![]() |
Bridge Statistics for Wheatland, New York (NY) - Condition, Traffic, Stress, Structural Evaluation, Project CostsBack to: Wheatland, NY, New York, New York forum, All US cities. National Bridge Inventory (NBI) Statistics Number of bridges: 19 Total length: 90 meters (295ft) Total costs: $15,649,000 Total average daily traffic: 189,028 Total average daily truck traffic: 38,637 National Bridge Inventory (NBI) Registered Bridges for Wheatland
Bridge Condition - Deck Bridge Condition - Superstructure Bridge Condition - Substructure Bridge Condition - Channel Find on map >>
Structure Number: 102375, Location: 1.2MI S INTERS.RTS 36&383 (Lat: 42.995736, Lng: -77.862233), Route carried "on" structure: State highway 36, Year Built: 1989, Status: Open, Structure Length: 4.63m (15.19ft), Average Daily Traffic: 5,870 (year 2007), Truck Traffic: 8%, Average Future Daily Traffic: 8,370 (year 2027), Design Load: HS 20, Features Intersected: OATKA CREEK Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.895, Lanes on structure: 2, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 13.4m (44.0ft), Skew: 9 degrees, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 2, Length of Maximum Span: 22.2m (72.8ft), Curb-To-Curb Width: 13.4m (44.0ft), Out-to-Out Width: 14.0m (45.9ft) Condition: Deck: Very good, Superstructure: Excellent, Substructure: Good, Channel: Good, Operating Rating: 55.3 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 32.7 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Better than present minimum criteria, Deck Geometry: Equal to present minimum criteria, Waterway Adequacy: Somewhat better than minimum adequacy, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 4.63m (15.19ft), Designated Inspection Frequency: Every 24 months, Inspection Date: September 2006, Bridge Improvement Cost: $507,000, Roadway Improvement Cost: $301,000, Total Project Cost: $808,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete, Deck Protection: Epoxy Coated Reinforcing Find on map >>
Structure Number: 102376, Location: JCT RTS36+NYS THRUWAY I90 (Lat: 43.030022, Lng: -77.877047), Route carried "on" structure: State highway 36, Year Built: 1954, Year Reconstructed: 1977, Status: Open, Structure Length: 7.16m (23.49ft), Average Daily Traffic: 1,590 (year 2006), Truck Traffic: 8%, Average Future Daily Traffic: 2,251 (year 2026), Design Load: HS 20+Mod, Features Intersected: RTE I90 Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 6.111, Lanes on structure: 2, Lanes under structure: 8, Base Highway Network: Yes, Owner: State Toll Authority, Maintenance Responsibility: State Highway Agency, Approaching Roadway Width: 10.1m (33.1ft), Skew: 2 degrees, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 4, Length of Maximum Span: 22.6m (74.1ft), Curb or Sidewalk Widths: Left: 0.2m (0.7ft), Right: 0.2m (0.7ft), Curb-To-Curb Width: 9.1m (29.9ft), Out-to-Out Width: 10.1m (33.1ft) Condition: Deck: Good, Superstructure: Good, Substructure: Satisfactory, Operating Rating: 84.4 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 49.9 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Somewhat better than minimum adequacy, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present minimum criteria, Length Of Structure Improvement: 7.16m (23.49ft), Designated Inspection Frequency: Every 24 months, Inspection Date: November 2006, Bridge Improvement Cost: $507,000, Roadway Improvement Cost: $301,000, Total Project Cost: $808,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 104339, Location: 3.2 MI W JCT RTS 251 & 15 (Lat: 43.004925, Lng: -77.730219), Route carried "on" structure: State highway 251, Year Built: 1995, Status: Open, Structure Length: 8.26m (27.10ft), Average Daily Traffic: 2,649 (year 2006), Truck Traffic: 8%, Average Future Daily Traffic: 3,777 (year 2026), Design Load: HS 25, Features Intersected: GENESEE RIVER Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 3.387, Lanes on structure: 2, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 10.9m (35.8ft), Skew: 2 degrees, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 3, Length of Maximum Span: 39.6m (129.9ft), Curb-To-Curb Width: 10.9m (35.8ft), Out-to-Out Width: 11.5m (37.7ft) Condition: Deck: Very good, Superstructure: Excellent, Substructure: Excellent, Channel: Very good, Operating Rating: 89.8 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 64.4 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Superior to present desirable criteria, Deck Geometry: Somewhat better than minimum adequacy, Waterway Adequacy: Equal to present minimum criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 8.26m (27.10ft), Designated Inspection Frequency: Every 24 months, Underwater Inspection Frequency: Every 60 months, Inspection Date: June 2007, Underwater Inspection Date: September 2005, Bridge Improvement Cost: $544,000, Roadway Improvement Cost: $323,000, Total Project Cost: $867,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete, Deck Protection: Epoxy Coated Reinforcing Find on map >>
Structure Number: 331736, Location: 0.5 MI W OF MUMFORD (Lat: 42.992483, Lng: -77.865725), Route carried "on" structure: County highway , Year Built: 1912, Status: Open, Structure Length: 0.82m (2.69ft), Average Daily Traffic: 2,071 (year 2002), Truck Traffic: 6%, Average Future Daily Traffic: 3,402 (year 2022), Features Intersected: SPRING CREEK BR 2, Facility Carried by Structure: GEORGE STREET Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Owner: County Highway Agency, Approaching Roadway Width: 10.3m (33.8ft), Material/Design: Concrete continuous, Design/Construction: Slab, Number Of Spans In Main Unit: 2, Length of Maximum Span: 3.9m (12.8ft), Curb or Sidewalk Widths: Left: 0.0m, Right: 1.6m (5.2ft), Curb-To-Curb Width: 10.5m (34.4ft), Out-to-Out Width: 13.1m (43.0ft) Condition: Deck: Satisfactory, Superstructure: Satisfactory, Substructure: Poor, Channel: Satisfactory, Operating Rating: 43.8 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 26.2 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Meets minimum limits, Deck Geometry: Somewhat better than minimum adequacy, Waterway Adequacy: Meets minimum limits, Approach Roadway Alignment: Better than present minimum criteria, Length Of Structure Improvement: 0.82m (2.69ft), Designated Inspection Frequency: Every 24 months, Inspection Date: June 2006, Bridge Improvement Cost: $209,000, Roadway Improvement Cost: $125,000, Total Project Cost: $334,000 ( Estimate for 2007), Wearing Surface/Protective System: Wearing Surface: Integral Concrete Find on map >>
Structure Number: 331737, Location: .15 MI S INT RTS 383 & 36 (Lat: 42.996758, Lng: -77.853614), Route carried "on" structure: County highway , Year Built: 1923, Year Reconstructed: 1973, Status: Open, Structure Length: 1.28m (4.20ft), Average Daily Traffic: 357 (year 1998), Truck Traffic: 5%, Average Future Daily Traffic: 494 (year 2018), Design Load: HS 20, Features Intersected: OATKA CREEK, Facility Carried by Structure: STATE STREET Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Owner: County Highway Agency, Approaching Roadway Width: 6.7m (22.0ft), Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 1, Length of Maximum Span: 11.8m (38.7ft), Curb or Sidewalk Widths: Left: 0.3m (1.0ft), Right: 0.3m (1.0ft), Curb-To-Curb Width: 6.7m (22.0ft), Out-to-Out Width: 7.6m (24.9ft) Condition: Deck: Satisfactory, Superstructure: Fair, Substructure: Fair, Channel: Fair, Operating Rating: 55.1 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 32.9 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: Meets minimum limits, Waterway Adequacy: Meets minimum limits, Approach Roadway Alignment: Equal to present minimum criteria, Length Of Structure Improvement: 1.28m (4.20ft), Designated Inspection Frequency: Every 24 months, Inspection Date: June 2006, Bridge Improvement Cost: $210,000, Roadway Improvement Cost: $125,000, Total Project Cost: $335,000 ( Estimate for 2007), Deck Structure Type: Open Grating Find on map >>
Structure Number: 331738, Location: VILLAGE OF MUMFORD (Lat: 42.998167, Lng: -77.852694), Route carried "on" structure: County highway , Year Built: 1890, Year Reconstructed: 1929, Status: Open, Structure Length: 2.43m (7.97ft), Average Daily Traffic: 415 (year 1997), Truck Traffic: 5%, Average Future Daily Traffic: 574 (year 2017), Features Intersected: OATKA CREEK, Facility Carried by Structure: COUNTY ROAD 145 Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Owner: County Highway Agency, Approaching Roadway Width: 6.0m (19.7ft), Material/Design: Concrete continuous, Design/Construction: Girder and Floorbeam System, Number Of Spans In Main Unit: 2, Length of Maximum Span: 11.8m (38.7ft), Curb-To-Curb Width: 6.7m (22.0ft), Out-to-Out Width: 8.0m (26.2ft) Condition: Deck: Poor, Superstructure: Poor, Substructure: Poor, Channel: Satisfactory, Operating Rating: 40.9 metric tons, Inventory Rating: 11.4 metric tons, Structural Evaluation: Meets minimum limits, Deck Geometry: Meets minimum limits, Waterway Adequacy: Meets minimum limits, Approach Roadway Alignment: Somewhat better than minimum adequacy, Length Of Structure Improvement: 2.43m (7.97ft), Designated Inspection Frequency: Every 12 months, Inspection Date: May 2007, Bridge Improvement Cost: $210,000, Roadway Improvement Cost: $125,000, Total Project Cost: $335,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous, Membrane: Preformed Fabric Find on map >>
Structure Number: 331791, Location: 0.5 MI NE OF WEST CHILI (Lat: 43.010208, Lng: -77.791661), Route carried "on" structure: City street , Year Built: 1915, Year Reconstructed: 1955, Status: Posted for load, Structure Length: 2.92m (9.58ft), Average Daily Traffic: 484 (year 1996), Truck Traffic: 6%, Average Future Daily Traffic: 795 (year 2016), Design Load: H 20, Features Intersected: OATKA CREEK, Facility Carried by Structure: UNION STREET Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Owner: County Highway Agency, Approaching Roadway Width: 6.4m (21.0ft), Material/Design: Steel, Design/Construction: Girder and Floorbeam System, Number Of Spans In Main Unit: 1, Length of Maximum Span: 27.7m (90.9ft), Curb or Sidewalk Widths: Left: 0.4m (1.3ft), Right: 0.9m (3.0ft), Curb-To-Curb Width: 6.1m (20.0ft), Out-to-Out Width: 6.6m (21.7ft) Condition: Deck: Satisfactory, Superstructure: Poor, Substructure: Fair, Channel: Satisfactory, Operating Rating: 27.2 metric tons, Method Used To Determine Operating Rating: Allowable Stress (AS), Inventory Rating: 19.1 metric tons, Method Used To Determine Inventory Rating: Allowable Stress (AS), Structural Evaluation: Meets minimum limits, Deck Geometry: High priority of corrective action, Waterway Adequacy: Somewhat better than minimum adequacy, Approach Roadway Alignment: Somewhat better than minimum adequacy, Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 10.0 - 19.9% below), Length Of Structure Improvement: 2.92m (9.58ft), Designated Inspection Frequency: Every 12 months, Critical Feature Inspection Frequency: Every 12 months, Inspection Date: September 2007, Critical Feature Inspection Date: September 2007, Bridge Improvement Cost: $419,000, Roadway Improvement Cost: $249,000, Total Project Cost: $668,000 ( Estimate for 2007), Deck Structure Type: Wood or Timber, Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 331792, Location: 2 MI SW OF GARBUTT (Lat: 43.005669, Lng: -77.821386), Route carried "on" structure: County highway , Year Built: 1964, Status: Open, Structure Length: 3.38m (11.09ft), Average Daily Traffic: 1,721 (year 2000), Truck Traffic: 6%, Average Future Daily Traffic: 2,827 (year 2020), Design Load: HS 20, Features Intersected: OATKA CREEK, Facility Carried by Structure: CR 174 Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Owner: County Highway Agency, Approaching Roadway Width: 8.5m (27.9ft), Material/Design: Prestressed concrete, Design/Construction: Box Beam or Girders - Multiple, Number Of Spans In Main Unit: 2, Length of Maximum Span: 16.4m (53.8ft), Curb-To-Curb Width: 8.2m (26.9ft), Out-to-Out Width: 9.2m (30.2ft) Condition: Deck: Fair, Superstructure: Fair, Substructure: Fair, Channel: Satisfactory, Operating Rating: 83.1 metric tons, Inventory Rating: 29.3 metric tons, Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: Meets minimum limits, Waterway Adequacy: Meets minimum limits, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 3.38m (11.09ft), Designated Inspection Frequency: Every 24 months, Inspection Date: July 2006, Bridge Improvement Cost: $670,000, Roadway Improvement Cost: $399,000, Total Project Cost: $1,069,000 ( Estimate for 2007), Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 335909, Location: 1 MI SW OF SCOTTSVILLE (Lat: 43.009283, Lng: -77.765597), Route carried "on" structure: County highway , Year Built: 1948, Status: Open, Structure Length: 3.93m (12.89ft), Average Daily Traffic: 622 (year 1998), Truck Traffic: 5%, Average Future Daily Traffic: 861 (year 2018), Design Load: HS 20, Features Intersected: OATKA CREEK, Facility Carried by Structure: BOWERMAN ROAD Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Owner: County Highway Agency, Approaching Roadway Width: 6.0m (19.7ft), Skew: 4 degrees, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 2, Length of Maximum Span: 19.2m (63.0ft), Curb or Sidewalk Widths: Left: 0.7m (2.3ft), Right: 0.7m (2.3ft), Curb-To-Curb Width: 7.3m (24.0ft), Out-to-Out Width: 9.4m (30.8ft) Condition: Deck: Fair, Superstructure: Satisfactory, Substructure: Poor, Channel: Satisfactory, Operating Rating: 34.5 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 19.1 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Meets minimum limits, Deck Geometry: Meets minimum limits, Waterway Adequacy: Somewhat better than minimum adequacy, Approach Roadway Alignment: Somewhat better than minimum adequacy, Length Of Structure Improvement: 3.93m (12.89ft), Designated Inspection Frequency: Every 24 months, Inspection Date: June 2006, Bridge Improvement Cost: $800,000, Roadway Improvement Cost: $476,000, Total Project Cost: $1,276,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 551052, Location: 5.4 MI E OF EXIT 47 90I (Lat: 43.029881, Lng: -77.860131), Route carried "on" structure: Interstate 90, Year Built: 1952, Status: Open, Structure Length: 1.12m (3.67ft), Average Daily Traffic: 28,286 (year 2007), Truck Traffic: 22%, Average Future Daily Traffic: 42,712 (year 2027), Design Load: H 20, Features Intersected: MUMFORD RD- CR180 Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 4.034, Lanes on structure: 4, Lanes under structure: 2, Base Highway Network: Yes, Toll: On toll road, Owner: State Toll Authority, Approaching Roadway Width: 11.5m (37.7ft), Skew: 20 degrees, Material/Design: Concrete, Design/Construction: Frame, Number Of Spans In Main Unit: 1, Length of Maximum Span: 9.4m (30.8ft), Curb-To-Curb Width: 40.2m (131.9ft), Out-to-Out Width: 44.8m (147.0ft) Condition: Superstructure: Very good, Substructure: Very good, Operating Rating: 65.8 metric tons, Inventory Rating: 28.1 metric tons, Structural Evaluation: Better than present minimum criteria, Deck Geometry: Superior to present desirable criteria, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 1.12m (3.67ft), Designated Inspection Frequency: Every 24 months, Inspection Date: March 2006, Bridge Improvement Cost: $1,088,000, Roadway Improvement Cost: $647,000, Total Project Cost: $1,735,000 ( Estimate for 2007), Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 551053, Location: 7.5 MI E OF EXIT 47 90I (Lat: 43.033364, Lng: -77.820644), Route carried "on" structure: Interstate 90, Year Built: 1952, Status: Open, Structure Length: 0.70m (2.30ft), Average Daily Traffic: 28,286 (year 2007), Truck Traffic: 22%, Average Future Daily Traffic: 42,712 (year 2027), Design Load: H 20, Features Intersected: CRK FROM BLUE PND Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 7.253, Lanes on structure: 4, Base Highway Network: Yes, Toll: On toll road, Owner: State Toll Authority, Approaching Roadway Width: 29.3m (96.1ft), Skew: 23 degrees, Material/Design: Concrete, Design/Construction: Culvert, Number Of Spans In Main Unit: 1, Length of Maximum Span: 6.4m (21.0ft), Curb-To-Curb Width: 42.7m (140.1ft), Out-to-Out Width: 42.7m (140.1ft) Condition: Channel: Good, Culverts: Good, Operating Rating: 74.3 metric tons, Inventory Rating: 32.6 metric tons, Structural Evaluation: Better than present minimum criteria, Deck Geometry: Superior to present desirable criteria, Waterway Adequacy: Somewhat better than minimum adequacy, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 0.70m (2.30ft), Designated Inspection Frequency: Every 24 months, Inspection Date: July 2006, Bridge Improvement Cost: $644,000, Roadway Improvement Cost: $383,000, Total Project Cost: $1,027,000 ( Estimate for 2007), Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 551083, Location: 3.6 MI E OF EXIT 47 90I (Lat: 43.030047, Lng: -77.894833), Route carried "on" structure: County highway , Year Built: 1952, Year Reconstructed: 1991, Status: Open, Structure Length: 6.97m (22.87ft), Average Daily Traffic: 277 (year 2007), Truck Traffic: 5%, Average Future Daily Traffic: 383 (year 2027), Design Load: HS 20, Features Intersected: RTE I90, Facility Carried by Structure: BEULAH RD. CR 166 Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Owner: State Toll Authority, Approaching Roadway Width: 6.0m (19.7ft), Skew: 2 degrees, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 4, Length of Maximum Span: 22.2m (72.8ft), Curb-To-Curb Width: 9.4m (30.8ft), Out-to-Out Width: 10.0m (32.8ft) Condition: Deck: Fair, Superstructure: Good, Substructure: Very good, Operating Rating: 76.2 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 33.6 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Better than present minimum criteria, Deck Geometry: Equal to present minimum criteria, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 6.97m (22.87ft), Designated Inspection Frequency: Every 24 months, Inspection Date: April 2007, Bridge Improvement Cost: $771,000, Roadway Improvement Cost: $447,000, Total Project Cost: $1,218,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete, Deck Protection: Epoxy Coated Reinforcing Find on map >>
Structure Number: 551084, Location: 8.8 MI E OF EXIT 47 90I (Lat: 43.029733, Lng: -77.843406), Route carried "on" structure: County highway , Year Built: 1952, Status: Open, Structure Length: 7.92m (25.98ft), Average Daily Traffic: 432 (year 2002), Truck Traffic: 5%, Average Future Daily Traffic: 598 (year 2022), Features Intersected: RTE I90, Facility Carried by Structure: WINSLOW RD CR 188 Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Lanes under structure: 4, Owner: State Toll Authority, Approaching Roadway Width: 6.7m (22.0ft), Skew: 3 degrees, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 4, Length of Maximum Span: 25.0m (82.0ft), Curb or Sidewalk Widths: Left: 0.8m (2.6ft), Right: 0.8m (2.6ft), Curb-To-Curb Width: 7.9m (25.9ft), Out-to-Out Width: 10.1m (33.1ft) Condition: Deck: Fair, Superstructure: Satisfactory, Substructure: Fair, Operating Rating: 76.2 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 45.4 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: Somewhat better than minimum adequacy, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 7.92m (25.98ft), Designated Inspection Frequency: Every 24 months, Inspection Date: October 2006, Bridge Improvement Cost: $1,716,000, Roadway Improvement Cost: $1,021,000, Total Project Cost: $2,737,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 551085, Location: 7.9 MI E OF EXIT 47 90I (Lat: 43.036011, Lng: -77.812781), Route carried "on" structure: County highway , Year Built: 1953, Status: Open, Structure Length: 7.04m (23.10ft), Average Daily Traffic: 429 (year 2007), Truck Traffic: 5%, Average Future Daily Traffic: 594 (year 2027), Design Load: HS 20+Mod, Features Intersected: RTE I90, Facility Carried by Structure: WHEATLAND CTR RD Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Lanes under structure: 4, Owner: State Toll Authority, Approaching Roadway Width: 7.6m (24.9ft), Skew: 2 degrees, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 4, Length of Maximum Span: 23.2m (76.1ft), Curb-To-Curb Width: 9.5m (31.2ft), Out-to-Out Width: 10.1m (33.1ft) Condition: Deck: Very good, Superstructure: Satisfactory, Substructure: Fair, Operating Rating: 73.5 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 43.5 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: Equal to present minimum criteria, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 7.04m (23.10ft), Designated Inspection Frequency: Every 24 months, Inspection Date: September 2006, Bridge Improvement Cost: $1,525,000, Roadway Improvement Cost: $907,000, Total Project Cost: $2,432,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 102376, Location: JCT RTS36+NYS THRUWAY I90 (Lat: 43.030022, Lng: -77.877047), Route carried "under" structure: Interstate 90, Year Built: 1954, Structure Length: 7.16m (23.49ft), Average Daily Traffic: 28,286 (year 2007), Truck Traffic: 22%, Features Intersected: RTE I90, Facility Carried by Structure: RTE 36 Minimum Vertical Clearance: 4.45m (14.60ft), Kilometerpoint: 2.253, Lanes on structure: 2, Lanes under structure: 8, Toll: On toll road, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 22.6m (74.1ft) Find on map >>
Structure Number: 551083, Location: 3.6 MI E OF EXIT 47 90I (Lat: 43.030047, Lng: -77.894833), Route carried "under" structure: Interstate 90, Year Built: 1952, Structure Length: 6.97m (22.87ft), Average Daily Traffic: 28,286 (year 2007), Truck Traffic: 22%, Features Intersected: RTE I90, Facility Carried by Structure: BEULAH RD. CR 166 Minimum Vertical Clearance: 4.57m (14.99ft), Kilometerpoint: 0.805, Lanes on structure: 2, Toll: On toll road, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 22.2m (72.8ft) Find on map >>
Structure Number: 551084, Location: 8.8 MI E OF EXIT 47 90I (Lat: 43.029733, Lng: -77.843406), Route carried "under" structure: Interstate 90, Year Built: 1952, Structure Length: 7.92m (25.98ft), Average Daily Traffic: 28,286 (year 2007), Truck Traffic: 22%, Features Intersected: RTE I90, Facility Carried by Structure: WINSLOW RD CR 188 Minimum Vertical Clearance: 4.39m (14.40ft), Kilometerpoint: 5.004, Lanes on structure: 2, Lanes under structure: 4, Toll: On toll road, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 25.0m (82.0ft) Find on map >>
Structure Number: 551085, Location: 7.9 MI E OF EXIT 47 90I (Lat: 43.036011, Lng: -77.812781), Route carried "under" structure: Interstate 90, Year Built: 1953, Structure Length: 7.04m (23.10ft), Average Daily Traffic: 28,286 (year 2007), Truck Traffic: 22%, Features Intersected: RTE I90, Facility Carried by Structure: WHEATLAND CTR RD Minimum Vertical Clearance: 4.39m (14.40ft), Kilometerpoint: 7.643, Lanes on structure: 2, Lanes under structure: 4, Toll: On toll road, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 23.2m (76.1ft) Find on map >>
Structure Number: 704718, Location: 1.0MI W JCT RTS 383 + 251 (Lat: 43.013689, Lng: -77.773914), Route carried "under" structure: State highway 383, Year Built: 1911, Structure Length: 3.16m (10.37ft), Average Daily Traffic: 2,395 (year 2006), Truck Traffic: 5%, Features Intersected: RTE 383, Facility Carried by Structure: ROCH & SOUTHERN Minimum Vertical Clearance: 4.26m (13.98ft), Kilometerpoint: 7.691, Lanes under structure: 2, Material/Design: Steel, Design/Construction: Girder and Floorbeam System, Length of Maximum Span: 30.7m (100.7ft) Discuss this city on our hugely popular New York forum Back to: Wheatland, NY, New York, All US cities.
|
![]() |