes (,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 30.5m (100.1ft),  Skew: 30 degrees,  Material/Design: Concrete,  Design/Construction: Frame,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 13.4m (44.0ft),  Curb-To-Curb Width: 31.1m (102.0ft),  Out-to-Out Width: 32.3m (106.0ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Good,  Operating Rating: 83.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 50.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.58m (5.18ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2006,  Bridge Improvement Cost: $1,061,000,  Roadway Improvement Cost: $106,000,  Total Project Cost: $1,592,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>

Structure Number: 519,  Location: 2.0 Mi E of JCT RI 3 (Lat: 41.659667,  Lng: -71.546167),  Route carried "on" structure: Alternate State highway ,  Year Built: 1957,  Year Reconstructed: 1998,  Status: Open,  Structure Length: 8.20m (26.90ft),  Average Daily Traffic: 7,900 (year 1992),  Truck Traffic: 10%,  Design Load: HS 20,  Features Intersected: I-95,  Facility Carried by Structure: NEW LONDON TPK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Skew: 24 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 24.7m (81.0ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 14.5m (47.6ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 90.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 54.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 8.20m (26.90ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2008,  Bridge Improvement Cost: $2,501,000,  Roadway Improvement Cost: $250,000,  Total Project Cost: $3,752,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>

Structure Number: 52,  Location: 0.7 Mi N DIVISION ST. (Lat: 41.650333,  Lng: -71.607667),  Route carried "on" structure: State highway 3,  Year Built: 1957,  Year Reconstructed: 2006,  Status: Open,  Structure Length: 3.51m (11.52ft),  Average Daily Traffic: 15,500 (year 2003),  Truck Traffic: 5%,  Average Future Daily Traffic: 14,201 (year 2028),  Design Load: HS 20,  Features Intersected: I-95
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 4,  Base Highway Network: Yes (,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 20.7m (67.9ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 17.1m (56.1ft),  Curb or Sidewalk Widths: Left: 0.3m (1.0ft),  Right: 0.3m (1.0ft),  Curb-To-Curb Width: 20.7m (67.9ft),  Out-to-Out Width: 21.9m (71.9ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Operating Rating: 81.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 49.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 3.41m (11.19ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2008,  Bridge Improvement Cost: $2,241,000,  Roadway Improvement Cost: $224,000,  Total Project Cost: $3,362,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>

Structure Number: 521,  Location: 0.7 Mi S of JCT RI 3 (Lat: 41.648833,  Lng: -71.614000),  Route carried "on" structure: Interstate 95,  Year Built: 1960,  Status: Open,  Structure Length: 1.28m (4.20ft),  Average Daily Traffic: 53,600 (year 2006),  Truck Traffic: 10%,  Average Future Daily Traffic: 65,213 (year 2028),  Design Load: HS 20,  Features Intersected: BIG RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Base Highway Network: Yes (,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 23.2m (76.1ft),  Skew: 32 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 4.0m (13.1ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 89.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.40m (4.59ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: June 2006,  Underwater Inspection Date: May 2003,  Bridge Improvement Cost: $4,203,000,  Roadway Improvement Cost: $420,000,  Total Project Cost: $6,304,000 ( Estimate for 2007)
Find on map >>

Structure Number: 586,  Location: 1.0 Mi S of JCT RI 3 (Lat: 41.641167,  Lng: -71.625167),  Route carried "on" structure: Interstate 95,  Year Built: 1968,  Status: Open,  Structure Length: 2.71m (8.89ft),  Average Daily Traffic: 24,655 (year 1999),  Truck Traffic: 10%,  Average Future Daily Traffic: 32,946 (year 2028),  Design Load: HS 20,  Features Intersected: WEAVER HILL RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes (,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 26.2m (86.0ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 13.1m (43.0ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Poor,  Operating Rating: 97.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 58.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Equal to present minimum criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.71m (8.89ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2007,  Bridge Improvement Cost: $739,000,  Roadway Improvement Cost: $74,000,  Total Project Cost: $1,108,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 5862,  Location: 1.0 Mi S of JCT RI 3 (Lat: 41.641167,  Lng: -71.641667),  Route carried "on" structure: Interstate 95,  Year Built: 1968,  Status: Open,  Structure Length: 2.71m (8.89ft),  Average Daily Traffic: 25,162 (year 1999),  Truck Traffic: 10%,  Average Future Daily Traffic: 33,623 (year 2028),  Design Load: HS 20,  Features Intersected: WEAVER HILL RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes (,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 26.2m (86.0ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 13.1m (43.0ft)

Condition: Deck: Poor,  Superstructure: Fair,  Substructure: Poor,  Operating Rating: 97.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 58.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Equal to present minimum criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.71m (8.89ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2007,  Bridge Improvement Cost: $185,000,  Roadway Improvement Cost: $19,000,  Total Project Cost: $278,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 588,  Location: 1.3 Mi N of JCT RI 102 (Lat: 41.619500,  Lng: -71.645667),  Route carried "on" structure: Interstate 95,  Year Built: 1968,  Status: Open,  Structure Length: 2.29m (7.51ft),  Average Daily Traffic: 26,800 (year 2006),  Truck Traffic: 10%,  Average Future Daily Traffic: 32,946 (year 2028),  Design Load: HS 20,  Features Intersected: ROBIN HOLLOW RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes (,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 19.2m (63.0ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 13.1m (43.0ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Operating Rating: 68.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.68m (8.79ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2006,  Bridge Improvement Cost: $1,288,000,  Roadway Improvement Cost: $129,000,  Total Project Cost: $1,932,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>

Structure Number: 5882,  Location: 1.3 Mi N of JCT RI 102 (Lat: 41.619333,  Lng: -71.646000),  Route carried "on" structure: Interstate 95,  Year Built: 1965,  Status: Open,  Structure Length: 2.29m (7.51ft),  Average Daily Traffic: 26,800 (year 2006),  Truck Traffic: 10%,  Average Future Daily Traffic: 33,623 (year 2028),  Design Load: HS 20,  Features Intersected: ROBIN HOLLOW RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes (,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 19.2m (63.0ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 14.0m (45.9ft)

Condition: Deck: Poor,  Superstructure: Fair,  Substructure: Fair,  Operating Rating: 68.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.01m (6.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2006,  Bridge Improvement Cost: $197,000,  Roadway Improvement Cost: $20,000,  Total Project Cost: $296,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>

Structure Number: 589,  Location: 0.8 Mi S of JCT RI165&I95 (Lat: 41.602333,  Lng: -71.658333),  Route carried "on" structure: State highway 102,  Year Built: 1969,  Status: Open,  Structure Length: 9.88m (32.41ft),  Average Daily Traffic: 7,600 (year 2006),  Truck Traffic: 10%,  Average Future Daily Traffic: 10,083 (year 2028),  Design Load: HS 20,  Features Intersected: I-95
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 4,  Base Highway Network: Yes (,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 18.3m (60.0ft),  Skew: 33 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 31.7m (104.0ft),  Curb or Sidewalk Widths: Left: 0.6m (2.0ft),  Right: 0.6m (2.0ft),  Curb-To-Curb Width: 18.3m (60.0ft),  Out-to-Out Width: 21.3m (69.9ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Poor,  Operating Rating: 68.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 41.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 9.60m (31.50ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2006,  Bridge Improvement Cost: $6,695,000,  Roadway Improvement Cost: $670,000,  Total Project Cost: $10,043,000 ( Estimate for 2007),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>

Structure Number: 519,  Location: 2.0 Mi E of JCT RI 3 (Lat: 41.659667,  Lng: -71.546167),  Route carried "under" structure: Interstate 95,  Year Built: 1957,  Structure Length: 8.20m (26.90ft),  Average Daily Traffic: 46,000 (year 2006),  Truck Traffic: 10%,  Features Intersected: I-95,  Facility Carried by Structure: NEW LONDON TPK
Minimum Vertical Clearance: 5.12m (16.80ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 24.7m (81.0ft)

Find on map >>

Structure Number: 52,  Location: 0.7 Mi N DIVISION ST. (Lat: 41.650333,  Lng: -71.607667),  Route carried "under" structure: Interstate 95,  Year Built: 1957,  Structure Length: 3.51m (11.52ft),  Average Daily Traffic: 25,000 (year 2006),  Truck Traffic: 10%,  Features Intersected: I-95,  Facility Carried by Structure: RI 3 NSENECK HL RD
Minimum Vertical Clearance: 4.26m (13.98ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 17.1m (56.1ft)

Find on map >>

Structure Number: 586,  Location: 1.0 Mi S of JCT RI 3 (Lat: 41.641167,  Lng: -71.625167),  Route carried "under" structure: City street ,  Year Built: 1968,  Structure Length: 2.71m (8.89ft),  Average Daily Traffic: 1 (year 2006),  Features Intersected: WEAVER HILL RD,  Facility Carried by Structure: I-95 NORTHBOUND
Minimum Vertical Clearance: 4.47m (14.67ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 26.2m (86.0ft)

Find on map >>

Structure Number: 589,  Location: 0.8 Mi S of JCT RI165&I95 (Lat: 41.602333,  Lng: -71.658333),  Route carried "under" structure: Interstate 95,  Year Built: 1969,  Structure Length: 9.88m (32.41ft),  Average Daily Traffic: 18,000 (year 2006),  Truck Traffic: 10%,  Features Intersected: I-95,  Facility Carried by Structure: RI 102 VICTORY HWY
Minimum Vertical Clearance: 0.49m (1.61ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 31.7m (104.0ft)

Discuss this city on our hugely popular Rhode Island forum

Back to: West Greenwich, RI, Rhode Island, All US cities.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2009 Advameg, Inc.