![]() |
Bridge Statistics for West Jordan, Utah (UT) - Condition, Traffic, Stress, Structural Evaluation, Project CostsBack to: West Jordan, UT, Utah, Utah forum, All US cities. National Bridge Inventory (NBI) Statistics Number of bridges: 14 Total length: 56 meters (184ft) Total costs: $4,260,000 Total average daily traffic: 349,823 Total average daily truck traffic: 13,810 National Bridge Inventory (NBI) Registered Bridges for West Jordan
Bridge Condition - Deck Bridge Condition - Superstructure Bridge Condition - Substructure Bridge Condition - Channel Find on map >>
Structure Number: 35021D, Location: 2650 W.8660 SO.,W.JORDAN (Lat: 40.594056, Lng: -111.957278), Route carried "on" structure: City street , Year Built: 1981, Status: Open, Structure Length: 0.85m (2.79ft), Average Daily Traffic: 1,050 (year 2002), Truck Traffic: 1%, Average Future Daily Traffic: 1,276 (year 2022), Design Load: HS 20, Features Intersected: UTAH AND SALT LAKE CANAL, Facility Carried by Structure: 8660 SOUTH STREET Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Owner: City or Municipal Highway Agency, Approaching Roadway Width: 10.7m (35.1ft), Skew: 1 degrees, Material/Design: Concrete, Design/Construction: Frame, Number Of Spans In Main Unit: 1, Length of Maximum Span: 7.9m (25.9ft), Curb or Sidewalk Widths: Left: 2.0m (6.6ft), Right: 2.0m (6.6ft), Curb-To-Curb Width: 11.9m (39.0ft), Out-to-Out Width: 16.5m (54.1ft) Condition: Deck: Good, Superstructure: Satisfactory, Substructure: Good, Channel: Good, Operating Rating: 32.4 metric tons, Method Used To Determine Operating Rating: Allowable Stress (AS), Inventory Rating: 32.4 metric tons, Method Used To Determine Inventory Rating: Allowable Stress (AS), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Equal to present minimum criteria, Waterway Adequacy: Better than present minimum criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 1.50m (4.92ft), Designated Inspection Frequency: Every 24 months, Inspection Date: November 2007, Bridge Improvement Cost: $161,000, Roadway Improvement Cost: $16,000, Total Project Cost: $266,000 ( Estimate for 2000), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous, Deck Protection: Epoxy Coated Reinforcing Find on map >>
Structure Number: 35022D, Location: 3100 W.7000 SO.-W.JORDAN (Lat: 40.623972, Lng: -111.965500), Route carried "on" structure: City street , Year Built: 1986, Status: Open, Structure Length: 0.88m (2.89ft), Average Daily Traffic: 16,320 (year 2002), Truck Traffic: 10%, Average Future Daily Traffic: 19,829 (year 2022), Features Intersected: UTAH & SALT LAKE CANAL, Facility Carried by Structure: 7000 SOUTH STREET Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Owner: City or Municipal Highway Agency, Approaching Roadway Width: 11.0m (36.1ft), Skew: 1 degrees, Material/Design: Concrete, Design/Construction: Slab, Number Of Spans In Main Unit: 1, Length of Maximum Span: 7.9m (25.9ft), Curb or Sidewalk Widths: Left: 1.5m (4.9ft), Right: 1.5m (4.9ft), Curb-To-Curb Width: 17.8m (58.4ft), Out-to-Out Width: 21.2m (69.6ft) Condition: Deck: Good, Superstructure: Good, Substructure: Good, Channel: Good, Operating Rating: 32.4 metric tons, Method Used To Determine Operating Rating: Allowable Stress (AS), Inventory Rating: 32.4 metric tons, Method Used To Determine Inventory Rating: Allowable Stress (AS), Structural Evaluation: Better than present minimum criteria, Deck Geometry: Superior to present desirable criteria, Waterway Adequacy: Better than present minimum criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 1.60m (5.25ft), Designated Inspection Frequency: Every 24 months, Inspection Date: November 2007, Bridge Improvement Cost: $212,000, Roadway Improvement Cost: $21,000, Total Project Cost: $350,000 ( Estimate for 2000), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 35048E, Location: 2500 W.9000 SO.,W.JORDAN (Lat: 40.587611, Lng: -111.954306), Route carried "on" structure: City street , Year Built: 1996, Status: Open, Structure Length: 0.79m (2.59ft), Average Daily Traffic: 26,040 (year 2002), Truck Traffic: 2%, Average Future Daily Traffic: 31,639 (year 2022), Design Load: HS 20, Features Intersected: UTAH & SALT LAKE CANAL, Facility Carried by Structure: 9000 SOUTH STREET Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 5, Owner: City or Municipal Highway Agency, Approaching Roadway Width: 24.7m (81.0ft), Skew: 24 degrees, Material/Design: Concrete, Design/Construction: Culvert, Number Of Spans In Main Unit: 1, Length of Maximum Span: 7.0m (23.0ft), Curb or Sidewalk Widths: Left: 1.0m (3.3ft), Right: 1.0m (3.3ft) Condition: Channel: Good, Culverts: Good, Operating Rating: 32.4 metric tons, Method Used To Determine Operating Rating: Allowable Stress (AS), Inventory Rating: 32.4 metric tons, Method Used To Determine Inventory Rating: Allowable Stress (AS), Structural Evaluation: Better than present minimum criteria, Waterway Adequacy: Better than present minimum criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 1.40m (4.59ft), Designated Inspection Frequency: Every 24 months, Inspection Date: November 2007, Bridge Improvement Cost: $233,000, Roadway Improvement Cost: $23,000, Total Project Cost: $384,000 ( Estimate for 2000) Find on map >>
Structure Number: 35054D, Location: 1000 WEST 7800 SOUTH (Lat: 40.609353, Lng: -111.921336), Route carried "on" structure: City street , Year Built: 1966, Status: Open, Structure Length: 2.62m (8.60ft), Average Daily Traffic: 27,505 (year 2002), Truck Traffic: 2%, Average Future Daily Traffic: 33,419 (year 2022), Design Load: HS 20, Features Intersected: JORDAN RIVER, Facility Carried by Structure: 7800 SOUTH STREET Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 4, Owner: City or Municipal Highway Agency, Approaching Roadway Width: 21.3m (69.9ft), Material/Design: Concrete continuous, Design/Construction: Slab, Number Of Spans In Main Unit: 3, Length of Maximum Span: 11.0m (36.1ft), Curb or Sidewalk Widths: Left: 1.2m (3.9ft), Right: 1.2m (3.9ft), Curb-To-Curb Width: 20.0m (65.6ft), Out-to-Out Width: 22.6m (74.1ft) Condition: Deck: Satisfactory, Superstructure: Fair, Substructure: Fair, Channel: Fair, Operating Rating: 32.4 metric tons, Method Used To Determine Operating Rating: Allowable Stress (AS), Inventory Rating: 32.4 metric tons, Method Used To Determine Inventory Rating: Allowable Stress (AS), Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: Better than present minimum criteria, Waterway Adequacy: Equal to present desirable criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 3.50m (11.48ft), Designated Inspection Frequency: Every 24 months, Inspection Date: November 2007, Bridge Improvement Cost: $515,000, Roadway Improvement Cost: $52,000, Total Project Cost: $851,000 ( Estimate for 2000), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 35105V, Location: 8600 SO.2700 W.,W.JORDAN (Lat: 40.595361, Lng: -111.957747), Route carried "on" structure: City street , Year Built: 1950, Year Reconstructed: 1989, Status: Open, Structure Length: 0.64m (2.10ft), Average Daily Traffic: 10,835 (year 2002), Truck Traffic: 2%, Average Future Daily Traffic: 13,165 (year 2022), Design Load: HS 20, Features Intersected: UTAH & SALT LAKE CANAL, Facility Carried by Structure: 2700 WEST STREET Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Owner: City or Municipal Highway Agency, Approaching Roadway Width: 7.9m (25.9ft), Skew: 3 degrees, Material/Design: Steel, Design/Construction: Culvert, Number Of Spans In Main Unit: 1, Length of Maximum Span: 6.1m (20.0ft) Condition: Channel: Good, Culverts: Good, Operating Rating: 32.4 metric tons, Method Used To Determine Operating Rating: Allowable Stress (AS), Inventory Rating: 32.4 metric tons, Method Used To Determine Inventory Rating: Allowable Stress (AS), Structural Evaluation: Better than present minimum criteria, Waterway Adequacy: Equal to present desirable criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 1.30m (4.27ft), Designated Inspection Frequency: Every 24 months, Inspection Date: November 2007, Bridge Improvement Cost: $105,000, Roadway Improvement Cost: $11,000, Total Project Cost: $174,000 ( Estimate for 2000) Find on map >>
Structure Number: 35163E, Location: 1840 W. 9000 SO.-W.JORDAN (Lat: 40.587639, Lng: -111.941750), Route carried "on" structure: City street , Year Built: 1996, Status: Open, Structure Length: 0.70m (2.30ft), Average Daily Traffic: 26,040 (year 2003), Truck Traffic: 2%, Average Future Daily Traffic: 31,639 (year 2023), Design Load: HS 20, Features Intersected: SOUTH JORDAN CANAL, Facility Carried by Structure: 9000 SOUTH STREET Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 5, Owner: City or Municipal Highway Agency, Approaching Roadway Width: 24.7m (81.0ft), Skew: 21 degrees, Material/Design: Concrete, Design/Construction: Culvert, Number Of Spans In Main Unit: 1, Length of Maximum Span: 6.4m (21.0ft), Curb or Sidewalk Widths: Left: 1.2m (3.9ft), Right: 1.2m (3.9ft) Condition: Channel: Good, Culverts: Good, Operating Rating: 32.4 metric tons, Method Used To Determine Operating Rating: Allowable Stress (AS), Inventory Rating: 32.4 metric tons, Method Used To Determine Inventory Rating: Allowable Stress (AS), Structural Evaluation: Better than present minimum criteria, Waterway Adequacy: Equal to present desirable criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 1.30m (4.27ft), Designated Inspection Frequency: Every 24 months, Inspection Date: November 2007, Bridge Improvement Cost: $217,000, Roadway Improvement Cost: $22,000, Total Project Cost: $359,000 ( Estimate for 2000), Deck Structure Type: Concrete Cast-file-Place Find on map >>
Structure Number: 35179D, Location: 1150 WEST 7800 SOUTH (Lat: 40.608861, Lng: -111.923806), Route carried "on" structure: City street , Year Built: 1966, Status: Open, Structure Length: 0.67m (2.20ft), Average Daily Traffic: 27,005 (year 2003), Truck Traffic: 2%, Average Future Daily Traffic: 32,811 (year 2023), Design Load: HS 20, Features Intersected: NORTH JORDAN CANAL, Facility Carried by Structure: 7800 SOUTH STREET Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 4, Owner: City or Municipal Highway Agency, Approaching Roadway Width: 21.3m (69.9ft), Skew: 20 degrees, Material/Design: Concrete, Design/Construction: Frame, Number Of Spans In Main Unit: 1, Length of Maximum Span: 6.1m (20.0ft), Curb or Sidewalk Widths: Left: 2.0m (6.6ft), Right: 0.0m, Curb-To-Curb Width: 21.0m (68.9ft), Out-to-Out Width: 24.6m (80.7ft) Condition: Deck: Satisfactory, Superstructure: Good, Substructure: Good, Channel: Good, Operating Rating: 32.4 metric tons, Method Used To Determine Operating Rating: Allowable Stress (AS), Inventory Rating: 32.4 metric tons, Method Used To Determine Inventory Rating: Allowable Stress (AS), Structural Evaluation: Better than present minimum criteria, Deck Geometry: Superior to present desirable criteria, Waterway Adequacy: Equal to present minimum criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 1.30m (4.27ft), Designated Inspection Frequency: Every 24 months, Inspection Date: November 2007, Bridge Improvement Cost: $206,000, Roadway Improvement Cost: $21,000, Total Project Cost: $341,000 ( Estimate for 2000), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 35183D, Location: 6700 SOUTH 2200 WEST (Lat: 40.628361, Lng: -111.948222), Route carried "on" structure: City street , Year Built: 1989, Status: Open, Structure Length: 0.67m (2.20ft), Average Daily Traffic: 3,000 (year 2003), Truck Traffic: 5%, Average Future Daily Traffic: 3,645 (year 2023), Design Load: HS 20, Features Intersected: CANAL ROAD., Facility Carried by Structure: 2200 WEST STREET Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Owner: City or Municipal Highway Agency, Approaching Roadway Width: 12.4m (40.7ft), Skew: 1 degrees, Material/Design: Concrete, Design/Construction: Slab, Number Of Spans In Main Unit: 1, Length of Maximum Span: 6.1m (20.0ft), Curb or Sidewalk Widths: Left: 2.7m (8.9ft), Right: 2.7m (8.9ft), Curb-To-Curb Width: 13.6m (44.6ft), Out-to-Out Width: 16.7m (54.8ft) Condition: Deck: Satisfactory, Superstructure: Good, Substructure: Satisfactory, Channel: Satisfactory, Operating Rating: 32.4 metric tons, Method Used To Determine Operating Rating: Allowable Stress (AS), Inventory Rating: 32.4 metric tons, Method Used To Determine Inventory Rating: Allowable Stress (AS), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Superior to present desirable criteria, Waterway Adequacy: Equal to present minimum criteria, Approach Roadway Alignment: Equal to present minimum criteria, Designated Inspection Frequency: Every 24 months, Inspection Date: November 2007, Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: E2379, Location: 1.3 MI.W.OF REDWOOD RD. (Lat: 40.609344, Lng: -111.963250), Route carried "on" structure: State highway 48, Year Built: 1992, Status: Open, Structure Length: 0.67m (2.20ft), Average Daily Traffic: 30,094 (year 2002), Truck Traffic: 2%, Average Future Daily Traffic: 36,564 (year 2022), Design Load: HS 20, Features Intersected: UTAH-SALT LAKE CANAL Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 15.318, Lanes on structure: 3, Owner: State Highway Agency, Approaching Roadway Width: 7.9m (25.9ft), Material/Design: Concrete, Design/Construction: Culvert, Number Of Spans In Main Unit: 1, Length of Maximum Span: 6.1m (20.0ft), Curb or Sidewalk Widths: Left: 1.8m (5.9ft), Right: 1.8m (5.9ft), Curb-To-Curb Width: 27.1m (88.9ft), Out-to-Out Width: 31.5m (103.3ft) Condition: Channel: Very good, Culverts: Good, Operating Rating: 32.4 metric tons, Method Used To Determine Operating Rating: Allowable Stress (AS), Inventory Rating: 32.4 metric tons, Method Used To Determine Inventory Rating: Allowable Stress (AS), Structural Evaluation: Better than present minimum criteria, Deck Geometry: Superior to present desirable criteria, Waterway Adequacy: Equal to present desirable criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 1.30m (4.27ft), Designated Inspection Frequency: Every 24 months, Inspection Date: Febuary 2007, Bridge Improvement Cost: $264,000, Roadway Improvement Cost: $26,000, Total Project Cost: $435,000 ( Estimate for 2000), Deck Structure Type: Concrete Precast Panels, Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: E2381, Location: 9000 SOUTH 900 WEST (Lat: 40.587472, Lng: -111.918997), Route carried "on" structure: State highway 209, Year Built: 1994, Status: Open, Structure Length: 0.73m (2.40ft), Average Daily Traffic: 37,320 (year 2002), Truck Traffic: 2%, Average Future Daily Traffic: 45,344 (year 2022), Design Load: HS 20, Features Intersected: NORTH JORDAN CANAL Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 10.265, Lanes on structure: 4, Owner: State Highway Agency, Approaching Roadway Width: 25.6m (84.0ft), Skew: 1 degrees, Material/Design: Concrete, Design/Construction: Culvert, Number Of Spans In Main Unit: 1, Length of Maximum Span: 6.4m (21.0ft) Condition: Channel: Good, Culverts: Good, Operating Rating: 32.4 metric tons, Method Used To Determine Operating Rating: Allowable Stress (AS), Inventory Rating: 32.4 metric tons, Method Used To Determine Inventory Rating: Allowable Stress (AS), Structural Evaluation: Better than present minimum criteria, Waterway Adequacy: Equal to present desirable criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 1.40m (4.59ft), Designated Inspection Frequency: Every 24 months, Inspection Date: Febuary 2007, Bridge Improvement Cost: $189,000, Roadway Improvement Cost: $19,000, Total Project Cost: $312,000 ( Estimate for 2000) Find on map >>
Structure Number: E2486, Location: 9300 SOUTH REDWOOD ROAD (Lat: 40.581889, Lng: -111.938556), Route carried "on" structure: State highway 68, Year Built: 2004, Status: Open, Structure Length: 1.32m (4.33ft), Average Daily Traffic: 18,995 (year 2002), Truck Traffic: 10%, Average Future Daily Traffic: 23,079 (year 2022), Design Load: HS 20, Features Intersected: SOUTH JORDAN CANAL Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 74.688, Lanes on structure: 5, Owner: State Highway Agency, Approaching Roadway Width: 25.3m (83.0ft), Skew: 26 degrees, Material/Design: Concrete, Design/Construction: Culvert, Number Of Spans In Main Unit: 1, Length of Maximum Span: 11.6m (38.1ft), Curb or Sidewalk Widths: Left: 1.8m (5.9ft), Right: 1.8m (5.9ft), Curb-To-Curb Width: 25.2m (82.7ft), Out-to-Out Width: 30.7m (100.7ft) Condition: Channel: Good, Culverts: Good, Operating Rating: 32.4 metric tons, Method Used To Determine Operating Rating: Allowable Stress (AS), Inventory Rating: 32.4 metric tons, Method Used To Determine Inventory Rating: Allowable Stress (AS), Structural Evaluation: Better than present minimum criteria, Deck Geometry: Superior to present desirable criteria, Waterway Adequacy: Equal to present desirable criteria, Approach Roadway Alignment: Equal to present desirable criteria, Designated Inspection Frequency: Every 24 months, Inspection Date: Febuary 2007, Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Latex Concrete, Deck Protection: Epoxy Coated Reinforcing Find on map >>
Structure Number: F 244, Location: 9000 SOUTH 800 WEST (Lat: 40.587639, Lng: -111.912972), Route carried "on" structure: State highway 209, Year Built: 1971, Status: Open, Structure Length: 2.56m (8.40ft), Average Daily Traffic: 37,320 (year 2002), Truck Traffic: 2%, Average Future Daily Traffic: 45,344 (year 2022), Design Load: HS 20, Features Intersected: JORDAN RIVER Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 10.780, Lanes on structure: 4, Owner: State Highway Agency, Approaching Roadway Width: 18.3m (60.0ft), Skew: 1 degrees, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 2, Length of Maximum Span: 12.2m (40.0ft), Curb-To-Curb Width: 19.1m (62.7ft), Out-to-Out Width: 20.2m (66.3ft) Condition: Deck: Satisfactory, Superstructure: Satisfactory, Substructure: Satisfactory, Channel: Satisfactory, Operating Rating: 32.4 metric tons, Method Used To Determine Operating Rating: Allowable Stress (AS), Inventory Rating: 32.4 metric tons, Method Used To Determine Inventory Rating: Allowable Stress (AS), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Equal to present minimum criteria, Waterway Adequacy: Equal to present desirable criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 3.50m (11.48ft), Designated Inspection Frequency: Every 24 months, Inspection Date: Febuary 2007, Bridge Improvement Cost: $477,000, Roadway Improvement Cost: $48,000, Total Project Cost: $788,000 ( Estimate for 2000), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete Find on map >>
Structure Number: C 927, Location: 7500 SO.REDWOOD ROAD (Lat: 40.614444, Lng: -111.971833), Route carried "under" structure: State highway 68, Year Built: 2003, Structure Length: 23.63m (77.53ft), Average Daily Traffic: 38,305 (year 2002), Truck Traffic: 7%, Features Intersected: SR-68, Facility Carried by Structure: PEDESTRIAN O'PASS. Minimum Vertical Clearance: 5.46m (17.91ft), Kilometerpoint: 78.283, Lanes under structure: 6, Material/Design: Steel, Design/Construction: Truss - Thru, Length of Maximum Span: 37.2m (122.0ft) Find on map >>
Structure Number: R 255, Location: 6200 S. 3800 W., SL. CO. (Lat: 40.609417, Lng: -111.921417), Route carried "under" structure: State highway 154, Year Built: 1993, Structure Length: 19.75m (64.80ft), Average Daily Traffic: 49,994 (year 2002), Truck Traffic: 6%, Features Intersected: SR-154,BANGERTER HWY., Facility Carried by Structure: PEDESTRIAN O'PASS. Minimum Vertical Clearance: 6.07m (19.91ft), Kilometerpoint: 23.931, Lanes under structure: 8, Material/Design: Steel, Design/Construction: Truss - Thru, Length of Maximum Span: 43.3m (142.1ft) Discuss this city on our hugely popular Utah forum Back to: West Jordan, UT, Utah, All US cities.
|
![]() |